CN203917919U - A kind of energy-saving equipment for zinc powder preparation device - Google Patents

A kind of energy-saving equipment for zinc powder preparation device Download PDF

Info

Publication number
CN203917919U
CN203917919U CN201420190821.1U CN201420190821U CN203917919U CN 203917919 U CN203917919 U CN 203917919U CN 201420190821 U CN201420190821 U CN 201420190821U CN 203917919 U CN203917919 U CN 203917919U
Authority
CN
China
Prior art keywords
evaporation tank
delivery outlet
pond
pipeline
zinc powder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420190821.1U
Other languages
Chinese (zh)
Inventor
翟国华
严海锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Kecheng Nonferrous Metal New Material Co ltd
Shanghai Sheng Innovative Materials Co ltd
Original Assignee
JIANGSU KECHUANG METALLURGY NEW MATERIAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU KECHUANG METALLURGY NEW MATERIAL CO Ltd filed Critical JIANGSU KECHUANG METALLURGY NEW MATERIAL CO Ltd
Priority to CN201420190821.1U priority Critical patent/CN203917919U/en
Application granted granted Critical
Publication of CN203917919U publication Critical patent/CN203917919U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model discloses a kind of energy-saving equipment for zinc powder preparation device, it comprises heat-exchanging chamber (1), melt pond (2), combustion chamber (3), evaporation tank (4) and condenser (5), the gas outlet of combustion chamber (3) is connected with the input port of evaporation tank (4) by pipeline I (6), evaporation tank (4) is provided with delivery outlet I and delivery outlet II, the delivery outlet I of evaporation tank (4) is connected with the input port of melting pond (2) by pipeline II, the delivery outlet that melts pond (2) is connected with the input port of heat-exchanging chamber (1) by pipeline III (7), the delivery outlet of heat-exchanging chamber (1) is connected with chimney (8), the delivery outlet II of evaporation tank (4) is communicated with condenser (5) by pipeline IV (9).

Description

A kind of energy-saving equipment for zinc powder preparation device
Technical field
The utility model relates to a kind of energy-saving equipment for zinc powder preparation device.
Background technology
In current zinc powder preparation device in melting tank and evaporation tank owing to there is no oxidation, like this preparation process in zinc liquid be easily oxidized, so not only loss a large amount of zinc resources, and prepare zinc powder purity not high, mass ratio is poor, and has increased thermal losses.
Summary of the invention
The utility model provides a kind of energy-saving equipment for zinc powder preparation device, and it not only can anti-oxidation, reduces the loss of zinc resource, and can reduce thermal losses.
The utility model has adopted following technical scheme: a kind of energy-saving equipment for zinc powder preparation device, it comprises heat-exchanging chamber, melt pond, combustion chamber, evaporation tank and condenser, the gas outlet of combustion chamber is connected with the input port of evaporation tank by pipeline I, evaporation tank is provided with delivery outlet I and delivery outlet II, the delivery outlet I of evaporation tank is connected with the input port of melting pond by pipeline II, the delivery outlet that melts pond is connected with the input port of heat-exchanging chamber by pipeline III, the delivery outlet of heat-exchanging chamber is connected with chimney, the delivery outlet II of evaporation tank is communicated with condenser by pipeline IV.
Described evaporation tank input port place is provided with anterior point for measuring temperature, is provided with rear portion point for measuring temperature at evaporation tank delivery outlet, is provided with evaporation tank arc on the top of evaporation tank.In described condenser, be provided with condenser point for measuring temperature.Described pipeline II is set to two-way pipeline, and the delivery outlet I of described evaporation tank is communicated with the input port of melting pond by two-way pipeline.Described side, thawing pond is provided with charging aperture, in thawing pond, is provided with melting tank point for measuring temperature, is provided with and melts pond arc on the top of melting pond.In described heat-exchanging chamber, be provided with tail gas point for measuring temperature and air point for measuring temperature.
The utlity model has the following beneficial effect that has: adopted after above technical scheme, after transferring calorific value to, the utility model prize combustion gas enters evaporation tank, melting tank, to heat-exchanging chamber, can make waste gas and air realize exchange by heat-exchanging chamber, can make like this combustion chamber air themperature promote 50 DEG C, use chimney temperature and be down to 500 DEG C of temperature by 1000 DEG C, thereby lowered heat waste.In the utility model melting tank and evaporation tank, add arc, do not have to have oxidation above arc zinc liquid, ton zinc powder loss zinc resource is in 35kg left and right, thermal losses is large, arc can absorb heat and realize heat transfer, heat conduction to switch room, play isolated air simultaneously, prevent oxidation, zinc resource loss can be down to 10kg left and right.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
In Fig. 1, the utility model provides a kind of energy-saving equipment for zinc powder preparation device, it comprises heat-exchanging chamber 1, melt pond 2, combustion chamber 3, evaporation tank 4 and condenser 5, the gas outlet of combustion chamber 3 is connected with the input port of evaporation tank 4 by pipeline I 6, described evaporation tank 4 input port places are provided with anterior point for measuring temperature 10, be provided with rear portion point for measuring temperature 11 at evaporation tank 4 delivery outlets, be provided with evaporation tank arc 12 on the top of evaporation tank 4, evaporation tank 4 is provided with delivery outlet I and delivery outlet II, the delivery outlet I of evaporation tank 4 is connected with the input port of melting pond 2 by pipeline II, melt 2 sides, pond and be provided with charging aperture 15, in thawing pond 2, be provided with melting tank point for measuring temperature 16, be provided with and melt pond arc 17 on the top of melting pond 2, pipeline II 14 is set to two-way pipeline, the delivery outlet I of described evaporation tank 4 is communicated with the input port of melting pond 2 by two-way pipeline, the delivery outlet that melts pond 2 is connected with the input port of heat-exchanging chamber 1 by pipeline III 7, in heat-exchanging chamber 1, be provided with tail gas point for measuring temperature 18 and air point for measuring temperature 19, the delivery outlet of heat-exchanging chamber 1 is connected with chimney 8, the delivery outlet II of evaporation tank 4 is communicated with condenser 5 by pipeline IV 9, in condenser 5, be provided with condenser point for measuring temperature 13.

Claims (6)

1. the energy-saving equipment for zinc powder preparation device, it is characterized in that it comprises heat-exchanging chamber (1), melt pond (2), combustion chamber (3), evaporation tank (4) and condenser (5), the gas outlet of combustion chamber (3) is connected with the input port of evaporation tank (4) by pipeline I (6), evaporation tank (4) is provided with delivery outlet I and delivery outlet II, the delivery outlet I of evaporation tank (4) is connected with the input port of melting pond (2) by pipeline II, the delivery outlet that melts pond (2) is connected with the input port of heat-exchanging chamber (1) by pipeline III (7), the delivery outlet of heat-exchanging chamber (1) is connected with chimney (8), the delivery outlet II of evaporation tank (4) is communicated with condenser (5) by pipeline IV (9).
2. the energy-saving equipment for zinc powder preparation device according to claim 1, it is characterized in that described evaporation tank (4) input port place is provided with anterior point for measuring temperature (10), be provided with rear portion point for measuring temperature (11) at evaporation tank (4) delivery outlet, be provided with evaporation tank arc (12) on the top of evaporation tank (4).
3. the energy-saving equipment for zinc powder preparation device according to claim 1, is characterized in that being provided with condenser point for measuring temperature (13) in described condenser (5).
4. the energy-saving equipment for zinc powder preparation device according to claim 1, is characterized in that described pipeline II (14) is set to two-way pipeline, and the delivery outlet I of described evaporation tank (4) is communicated with the input port of melting pond (2) by two-way pipeline.
5. the energy-saving equipment for zinc powder preparation device according to claim 1, it is characterized in that described side, thawing pond (2) is provided with charging aperture (15), in thawing pond (2), be provided with melting tank point for measuring temperature (16), be provided with and melt pond arc (17) on the top of melting pond (2).
6. the energy-saving equipment for zinc powder preparation device according to claim 1, is characterized in that being provided with tail gas point for measuring temperature (18) and air point for measuring temperature (19) in described heat-exchanging chamber (1).
CN201420190821.1U 2014-04-21 2014-04-21 A kind of energy-saving equipment for zinc powder preparation device Expired - Lifetime CN203917919U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420190821.1U CN203917919U (en) 2014-04-21 2014-04-21 A kind of energy-saving equipment for zinc powder preparation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420190821.1U CN203917919U (en) 2014-04-21 2014-04-21 A kind of energy-saving equipment for zinc powder preparation device

Publications (1)

Publication Number Publication Date
CN203917919U true CN203917919U (en) 2014-11-05

Family

ID=51813800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420190821.1U Expired - Lifetime CN203917919U (en) 2014-04-21 2014-04-21 A kind of energy-saving equipment for zinc powder preparation device

Country Status (1)

Country Link
CN (1) CN203917919U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103990807A (en) * 2014-04-21 2014-08-20 江苏科创金属新材料有限公司 Energy-saving equipment for zinc powder preparation device
CN109550970A (en) * 2018-12-25 2019-04-02 江苏科创金属新材料有限公司 A kind of preparation facilities of the dedicated zinc powder of water paint

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103990807A (en) * 2014-04-21 2014-08-20 江苏科创金属新材料有限公司 Energy-saving equipment for zinc powder preparation device
CN103990807B (en) * 2014-04-21 2017-04-12 江苏科创金属新材料有限公司 Energy-saving equipment for zinc powder preparation device
CN109550970A (en) * 2018-12-25 2019-04-02 江苏科创金属新材料有限公司 A kind of preparation facilities of the dedicated zinc powder of water paint

Similar Documents

Publication Publication Date Title
CN203917919U (en) A kind of energy-saving equipment for zinc powder preparation device
CN203454817U (en) Waste heat recycling mechanism of aluminum melting furnace
CN202013095U (en) Smoke gas residual heat recovery melting furnace
CN103990807A (en) Energy-saving equipment for zinc powder preparation device
CN202555828U (en) Zinc powder melting evaporating device
CN203432297U (en) Push plate type microwave high-temperature multipurpose furnace
CN203572241U (en) Cooling water circulation system for heating furnace
CN202955975U (en) Curing furnace
CN205170794U (en) Yellow meal worm extraction of essential oil device convenient to reload
CN204026998U (en) A kind of living beings regenerative hot blast stove
CN202961923U (en) Stock solution flash evaporation apparatus suitable for III-effective alkali concentration evaporator
CN202442583U (en) Manganese zinc ferrite sintering furnace
CN202041081U (en) Separate air channel structure for dry cement kiln
CN204648988U (en) Single excellent heating furnace hot-gas recoverer
CN202881163U (en) Hot-air apparatus in air-conveying system for producing carbon black
CN204380650U (en) A kind of water reducer sulfonation production device
CN204778837U (en) A heat energy circulation response device for preparing phosphoric pentoxide
CN202562253U (en) Surface heating type zinc ingot melting tank
CN203908369U (en) Immersion type heat exchanger
CN202765597U (en) Electrolyte storage tank
CN202836294U (en) Fresh air heat exchanging device
CN203424773U (en) Energy-saving pan
CN203595130U (en) Regenerative burner for heating furnace
CN201933102U (en) Energy-saving high-efficiency reduction sponge iron tunnel kiln
CN201748635U (en) Hot air furnace with auxiliary hot air draught device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 200085 room 7023, building 5, no.741 Yaozhou Road, Xincun Township, Chongming District, Shanghai

Patentee after: Shanghai Sheng innovative materials Co.,Ltd.

Address before: 225300, room 1, 303 drug Avenue, Taizhou Economic Development Zone, Taizhou, Jiangsu

Patentee before: JIANGSU KECHUANG METAL NEW MATERIAL Co.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20210608

Address after: 200085 room 7023, building 5, no.741 Yaozhou Road, Xincun Township, Chongming District, Shanghai

Patentee after: Shanghai Sheng innovative materials Co.,Ltd.

Patentee after: Jiangsu Kecheng nonferrous metal new material Co.,Ltd.

Address before: 200085 room 7023, building 5, no.741 Yaozhou Road, Xincun Township, Chongming District, Shanghai

Patentee before: Shanghai Sheng innovative materials Co.,Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20141105