CN208431002U - The exchange apparatus for work of tunnel excavation trolley and anchor pole Operation Van - Google Patents

The exchange apparatus for work of tunnel excavation trolley and anchor pole Operation Van Download PDF

Info

Publication number
CN208431002U
CN208431002U CN201820797345.8U CN201820797345U CN208431002U CN 208431002 U CN208431002 U CN 208431002U CN 201820797345 U CN201820797345 U CN 201820797345U CN 208431002 U CN208431002 U CN 208431002U
Authority
CN
China
Prior art keywords
frame
connector housing
anchor pole
trestle
working panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820797345.8U
Other languages
Chinese (zh)
Inventor
刘小强
李敬国
杨奎
申宝玉
焦磊
张守乾
刑超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201820797345.8U priority Critical patent/CN208431002U/en
Application granted granted Critical
Publication of CN208431002U publication Critical patent/CN208431002U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model belongs to the exchange apparatus for work of a kind of tunnel excavation trolley and anchor pole Operation Van, and device includes car body, connector housing, the left and right preparation for connecing frame, protective net, working panel and drilling machine fixing seat up and down.The protective net for removing anchor pole Operation Van by the exchange of anchor pole Operation Van and tunnel excavation trolley, it is left and right on connect frame and it is left and right under connect frame, replacement anchor pole working panel is that trolley working panel forms tunnel excavation trolley.The utility model can be such that tunnel excavation trolley and anchor pole Operation Van operation function exchanges, and there is design rationally to save labor, and low cost shortens working procedure duration, reduce construction investment and the high advantage of construction efficiency.

Description

The exchange apparatus for work of tunnel excavation trolley and anchor pole Operation Van
Technical field
The utility model belongs to the exchange apparatus for work of a kind of tunnel excavation trolley and anchor pole Operation Van.
Background technique
Tunnel excavation trolley is used in tunnelling to helping out in the construction operation of ascending a height in chapelet face, such as at present Build high-altitude framework of steel reinforcement, support shuttering etc..Tunnel excavation trolley is two layers of rack body, has two layers of operation platform thereon under it End sets wheel, and tunnel excavation trolley is conducive in tunnel central space operation.
Anchor pole operation is to carry out armature boring in the chapelet face domed end of tunnelling, side wall, and anchor pole operation usually first exists Scaffold construction platform is set up in chapelet face, and work surface requires to be made to facilitate with punching air drill machine close to domed end and side wall Industry.
In tunnel excavation construction, vault armature boring system can not normally be set on existing excavation trolley, need to supportted Set up the scaffold of anchor pole operation when son faces, and set up the scaffold of anchor pole operation, more it is numb it is numerous, take a lot of work it is laborious, with work Cheng Jindu need to tear open repeatedly take, speed of application is slow, at high cost.And when setting up scaffold, tunnel excavation trolley need to be first moved, then Carry out anchor pole job execution.The two operation intersection conflict expends a large amount of manpower and material resources and time when the two converts form of construction work, The invalid construction time is long, and operating efficiency is low.
Summary of the invention
Therefore, the purpose of this utility model is to design the exchange operation dress of a kind of tunnel excavation trolley and anchor pole Operation Van It sets, tunnel excavation trolley and anchor pole Operation Van operation function can be made to exchange, there is design rationally to save labor, low cost shortens Working procedure duration reduces construction investment and the high advantage of construction efficiency.
For this reason, the device that a kind of tunnel excavation trolley and anchor pole Operation Van exchange, by main longitudinal grider, upper main beam and wheel It is formed, in which:
Car body: it is used to form the mobile support frame of tunnel excavation trolley and anchor pole Operation Van.Car body is square type frame body, The quadrangle of frame body is four main vertical beams.Between the upper end and lower part of two main vertical beams of front and back ends transverse direction in gauge from be equipped with it is upper, Lower main beam.In gauge from equipped with upper and lower stringer between the upper end and lower part of two main vertical beams of front and back ends longitudinal direction.Four masters are perpendicular The lower end of beam is equipped with wheel.The upper end of four main vertical beams is equipped with and inserts solid insertion tube slot for protective net pillar.The outside two of upper and lower stringer End is equipped with joint flange disk from several connector housings, the outboard end of connector housing is equipped in gauge.Or corresponding on upper and lower stringer is in gauge From equipped with the several through-holes passed through for several connector housings.
Connector housing: connect on will be left and right frame and it is left and right under connect frame and the frame body of car body is linked together.Upper and lower stringer Outside both ends in gauge from be equipped with several connector housings.The outboard end of connector housing is equipped with joint flange disk.Or it is right on upper and lower stringer It should be in gauge from equipped with the several through-holes passed through for several connector housings.One end of connector housing is equipped with joint flange disk, connector housing It is external thread part that the other end, which is equipped with, and the connector housing with external thread part passes through on two upper longitudinal beams or two lower stringers after corresponding through-hole It is screwed into one with the cylinder that is spirally connected being spirally connected on ring flange.
Frame is connect on left and right: being used to form the operation table top of the upper end two sides of car body square type frame body.Upper left connects frame or upper right The lower part for connecing frame, which is equipped with, several connects trestle in what spacing distance was distributed side by side.Joint flange disk with connector housing or the ring flange that is spirally connected The trestle end that connects of respective side is correspondingly provided with mounting flange.Mounting flange passes through the joint method of the first fastening bolt and connector housing Blue disk or the ring flange that is spirally connected, which are connected, makes the connector housing of respective side be connected with the trestle that connects of corresponding end.Connect the upper end of trestle Equipped with working panel.It connects and is equipped with fixes sleeve in the middle part of the lower end of trestle, the plug division of the upper end of inclined strut is plugged in fixes sleeve In, the lower end of inclined strut is fixed as one by the second fastening bolt with the main vertical beam of corresponding lower end.
Frame is connect under left and right: being used to form the operation table top of the lower end two sides of car body square type frame body.Lower-left connects frame or bottom right The lower part for connecing frame, which is equipped with, several connects trestle in what spacing distance was distributed side by side.Joint flange disk with connector housing or the ring flange that is spirally connected The trestle end that connects of respective side is correspondingly provided with mounting flange, and mounting flange passes through the joint method of the first fastening bolt and connector housing Blue disk or the ring flange that is spirally connected, which are connected, makes the connector housing of respective side be connected with the trestle that connects of corresponding end.Connect the upper end of trestle Equipped with working panel.It connects and is equipped with fixes sleeve in the middle part of the lower end of trestle, the plug division of the upper end of inclined strut is plugged in fixes sleeve In, the lower end of inclined strut is fixed as one by the second fastening bolt with the main vertical beam of corresponding lower end.
Protective net: for protecting dropstone and limitation drilling rod rotating range.Protective net carry out cover mobile support frame and it is left and right on connect frame Upper end space, camber, the periphery of protective net are the frame being made of angle steel to protective net in the form of sheets.Be equipped in frame is in interval distance The steel mesh being made of horizontal, vertical reinforcing bar from distribution.The frame lower end of insertion tube groove location on corresponding four main vertical beams is set There is insertion tube.The upper end of four protective net pillars is inserted admittedly in corresponding insertion tube, and the lower end of four protective net pillars is inserted solid corresponding slotting In cylinder slot.
Working panel: it constructs on it for worker, working panel is divided into trolley working panel and anchor pole working panel.Trolley The periphery of working panel is the frame being made of angle steel.The vertical reinforcement composition being distributed in interval distance is equipped in frame Reinforcing bar column.The periphery of anchor pole working panel is the frame being made of angle steel, be equipped in frame be distributed in interval distance by The steel mesh of horizontal, vertical reinforcing bar composition.The width of frame is greater than the upper surface outside of main beam or two lower main beams on two Between length.
Drilling machine fixing seat: for fixing gadder lower end on anchor pole working panel.The upper surface of drilling machine fixing seat is equipped with Gu the lower end peripheral of frame groove, drilling machine fixing seat is equipped with several pillars in spacing distance, the two sides of drilling machine fixing seat set handle.
Above structure and method have reached the purpose of the present invention.
The present invention can be such that tunnel excavation trolley and anchor pole Operation Van operation function exchanges, and there is design rationally to save labor, Low cost shortens working procedure duration, reduces construction investment and the high advantage of construction efficiency.Specific advantage is as follows:
(1) present invention can be such that the difficulty of construction in tunnel chapelet face significantly reduces, and save labor, high-quality, efficiency It is high.
(2) present invention makes the construction cost in tunnel chapelet face reduce by 80% or more compared with the construction cost of conventional method, can save Save a large amount of human and material resources.
(3) chapelet surface construction speed in tunnel of the present invention is fast, and easily construction and security risk are small, it is ensured that construction safety, reduction are applied Work difficulty, it is ensured that tunnel chapelet face safe construction.
Detailed description of the invention
Fig. 1 is the using state structure diagram of the utility model.
Fig. 2 is the connector housing of the utility model and the structural schematic diagram for connecing trestle interconnecting piece and trolley working panel.
Fig. 3 is another connector housing of the utility model and the attachment structure schematic diagram for connecing trestle interconnecting piece.
Fig. 4 is the partial structural diagram of the anchor pole Operation Van job state of the utility model.
Fig. 5 is the structural schematic diagram of the anchor pole working panel of the utility model.
Fig. 6 is the structural schematic diagram of the drilling machine fixing seat of the utility model.
Specific embodiment
As shown in Figures 1 to 6, the device that a kind of tunnel excavation trolley and anchor pole Operation Van exchange, by main longitudinal grider 9, upper master Crossbeam 5 and wheel 11 are formed, in which:
Car body: it is used to form the mobile support frame of tunnel excavation trolley and anchor pole Operation Van.Car body is square type frame body, The quadrangle of frame body is four main vertical beams.It is upper from being equipped in gauge between the upper end and lower part of two main vertical beams of front and back ends transverse direction Main beam 5 and lower main beam 10.Between the upper end and lower part of two main vertical beams of front and back ends longitudinal direction in gauge from be equipped with upper longitudinal beam, Lower stringer 18.The lower end of four main vertical beams is equipped with wheel, for being moved easily car body.The upper end of four main vertical beams is equipped with for protective net Pillar inserts solid insertion tube slot 34.The outside both ends of upper and lower stringer are in gauge from equipped with several connector housings 19, the outboard end of connector housing Equipped with joint flange disk 15.Or corresponding on upper and lower stringer is in gauge from equipped with the several through-holes 25 passed through for several connector housings.Vehicle Body is located in tunnel 8.
Connector housing: for upper left to be connect frame 2, upper right connects frame 7 and lower-left connects frame 1, bottom right connects the frame body of frame 13 Yu car body It is linked together.
The outside both ends of upper and lower stringer are in gauge from equipped with several connector housings, the conplane connector housing of same side Most preferably two sides respectively set one and centre sets one.The outboard end of connector housing is equipped with joint flange disk 15.
Or corresponding on upper and lower stringer is in gauge from equipped with the several through-holes 25 passed through for several connector housings.The one of connector housing End is equipped with joint flange disk, and it is external thread part 24 that the other end of connector housing, which is equipped with, and the connector housing with external thread part passes through on two It is screwed into one after corresponding through-hole with the cylinder 22 that is spirally connected being spirally connected on ring flange 23 on stringer or two lower stringers.Above two connector Frame structure can be selected as needed.
Frame is connect on left and right: being used to form the operation table top of the upper end two sides of car body square type frame body.Upper left connects frame or upper right The lower part for connecing frame, which is equipped with, several connects trestle 21 in what spacing distance was distributed side by side.To connect trestle best for same side conplane One is respectively set for two sides and centre sets one.
Mounting flange 20 is correspondingly provided with the joint flange disk of connector housing or the trestle end that connects for the ring flange respective side that is spirally connected. Mounting flange, which is connected by the first fastening bolt 16 with the joint flange disk of connector housing or the ring flange that is spirally connected, makes respective side Connector housing be connected with the trestle that connects of corresponding end, the upper left for completing respective side connects frame or upper right connects frame or lower-left connect frame, Or bottom right connects the connection of frame and support frame.
The upper end for connecing trestle of three same plane the same sides is equipped with working panel.The connector housing of i.e. adjacent the same side Upper end is equipped with working panel.
It connects and is equipped with fixes sleeve 27 in the middle part of the lower end of trestle, the plug division 26 of the upper end of inclined strut 12 is plugged in fixes sleeve In, the lower end of inclined strut is fixed as one by the second fastening bolt 28 with the main vertical beam of corresponding lower end, and inclined strut is in main vertical beam Stable triangle bearing diagonal is formed with the lower end middle part for connecing trestle.
Frame is connect under left and right: being used to form the operation table top of the lower end two sides of car body square type frame body.Lower-left connects frame or bottom right The lower part for connecing frame, which is equipped with, several connects trestle in what spacing distance was distributed side by side.The conplane of same side connects trestle most preferably Two sides respectively set one and centre sets one.With the joint flange disk of connector housing or the ring flange respective side that is spirally connected to connect trestle end corresponding Equipped with mounting flange, mounting flange is linked to be by the joint flange disk or the ring flange that is spirally connected of the first fastening bolt and connector housing The connector housing of respective side is integrally set to be connected with the trestle that connects of corresponding end.The upper end for connecing trestle is equipped with working panel.Connect trestle Lower end in the middle part of be equipped with fixes sleeve, the plug division of the upper end of inclined strut is plugged in fixes sleeve, and the lower end of inclined strut passes through Second fastening bolt is fixed as one with the main vertical beam of corresponding lower end.Inclined strut main vertical beam with connect trestle lower end in the middle part of formed Stable triangle bearing diagonal.
Protective net 3: for protecting dropstone and limitation drilling rod rotating range.Protective net carry out cover mobile support frame and it is left and right on connect The upper end space of frame.Protective net camber in the form of sheets.The periphery of protective net is the frame 17 being made of angle steel.Equipped between being in frame Every the steel mesh of range distribution being made of transverse steel 35, vertical reinforcement 14.Insertion tube groove location on corresponding four main vertical beams Frame lower end be equipped with insertion tube 33.It inserts admittedly in corresponding insertion tube, under four protective net pillars the upper end of four protective net pillars 6 Insert solid in corresponding insertion tube slot in end.
Working panel: it constructs on it for worker, working panel is divided into trolley working panel and anchor pole working panel.Trolley The periphery of working panel is the frame 17 being made of angle steel.14 groups of vertical reinforcement to be distributed in interval distance are equipped in frame At reinforcing bar column.The periphery of anchor pole working panel is the frame being made of angle steel, is equipped with and is distributed in interval distance in frame The steel mesh being made of horizontal, vertical reinforcing bar.The width of frame is greater than on two outside the upper surface of main beam or two lower main beams Length between side.The mesh of steel mesh is caught in for the pillar of drilling rod and the lower end of drilling machine fixing seat.It is described by horizontal, vertical Each mesh of the steel mesh of reinforcing bar composition forms limit drilling rod hole 36, and drilling rod passes through limit drilling rod hole.
Drilling machine fixing seat 29: for fixing 30 lower end of gadder on anchor pole working panel.The upper surface of drilling machine fixing seat Equipped with solid frame groove 37, the lower end peripheral of drilling machine fixing seat is equipped with several pillars 39 in spacing distance, can be located at four corner of lower end. The two sides of drilling machine fixing seat set handle 38, to be moved easily drilling machine fixing seat.
The same side same plane top connection frame is 3.
The lateral surface of the same side same plane top connection frame top connection ring flange is staggered setting.It is i.e. two neighboring to connect Head frame is staggered 0.5m, prevents same section stress.
The two sides of the working panel are equipped with guardrail 4, to guarantee construction personnel's safety.
The pillar of the drilling machine fixing seat lower end fixes in the mesh of the steel mesh in correspondence portion.
A kind of exchange operational method for realizing tunnel excavation trolley Yu anchor pole Operation Van, includes the following steps:
(1) preparation of construction: prepare car body, connector housing, it is left and right on connect frame, it is left and right under connect frame, protective net, working panel and brill Machine fixing seat.
(2) preparation of tunnel excavation trolley: the car body of tunnel excavation trolley is square type frame body.The quadrangle of frame body is four The main vertical beam of root.In gauge from equipped with upper and lower main beam between the upper end and lower part of two main vertical beams of front and back ends transverse direction.Front and back ends In gauge from equipped with upper and lower stringer between the upper end and lower part of two longitudinal main vertical beams.The lower end of four main vertical beams is equipped with wheel. The upper end of four main vertical beams is equipped with and inserts solid insertion tube slot for protective net pillar.The outside both ends of upper and lower stringer are in gauge from equipped with number The outboard end of root connector housing, connector housing is equipped with joint flange disk;Or corresponding on upper and lower stringer is in gauge from equipped with for several connectors Several through-holes that frame passes through.
(3) construction operation of tunnel excavation trolley: the upper surface difference of the upper surface of main beam and two lower main beams on two It is laid with trolley working panel.The periphery of trolley working panel is the frame being made of angle steel, and being equipped in frame is in interval distance The reinforcing bar column of vertical reinforcement composition from distribution.Guardrail is installed in the two sides of trolley working panel.Station of constructing works in trolley Tunnel excavation construction is carried out on panel.
(4) preparation of anchor pole Operation Van:
(a) connect on will be left and right frame and it is left and right under connect the mounting flange connect on trestle of frame respectively and be located at tunnel excavation Joint flange disk on the connector housing of the upper and lower two sides of trolley is connected by the first fastening spiral shell.
Or the connector housing one end for being equipped with external thread part is penetrated from the correspondence through-hole on the upper and lower stringer in side from another respectively Correspondence through-hole on the upper and lower stringer in side is screwed into one with the cylinder that is spirally connected being spirally connected on ring flange again after being pierced by.Frame is connect on will be left and right With it is left and right under connect the mounting flange connect on trestle of frame respectively and be located on tunnel excavation trolley, on the connector housing of middle two sides Joint flange disk or the ring flange that is spirally connected be connected by the first fastening spiral shell, it is left and right on connect frame and be located at tunnel excavation platform Vehicle upper end two sides connect the lower part two sides that frame is located at tunnel excavation trolley under left and right.
The plug division of the upper end of inclined strut is plugged in the fixes sleeve connect in the middle part of trestle lower end, and the lower end of inclined strut passes through Second fastening bolt is fixed as one with the main vertical beam of corresponding lower end.
(b) be laid with anchor pole working panel: connect on left and right respectively frame and it is left and right under connect connecing for frame and be laid with anchor pole on trestle Working panel.The upper end of main beam and the upper surface of two lower main beams are laid with anchor pole working panel respectively on two.
(c) be laid with protective net: the lower end of four protective net pillars is inserted respectively admittedly in the insertion tube slot on four main vertical beams, and four Insert solid in the insertion tube on corresponding protective net in the upper end of protective net pillar.
(d) guardrail 4 is installed in the two sides of anchor pole working panel.Set in the two sides of anchor pole working panel in spacing distance Intubation, guardrail lower end are inserted solid in corresponding intubation.
(5) construction operation in anchor pole Operation Van: by the fixed anchor pole working panel for being seated in 30 lower section of gadder of drilling machine On, the pillar of the lower end of drilling machine fixing seat is caught in the limit drilling rod hole of anchor pole working panel.By 32, drilling rod of 31 front end of drilling machine It holds from the tunnel chapelet face passed through in one limit drilling rod hole of correspondence on corresponding protective net on the outside of insertion protective net, gadder lower end card Gu carrying out armature boring construction in the solid frame groove of drilling machine fixing seat.
Or the pillar of the lower end of drilling machine fixing seat is caught in the limit drilling rod hole of anchor pole working panel, gadder lower end fixes In the solid frame groove of drilling machine fixing seat, armature boring construction is carried out;
(6) exchange of anchor pole Operation Van and tunnel excavation trolley: remove anchor pole Operation Van protective net, it is left and right on connect frame and Frame is connect under left and right, replacement anchor pole working panel is that trolley working panel forms tunnel excavation trolley.
It is described it is left and right on connect frame and it is left and right under to connect each lateral surface of frame be plane.The square of the tunnel excavation trolley Type frame body is to be fixedly welded integral steel framework.
The quantity of the drilling machine fixing seat is identical as drilling machine quantity.
In short, the utility model can be such that tunnel excavation trolley and anchor pole Operation Van operation function exchanges, there is design rationally, It saves labor, low cost shortens working procedure duration, reduces construction investment and the high advantage of construction efficiency.It can promote the use of.

Claims (6)

1. the exchange apparatus for work of a kind of tunnel excavation trolley and anchor pole Operation Van, by main longitudinal grider, upper main beam and wheel institute group At, it is characterised in that:
Car body: being used to form the mobile support frame of tunnel excavation trolley and anchor pole Operation Van, and car body is square type frame body, frame The quadrangle of body is four main vertical beams, upper and lower main from being equipped in gauge between the upper end and lower part of two main vertical beams of front and back ends transverse direction Crossbeam, in gauge from being equipped with upper and lower stringer between the upper end and lower part of two main vertical beams of front and back ends longitudinal direction, four main vertical beams Lower end is equipped with wheel, and the upper end of four main vertical beams, which is equipped with, inserts solid insertion tube slot for protective net pillar, and the outside both ends of upper and lower stringer are in Gauge is equipped with joint flange disk from several connector housings, the outboard end of connector housing is equipped with;Or on upper and lower stringer it is corresponding in gauge from setting There are the several through-holes passed through for several connector housings;
Connector housing: connect on will be left and right frame and it is left and right under connect frame and the frame body of car body is linked together, upper and lower stringer it is outer Side both ends are equipped with joint flange disk from several connector housings, the outboard end of connector housing is equipped in gauge;Or correspondence is on upper and lower stringer For gauge from being equipped with the several through-holes passed through for several connector housings, one end of connector housing is equipped with joint flange disk, connector housing it is another It is external thread part that end, which is equipped with, the connector housing with external thread part pass through on two upper longitudinal beams or two lower stringers after corresponding through-hole with spiral shell The cylinder that is spirally connected on acting flange disk is screwed into one;
Frame is connect on left and right: being used to form the operation table top of the upper end two sides of car body square type frame body, upper left connects frame or upper right connects frame Lower part be equipped in spacing distance be distributed side by side it is several connect trestle, it is corresponding with the joint flange disk of connector housing or the ring flange that is spirally connected The trestle end that connects of side is correspondingly provided with mounting flange, and mounting flange passes through the joint flange disk of the first fastening bolt and connector housing Or the ring flange that is spirally connected is connected the connector housing of respective side is made to be connected with the trestle that connects of corresponding end, the upper end for connecing trestle is equipped with Working panel connects and is equipped with fixes sleeve in the middle part of the lower end of trestle, and the plug division of the upper end of inclined strut is plugged in fixes sleeve, tiltedly The lower end of pillar is fixed as one by the second fastening bolt with the main vertical beam of corresponding lower end;
Frame is connect under left and right: being used to form the operation table top of the lower end two sides of car body square type frame body, lower-left connects frame or bottom right connects frame Lower part be equipped in spacing distance be distributed side by side it is several connect trestle, it is corresponding with the joint flange disk of connector housing or the ring flange that is spirally connected The trestle end that connects of side is correspondingly provided with mounting flange, and mounting flange passes through the joint flange disk of the first fastening bolt and connector housing Or the ring flange that is spirally connected is connected the connector housing of respective side is made to be connected with the trestle that connects of corresponding end, the upper end for connecing trestle is equipped with Working panel connects and is equipped with fixes sleeve in the middle part of the lower end of trestle, and the plug division of the upper end of inclined strut is plugged in fixes sleeve, tiltedly The lower end of pillar is fixed as one by the second fastening bolt with the main vertical beam of corresponding lower end;
Protective net: for protecting dropstone and limitation drilling rod rotating range, protective net carry out cover mobile support frame and it is left and right on connect the upper of frame End spaces, camber, the periphery of protective net are the frame being made of angle steel to protective net in the form of sheets, are equipped in frame in spacing distance point The steel mesh of cloth being made of horizontal, vertical reinforcing bar, the frame lower end for corresponding to the insertion tube groove location on four main vertical beams, which is equipped with, inserts Cylinder, the upper end of four protective net pillars are inserted admittedly in corresponding insertion tube, and the lower end of four protective net pillars is inserted solid in corresponding insertion tube slot In;
Working panel: constructing on it for worker, and working panel is divided into trolley working panel and anchor pole working panel, trolley work The periphery of panel is the frame being made of angle steel, and the reinforcing bar for the vertical reinforcement composition being distributed in interval distance is equipped in frame Column, the periphery of anchor pole working panel are the frame being made of angle steel, be equipped in frame be distributed in interval distance by horizontal, vertical The steel mesh formed to reinforcing bar, the width of frame are greater than on two the length between on the outside of the upper surface of main beam or two lower main beams Degree;
Drilling machine fixing seat: for fixing gadder lower end on anchor pole working panel, the upper surface of drilling machine fixing seat is equipped with solid frame The lower end peripheral of groove, drilling machine fixing seat is equipped with several pillars in spacing distance, and the two sides of drilling machine fixing seat set handle.
2. device according to claim 1, it is characterised in that: the same side same plane top connection frame top connection flange The lateral surface of disk is staggered setting.
3. device according to claim 1, it is characterised in that: the two sides of the working panel are equipped with guardrail.
4. device according to claim 1, it is characterised in that: each of the steel mesh being made of horizontal, vertical reinforcing bar Mesh forms limit drilling rod hole, and drilling rod passes through limit drilling rod hole.
5. device according to claim 1, it is characterised in that: the pillar of the drilling machine fixing seat lower end fixes in correspondence portion Steel mesh mesh in.
6. device according to claim 1, it is characterised in that: the same side same plane top connection frame is 3.
CN201820797345.8U 2018-05-28 2018-05-28 The exchange apparatus for work of tunnel excavation trolley and anchor pole Operation Van Expired - Fee Related CN208431002U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820797345.8U CN208431002U (en) 2018-05-28 2018-05-28 The exchange apparatus for work of tunnel excavation trolley and anchor pole Operation Van

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820797345.8U CN208431002U (en) 2018-05-28 2018-05-28 The exchange apparatus for work of tunnel excavation trolley and anchor pole Operation Van

Publications (1)

Publication Number Publication Date
CN208431002U true CN208431002U (en) 2019-01-25

Family

ID=65099803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820797345.8U Expired - Fee Related CN208431002U (en) 2018-05-28 2018-05-28 The exchange apparatus for work of tunnel excavation trolley and anchor pole Operation Van

Country Status (1)

Country Link
CN (1) CN208431002U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108506006A (en) * 2018-05-28 2018-09-07 中交公局第工程有限公司 The exchange operational method and its device of tunnel excavation trolley and anchor pole Operation Van

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108506006A (en) * 2018-05-28 2018-09-07 中交公局第工程有限公司 The exchange operational method and its device of tunnel excavation trolley and anchor pole Operation Van

Similar Documents

Publication Publication Date Title
CN202706503U (en) Electric lifting discharging platform for main building construction
CN105586867A (en) Installation method for over-length over-weight steel reinforcement cage
CN208431002U (en) The exchange apparatus for work of tunnel excavation trolley and anchor pole Operation Van
CN108506006A (en) The exchange operational method and its device of tunnel excavation trolley and anchor pole Operation Van
CN105603884A (en) Safety protection platform for bridge cap beam construction
CN206873495U (en) A kind of Portable piping lane side wall formwork jumbo
CN203271096U (en) Operating platform
CN210025768U (en) A operation platform system for caisson template installation
CN211498507U (en) Whole reassembling type protection rack
CN205276860U (en) A template system that is used for two secondary structure at rail hang qu station to execute doing
CN208734045U (en) Monoblock type mould bases for Super High fission conjoined composite structure
CN201148726Y (en) Independent hanging scaffold super large operating platform
CN202431011U (en) Reusable tool type bolting reinforcing steel bar processing shed for construction site
CN210289068U (en) Elevator shaft lifting platform
CN205472340U (en) People's passageway on instrument formula tower crane
CN212176482U (en) Scaffold for building construction
CN209799320U (en) Integral steel platform for multi-cylinder steel plate shear wall
CN205976413U (en) A hang cage subassembly for installing tower crane support side pipe
CN102322136A (en) Full-module-assembly adhesion type lifting scaffold
CN207277870U (en) A kind of elevator protective device with shaped
CN207620433U (en) A kind of suspension type riding track mounting structure based on central tube
CN206153467U (en) Shield structure section of jurisdiction steel reinforcement cage rack for manufacturing
CN219952651U (en) Fixed slot type protective net for climbing frame
CN214329789U (en) Scaffold frame that building engineering used
CN217480863U (en) Protective cover for elevator shaft on operation layer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190125

CF01 Termination of patent right due to non-payment of annual fee