CN208349823U - A kind of smelting furnace - Google Patents

A kind of smelting furnace Download PDF

Info

Publication number
CN208349823U
CN208349823U CN201820812977.7U CN201820812977U CN208349823U CN 208349823 U CN208349823 U CN 208349823U CN 201820812977 U CN201820812977 U CN 201820812977U CN 208349823 U CN208349823 U CN 208349823U
Authority
CN
China
Prior art keywords
burner
heat accumulation
suction line
storage heater
furnace body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820812977.7U
Other languages
Chinese (zh)
Inventor
杨克迈
赵守明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tung Liang Aluminum Co Ltd
Original Assignee
Tung Liang Aluminum Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tung Liang Aluminum Co Ltd filed Critical Tung Liang Aluminum Co Ltd
Priority to CN201820812977.7U priority Critical patent/CN208349823U/en
Application granted granted Critical
Publication of CN208349823U publication Critical patent/CN208349823U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Abstract

The utility model discloses a kind of smelting furnaces, belong to liquid aluminium impurity removing technology field, including furnace body, for space needed for providing melting;First heat accumulation burner, is set on the side wall of the furnace body, is composed of the first storage heater that puff prot is directed toward the first burner of the furnace interior and is connected with first burner;Second heat accumulation burner is set on the side wall of the furnace body with what the first heat accumulation burner was separated by, is composed of the second storage heater that puff prot is directed toward the second burner of the furnace interior and is connected with second burner.Melting and purification of the smelting furnace for aluminium base in aluminum substrate production process, use at least two burners, cooperate corresponding storage heater to carry out burning jet and bleeding respectively, improve the rate of recovery of waste heat in furnace, reduce the hot driving of stove.

Description

A kind of smelting furnace
Technical field
The utility model relates to liquid aluminium impurity removing technology fields, in particular to a kind of smelting furnace.
Background technique
Aluminum substrate is a kind of metal-based copper-clad plate with good heat radiating function, and general single sided board is by three-decker institute group At being circuit layer (copper foil), insulating layer and metal-based layer respectively.For it is high-end use be also designed as dual platen, structure is Circuit layer, insulating layer, aluminium base, insulating layer, circuit layer.It is multi-layer board that only a few, which is applied, can be by common multi-layer board and insulation Layer, aluminium base are bonded.
LED aluminum base plate is exactly the meaning of PCB and printed wiring board, and only the material of wiring board is aluminium alloy, it is thermally conductive compared with Fastly.
It before preparing aluminum substrate, to clean to aluminium, one of importance of removal of impurities is exactly to melt to aluminium Refining, to purify the ingredient of melt, the mode that existing smelting furnace generallys use single fire mouth heats metal in furnace, heat benefit Low with rate, heat consumption is high, and stove energy consumption is big.
Utility model content
In view of the above technical problems, a kind of smelting furnace described in the utility model is for aluminium base in aluminum substrate production process Melting and purification, use at least two burners, cooperate corresponding storage heater to carry out burning jet and bleeding respectively, mention The rate of recovery of waste heat, reduces the hot driving of stove in high furnace.
To achieve the above object, a kind of smelting furnace designed by the utility model, including following part:
Furnace body is provided with bell on the furnace body for space needed for providing melting;
First heat accumulation burner, the first heat accumulation burner are set on the side wall of the furnace body, be directed toward as puff prot described in First burner of furnace interior and the first storage heater being connected with first burner are composed, wherein first burner Be connected respectively with suction line and gas exhaust piping by first storage heater, the suction line by air intake pipe road and The composition of combustion gas suction line parallel connection is all provided on the air intake pipe road, the combustion gas suction line and the gas exhaust piping It is equipped with solenoid valve;
What the second heat accumulation burner, the second heat accumulation burner and the first heat accumulation burner were separated by is set to the furnace body On side wall, the second storage heater group for being directed toward the second burner of the furnace interior by puff prot and be connected with second burner It closes, wherein second burner is connected with suction line and gas exhaust piping respectively by second storage heater, it is described Suction line is constituted by air intake pipe road and combustion gas suction line are in parallel, the air intake pipe road, combustion gas sucking Solenoid valve is provided on pipeline and the gas exhaust piping.
It as a preferred embodiment of the above technical solution, further include third heat accumulation burner, the third heat accumulation burner and described first What heat accumulation burner and the second heat accumulation burner were separated by is set on the side wall of the furnace body, is directed toward in the furnace body by puff prot The third burner in portion and the third storage heater being connected with the third burner are composed, wherein the third burner passes through institute It states third storage heater to be connected with suction line and gas exhaust piping respectively, the suction line is inhaled by air intake pipe road and combustion gas Enter the composition of pipeline parallel connection, is provided with electricity on the air intake pipe road, the combustion gas suction line and the gas exhaust piping Magnet valve.
As a preferred embodiment of the above technical solution, from the point of view of furnace body vertical view, the first heat accumulation burner, described the Two heat accumulation burners and the third heat accumulation burner are uniformly set on the side wall of the furnace body, i.e., the spacing phase between three Together.
As a preferred embodiment of the above technical solution, the first heat accumulation burner, the second heat accumulation burner and third storage The horizontal position of hot burner is consistent.
As a preferred embodiment of the above technical solution, the first heat accumulation burner, the second heat accumulation burner and third storage The air intake pipe road of hot burner is finally merged into pipeline at one, combustion gas suction line is also finally merged into pipeline at one.
As a preferred embodiment of the above technical solution, the first heat accumulation burner, the second heat accumulation burner and third storage The gas exhaust piping of hot burner is finally merged into pipeline at one.
As a preferred embodiment of the above technical solution, first storage heater, second storage heater and the third storage heater Main structure be the honeycomb regenerative structure for using sodium fluoride, lithium fluoride and lithium hydride as heat storage medium.
The utility model embodiment compared with prior art, have the following advantages that and the utility model has the advantages that
The utility model embodiment uses at least two burners, and corresponding storage heater is cooperated to carry out burning jet and row respectively Gas operation, improves the rate of recovery of waste heat in furnace, reduces the hot driving of stove.
Detailed description of the invention
Fig. 1 is smelting furnace overlooking structure diagram.
In figure: furnace body 1, bell 1.1, the first heat accumulation burner 2, the first burner 2.1, the first storage heater 2.2, the second heat accumulation are burnt Mouth 3, the second burner 3.1, the second storage heater 3.2, third heat accumulation burner 4, third burner 4.1, third storage heater 4.2.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments:
Embodiment 1: referring to Fig. 1, and a kind of smelting furnace is made of furnace body 1, the first heat accumulation burner 2 and the second heat accumulation burner 3, For the smelting furnace of existing single fire mouth, the present embodiment uses two burners, and corresponding storage heater is cooperated to be fired respectively Jet and bleeding are burnt, the rate of recovery of waste heat in furnace is improved, reduces the hot driving of stove;
It includes furnace body 1, for space needed for providing melting, is provided with bell 1.1 on the furnace body 1;
The first heat accumulation burner 2 being set on the side wall of the furnace body 1, be directed toward by puff prot inside the furnace body 1 One burner 2.1 and the first storage heater 2.2 being connected with first burner 2.1 are composed, wherein first burner 2.1 It is connected respectively with suction line and gas exhaust piping by first storage heater 2.2, the suction line is by air intake pipe The composition on road and combustion gas suction line parallel connection, on the air intake pipe road, the combustion gas suction line and the gas exhaust piping It is provided with solenoid valve;
The the second heat accumulation burner 3 on the side wall for being set to the furnace body 1 being separated by with the first heat accumulation burner 2, by spraying 3.2 groups of the second storage heater that port is directed toward the second burner 3.1 inside the furnace body 1 and is connected with second burner 3.1 It closes, wherein second burner 3.1 is connected with suction line and gas exhaust piping respectively by second storage heater 3.2 Logical, the suction line is constituted by air intake pipe road and combustion gas suction line are in parallel, the air intake pipe road, the combustion Solenoid valve is provided on gas suction line and the gas exhaust piping;
The main structure of first storage heater 2.2 and second storage heater 3.2 is to use lithium fluoride for heat storage medium Honeycomb regenerative structure.
In actual use, when the first 2.1 jet combustion of burner, the second burner 3.1 is in suction condition, the second storage heater 3.2 heats absorbed in tail gas carry out accumulation of heat, and then when the second 3.1 jet combustion of burner, the first burner 2.1 is in air-breathing shape State, the first storage heater 2.2 absorb the heat in tail gas and carry out accumulation of heat, and the second storage heater 3.2 is by air used in the second burner 3.1 It is preheated with combustion gas, in this way, the first heat accumulation burner 2 and the second heat accumulation burner 3 are used alternatingly.
Embodiment 2: refer to Fig. 1, a kind of smelting furnace, difference from example 1 is that: further include third heat accumulation burner 4, the third heat accumulation burner 4 and the first heat accumulation burner 2 and 3 homogeneous phase of the second heat accumulation burner every be set to it is described On the side wall of furnace body 1, third burner 4.1 inside the furnace body 1 is directed toward by puff prot and is connected with the third burner 4.1 Third storage heater 4.2 be composed, wherein the third burner 4.1 by the third storage heater 4.2 respectively with air intake duct Road is connected with gas exhaust piping, and the suction line is constituted by air intake pipe road and combustion gas suction line are in parallel, the sky It is provided with solenoid valve on gas suction line, the combustion gas suction line and the gas exhaust piping, the first heat accumulation burner 2, The second heat accumulation burner 3 is consistent with the horizontal position of the third heat accumulation burner 4;
The main structure of first storage heater 2.2, second storage heater 3.2 and the third storage heater 4.2 is to adopt With the honeycomb regenerative structure that sodium fluoride is heat storage medium.
In actual use, when the first 2.1 jet combustion of burner, the second burner 3.1 and third burner 4.1 are in air-breathing shape State, the second storage heater 3.2 and third storage heater 4.2 absorb the heat in tail gas and carry out accumulation of heat, and then 3.1 jet of the second burner is fired When burning, the first burner 2.1 and third burner 4.1 are in suction condition, and the first storage heater 2.2 and third storage heater 4.2 absorb tail Heat in gas carries out accumulation of heat, and the second storage heater 3.2 preheats air used in the second burner 3.1 and combustion gas, subsequently When third 4.1 jet combustion of burner, the first burner 2.1 and the second burner 3.1 are in suction condition, the first storage heater 2.2 and Two storage heaters 3.2 absorb the heat in tail gas and carry out accumulation of heat, and third storage heater 42 is by air used in third burner 4.1 and combustion gas It is preheated, in this way, the first heat accumulation burner 2, the second heat accumulation burner 3 and third heat accumulation burner 4 are used alternatingly.
Embodiment 3: refer to Fig. 1, a kind of smelting furnace, with embodiment 2 the difference is that: the first heat accumulation burner 2, The air intake pipe road of the second heat accumulation burner 3 and the third heat accumulation burner 4 is finally merged into pipeline at one, combustion gas sucking Pipeline is also finally merged into pipeline at one;The first heat accumulation burner 2, the second heat accumulation burner 3 and the third heat accumulation are burnt The gas exhaust piping of mouth 4 is finally merged into pipeline at one.
The main structure of first storage heater 2.2, second storage heater 3.2 and the third storage heater 4.2 is to adopt With the honeycomb regenerative structure that lithium hydride is heat storage medium.

Claims (7)

1. a kind of smelting furnace, which is characterized in that including following part:
Furnace body (1) is provided with bell (1.1) on the furnace body (1) for space needed for providing melting;
First heat accumulation burner (2), the first heat accumulation burner (2) are set on the side wall of the furnace body (1), are directed toward by puff prot The first storage heater (2.2) group furnace body (1) internal the first burner (2.1) and be connected with first burner (2.1) Close, wherein first burner (2.1) by first storage heater (2.2) respectively with suction line and gas exhaust piping phase Connection, the suction line are constituted by air intake pipe road and combustion gas suction line are in parallel, the air intake pipe road, described Solenoid valve is provided on combustion gas suction line and the gas exhaust piping;
What the second heat accumulation burner (3), the second heat accumulation burner (3) and the first heat accumulation burner (2) were separated by is set to described On the side wall of furnace body (1), by puff prot be directed toward internal the second burner (3.1) of the furnace body (1) and with second burner (3.1) the second storage heater (3.2) being connected is composed, wherein second burner (3.1) passes through second storage heater (3.2) it is connected respectively with suction line and gas exhaust piping, the suction line is by air intake pipe road and combustion gas suction line Composition in parallel is provided with solenoid valve on the air intake pipe road, the combustion gas suction line and the gas exhaust piping.
2. a kind of smelting furnace according to claim 1, it is characterised in that: further include third heat accumulation burner (4), the third Heat accumulation burner (4) is set to the furnace body (1) with what the first heat accumulation burner (2) and the second heat accumulation burner (3) were separated by Side wall on, be directed toward the internal third burner (4.1) of the furnace body (1) by puff prot and be connected with the third burner (4.1) Logical third storage heater (4.2) is composed, wherein the third burner (4.1) passes through the third storage heater (4.2) difference Be connected with suction line and gas exhaust piping, the suction line by air intake pipe road and combustion gas suction line parallel connection structure At being provided with solenoid valve on the air intake pipe road, the combustion gas suction line and the gas exhaust piping.
3. a kind of smelting furnace according to claim 2, it is characterised in that: described from the point of view of being overlooked from the furnace body (1) First heat accumulation burner (2), the second heat accumulation burner (3) and the third heat accumulation burner (4) are uniformly set to the furnace body (1) on side wall, i.e., the spacing between three is identical.
4. a kind of smelting furnace according to claim 2 or 3, it is characterised in that: the first heat accumulation burner (2), described The horizontal position of two heat accumulation burners (3) and the third heat accumulation burner (4) is consistent.
5. a kind of smelting furnace according to claim 2, it is characterised in that: the first heat accumulation burner (2), second storage The air intake pipe road of hot burner (3) and the third heat accumulation burner (4) is finally merged into pipeline at one, combustion gas suction line also Finally it is merged into pipeline at one.
6. a kind of smelting furnace according to claim 2, it is characterised in that: the first heat accumulation burner (2), second storage The gas exhaust piping of hot burner (3) and the third heat accumulation burner (4) is finally merged into pipeline at one.
7. a kind of smelting furnace according to claim 2, it is characterised in that: first storage heater (2.2), described second store The main structure of hot device (3.2) and the third storage heater (4.2) is to use sodium fluoride, lithium fluoride and lithium hydride for heat storage medium Honeycomb regenerative structure.
CN201820812977.7U 2018-05-29 2018-05-29 A kind of smelting furnace Active CN208349823U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820812977.7U CN208349823U (en) 2018-05-29 2018-05-29 A kind of smelting furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820812977.7U CN208349823U (en) 2018-05-29 2018-05-29 A kind of smelting furnace

Publications (1)

Publication Number Publication Date
CN208349823U true CN208349823U (en) 2019-01-08

Family

ID=64891148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820812977.7U Active CN208349823U (en) 2018-05-29 2018-05-29 A kind of smelting furnace

Country Status (1)

Country Link
CN (1) CN208349823U (en)

Similar Documents

Publication Publication Date Title
CN201032141Y (en) Yellow phosphorus tail gas combustion utilizing boiler
CN208349823U (en) A kind of smelting furnace
CN202182624U (en) Energy-saving aluminium melting conjuncted furnace
CN202297736U (en) Improved aluminum scrap furnace
CN201417083Y (en) Novel direct-fired melting furnace
CN106229427B (en) The power battery pack of compact
CN203917919U (en) A kind of energy-saving equipment for zinc powder preparation device
CN211011453U (en) Biomass fuel boiler waste heat recovery device
CN203595274U (en) Three-section heat exchange type air heating furnace
CN109675398A (en) A kind of emission-control equipment of carbon fiber production
CN207372467U (en) A kind of energy-saving gas soldering oven
CN215524154U (en) Energy-saving gas type crucible furnace
CN205919672U (en) Melting smelting furnace
CN110500608A (en) Power economized boiler low-temperature air preheater
CN206291738U (en) A kind of off-gas recovery processing unit
CN208349821U (en) A kind of casting smelting furnace
CN219674181U (en) Double-preheating type heat accumulating combustion furnace
CN213977410U (en) Multifunctional high silica glass fiber platinum-substituted crucible furnace
CN215832456U (en) Heat accumulating type smelting furnace
CN208200730U (en) The double-deck glass pottery smelting furnace
CN211651266U (en) Waste heat utilization system for producing electric ceramic shuttle kiln
CN210568551U (en) Low-temperature air preheater of energy-saving boiler
CN102654289A (en) Cooking and heating furnace with upper and lower gas ducts
CN216769423U (en) Three-box type gas heating system
CN211546633U (en) Annealing furnace device for processing tinned copper wire

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant