CN208505550U - Door/window testing machine calibrating installation and its simulation window - Google Patents

Door/window testing machine calibrating installation and its simulation window Download PDF

Info

Publication number
CN208505550U
CN208505550U CN201821256535.5U CN201821256535U CN208505550U CN 208505550 U CN208505550 U CN 208505550U CN 201821256535 U CN201821256535 U CN 201821256535U CN 208505550 U CN208505550 U CN 208505550U
Authority
CN
China
Prior art keywords
window
door
simulation
calibrating installation
simulation window
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821256535.5U
Other languages
Chinese (zh)
Inventor
陆进宇
刘全红
冯海盈
李淑香
付翀
孙钦密
王戈
赵伟明
暴冰
张中杰
张奇峰
何开宇
单海娣
冯莹
任翔
杨楠
范博
冯海广
占桂荣
王振宇
李海滨
秦国君
陆启明
闫库
白玉生
卜晓雪
李晨希
张晓锋
叶献锋
葛笏良
赵芳芳
胡昱麟
尚廷东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU DONGCHEN TECHNOLOGY Co Ltd
Henan Institute of Metrology
Original Assignee
ZHENGZHOU DONGCHEN TECHNOLOGY Co Ltd
Henan Institute of Metrology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU DONGCHEN TECHNOLOGY Co Ltd, Henan Institute of Metrology filed Critical ZHENGZHOU DONGCHEN TECHNOLOGY Co Ltd
Application granted granted Critical
Publication of CN208505550U publication Critical patent/CN208505550U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The utility model relates to a kind of door/window testing machine calibrating installations, including simulation window, simulation window includes the simulation window ontology that front side for being installed in corresponding door and window experimental machine is windward side, simulation window ontology, which has, mitigates chamber, the windward side of simulation window ontology is provided with the air inlet communicated with the mitigation chamber, door and window experimental machine calibrating installation further includes the gas flowmeter calibrating installation examined and determine for the gas flowmeter to door/window testing machine and the pressure sensor calibrating device examined and determine for the pressure sensor to door/window testing machine, the leeward side of simulation window ontology, which is provided with, to be connected the gas flowmeter calibrating installation with the first connecting hole for mitigating chamber and connect the second connecting hole of the pressure sensor calibrating device with mitigation chamber.The utility model solve the problems, such as the prior art in door and window experimental machine pressure sensor, be not inconsistent with practical service environment in flow sensor verification process.

Description

Door/window testing machine calibrating installation and its simulation window
Technical field
The utility model relates to the door/window testing machine calibrating installations and its simulation window in calibrating field.
Background technique
It needs that door and window is installed on construction wall, for door and window, needs the resisting wind press capacity to door and window, air permeability Can, rain leakage performance these three physical properties tested, the testing machine that can carry out testing inspection to door and window be known as door and window Testing machine, the ZMC series door/window testing machine of existing door/window testing machine such as MIS industrial system (China) Co., Ltd production, door Window testing machine includes testing machine rack, and true erection of doors and windows in testing machine rack when use, door/window testing machine includes peace Loaded on the sucktion fan in testing machine rack and equipment of drenching with rain, sucktion fan can generate normal pressure and negative pressure to door and window, lead to Whether the pressure sensor door and window for crossing door/window testing machine itself meets the requirements, and door and window experimental machine further includes detecting the wind of sucktion fan The flow sensor of machine flow.Equipment of drenching with rain is used to detect the watertightness of door and window.
Due to the requirement of vertification regulation, need to carry out regularly the pressure sensor and flow sensor of door/window testing machine Calibrating, and verification process in the prior art be by door/window testing machine pressure sensor and flow sensor disassemble, It is then delivered to calibrating laboratory to go to examine and determine, certain labour can be wasted by dismounting pressure sensor and flow sensor, and is easy Pressure sensor and flow sensor are caused to damage in disassembly process, certainly more importantly, after dismounting, pressure sensing The use environment of device and flow sensor changes, and influences final verification result.
Utility model content
The purpose of this utility model is to provide a kind of door/window testing machine calibrating installations, to solve the prior art to door and window reality The problem of testing the pressure sensor in machine, not being inconsistent in flow sensor verification process with practical service environment;The utility model Purpose, which also resides in, provides simulation window used in one kind door/window testing machine calibrating installation.
In order to solve the above technical problems, the technical solution of door/window testing machine calibrating installation is as follows in the utility model:
A kind of door/window testing machine calibrating installation, including simulation window, simulation window include for being installed on corresponding door and window experimental machine On front side be windward side simulation window ontology, simulation window ontology have mitigate chamber, the windward side of simulation window ontology be provided with It is described to mitigate the air inlet that communicates of chamber, door and window experimental machine calibrating installation further include for the gas flowmeter to door/window testing machine into The gas flowmeter calibrating installation of row calibrating and the pressure sensor examined and determine for the pressure sensor to door/window testing machine Calibrating installation, the leeward side of simulation window ontology are provided with the connection gas flowmeter calibrating installation and connect with the first of mitigation chamber Hole and the connection pressure sensor calibrating device and the second connecting hole for mitigating chamber.
The air inlet has multiple, and each air inlet is arranged along same center of circle uniform intervals, and first connection hole is in institute State the positive rear side of center location.
Simulation window ontology includes the surrounding side wall between the windward side and leeward side, and surrounding side wall is hollow knot Structure.
The leeward side of simulation window ontology is pressed with reinforcing rib structure outstanding facing forward.
The technical solution of simulation window in the utility model are as follows:
The simulation window of door/window testing machine calibrating installation is windward including the front side for being installed in corresponding door and window experimental machine The simulation window ontology of side, simulation window ontology, which has, mitigates chamber, and the windward side of simulation window ontology is provided with to be communicated with the mitigation chamber Air inlet, the leeward side of simulation window ontology be provided with for connect corresponding gas flowmeter calibrating installation and mitigate chamber first Connecting hole and connection corresponding pressure sensor calibrating installation and the second connecting hole for mitigating chamber.
The air inlet has multiple, and each air inlet is arranged along same center of circle uniform intervals, and first connection hole is in institute State the positive rear side of center location.
Simulation window ontology includes the surrounding side wall between the windward side and leeward side, and surrounding side wall is hollow knot Structure.
The leeward side of simulation window ontology is pressed with reinforcing rib structure outstanding facing forward.
The utility model has the following beneficial effects: when pressure sensor, the flow sensor of door/window testing machine are examined and determine, It is not required to dismantle pressure sensor and flow sensor, simulation window is directly mounted on simulation test machine, simulation is tested The window of survey, the blower output pressure and gas flow of door/window testing machine itself, passes through pressure sensor calibrating device and flow Sensor calibrating installation directly examines and determine the pressure sensor and flow sensor of door/window testing machine, ensure that door and window is tested The pressure sensor and flow sensor of machine are accredited under true use environment, and the steady of air-flow can be advantageously ensured that by mitigating chamber It is qualitative, guarantee final verification result.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of one embodiment of door/window testing machine calibrating installation in the utility model;
Fig. 2 is the structural schematic diagram of simulation window in Fig. 1;
Fig. 3 is the structural schematic diagram of the windward side of simulation window in Fig. 1;
Fig. 4 is the structural schematic diagram of the leeward side of simulation window in Fig. 1;
Fig. 5 is the cooperation schematic diagram of gas flowmeter calibrating installation and simulation window in Fig. 1;
Fig. 6 is the cooperation schematic diagram of pressure sensor calibrating device and simulation window in Fig. 1.
Specific embodiment
A kind of implementation of door/window testing machine calibrating installation is for example shown in Fig. 1 ~ 5: including simulation window 2 and after being connected to simulation window The instrument room 12 of side, simulation window 2 include the simulation window ontology that front side for being installed in corresponding door and window experimental machine is windward side, Simulation window ontology includes front side board 4, back side panel and the surrounding side wall 1 being set between front side board, back side panel, entire simulation window sheet Body is square structure, and surrounding side wall is hollow structure, defines between front side board, back side panel and surrounding side wall and mitigates chamber 7.Simulation The air inlet 3 that left and right is communicated with mitigation chamber is set on windward side, that is, front side board of window ontology, air inlet 3 has multiple, each 3 edge of air inlet The circumferential uniform intervals in the same center of circle are arranged.The middle part of front side board and surrounding are provided with the screw thread that axis extends along the longitudinal direction Simulation window ontology can be fixed in door and window experimental machine by hole 5, when use by the attachment screw that installs from front to back.Simulation The first connecting hole 17 and the second connecting hole 18 are provided on leeward side, that is, back side panel of window ontology, wherein the first connecting hole 17 is in The positive rear side of each surrounded center location of air inlet.The leeward side of simulation window ontology is pressed with reinforcing rib structure 19 outstanding facing forward. The leeward side outer ring of simulation window exposes to instrument room, which can cooperate with press strip, is fixed by press strip to simulation window.
Calibrating installation further includes being connected with the first connecting hole 17 for examining to the gas flowmeter of door and window experimental machine Fixed gas flowmeter calibrating installation 14 and the pressure sensor progress being used for door and window experimental machine being connected with the second connecting hole The pressure sensor calibrating device 16 of calibrating.Gas flowmeter calibrating installation and pressure sensor calibrating device are installed on instrument room In 12, in the utility model, gas flowmeter calibrating installation includes three range limiting values by small the first standard successively to become larger Flowmeter 27, the second proving flowmeter 28 and third proving flowmeter 29, each proving flowmeter are one-way flow meter, one-way flow Meter refers to that by the gas direction of gas flowmeter can only be a direction, is connected with and is arranged in parallel on the first connecting hole First flow examines and determine gas circuit 21 and second flow examines and determine gas circuit 22, is provided with first switch valve in first flow calibrating gas circuit 21 23, second flow examines and determine and is provided with second switch valve 24 in gas circuit 22.Three proving flowmeters are arranged in parallel, three normal flows The inlet end of meter and air inlet path 25 are connected with first flow calibrating gas circuit 21 together, the outlet side of three proving flowmeters and exhaust Road 26 is connected with second flow calibrating gas circuit 22 together, in the place gas circuit of exhaust line 26, air inlet path 25 and each proving flowmeter On be provided with switch valve, the switch valve where each proving flowmeter in gas circuit is flow control valve, exhaust line, air inlet path institute Switch valve in gas circuit is also flow control valve.Pressure sensor calibrating device includes that three range limiting values are successively become by small Big the first standard pressure transducer 32, the second standard pressure transducer 33 and third standard pressure transducer 34, each standard pressure Force snesor is arranged in parallel, and is connected by the first gas circuit with the second connecting hole, in the place gas circuit of each standard pressure transducer On be serially connected with switch valve and helical pipe 35, helical pipe 35 can further improve gas stabilization, guarantee standard pressure The calibration accuracy of force snesor.Figure middle term 13 indicates the air inlet pipe communicated with air inlet path, and item 15 indicates the row communicated with exhaust line Tracheae.
Be additionally provided in instrument room power supply and each switch valve of control and with each standard pressure transducer and each normal flow The CPU9 of meter sampling connection, figure middle term 10 indicate power supply, are provided with liquid crystal touch screen 11 on rear side of instrument room.It is tested to door and window Machine examination timing, simulation window is installed in door and window experimental machine 40, the sucktion fan of door and window experimental machine itself can produce normal pressure And negative pressure, by taking the flow sensor calibrating to door/window testing machine as an example, when the sucktion fan of door/window testing machine generates normal pressure When, first switch valve is opened, and corresponding proving flowmeter work, air inlet path is closed, and exhaust line is opened, can be to door and window experimental machine Flow sensor carries out positive pressure range calibrating, and when the sucktion fan air-breathing of door and window experimental machine generates negative pressure, second switch valve is beaten It opens, exhaust line is closed, and air inlet path is opened, and can be carried out range of negative pressure calibrating to the flow sensor of door/window testing machine, be passed through gas The selection on road, each proving flowmeter can carry out positive pressure, negative pressure value calibrating, eliminate a proving flowmeter, reduce mark The use of quasi- flowmeter, not only saves cost, can be mounted in an instrument room after reducing proving flowmeter number It is interior, it realizes highly integrated.Switch valve where proving flowmeter in gas circuit is flow control valve, passes through making for flow control valve With the state that small flow and high pressure may be implemented generates, and small flow and high-pressure state are the main works of door/window testing machine Make state.By exhaust line, the adjusting of the switch valve of air inlet path, common realize is adjusted with the electric blower of door/window testing machine itself Multi-state in-circuit emulation detection.The multiple proving flowmeters and standard pressure transducer why used are to guarantee right The calibration accuracy in detection range answered.

Claims (8)

1. a kind of door/window testing machine calibrating installation, it is characterised in that: including simulation window, simulation window includes for being installed on respective doors Front side in window experimental machine is the simulation window ontology of windward side, and simulation window ontology, which has, mitigates chamber, the windward side of simulation window ontology It is provided with the air inlet communicated with the mitigation chamber, door and window experimental machine calibrating installation further includes for the gas to door/window testing machine The gas flowmeter calibrating installation and the pressure examined and determine for the pressure sensor to door/window testing machine that flowmeter is examined and determine Force snesor calibrating installation, the leeward side of simulation window ontology are provided with the connection gas flowmeter calibrating installation and mitigate chamber First connecting hole and the connection pressure sensor calibrating device and the second connecting hole for mitigating chamber.
2. door/window testing machine calibrating installation according to claim 1, it is characterised in that: the air inlet have it is multiple, respectively into Air port arranges that first connection hole is in the positive rear side of the center location along same center of circle uniform intervals.
3. door/window testing machine calibrating installation according to claim 1, it is characterised in that: simulation window ontology includes positioned at described Surrounding side wall between windward side and leeward side, surrounding side wall are hollow structure.
4. door/window testing machine calibrating installation according to claim 2, it is characterised in that: the leeward side of simulation window ontology is pressed with Reinforcing rib structure outstanding facing forward.
5. the simulation window of door/window testing machine calibrating installation, it is characterised in that: including for being installed in corresponding door and window experimental machine Front side be windward side simulation window ontology, simulation window ontology have mitigate chamber, the windward side of simulation window ontology be provided with it is described The air inlet that chamber communicates is mitigated, the leeward side of simulation window ontology is provided with for connecting corresponding gas flowmeter calibrating installation and delaying With the first connecting hole and connection corresponding pressure sensor calibrating installation of chamber and the second connecting hole for mitigating chamber.
6. simulation window according to claim 5, it is characterised in that: the air inlet has multiple, and each air inlet is along same circle Heart uniform intervals arrangement, first connection hole is in the positive rear side of the center location.
7. simulation window according to claim 5, it is characterised in that: simulation window ontology include be located at the windward side with it is leeward Surrounding side wall between side, surrounding side wall are hollow structure.
8. simulation window according to claim 6, it is characterised in that: the leeward side of simulation window ontology is pressed with outstanding forward add Strengthening tendons structure.
CN201821256535.5U 2018-06-20 2018-08-06 Door/window testing machine calibrating installation and its simulation window Active CN208505550U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2018209471371 2018-06-20
CN201820947137 2018-06-20

Publications (1)

Publication Number Publication Date
CN208505550U true CN208505550U (en) 2019-02-15

Family

ID=65299726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821256535.5U Active CN208505550U (en) 2018-06-20 2018-08-06 Door/window testing machine calibrating installation and its simulation window

Country Status (1)

Country Link
CN (1) CN208505550U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108709702A (en) * 2018-06-20 2018-10-26 河南省计量科学研究院 A kind of door/window testing machine calibrating installation and its simulation window

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108709702A (en) * 2018-06-20 2018-10-26 河南省计量科学研究院 A kind of door/window testing machine calibrating installation and its simulation window

Similar Documents

Publication Publication Date Title
CN108709696B (en) Calibrating device for building exterior door and window testing machine
CN204903525U (en) Gas detector environmental test case
CN208313535U (en) Door/window testing machine calibrating installation and combinations thereof gas flowmeter
CN108827625A (en) A kind of building element testing machine calibrating installation and its simulation window
CN103837215B (en) Commutation valve type p.V.T.t method gas flow meter
CN208505550U (en) Door/window testing machine calibrating installation and its simulation window
CN208313534U (en) Building external doors and windows testing machine calibrating installation
CN208688801U (en) Building element testing machine calibrating installation and its simulation window
CN208313531U (en) Calibrating installation for the calibrating of glass curtain wall testing machine
CN208313532U (en) Calibrating installation for the calibrating of building curtain wall testing machine
CN102565695B (en) Wind pressure switch tester and control method thereof
CN102589658B (en) Starting-stopping heavy-caliber water flow calibrating device and starting-stopping heavy-caliber water flow calibrating method
CN207540718U (en) A kind of multichannel air-tightness tester
CN108007536A (en) A kind of valve-embedded condition checkout gear of intelligent gas meter and detection method
CN208313536U (en) Live door and window detector calibrating installation
CN108731931A (en) A kind of building element testing machine calibrating installation and calibration method
CN209656372U (en) A kind of gas analyzer assay calibration sampler
CN208505549U (en) Build outer glass curtain wall testing machine calibrating installation
CN108709702A (en) A kind of door/window testing machine calibrating installation and its simulation window
CN108709699A (en) A kind of building curtain wall testing machine calibrating installation
CN208313533U (en) Building curtain wall testing machine calibrating installation
CN108709703B (en) Calibrating device for building outer glass curtain wall testing machine
CN102829933A (en) Air tightness detector for photoelectric instrument
CN108709700A (en) A kind of door/window testing machine calibrating installation and combinations thereof gas flowmeter
CN206862878U (en) New six passages corrosion change carbonate analyzer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant