CN208415309U - A kind of shield export & import soil body end ruggedized construction - Google Patents

A kind of shield export & import soil body end ruggedized construction Download PDF

Info

Publication number
CN208415309U
CN208415309U CN201820988713.7U CN201820988713U CN208415309U CN 208415309 U CN208415309 U CN 208415309U CN 201820988713 U CN201820988713 U CN 201820988713U CN 208415309 U CN208415309 U CN 208415309U
Authority
CN
China
Prior art keywords
shield
soil
building enclosure
tunnel
outside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820988713.7U
Other languages
Chinese (zh)
Inventor
蔡锐
史军军
靳涛
李新朋
杨广钊
常国栋
赵艳双
赵帅
赵成
杨佳
杨晓彤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN201820988713.7U priority Critical patent/CN208415309U/en
Application granted granted Critical
Publication of CN208415309U publication Critical patent/CN208415309U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of shield export & import soil body end ruggedized constructions, including soil stabilization area, after pour ring beam, shield circular tunnel and station pit building enclosure, the station pit building enclosure is set on the outside of two holes of shield circular tunnel, ring beam is poured after being equipped on the outside of station pit building enclosure, soil stabilization area is equipped with outside shield circular tunnel in station pit building enclosure, soil stabilization area is the cube shaped plain concrete block poured, soil stabilization area is covered on outside the hole of shield circular tunnel, the construction method that end reinforces in this bid section is rotary jet grouting form, advantageous grouting and reinforcing condition, it can be quickly, effectively improve stratum, ensure structure safety and normal use that shield launching and received construction safety and periphery construction are built;It simplifies shield and receives technique, have many advantages, such as that simple process, technologically advanced, exploitativeness is strong, can obtain good economic benefit and social benefit.

Description

A kind of shield export & import soil body end ruggedized construction
Technical field
The utility model relates to tunnels and underground engineering technical fields, more specifically, it relates to a kind of shield export & import Soil body end ruggedized construction.
Background technique
With the continuous improvement of the technology of building, construction level and construction requirements, more and more new processes, novel construction method application Into the construction of tunnels and underground engineering, and the Typical Representative that shield method is excavated as tunnel machine, it is gradually widely applied In traffic engineering field, field of urban rail, hydraulic engineering field and municipal field tunnel construction.Especially in city Tunnel, submerged tunnel, city planting ductwork construction in, shield method, safe, high-quality, environmentally friendly, civilized construction quick with its etc. is many excellent Gesture is increasingly becoming the first choice of all kinds of construction methods.But its construction risk can not still despise, and there are still cave in, gush in work progress Water gushes the risks such as sand, especially shield launching or receives the stage.
Present shield reception end reinforcing mode mainly has rotary jet strengthening, stirring to reinforce, sleeve valve barrel grouting is reinforced, freezing adds Gu the plain concrete joint reinforcement together with adding, these reinforcing modes must all carry out pipeline and change to move and traffic is led and changed, and carry out end Nonetheless the outer operation of well collapsing also easily occurs during shield, leak, leaks phenomena such as mud, spillage, wind of constructing Danger is huge, and causes receiver section shield tunnel faulting of slab ends, breakage and infiltration.Therefore, when conventional end reinforcement means because traffic, When the factors such as pipeline can not be implemented, a kind of shield export & import soil body end ruggedized construction is needed to meet construction demand.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of shield export & import soil body ends Ruggedized construction, to solve the problems mentioned in the above background technology.
To achieve the above object, the utility model provides the following technical solutions:
A kind of shield export & import soil body end ruggedized construction, including soil stabilization area, after pour ring beam, shield circular tunnel and Station pit building enclosure, the station pit building enclosure are set on the outside of two holes of shield circular tunnel, station base Ring beam is poured after being equipped on the outside of pit enclosure structure, is equipped with soil stabilization outside the shield circular tunnel in station pit building enclosure Area, soil stabilization area are the cube shaped plain concrete block poured, and soil stabilization area is covered on the hole of shield circular tunnel Outside, the construction method that end reinforces in this bid section are rotary jet grouting form.
Further, the station pit building enclosure of side is glass fiber-reinforced polymer at the hole of the shield circular tunnel.
Further, the strength mark that the plain concrete block in the soil stabilization area uses for the concreting of C10 and At.
Further, the length in the soil stabilization area at a hole of the shield circular tunnel be 6m, width 12m, Height is 12m, with a thickness of 3m.
Further, the length in the soil stabilization area at another hole of the shield circular tunnel is 8m, width is It 12m, is highly 12m, with a thickness of 3m.
Further, two hole diameters of the shield circular tunnel are 6m.
In conclusion the utility model has the advantages that compared with prior art
The shield export & import soil body end ruggedized construction of the utility model, station pit building enclosure are set to shield circle On the outside of two holes in tunnel, ring beam, the shield in station pit building enclosure are poured after being equipped on the outside of station pit building enclosure Soil stabilization area is equipped with outside structure circular tunnel, the construction method that end reinforces in this bid section is rotary jet grouting form, advantageous Grouting and reinforcing condition can quickly and efficiently improve stratum, ensure that shield launching and received construction safety and periphery construction are built Structure safety and normal use;Shield is simplified compared with conventional shield structure and receives technique, has simple process, technology first Into, exploitativeness is strong the advantages that, compensate for the defect that China shield export & import soil body end reinforces reception technique, can obtain good Economic benefit and social benefit.
For the structure feature and effect for more clearly illustrating the utility model, come with reference to the accompanying drawing with specific embodiment pair The utility model is described in detail.
Detailed description of the invention
Fig. 1 is the shield export & import soil stabilization floor map of the utility model.
Fig. 2 is the shield export & import soil stabilization elevational schematic view of the utility model.
Wherein, arrow indicates shield driving direction.
Appended drawing reference: ring beam, 3- shield circular tunnel, 4- station pit building enclosure are poured after 1- soil stabilization area, 2-.
Specific embodiment
The technical solution of the utility model is described further in the following with reference to the drawings and specific embodiments.
Referring to Fig. 1-2, a kind of shield export & import soil body end ruggedized construction, including soil stabilization area 1, after pour ring beam 2, shield Structure circular tunnel 3 and station pit building enclosure 4, the station pit building enclosure 4 are set to two of shield circular tunnel 3 On the outside of hole, ring beam 2 is poured after being equipped on the outside of station pit building enclosure 4, the shield circle tunnel in station pit building enclosure 4 Soil stabilization area 1 is equipped with outside road 3, soil stabilization area 1 is the cube shaped plain concrete block poured, and soil stabilization area 1 is covered It covers outside the hole in shield circular tunnel 3, the construction method that end reinforces in this bid section is rotary jet grouting form.It originates, connect Receiving end reinforcing body is length × width × height=6~8m × 12m × 12m.
Preferably, in the present embodiment, the station pit building enclosure 4 of side is adopted at the hole of the shield circular tunnel 3 Use glass fiber-reinforced polymer.
Preferably, in the present embodiment, the strength mark that the plain concrete block in the soil stabilization area 1 uses is C10 Concreting form, the length in the soil stabilization area 1 at a hole of shield circular tunnel 3 is 6m, width 12m, Height is 12m, with a thickness of 3m;The length in the soil stabilization area 1 at another hole of shield circular tunnel 3 is 8m, width is It 12m, is highly 12m, with a thickness of 3m;Two hole diameters of shield circular tunnel 3 are 6m.
Technical principle of the utility model has been described above with reference to specific embodiments, is only the preferred implementation of the utility model Mode.The protection scope of the utility model is not limited merely to above-described embodiment, technology belonging to the idea of the present invention Scheme belongs to the protection scope of the utility model.Those skilled in the art, which does not need to pay for creative labor, to be associated To other specific embodiments of the utility model, these modes are fallen within the protection scope of the utility model.

Claims (6)

1. a kind of shield export & import soil body end ruggedized construction, including soil stabilization area (1), after pour ring beam (2), shield circle tunnel Road (3) and station pit building enclosure (4), which is characterized in that the station pit building enclosure (4) is set to shield circle tunnel On the outside of two holes in road (3), ring beam (2), station pit building enclosure are poured after being equipped on the outside of station pit building enclosure (4) (4) it is equipped with soil stabilization area (1) outside the shield circular tunnel (3) in, soil stabilization area (1) is that the cube morph poured mixes Solidifying soil block body, soil stabilization area (1) is covered on outside the hole of shield circular tunnel (3), the construction that end reinforces in this bid section Method is rotary jet grouting form.
2. a kind of shield export & import soil body end ruggedized construction according to claim 1, which is characterized in that the shield circle The station pit building enclosure (4) of side is glass fiber-reinforced polymer at the hole in shape tunnel (3).
3. a kind of shield export & import soil body end ruggedized construction according to claim 1 or 2, which is characterized in that the soil The strength mark that the plain concrete block of body stabilization zone (1) uses forms for the concreting of C10.
4. a kind of shield export & import soil body end ruggedized construction according to claim 3, which is characterized in that the shield circle The length in the soil stabilization area (1) at one hole in shape tunnel (3) is 6m, width 12m, is highly 12m, with a thickness of 3m.
5. a kind of shield export & import soil body end ruggedized construction according to claim 4, which is characterized in that the shield circle The length in the soil stabilization area (1) at another hole in shape tunnel (3) is 8m, width 12m, be highly 12m, with a thickness of 3m。
6. a kind of shield export & import soil body end ruggedized construction according to claim 5, which is characterized in that the shield circle Two hole diameters in shape tunnel (3) are 6m.
CN201820988713.7U 2018-06-26 2018-06-26 A kind of shield export & import soil body end ruggedized construction Active CN208415309U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820988713.7U CN208415309U (en) 2018-06-26 2018-06-26 A kind of shield export & import soil body end ruggedized construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820988713.7U CN208415309U (en) 2018-06-26 2018-06-26 A kind of shield export & import soil body end ruggedized construction

Publications (1)

Publication Number Publication Date
CN208415309U true CN208415309U (en) 2019-01-22

Family

ID=65109434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820988713.7U Active CN208415309U (en) 2018-06-26 2018-06-26 A kind of shield export & import soil body end ruggedized construction

Country Status (1)

Country Link
CN (1) CN208415309U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794286A (en) * 2020-07-07 2020-10-20 浙江华东工程咨询有限公司 Underground space protection structure for underground penetration in soft soil stratum and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794286A (en) * 2020-07-07 2020-10-20 浙江华东工程咨询有限公司 Underground space protection structure for underground penetration in soft soil stratum and construction method
CN111794286B (en) * 2020-07-07 2021-08-10 浙江华东工程咨询有限公司 Underground space protection structure for underground penetration in soft soil stratum and construction method

Similar Documents

Publication Publication Date Title
CN101985882B (en) Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel
CN103015402B (en) Construction method for inhibiting frost heaving and thaw collapse of horizontally frozen end through cement-soil reinforcement method
CN106593470A (en) High-permeability water-rich sand shield terminal reinforcing system and construction method thereof
CN106014456A (en) Double-layer lining special quasi-circular sectional mining method tunnel structure and construction method thereof
CN103437417B (en) Part repair structure for steel lining of drainage pipeline
CN106121658B (en) Freezing method sinking shaft well wall supporting structure and construction method thereof
CN105862990A (en) Prefabricated assembly well wall structure and construction method thereof
CN109296371A (en) MJS method and horizontal freezing joint reinforcement pressure-bearing rich water arenaceous stratum overlap the system and its construction method that section is worn under station
CN108361045A (en) A kind of duct pieces of shield tunnel being adapted to soft soil layer
CN203669876U (en) Non-end shield reinforcement arrival structure
CN208415309U (en) A kind of shield export & import soil body end ruggedized construction
CN107740427A (en) A kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure
CN101748742B (en) Dual-plugging construction method of concrete and flange for depressurization well
CN206299392U (en) A kind of high osmosis water-rich sand layer shield end reinforcement system
CN204825993U (en) Underground continuous wall stagnant water, lap guard stream joint design
CN203904857U (en) Precast-concrete three-arch culvert pipe
CN102864833A (en) Application of finished plastic inspection well in outdoor drainage system
CN204420369U (en) A kind of linkage structure of large-caliber drainage pipeline
CN204187155U (en) A kind of underground steel and concrete structure pipeline of inner wall belt spiral compound stiffening ring
CN105275001A (en) Novel replaceable hard and rigid combined double-layer curved-grain net-shaped pervious pipe for slope
CN108930323A (en) A kind of pipe jacking construction method
CN201883453U (en) Combined pipe jacking working well
CN204080861U (en) Inspection-pit between a kind of Novel top pipeline section
CN109519176B (en) Mining tunnel grouting reinforcement method and structure for water-rich granite residual soil stratum
CN105256804A (en) Preparation device and backfilling method for flow-state cement soil

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant