CN208313535U CN201820947120.6U CN201820947120U CN208313535U CN 208313535 U CN208313535 U CN 208313535U CN 201820947120 U CN201820947120 U CN 201820947120U CN 208313535 U CN208313535 U CN 208313535U
Authority
CN
China
Prior art keywords
flow
flowmeter
window
gas circuit
calibrating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820947120.6U
Other languages
Chinese (zh)
Inventor
冯海盈
陆进宇
刘全红
孙钦密
付翀
赵伟明
闫库
胡昱麟
白玉生
叶献锋
张晓锋
李晨希
秦国君
卜晓雪
张中杰
杨楠
范博
冯海广
暴冰
任翔
单海娣
占桂荣
陆启明
李海滨
王振宇
尚廷东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU DONGCHEN TECHNOLOGY Co Ltd
Henan Institute of Metrology
Original Assignee
ZHENGZHOU DONGCHEN TECHNOLOGY Co Ltd
Henan Institute of Metrology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU DONGCHEN TECHNOLOGY Co Ltd, Henan Institute of Metrology filed Critical ZHENGZHOU DONGCHEN TECHNOLOGY Co Ltd
Priority to CN201820947120.6U priority Critical patent/CN208313535U/en
Application granted granted Critical
Publication of CN208313535U publication Critical patent/CN208313535U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

The utility model relates to a kind of door/window testing machine calibrating installations, including simulation window, simulation window includes with the simulation window ontology for mitigating chamber, the windward side of simulation window ontology is provided with air inlet, door/window testing machine calibrating installation further includes combination gas flowmeter, combination gas flowmeter includes the first flow calibrating gas circuit being arranged in parallel and second flow calibrating gas circuit, combining gas flowmeter further includes at least two proving flowmeters, the leeward side of simulation window is provided with flow value channel, first switch valve is provided in first flow calibrating gas circuit, second switch valve is provided in second flow calibrating gas circuit, the inlet end of each proving flowmeter is connected together with air inlet path with first flow calibrating gas circuit, the outlet side of each proving flowmeter is connected together with exhaust line with second flow calibrating gas circuit.The technical issues of gas flowmeter calibrating that the utility model solves in the prior art to realize under positive pressure, subnormal ambient needs to be used in a greater number proving flowmeter.

