CN201883453U - Combined pipe jacking working well - Google Patents

Combined pipe jacking working well Download PDF

Info

Publication number
CN201883453U
CN201883453U CN2010206415636U CN201020641563U CN201883453U CN 201883453 U CN201883453 U CN 201883453U CN 2010206415636 U CN2010206415636 U CN 2010206415636U CN 201020641563 U CN201020641563 U CN 201020641563U CN 201883453 U CN201883453 U CN 201883453U
Authority
CN
China
Prior art keywords
well
anchor
well body
sinking
shoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206415636U
Other languages
Chinese (zh)
Inventor
吴纪东
王明远
刘勇
杨杰
张双梅
郭伟
王松阳
武刘伟
刘军
陈波
光军伟
苏炳臣
任佩宏
陈喆
吕黎涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Municipal Engineering General Corp
Original Assignee
Zhengzhou Municipal Engineering General Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Municipal Engineering General Corp filed Critical Zhengzhou Municipal Engineering General Corp
Priority to CN2010206415636U priority Critical patent/CN201883453U/en
Application granted granted Critical
Publication of CN201883453U publication Critical patent/CN201883453U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a combined pipe jacking working well, which comprises a working well body made from reinforced concrete. An anchor sprayed concrete supporting structure is arranged outside the well body, the bottom end of the anchor sprayed concrete supporting structure is positioned on a bottom plate of the well body, and the top end of the anchor sprayed concrete supporting structure is higher than the top end of the well head. Since the anchor sprayed concrete supporting structure arranged outside can be used as a formwork during construction of working well side wall casting, usage of formwork, supports, wall feed-through bolts and the like is reduced during manufacturing process of the well body. After the well body is prefabricated, the anchor sprayed concrete supporting structure and the well body function as a wall so as to provide double safety guarantee to construction staff in the well. During construction, the sinking process is omitted, sinking stop, well deflection, sinking stalling, excessive sinking and the like during sinking process can be avoided, sinking observation is omitted, and quality risk is reduced.

Description

The combined type upper pipe working well
Technical field
The utility model relates to a kind of convenient making and the combined type upper pipe working well that uses in mechanical jacking construction.
Background technology
Development along with civilization of human society; people begin to reach on the ground the underground various artificial structure of building; various construction technologies have been produced thus; wherein trenchless technology is exactly a kind of in all construction technologies of building at underground artificial structure; the trenchless engineering technology has thoroughly solved in the piping laying construction the destruction of City Building and the difficult problems such as obstruction of road traffic, is highlighting its advantage aspect steady soil and the environmental protection.
Trenchless technology is to utilize few excavation: promptly active well and received well excavation, pipeline not excavation technology carry out the laying or the replacing of underground utilities, by active well the pipe that will bury underground is headed in the soil.This technology is widely used in the non-excavation laying of various pipelines such as city underground water supply and drainage pipeline, natural gas petroleum pipeline, communication cable in China.Its energy highway crossing, railway, bridge, high mountain, river, any building in straits and ground.Adopt this technology construction, the obstruction that can save a large number of expropriation of land removal expense, minimizing environmental pollution and road has remarkable economic efficiency and social benefit.
Active well then is the key link in the jacking construction, the effect of active well be to descend definitely engineering the position, carry and to finish the required various materials of underground construction, provide the operating space for various materials are processed to form final structure.
The tradition upper pipe working well adopts the drop shaft sinking construction, is to utilize the deadweight of prefabricated reinforced concrete well body and cooperate the well body well that sinks to finishing the work in place with soil digging in the artificial or mechanical well.Guaranteed that also thereby the relatively stable of well body surrounding soil lay good basis for later jacking construction though do like this, but open caisson construction itself has the certain quality risk, as well body in the open caisson process stop sinking, well body deflection, sinking stall in addition sink excessive etc., though the corresponding measure of the above-mentioned quality risk of reply is also arranged, but operate relative complex after all, risk factors are more, and when construction labour intensity big, cost is higher.The anchor shoring shotcrete method is a kind of common supporting method, but is used for the construction that tunnel, mountain rock etc. are located more, does not use the upper pipe working well of anchor shoring shotcrete structure and method at present.
The utility model content
The purpose of this utility model be to provide a kind of safer reliable, be easy to construction and lower-cost combined type active well.
For achieving the above object, combined type upper pipe working well of the present utility model comprises the active well well body that steel concrete is made, the external anchor shoring shotcrete structure that is equipped with of well, the bottom of described anchor shoring shotcrete structure is lower than the base plate of described well body, the top of described anchor shoring shotcrete structure is higher than the top of described well body, and described anchor shoring shotcrete structure is not established anchor pole at the hole of active well.
Described well body comprises side wall, roof and base plate, and the base plate bottom is cast with concrete cushion, and roof upwards connection is provided with the pit shaft that passes through for the people; Described anchor shoring shotcrete structure is an annular, and is extended to ground by the foundation ditch bottom in vertical direction; Described Jing Ticeqiang is that the external diameter of annular and Jing Ticeqiang is identical with the internal diameter of anchor shoring shotcrete structure.
The utlity model has following advantage:
1. the utility model is simple in structure, and is easy to use.Because the anchor shoring shotcrete structure in the outside is when serving as foundation pit enclosure structure, template in the time of also can doublely working well side wall pouring construction, therefore make to reduce in the process use amount of materials such as template, support, through-wall bolt in the well system, thereby reduced labour intensity and construction cost accordingly.
The well body is prefabricated finish after, anchor shoring shotcrete structure and well body play the effect of going along with sb. to guard him together jointly, thereby provide more solid dual safety guarantee for constructor in the well.
3. because the utility model need not adopt the drop shaft sinking construction, therefore the well body that can avoid occurring in the open caisson process in the past stops problems such as sinkings, well body deflection, sinking stall, sinking be excessive, the observation work of also need not sinking when constructing simultaneously, has correspondingly reduced difficulty of construction, has saved the required manpower of constructing the quality risk when having reduced construction, the operating efficiency when having improved construction.
This structure decrease a large amount of concrete, the amount of reinforcement of caisson structure in the past, material economy can reduce construction costs.
Description of drawings
Fig. 1 is a sectional structure schematic diagram of the present utility model;
Fig. 2 is the A-A sectional view of Fig. 1.
The specific embodiment
As shown in Figure 1, combined type upper pipe working well of the present utility model comprises the active well well body that steel concrete is made, and described well body comprises side wall 1, roof 2 and base plate 3, and base plate 3 bottoms are cast with concrete cushion 4, roof 2 upwards connection is provided with the pit shaft 5 that passes through for the people, is provided with cat ladder 6 in the pit shaft 5.The external anchor shoring shotcrete structure that is equipped with of well, the anchor shoring shotcrete structure comprises anchor pole 7 and concrete wall 8.Described anchor shoring shotcrete structure is an annular, and is extended to ground by the foundation ditch bottom in vertical direction; Described well side wall 1 is that the external diameter of annular and well side wall 1 is identical with the internal diameter of described concrete wall 8.Wherein, the foundation bed of described concrete wall 8 and anchor pole 7 is lower than active well well body basis, active well well body top is lower than anchor shotcrete support structure top, make the anchor shoring shotcrete structure play omnibearing support action, the template when being convenient to simultaneously make the well body during as active well side wall pouring construction to the well body.
Because the external diameter of well body is identical with the internal diameter of described concrete wall 8, therefore anchor shoring shotcrete structure and well body can be fitted closely, in work progress concrete wall 8 can be directly as the reinforced concrete well body outer wall template when prefabricated, can save the use amount of materials such as template, support, through-wall bolt thus, thereby labour intensity and construction cost have been reduced accordingly, the well body is prefabricated finish after, anchor shoring shotcrete structure and side wall 1 jointly provide more solid dual safety guarantee for constructor in the well together.
During construction, 80 millimeters of anchor pole 7 hole drilling diameters become downward 15 ° of orifice angle level, and anchor pole 7 employing diameters are the indented bars more than 22 millimeters; Except that top layer anchor pole 7 and bottom anchor pole 7, other anchor poles 7 must apply prestressing force; Anchor shotcrete support architecture basics bottom surface is lower than active well well body basis, and active well well body top is lower than anchor shotcrete support structure top.Concrete construction sequence is as follows:
(1) excavation pit; Reserve the soil layer of 5-10 cm thick by manual amendment at Po Bishang during excavation.
(2) adopt luoyang spade pore-forming and insert anchor pole 7, become downward 15 degree of orifice angle level, 80 millimeters of drilling diameters;
(3) perfusion mortar;
(4) reinforced mesh colligation;
(5) spray concrete and maintenance;
(6) apply prestressing force;
(7) active well side wall 1 steel concrete is built;
(8) active well base plate 3 steel concrete are built and concrete cushion 4 is built;
(9) active well seals and builds pit shaft 5 by laying bricks or stones;
(10) the medium coarse sand backfill is carried out in active well backfill on base plate 3, form medium-sand seam 9.
Combined type upper pipe working well of the present utility model carries out active well equipment earlier and installs in use; Carry out the jacking of active well pipeline 11 again.The first use, the concrete that needs before the jacking to guarantee base plate 3 reaches 100% of design strength.

Claims (2)

1. combined type upper pipe working well, it is characterized in that: comprise the active well well body that steel concrete is made, the external anchor shoring shotcrete structure that is equipped with of well, the bottom of described anchor shoring shotcrete structure is lower than the base plate of described well body, and the top of described anchor shoring shotcrete structure is higher than the top of described well body.
2. combined type upper pipe working well according to claim 1 is characterized in that: described well body comprises side wall, roof and base plate, and the base plate bottom is cast with concrete cushion, and roof upwards connection is provided with the pit shaft that passes through for the people; Described anchor shoring shotcrete structure is an annular, and is extended to ground by the foundation ditch bottom in vertical direction; Described Jing Ticeqiang is that the external diameter of annular and Jing Ticeqiang is identical with the internal diameter of anchor shoring shotcrete structure.
CN2010206415636U 2010-12-06 2010-12-06 Combined pipe jacking working well Expired - Fee Related CN201883453U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206415636U CN201883453U (en) 2010-12-06 2010-12-06 Combined pipe jacking working well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206415636U CN201883453U (en) 2010-12-06 2010-12-06 Combined pipe jacking working well

Publications (1)

Publication Number Publication Date
CN201883453U true CN201883453U (en) 2011-06-29

Family

ID=44180991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206415636U Expired - Fee Related CN201883453U (en) 2010-12-06 2010-12-06 Combined pipe jacking working well

Country Status (1)

Country Link
CN (1) CN201883453U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173274A (en) * 2019-05-31 2019-08-27 武汉市武昌市政建设(集团)有限公司 A kind of head is removed obstacles method
CN112195973A (en) * 2020-09-11 2021-01-08 北京市政路桥股份有限公司 Pipe jacking working well structure and construction method thereof
CN113279470A (en) * 2021-06-30 2021-08-20 广东省第四建筑工程有限公司 Open-cut improved prefabricated horse riding well construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173274A (en) * 2019-05-31 2019-08-27 武汉市武昌市政建设(集团)有限公司 A kind of head is removed obstacles method
CN112195973A (en) * 2020-09-11 2021-01-08 北京市政路桥股份有限公司 Pipe jacking working well structure and construction method thereof
CN113279470A (en) * 2021-06-30 2021-08-20 广东省第四建筑工程有限公司 Open-cut improved prefabricated horse riding well construction method

Similar Documents

Publication Publication Date Title
CN103967031B (en) A kind of caisson of consolidated subsoil and stake combination foundation and construction method thereof
CN109026064B (en) Construction method for large-span multi-arch tunnel with semi-bright and semi-dark
CN102518135A (en) Foundation pit support construction method combining horizontal rotary jet-grouting soil bolting and bore concrete piles
CN104675403A (en) Underground space construction method and supporting structure
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN103046557A (en) Foundation pit water-sealing supporting method by using long spiral cement soil mixing structural steel pile
CN103147442A (en) Ultra-deep foundation pit press-grouting pile and prestressed anchor combined supporting construction method
CN106049505A (en) Construction method for deep foundation pit supporting and protecting system
CN209924998U (en) Shallow earthing shield tunnel is worn road reinforcement protection architecture down
CN110939303B (en) Semi-reverse construction method of cyclone pool
CN101353896A (en) Semi-reverse construction method for ultra-large-diameter and ultra-buried depth storage tank
CN101838957B (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN207211165U (en) A kind of compound antiskid piling wall retaining structure suitable for reservoir stability
CN110055973B (en) Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method
CN103758132B (en) The construction technology of the cantilever soldier pile retaining structure on slope is put in a kind of combination
CN201883453U (en) Combined pipe jacking working well
CN112012763A (en) Construction method of double-layer primary support multi-arch tunnel structure
CN109930610A (en) Constrained environment foundation pit adds the construction method of steel pipe mixing diagonal brace using concrete
CN210122735U (en) Underground structure anti-floating system based on outward-protruding wing foot plate
CN103510525A (en) Cascade support method of foundation trench of gravity type cement cob wall combined single-row piles
CN209687506U (en) Wear river shallow buried covered excavation electric power tunnel constructing structure
CN206245321U (en) Cut slope composite supporting construction
CN109306712A (en) Upper pipe working well is inverse to build construction
CN106088764B (en) A kind of stepped prefabricated assembled circular underground granary of encased steel plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110629

Termination date: 20171206