CN205976413U - A hang cage subassembly for installing tower crane support side pipe - Google Patents
A hang cage subassembly for installing tower crane support side pipe Download PDFInfo
- Publication number
- CN205976413U CN205976413U CN201620794817.5U CN201620794817U CN205976413U CN 205976413 U CN205976413 U CN 205976413U CN 201620794817 U CN201620794817 U CN 201620794817U CN 205976413 U CN205976413 U CN 205976413U
- Authority
- CN
- China
- Prior art keywords
- square tube
- tower crane
- supporting square
- cage assembly
- top connecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 14
- 239000010959 steel Substances 0.000 claims description 14
- 238000009434 installation Methods 0.000 abstract description 9
- 238000000034 method Methods 0.000 abstract description 6
- 238000010276 construction Methods 0.000 abstract description 5
- 230000007306 turnover Effects 0.000 abstract description 2
- 230000002349 favourable effect Effects 0.000 abstract 1
- 238000003466 welding Methods 0.000 description 6
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Jib Cranes (AREA)
Abstract
The utility model discloses a hang cage subassembly for installing tower crane support side pipe, it includes: the top of top connecting rod, the overlap joint support side's pipe on the wall body that temporarily is fixed in tower crane department, and the two cages body, be located support side manage relative both sides side and respectively detachably be fixed in the both ends of top connecting rod. So, when this string of cage of installation to the top connecting rod of overlap joint on interim fixed support side's pipe be as support piece, and the cage that both sides will the side of support be managed to the mode through can dismantling the connection is physically fixed on the connecting rod of top, when demolising this string of cage, it can to demolish the detachable connecting piece. This kind of simple and convenient installation and dismantlement method are favorable to accelerating the construction progress of tower crane, and its simple structure, with low costs, have very strong suitability. In addition, this string of cage has the turnover function, can the sharp use of circulation between the pipe of the support side with the model.
Description
Technical field
This utility model is related to the realm of building construction and in particular to a kind of hanging cage group for installing tower crane supporting square tube
Part.
Background technology
The installation method that the supporting square tube of Super High tower crane is traditional is first pre-buried in Core Walls Structure body of wall, and is installing steel plate
Upper welding temporary support, then lifted support scheme is in place by tower crane, then set up operating platform in the air in height and installation is applied
Workman person is supported the erecting and welding work of square tube on the operational platform, removes temporary support and behaviour after the completion of welding to be installed
Make platform;And when removing supporting square tube, need to set up again operating platform.The installation method of above-mentioned this supporting square tube is very
Trouble and construction cost height, also have larger potential safety hazard.
Utility model content
Technical problem to be solved in the utility model is to provide on a kind of supporting square tube directly riding upon and fixing temporarily,
There is easy installation and removal and the hanging cage assembly that can be used in turn.
For solving above technical problem, the technical solution adopted in the utility model is as follows:
A kind of hanging cage assembly for installing tower crane supporting square tube, it includes:
Top connecting bar, is overlapped in the top of the supporting square tube on the body of wall being temporarily fixed at tower crane;And
Two cage body, be detachably secured to described top connecting bar positioned at two relative sides of described supporting square tube and respectively
Two ends.
Alternatively, described top connecting bar is U-shaped structure, and described supporting square tube is embedded at the U-shaped of described top connecting bar
In opening.
Alternatively, described top connecting bar is processed by shaped steel.
Alternatively, described cage body be rectangular box structure, include four vertical rods and be used for install adjacent described vertical rod it
Between cross bar.
Alternatively, described vertical rod and described cross bar are shaped steel and are welded to each other.
Alternatively, the bottom welding of described cage body has steel plate.
Alternatively, the quantity of described top connecting bar is two, and two described top connecting bar are arranged and difference position parallel
In the relative both sides of described cage body;The two ends of described top connecting bar are provided with the first fixing hole, two phases in described four vertical rods
Adjacent rod end is provided with second fixing hole corresponding with described first fixing hole.
Had the advantages that using this utility model of technique scheme for installing:
Install this hanging cage assembly when, using be overlapped on temporarily fix supporting square tube on top connecting bar as support
Part, and by way of being detachably connected, the cage body of supporting square tube both sides is fixed on top connecting bar;Removing this hanging cage
During assembly, dismountable attachment means are removed.This simply and easily installation and removal method is conducive to accelerating tower crane
Construction speed;And its structure is simple, low cost, has the very strong suitability.Additionally, this hanging cage assembly has turnover work(
Can, profit use can be circulated between the supporting square tube of same model.
Brief description
Fig. 1 is the front view of the hanging cage assembly that this utility model is used for installing tower crane supporting square tube.
Fig. 2 is the top view of the hanging cage assembly that this utility model is used for installing tower crane supporting square tube.
Fig. 3 is the structural representation that this utility model is used for top connecting bar in the hanging cage assembly install tower crane supporting square tube
Figure.
Fig. 4 is that this utility model is used for fixing with top connecting bar vertical rod in the hanging cage assembly install tower crane supporting square tube
Structural representation.
Specific embodiment
In order that those skilled in the art more fully understand the technical solution of the utility model, and make this utility model skill
The above-mentioned purpose of art scheme, feature and advantage can become apparent from understandable, below in conjunction with the accompanying drawings to this utility model work further
Detailed description.
With reference to Fig. 1 and Fig. 2, Fig. 1 illustrates this utility model for installing facing of the hanging cage assembly of tower crane supporting square tube
Figure, Fig. 2 illustrates this utility model for installing the top view of the hanging cage assembly of tower crane supporting square tube.From Fig. 1 and Fig. 2,
This utility model is used for installing the hanging cage assembly of tower crane supporting square tube mainly by top connecting bar 20 and the hanging cage group of hanging cage assembly
The cage body 30 of part forms.Hanging cage assembly 30 as accommodate workmen operating platform, so that workmen is supported square tube
10 installation and removal work;And top connecting bar 20 hangs cage body 30 on supporting square tube 10.
Specifically, when installing supporting square tube 10, this supporting square tube 10 is fixed with the Core Walls Structure body of wall at tower crane temporarily,
Carry out final being welded and fixed with personnel to be onstructed;Core when dismantling supporting square tube 10, at this supporting square tube 10 and tower crane
Cylinder body of wall is welded and fixed.Top connecting bar 20 is directly overlapped on the top of supporting square tube 10;The two ends of this top connecting bar 20 are divided
Two relative sides of supporting square tube 10 of not encorbelmenting, and suspention has cage body 30 respectively;Positioned at two relative sides of supporting square tube 10
Cage body 30 and the end of supporting square tube 10 between fixed by way of being detachably connected.
As one kind preferred embodiment, top connecting bar 20 is U-shaped structure, and with specific reference to Fig. 3, Fig. 3 illustrates this
Utility model is used for the structural representation of top connecting bar in the hanging cage assembly install tower crane supporting square tube.From the figure 3, it may be seen that U-shaped
The top connecting bar 20 of structure forms by push rod 21 and positioned at the side lever 22 at push rod 21 two ends;Wherein push rod 21 is directly overlapped on
The top of supporting square tube 10, two side levers 22 are located at the two relative sides of supporting square tube 10 respectively, make supporting square tube 10 just
In the U-shaped opening position of the top connecting bar 20 being embedded in U-shaped structure.Top connecting bar 20 using this structure relies on push rod 21
The U-shaped opening position being formed with side lever 22 is firmly connected with supporting square tube 10, and then improves stability and the peace of this hanging cage assembly
Quan Xing.
As one kind preferred embodiment, cage body 30 be rectangular box structure, refer again to Fig. 1 and Fig. 2 understand, its by
Vertical rod 31 and cross bar 32 fixation form.Specifically, the cage body 30 of rectangular box structure has four vertical rods being arranged side by side 31,
And it is fixed in the cross bar 32 between adjacent two vertical rods 21 in this four vertical rods 21;And, two adjacent vertical rods 21 it
Between at least there are three cross bars 32 positioned at its top, middle part and tail end.Cross bar thus by four vertical rods 21 and multilamellar
32 form the cage body 30 with higher structural integrity and safety.
As one kind preferred embodiment, vertical rod 31 and cross bar 32 are shaped steel and are interfixed by way of welding.
Generally, job site generally selects angle steel as vertical rod 31 and cross bar 32, and similarly, the processing of top connecting bar 20 is former
The shaped steel of angle steel one class also selected by material.
As one kind preferred embodiment, the bottom welding of the cage body 30 of rectangular box structure has steel plate 40.Specifically,
In the rectangular frame region of four vertical rods 31 and four cross bars 32 formation being located at its tail end, many bracing pieces are set, and
The top of bracing piece completely spreads checkered steel plate 40 and checkered steel plate 40 is welded and fixed with bracing piece.
As one kind preferred embodiment, the quantity of top connecting bar 20 is two, and two top connecting bar 20 are parallel
Arrange and be located at the relative both sides of cage body 30 respectively;From the figure 3, it may be seen that the side lever 22 in top connecting bar 20 is provided with first fixing
Hole 70;And with reference to Fig. 4, Fig. 4 is illustrated this utility model and is used for being connected with top in the hanging cage assembly install tower crane supporting square tube
The structural representation of the fixing vertical rod of bar, as shown in Figure 4, in four vertical rods 31, two adjacent rod ends are provided with first admittedly
Determine corresponding second fixing hole 80 in hole 70.Cage body 30 stress can be made more to balance using this design, structure is more steady
Gu, construction is safer.Additionally, when carrying out the installment work of this hanging cage assembly, only need to be in mutually corresponding first fixing hole 70
With setting bolt and nut 60 in the second fixing hole 80, you can realize being detachably connected between cage body 30 and top connecting bar 20.
In the dismounting work carrying out this hanging cage assembly, as long as removing the bolt and nut 60 in the first fixing hole 70 and the second fixing hole 80
, for recycling.
In sum, this utility model is used for installing the hanging cage assembly of tower crane supporting square tube to be overlapped on temporarily fixing propping up
Top connecting bar in support square tube is as support member, and is fixed the cage body of supporting square tube both sides by way of being detachably connected
On top connecting bar, you can complete the installment work of this hanging cage assembly;And dismountable connector is removed and can be completed
The dismounting work of this hanging cage assembly.This simply and easily installation and removal method is conducive to accelerating the construction speed of tower crane;And
And structure is simple, low cost, has the very strong suitability.Additionally, this hanging cage assembly has all rotating functions, can propping up in same model
Between support square tube, circulation profit uses.
Above in association with drawings and the embodiments, this utility model is described in detail, those skilled in the art
According to the above description this utility model can be made with many variations example.Thus, it is right that some details in embodiment should not constituted
Restriction of the present utility model, this utility model is by the scope being defined using appended claims as protection model of the present utility model
Enclose.
Claims (7)
1. a kind of hanging cage assembly for installing tower crane supporting square tube is it is characterised in that include:
Top connecting bar, is overlapped in the top of the supporting square tube on the body of wall being temporarily fixed at tower crane;And
Two cage body, be detachably secured to the two of described top connecting bar positioned at two relative sides of described supporting square tube and respectively
End.
2. the hanging cage assembly being used for installing tower crane supporting square tube as claimed in claim 1 is it is characterised in that described top connects
Bar is U-shaped structure, and described supporting square tube is embedded in the U-shaped opening position of described top connecting bar.
3. the hanging cage assembly being used for installing tower crane supporting square tube as claimed in claim 2 is it is characterised in that described top connects
Bar is processed by shaped steel.
4. the hanging cage assembly being used for installing tower crane supporting square tube as claimed in claim 1 is it is characterised in that described cage body is square
Shape frame structure, including four vertical rods with the cross bar that is arranged between adjacent described vertical rod.
5. the as claimed in claim 4 hanging cage assembly being used for installing tower crane supporting square tube is it is characterised in that described vertical rod and institute
State cross bar to be shaped steel and be welded to each other.
6. the as claimed in claim 4 hanging cage assembly being used for installing tower crane supporting square tube is it is characterised in that the bottom of described cage body
Portion is welded with steel plate.
7. the hanging cage assembly being used for installing tower crane supporting square tube as claimed in claim 4 is it is characterised in that described top connects
The quantity of bar is two, and two described top connecting bar are arranged parallel and are located at the relative both sides of described cage body respectively;Described top
The two ends of portion's connecting rod are provided with the first fixing hole, and in described four vertical rods, two adjacent rod ends are provided with described first admittedly
Determine corresponding second fixing hole in hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620794817.5U CN205976413U (en) | 2016-07-27 | 2016-07-27 | A hang cage subassembly for installing tower crane support side pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620794817.5U CN205976413U (en) | 2016-07-27 | 2016-07-27 | A hang cage subassembly for installing tower crane support side pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205976413U true CN205976413U (en) | 2017-02-22 |
Family
ID=58026467
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620794817.5U Expired - Fee Related CN205976413U (en) | 2016-07-27 | 2016-07-27 | A hang cage subassembly for installing tower crane support side pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205976413U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109914776A (en) * | 2019-04-29 | 2019-06-21 | 中冶建工集团有限公司 | A kind of assembled architecture overhanging balcony position peripheral structure |
-
2016
- 2016-07-27 CN CN201620794817.5U patent/CN205976413U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109914776A (en) * | 2019-04-29 | 2019-06-21 | 中冶建工集团有限公司 | A kind of assembled architecture overhanging balcony position peripheral structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106284089A (en) | A kind of steel trestle rapid constructing method | |
CN104389419A (en) | Cantilevered formwork platform installation structure and construction method | |
CN107524284A (en) | A kind of regularization pylon protection system and installation method | |
CN105625186A (en) | Method for constructing large-section concrete Y-shaped column | |
CN103206074A (en) | Elevator shaft template construction method, platform and support | |
CN110306774A (en) | A kind of installation method and device of spigot-and-socket builder's jack | |
CN103061501B (en) | Formwork supporting system for composite beam and floor-slab structure of building and construction method for formwork supporting system | |
CN108360380A (en) | A kind of bridge pier column construction operation platform and its construction method | |
CN106320704A (en) | Steel reinforced concrete structure formwork sleeve threaded rod pulling construction method | |
CN104746862A (en) | Temporary installation operating platform on overhead equipment foundation and erecting method thereof | |
CN105649348A (en) | Method for hosting and mounting steel tube column casings | |
CN201730338U (en) | Strut for supporting polyphenyl foam formwork walls | |
CN102912996A (en) | Steel tube concrete column high-altitude construction safety protection system | |
CN205976413U (en) | A hang cage subassembly for installing tower crane support side pipe | |
CN105649335A (en) | Construction method for core tube beam column structure of super high-rise building | |
CN204282803U (en) | To encorbelment formwork structure for mounting platform | |
CN206784915U (en) | A kind of new steel structure suspension type flooring gang form | |
CN203271096U (en) | Operating platform | |
CN215212279U (en) | Hanging bracket for supporting high-altitude operation platform | |
CN201943350U (en) | Supporting steel frame for die holder of high-altitude large span overhanging structure | |
CN204038917U (en) | Detachable external hanging type operating platform | |
CN209686833U (en) | Operating platform support frame and operating platform | |
CN207469752U (en) | A kind of venthole non-dismantling formwork | |
CN205976414U (en) | A hang cage subassembly for installing tower crane supporting circular pipe roof beam | |
CN207620433U (en) | A kind of suspension type riding track mounting structure based on central tube |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170222 |
|
CF01 | Termination of patent right due to non-payment of annual fee |