Description

Door/window testing machine calibrating installation and combinations thereof gas flowmeter
Technical field
The utility model relates to a kind of door/window testing machine calibrating installation and combinations thereof gas flowmeters.
Background technique
It needs that door and window is installed on construction wall, for door and window, needs the resisting wind press capacity to door and window, air permeability Can, rain leakage performance these three physical properties tested, the testing machine that can carry out testing inspection to door and window be known as door and window Testing machine, the ZMC series door/window testing machine of existing door/window testing machine such as MIS industrial system (China) Co., Ltd production, door Window testing machine includes testing machine rack, and true erection of doors and windows in testing machine rack when use, door/window testing machine includes peace Loaded on the sucktion fan in testing machine rack and equipment of drenching with rain, sucktion fan can generate normal pressure and negative pressure to door and window, lead to Whether the pressure sensor door and window for crossing door/window testing machine itself meets the requirements, and door and window experimental machine further includes detecting the wind of sucktion fan The flow sensor of machine flow.Equipment of drenching with rain is used to detect the watertightness of door and window.
According to vertification regulation, the pressure sensor in door/window testing machine and gas flowmeter needed is regularly examined It is fixed, be all in the past by door/window testing machine pressure sensor and gas flowmeter dismantle, take calibrating laboratory and go to examine and determine, grasp It is very troublesome to make process, we had investigated a kind of calibrating installation later comprising for simulating the simulation window of real window, There are also six proving flowmeters for being examined and determine gas flowmeter, six normal flows are calculated as three pairs, each pair of normal stream The positive pressure flow and negative pressure flow that meter can generate the sucktion fan in testing machine respectively are examined and determine, and why use three Group is to guarantee respectively to examine and determine the accuracy value in range, and calibrating installation further includes three standard pressure transducers, three standards Pressure sensor is for examining and determine the pressure sensor of door/window testing machine.Existing this calibrating installation there are the problem of In: since each gas flowmeter can only be detected unidirectionally, in order to realize to the gas flow in door/window testing machine into Row calibrating, the appearance that proving flowmeter must be pairs of are completed in gas flowmeter positive pressure environment and subnormal ambient It examines and determine respectively, the use number that this will lead to proving flowmeter is more, increases the cost of door/window testing machine calibrating installation, simultaneously Also it is unfavorable for the carrying transport of door/window testing machine.
Utility model content
The purpose of this utility model is to provide a kind of door/window testing machine calibrating installations, to solve in the prior art as realization The technical issues of gas flowmeter calibrating under positive pressure, subnormal ambient needs to be used in a greater number proving flowmeter.
In order to solve the above technical problems, the technical solution of door/window testing machine calibrating installation is as follows in the utility model:
A kind of door/window testing machine calibrating installation, including simulation window, simulation window include for being installed on corresponding door and window experimental machine On front side be windward side simulation window ontology, simulation window ontology have mitigate chamber, the windward side of simulation window ontology be provided with It is described to mitigate the air inlet that communicates of chamber, door/window testing machine calibrating installation further include for the gas flowmeter to door/window testing machine into The combination gas flowmeter of row calibrating, combination gas flowmeter include the first flow calibrating gas circuit and second flow being arranged in parallel Gas circuit is examined and determine, combination gas flowmeter further includes at least two proving flowmeters, and the leeward side of simulation window is provided with described in connection The flow value channel of chamber and first flow calibrating gas circuit, second flow calibrating gas circuit is mitigated, is set in first flow calibrating gas circuit It is equipped with first switch valve, is provided with second switch valve, the inlet end of each proving flowmeter and air inlet in second flow calibrating gas circuit Road is connected with first flow calibrating gas circuit together, and gas is examined and determine with second flow together with exhaust line in the outlet side of each proving flowmeter Road is connected, and is provided with switch valve in exhaust line, air inlet path and gas circuit where each proving flowmeter.
Each switch valve is flow control valve.
Instrument room is connected on rear side of simulation window, the combination gas flowmeter is set in the instrument room.
The technical solution of gas flowmeter is combined in the utility model are as follows:
A kind of combination gas flowmeter of door/window testing machine calibrating installation, the first flow including being arranged in parallel examine and determine gas circuit Gas circuit is examined and determine with second flow, combination gas flowmeter further includes at least two proving flowmeters, and first flow is examined and determine in gas circuit Be provided with first switch valve, be provided with second switch valve in second flow calibrating gas circuit, the inlet end of each proving flowmeter with into Gas circuit is connected with first flow calibrating gas circuit together, and the outlet side of each proving flowmeter is examined and determine together with exhaust line with second flow Gas circuit is connected, and is provided with switch valve in exhaust line, air inlet path and gas circuit where each proving flowmeter.
Each switch valve is flow control valve.
The utility model has the following beneficial effects: first opens when the sucktion fan of live door/window testing machine generates normal pressure It closes valve to open, corresponding proving flowmeter work, air inlet path is closed, and exhaust line is opened, can be to the gas flow of architectural experiment machine Meter carries out positive pressure range calibrating, and when the sucktion fan air-breathing of architectural experiment machine generates negative pressure, second switch valve is opened, exhaust line It closes, air inlet path is opened, and can be carried out range of negative pressure calibrating to the gas flowmeter of live door/window testing machine, be passed through the choosing of gas circuit It selects, each proving flowmeter can carry out positive pressure, negative pressure value calibrating, and proving flowmeter is not required to occur in pairs, reduce normal stream The use of meter number, reduces cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of one embodiment of door/window testing machine calibrating installation in the utility model;
Fig. 2 is the structural schematic diagram of simulation window in Fig. 1;
Fig. 3 is the structural schematic diagram of the windward side of simulation window in Fig. 1;
Fig. 4 is the structural schematic diagram of the leeward side of simulation window in Fig. 1;
Fig. 5 is the cooperation schematic diagram that gas flowmeter and simulation window are combined in Fig. 1;
Fig. 6 is the cooperation schematic diagram of pressure sensor calibrating device and simulation window in Fig. 1;
Fig. 7 is the usage state diagram of Fig. 1.
Specific embodiment
Described in a kind of implementation such as Fig. 1 ~ 7 of door/window testing machine calibrating installation: including simulation window 2 and after being connected to simulation window The instrument room 12 of side, simulation window 2 include the simulation window ontology that front side for being installed in corresponding door and window experimental machine is windward side, Simulation window ontology includes front side board 4, back side panel and the surrounding side wall 1 being set between front side board, back side panel, entire simulation window sheet Body is square structure, and surrounding side wall is hollow structure, defines between front side board, back side panel and surrounding side wall and mitigates chamber 7.Simulation The air inlet 3 that left and right is communicated with mitigation chamber is set on windward side, that is, front side board of window ontology, air inlet 3 has multiple, each 3 edge of air inlet The circumferential uniform intervals in the same center of circle are arranged.The middle part of front side board and surrounding are provided with the screw thread that axis extends along the longitudinal direction Simulation window ontology can be fixed in door and window experimental machine by hole 5, when use by the attachment screw that installs from front to back.Simulation Flow value channel 17 and pressure value channel 18 are provided on leeward side, that is, back side panel of window ontology, wherein flow value channel 17 are in the positive rear side of the surrounded center location of each air inlet.The leeward side of simulation window ontology is pressed with reinforcing rib knot outstanding facing forward Structure 19.
Calibrating installation further includes being connected with flow value channel 17 for the gas flowmeter progress to door and window experimental machine The combination gas flowmeter 14 of calibrating and the pressure sensor progress being used for door and window experimental machine being connected with pressure value channel The pressure sensor of calibrating examines and determine unit 16.Combination gas flowmeter and pressure sensor calibrating unit are installed on instrument room 12 Interior, in the utility model, combination gas flowmeter includes three range limiting values by small the first proving flowmeter successively to become larger 27, the second proving flowmeter 28 and third proving flowmeter 29, each proving flowmeter are one-way flow meter, and one-way flow meter is Refer to that by the gas direction of gas flowmeter can only be a direction, is connected with first be arranged in parallel on flow value channel Flow verification gas circuit 21 and second flow examine and determine gas circuit 22, are provided with first switch valve 23 in first flow calibrating gas circuit 21, the Second switch valve 24 is provided in two flow verification gas circuits 22.Three proving flowmeters are arranged in parallel, three proving flowmeters Inlet end is connected with first flow calibrating gas circuit 21 together with air inlet path 25, the outlet side of three proving flowmeters and exhaust line 26 It is connected together with second flow calibrating gas circuit 22, in the place gas circuit of exhaust line 26, air inlet path 25 and each proving flowmeter It is provided with switch valve, the switch valve where each proving flowmeter in gas circuit is flow control valve, gas where exhaust line, air inlet path The switch valve of road is also flow control valve.It includes that three range limiting values are successively become larger by small that pressure sensor, which examines and determine unit, First standard pressure transducer 32, the second standard pressure transducer 33 and third standard pressure transducer 34, each normal pressure pass Sensor is arranged in parallel, and is connected by the first gas circuit with pressure value channel, in the place gas circuit of each standard pressure transducer It is serially connected with switch valve and helical pipe 35, helical pipe 35 can further improve gas stabilization, guarantee normal pressure The calibration accuracy of sensor.Figure middle term 13 indicates the air inlet pipe communicated with air inlet path, and item 15 indicates the exhaust communicated with exhaust line Pipe.Figure middle term 41 indicates that the gas pressure being connected between flow value channel and flow verification gas circuit adjusts proportioning valve;Item 42 It indicates control plate, instrument is corresponded in control plate and instrument room and passes through wireless control connection.Outside the leeward side outer ring of simulation window It is exposed to instrument room, which can cooperate with press strip, be fixed by press strip to simulation window.
Be additionally provided in instrument room power supply and each switch valve of control and with each standard pressure transducer and each normal flow The CPU9 of meter sampling connection, figure middle term 10 indicate power supply, are provided with liquid crystal touch screen 11 on rear side of instrument room.It is tested to door and window When machine 40 is examined and determine, simulation window is installed in door and window experimental machine, the sucktion fan of door and window experimental machine itself can produce normal pressure And negative pressure, by taking the gas flowmeter calibrating to door/window testing machine as an example, when the sucktion fan of door/window testing machine generates normal pressure When, first switch valve is opened, and corresponding proving flowmeter work, air inlet path is closed, and exhaust line is opened, can be to door and window experimental machine Gas flowmeter carries out positive pressure range calibrating, and when the sucktion fan air-breathing of door and window experimental machine generates negative pressure, second switch valve is beaten It opens, exhaust line is closed, and air inlet path is opened, and can be carried out range of negative pressure calibrating to the gas flowmeter of door/window testing machine, be passed through gas The selection on road, each proving flowmeter can carry out positive pressure, negative pressure value calibrating, eliminate a proving flowmeter, reduce mark The use of quasi- flowmeter, not only saves cost, can be mounted in an instrument room after reducing proving flowmeter number It is interior, it realizes highly integrated.Switch valve where proving flowmeter in gas circuit is flow control valve, passes through making for flow control valve With the state that small flow and high pressure may be implemented generates, and small flow and high-pressure state are the main works of door/window testing machine Make state.By exhaust line, the adjusting of the switch valve of air inlet path, common realize is adjusted with the electric blower of door/window testing machine itself Multi-state in-circuit emulation detection.The multiple proving flowmeters and standard pressure transducer why used are to guarantee right The calibration accuracy in detection range answered.Calibrating installation in the utility model can also examine glass curtain wall testing machine It is fixed.
In the other embodiments of the utility model, pressure sensor examines and determine the number of unit Plays pressure sensor also It can according to need and be configured, such as two, four or other numbers;Combine of gas flowmeter Plays flowmeter Number can also be two, four or other numbers.

Claims (5)

1. a kind of door/window testing machine calibrating installation, it is characterised in that: including simulation window, simulation window includes corresponding for being installed on Front side in door and window experimental machine is the simulation window ontology of windward side, and simulation window ontology, which has, mitigates chamber, and simulation window ontology is windward Side is provided with the air inlet communicated with the mitigation chamber, and door/window testing machine calibrating installation further includes for the gas to door/window testing machine The combination gas flowmeter that flowmeter body is examined and determine, combination gas flowmeter include the first flow calibrating gas circuit being arranged in parallel Gas circuit is examined and determine with second flow, combination gas flowmeter further includes at least two proving flowmeters, the leeward side setting of simulation window Have and is connected to the flow value channel for mitigating chamber and first flow calibrating gas circuit, second flow calibrating gas circuit, first flow inspection Determine to be provided with first switch valve in gas circuit, be provided with second switch valve in second flow calibrating gas circuit, each proving flowmeter into Gas end is connected together with air inlet path with first flow calibrating gas circuit, and the outlet side of each proving flowmeter is together with exhaust line with second Flow verification gas circuit is connected, and is provided with switch valve in exhaust line, air inlet path and gas circuit where each proving flowmeter.
2. door/window testing machine calibrating installation according to claim 1, it is characterised in that: each switch valve is that flow is adjusted Valve.
3. door/window testing machine calibrating installation according to claim 1 or 2, it is characterised in that: be connected on rear side of simulation window Instrument room, the combination gas flowmeter are set in the instrument room.
4. a kind of combination gas flowmeter of door/window testing machine calibrating installation, it is characterised in that: first-class including what is be arranged in parallel Amount calibrating gas circuit and second flow examine and determine gas circuit, and combination gas flowmeter further includes at least two proving flowmeters, first flow It is provided with first switch valve in calibrating gas circuit, is provided with second switch valve in second flow calibrating gas circuit, each proving flowmeter Inlet end is connected together with air inlet path with first flow calibrating gas circuit, and the outlet side of each proving flowmeter is together with exhaust line with the Two flow verification gas circuits are connected, and are provided with switch valve in exhaust line, air inlet path and gas circuit where each proving flowmeter.
5. combination gas flowmeter according to claim 4, it is characterised in that: each switch valve is flow control valve.
CN201820947120.6U 2018-06-20 2018-06-20 Door/window testing machine calibrating installation and combinations thereof gas flowmeter Active CN208313535U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820947120.6U CN208313535U (en) 2018-06-20 2018-06-20 Door/window testing machine calibrating installation and combinations thereof gas flowmeter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820947120.6U CN208313535U (en) 2018-06-20 2018-06-20 Door/window testing machine calibrating installation and combinations thereof gas flowmeter

Publications (1)

Publication Number Publication Date
CN208313535U true CN208313535U (en) 2019-01-01

Family

ID=64707057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820947120.6U Active CN208313535U (en) 2018-06-20 2018-06-20 Door/window testing machine calibrating installation and combinations thereof gas flowmeter

Country Status (1)

Country Link
CN (1) CN208313535U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108709700A (en) * 2018-06-20 2018-10-26 河南省计量科学研究院 A kind of door/window testing machine calibrating installation and combinations thereof gas flowmeter
CN111811623A (en) * 2020-07-23 2020-10-23 三门核电有限公司 Auxiliary judgment method for measuring flow of high-pressure gas supply

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108709700A (en) * 2018-06-20 2018-10-26 河南省计量科学研究院 A kind of door/window testing machine calibrating installation and combinations thereof gas flowmeter
CN111811623A (en) * 2020-07-23 2020-10-23 三门核电有限公司 Auxiliary judgment method for measuring flow of high-pressure gas supply

Similar Documents

Publication Publication Date Title
CN108709696A (en) A kind of building external doors and windows testing machine calibrating installation
CN104155135B (en) Device for measuring clean air quantity attenuation rate of air cleaner
CN208313535U (en) Door/window testing machine calibrating installation and combinations thereof gas flowmeter
CN102539637B (en) Environment testing device
CN207610828U (en) Portable door and window leakproofness field detecting device
CN208313534U (en) Building external doors and windows testing machine calibrating installation
CN203490209U (en) Calibrating device for harmful gas detection alarm of coal mine
Yang et al. Research on flow resistance characteristics with different window/door opening angles
CN103837215B (en) Commutation valve type p.V.T.t method gas flow meter
CN208313531U (en) Calibrating installation for the calibrating of glass curtain wall testing machine
CN208688801U (en) Building element testing machine calibrating installation and its simulation window
CN208313532U (en) Calibrating installation for the calibrating of building curtain wall testing machine
CN208505550U (en) Door/window testing machine calibrating installation and its simulation window
CN205301167U (en) Gas concentration detection apparatus
CN102565695B (en) Wind pressure switch tester and control method thereof
CN208313536U (en) Live door and window detector calibrating installation
CN108007536A (en) A kind of valve-embedded condition checkout gear of intelligent gas meter and detection method
CN108731931A (en) A kind of building element testing machine calibrating installation and calibration method
CN208505549U (en) Build outer glass curtain wall testing machine calibrating installation
CN102829933B (en) Air tightness detector for photoelectric instrument
CN108709700A (en) A kind of door/window testing machine calibrating installation and combinations thereof gas flowmeter
CN102589658B (en) Starting-stopping heavy-caliber water flow calibrating device and starting-stopping heavy-caliber water flow calibrating method
CN208313533U (en) Building curtain wall testing machine calibrating installation
CN202814667U (en) Photoelectric instrument gas-tightness detector
CN108709699A (en) A kind of building curtain wall testing machine calibrating installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant