CN208309597U - A kind of reinforcement fabrication platform - Google Patents
A kind of reinforcement fabrication platform Download PDFInfo
- Publication number
- CN208309597U CN208309597U CN201820879132.XU CN201820879132U CN208309597U CN 208309597 U CN208309597 U CN 208309597U CN 201820879132 U CN201820879132 U CN 201820879132U CN 208309597 U CN208309597 U CN 208309597U
- Authority
- CN
- China
- Prior art keywords
- platform
- storage area
- welding machine
- reinforcing bar
- reinforcement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000002787 reinforcement Effects 0.000 title claims abstract description 51
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 20
- 238000003860 storage Methods 0.000 claims abstract description 53
- 238000003466 welding Methods 0.000 claims abstract description 37
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 30
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 27
- 239000010959 steel Substances 0.000 claims abstract description 27
- 210000003205 muscle Anatomy 0.000 claims abstract description 14
- 238000007789 sealing Methods 0.000 claims abstract description 11
- 238000010276 construction Methods 0.000 claims abstract description 8
- 238000009826 distribution Methods 0.000 claims abstract description 7
- 240000007594 Oryza sativa Species 0.000 claims description 2
- 235000007164 Oryza sativa Nutrition 0.000 claims description 2
- 235000009566 rice Nutrition 0.000 claims description 2
- 238000012545 processing Methods 0.000 abstract description 5
- 239000011265 semifinished product Substances 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 238000013461 design Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 241000251468 Actinopterygii Species 0.000 description 1
- 238000005299 abrasion Methods 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000013316 zoning Methods 0.000 description 1
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
The utility model provides a kind of reinforcement fabrication platform, including pricking platform, welding machine canopy, reinforcing bar storage area and platform base in advance, the pre- bundle platform, welding machine canopy and reinforcing bar storage area are both secured on platform base, two welding machine canopies are respectively arranged at the pre- opposite end for pricking platform, reinforcing bar storage area is set to the pre- side for pricking platform, and reinforcing bar storage area includes main reinforcement storage area, horizontal reinforcement and sound detecting pipe laydown area, girder rib storage area and sealing muscle storage area.To improve diaphram wall steel reinforcement cage processing quality, optimize the resource distribution of diaphram wall fabrication of reinforcing cage.Belong to urban track traffic (inter-city passenger rail) open-cut station foundation pit enclosure construction of diaphragm wall field.
Description
Technical field
The utility model relates to a kind of reinforcement fabrication platforms, belong to urban track traffic (inter-city passenger rail) open-cut station foundation pit
Go along with sb. to guard him construction of diaphragm wall field.
Background technique
Currently, the Yangtze River Delta, Pearl River Delta area open-cut station foundation pit enclosure structure form be mostly based on diaphram wall, " big "
Tonnage diaphram wall fabrication of reinforcing cage is inconvenient, rigidity is poor and integral hoisting it is difficult be always puzzlement construction it is crucial because
Element.The application utility model people is to rely on Pearl River Delta inter-city rail transit wide Buddhist loop wire GFHD-1 mark scientific center station, is carried out
Diaphram wall fabrication of reinforcing cage and integral hoisting Study on Problems propose a kind of reinforcement fabrication platform by research.
Summary of the invention
The purpose of this utility model is that: a kind of reinforcement fabrication platform is provided, to improve the processing of diaphram wall steel reinforcement cage
Quality optimizes the resource distribution of diaphram wall fabrication of reinforcing cage.
To solve the above problems, such a reinforcement fabrication platform of proposed adoption, including prick platform, welding machine canopy, reinforcing bar in advance and deposit
Area and platform base are put, the pre- bundle platform, welding machine canopy and reinforcing bar storage area are both secured on platform base, two welding machine canopies point
It is not set to the pre- opposite end for pricking platform, reinforcing bar storage area is set to the pre- side for pricking platform, and reinforcing bar storage area includes
Main reinforcement storage area, horizontal reinforcement and sound detecting pipe laydown area, girder rib storage area and sealing muscle storage area.
In aforementioned reinforcement fabrication platform, the wide 7m of the pre- bundle platform is 40 meters long, and pre- platform of pricking is by 7 meters long of I20a I-shaped
Steel is longitudinally arranged along platform, and longitudinal pitch is rice, and every I-steel is fixed on platform base by expansion bolt, pre- in installation
Each I-steel is adjusted when pricking platform, it is ensured that whole I-steel are on same absolute altitude;
In aforementioned reinforcement fabrication platform, described two welding machine canopies are respectively arranged at the pre- platform for pricking land lengths direction both ends
On the basis of, welding machine canopy is wide 3 meters, long 6 meters of container-type welding machine canopy, and the side of welding machine canopy is unenclosed construction, in welding machine canopy
Distribution is provided with A.C. welder along its length, the front of A.C. welder is provided with cabling hook, and cabling hook is walked
Flexible insulated hose is arranged at line, the cabling hook is hung on the roof of welding machine canopy by chain sling;
In aforementioned reinforcement fabrication platform, main ribs storage area, horizontal reinforcement and sound detecting pipe laydown area, girder rib storage area
It is made with the pile platform of sealing muscle storage area of I14a I-steel bracket, and reinforcing bar storage area is backwards to the pre- side for pricking platform
It is provided with reinforcing bar enclosing.
Compared with prior art, each function zoning of platform described in the utility model is clear, and especially semi-finished product are stored
Area;Unified processing storage frame for semi-finished is guaranteeing the unification of the facilities and equipments such as welding machine canopy, power distribution cabinet, illumination, the feelings of standardized administration
Under condition, reach the unification of reinforcing bar semi-finished product storage, to adapt to the civilized construction high standard requirement of modern construction building site;The platform
Planning is unified reasonable, can greatly improve processing efficiency, guarantees to can solve flat the rapid processing of diaphram wall reinforcing bar
Straight type, L-type (90~180 °) fabrication of reinforcing cage, it is with strong applicability.
Detailed description of the invention
Fig. 1 is the overlooking structure diagram of the utility model;
Fig. 2 is that the main reinforcement of main reinforcement storage area stacks the structural schematic diagram of bracket;
Fig. 3 is the structural schematic diagram that horizontal reinforcement and sound detecting pipe stack bracket;
Fig. 4 is the structural schematic diagram of girder rib storage tray;
Fig. 5 is the structural schematic diagram for sealing muscle storage tray..
Specific embodiment
It is practical new to this below in conjunction with attached drawing to keep the purpose of this utility model, technical solution and advantage clearer
Type is described in further detail, it should be understood that specific embodiment described herein is only to explain the utility model, not
For limiting the utility model.
Embodiment
The present embodiment is by taking the wide mark scientific center station Buddhist loop wire GFHD-1 of Pearl River Delta inter-city rail transit and the station great Shi as an example, newly
It builds wide mark two work areas, the one branch's scientific center station Buddhist loop wire GFHD-1 of Pearl River Delta inter-city rail transit and open cut wiring section is located at
Panyu District of Guangzhou City university city science popularization road, construction location are in the square area of Guangdong Scientific Centre.
The station great Shi and scientific center station building enclosure are all made of 1200mm thickness diaphram wall, two station diaphragm wall standard width
Wide is 6 meters, and wherein scientific center station NB73 and WB73 breadth is 6.3 meters, the long up to NB70 of scientific center station steel reinforcement cage cage
~73, a length of 40.594 meters of cage;Great Shi diaphragm wall breadth most width of standing is 6 meters, long up to NQ1~7 of cage, SQ1~7, WQ1~6,
NQ45~51, SQ45~51, EQ1~6, a length of 41.665 meters of cage;In conjunction with the station great Shi and the mobilization of scientific center station, meter
It draws and 8 and 4 areas steel reinforcement cage Yu Zha is respectively set at scientific center station and the station great Shi, according to two station diaphram wall steel reinforcement cages
Survey design and welding need, and each pre- region of pricking includes that steel reinforcement cage pricks one, platform in advance, semi-finished product laydown area one and welding machine
Two, canopy.
Pre- rolling stand selects opposed flattened, spacious place, which includes pre- bundle platform 1, welding machine canopy 2, reinforcing bar
Storage area 3 and platform base 4, the pre- bundle platform 1, welding machine canopy 2 and reinforcing bar storage area 3 are both secured on platform base 4, and two
Welding machine canopy 2 is respectively arranged at the pre- opposite end for pricking platform 1, and reinforcing bar storage area 3 is set to the pre- side for pricking platform 1, and reinforcing bar
Storage area 3 includes main reinforcement storage area 31, horizontal reinforcement and sound detecting pipe laydown area 32, girder rib storage area 33 and sealing muscle storage
Area 34 is respectively arranged with main reinforcement storage tray, horizontal reinforcement and sound detecting pipe stacking bracket, girder rib storage tray and sealing muscle and deposits
Put bracket.
According to the station great Shi and scientific center station diaphram wall steel reinforcement cage design conditions, scientific center station steel reinforcement cage is pricked flat in advance
Platform is pricked platform in advance and is designed by 7*42 meters by 7*40 meters of designs, the station great Shi steel reinforcement cage, the pre- I20a I-steel pricked platform and use 7 meters long
It is longitudinally arranged along platform, longitudinal pitch is 2 meters, and every I-steel is fixed on platform base using expansion bolt, pre- in installation
Each I-steel is adjusted when pricking platform, it is ensured that whole I-steel are on same absolute altitude.
According to diaphram wall fabrication of reinforcing cage needs, welding machine canopy 2 is set pricking in advance, each steel reinforcement cage is pricked in advance by platform 1
Two 3*6 meters of container-type welding machine canopies are arranged in area, and 3 meters of 2 both ends of welding machine canopy direction opens up transom window, and transom window size is not less than 1.2*
1.2 meters, welding machine canopy 2 is placed in pre- 1 both ends of bundle platform, pricks 1 alignment of platform with pre-;Consider security needs and single welding machine canopy 2
Size limitation, each 25 A.C. welders of interior configuration of welding machine canopy, six three step switch casees (one is illuminated switch box) and two
A second level distribution box, welding machine are longitudinally put along container, and each electric welding machine puts spacing not less than 500mm, after each electric welding machine
An independent switch case is arranged in metope, one hook of setting before welding machine, uses hose to carry out at hook cabling jacketed, prevents electrode holder
Line abrasion electric leakage;
Diaphragm wall reinforcing bar is broadly divided into vertical main reinforcement, horizontal bar, girder rib, shear bar and fish tail sealing muscle, in conjunction with all kinds of
The appearance character and size of reinforcing bar, which stack semi-finished product, divides into five regions, two 3*12 meters vertical main reinforcement storage areas 31,
32,3*3 meters of girder rib laydown areas 33 of one 3*6 meters of horizontal reinforcement and sound detecting pipe laydown area and a 3*3 meters of sealing muscle heaps
Area 34 is put, each semi-finished product laydown area domain distribution situation is detailed in Fig. 1-5, and each semi-finished product laydown area is all made of I14a I-steel bracket work
For pile platform, following I-steel bracket is made according to single width diaphragm wall amount of reinforcement and apparent size.
The main reinforcement of main reinforcement storage area 31 stacks bracket by the main reinforcement storage crossbeam 311 being laterally arranged and vertically arranged main reinforcement
It stores column 312 to form, main reinforcement storage column 312 is contour structure, and the bottom of main reinforcement storage column 312 is fixedly welded on master
Muscle is stored on crossbeam 311, and main reinforcement storage column 312 is distributed setting along the equal spacing in length direction of main reinforcement storage crossbeam 311, such as
Shown in Fig. 2;
The stacking bracket of horizontal reinforcement and sound detecting pipe laydown area 32 stores crossbeam 321 by horizontal bar and horizontal bar stores column
322 compositions, the bottom of horizontal bar storage column 322 is fixedly welded on horizontal bar storage crossbeam 321, and horizontal bar stores column
322 are distributed setting along the length direction of horizontal bar storage crossbeam 321, and fixed on each horizontal bar storage crossbeam 321 there are four water
Flat muscle stores column 322, and two high two is short, the short high 600mm of column, the high high 1310mm of column, and structure is as shown in Figure 3;
The stacking bracket of girder rib laydown area 33 is shown in Fig. 4, rectangular bottom support bracket is made of I-steel, in bottom support
The fixed four columns of the four corners of frame;
The stacking bracket of sealing muscle laydown area 34 is shown in Fig. 5, and table type bracket is made by I-steel, by perpendicular on table type bracket
It is made to support rod and fixes two horizontal supports, two horizontal supports are parallel to each other.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model
Protection scope within.
Claims (4)
1. a kind of reinforcement fabrication platform, it is characterised in that: including pricking platform (1), welding machine canopy (2), reinforcing bar storage area (3) peace in advance
Stylobate plinth (4), the pre- bundle platform (1), welding machine canopy (2) and reinforcing bar storage area (3) are both secured on platform base (4), and two
Welding machine canopy (2) is respectively arranged at the pre- opposite end for pricking platform (1), and reinforcing bar storage area (3) is set to the one of pre- bundle platform (1)
Side, and reinforcing bar storage area (3) includes main reinforcement storage area (31), horizontal reinforcement and sound detecting pipe laydown area (32), girder rib storage
Area (33) and sealing muscle storage area (34).
2. a kind of reinforcement fabrication platform according to claim 1, it is characterised in that: pre- bundle platform (1) the width 7m, long 40
Rice is pricked platform (1) in advance and is longitudinally arranged by 7 meters long of I20a I-steel along platform, and longitudinal pitch is 2 meters, and every I-steel passes through
Expansion bolt is fixed on platform base (4).
3. a kind of reinforcement fabrication platform according to claim 1, it is characterised in that: described two welding machine canopies (2) are respectively set
In on the platform base (4) for pricking platform (1) length direction both ends in advance, welding machine canopy (2) is the container-type welding machine of wide 3 meters, 6 meters of length
Canopy, the side of welding machine canopy (2) are unenclosed construction, and distribution along its length is provided with A.C. welder in welding machine canopy (2), exchanges
The front of electric welding machine is provided with cabling hook, and is arranged with flexible insulated hose at the cabling of cabling hook.
4. a kind of reinforcement fabrication platform according to claim 1, it is characterised in that: main ribs storage area (31), horizontal steel
The pile platform of muscle and sound detecting pipe laydown area (32), girder rib storage area (33) and sealing muscle storage area (34) is by I14a I-shaped
Steel bracket is made, and reinforcing bar storage area (3) is provided with reinforcing bar enclosing (5) backwards to the pre- side for pricking platform (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820879132.XU CN208309597U (en) | 2018-06-07 | 2018-06-07 | A kind of reinforcement fabrication platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820879132.XU CN208309597U (en) | 2018-06-07 | 2018-06-07 | A kind of reinforcement fabrication platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208309597U true CN208309597U (en) | 2019-01-01 |
Family
ID=64709092
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820879132.XU Expired - Fee Related CN208309597U (en) | 2018-06-07 | 2018-06-07 | A kind of reinforcement fabrication platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208309597U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111502355A (en) * | 2020-04-20 | 2020-08-07 | 江苏安赫智能装备科技有限公司 | Support and hanger green construction integrated system |
-
2018
- 2018-06-07 CN CN201820879132.XU patent/CN208309597U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111502355A (en) * | 2020-04-20 | 2020-08-07 | 江苏安赫智能装备科技有限公司 | Support and hanger green construction integrated system |
CN111502355B (en) * | 2020-04-20 | 2021-07-27 | 江苏安赫智能装备科技有限公司 | Support and hanger green construction integrated system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208309597U (en) | A kind of reinforcement fabrication platform | |
CN208009888U (en) | A kind of high slidably building template of stability | |
CN209082498U (en) | Locator under a kind of pile foundation construction casing | |
CN207775728U (en) | A kind of bridge construction survey platform that can be recycled | |
CN207063484U (en) | Movable operating platform for corridor construction | |
CN201762664U (en) | Bracket for mounting guardrail templates in bridge building | |
CN210167779U (en) | Novel self-supporting cable support and support system | |
CN115070935A (en) | Prefabricated bridge approach box girder reinforcement binding positioner of high pile pier | |
CN209873537U (en) | Temporary bridge structure for working of trash rack | |
CN207633773U (en) | A kind of glomeration building prefabricated construction reinforcing bar guiding tube dismounting system | |
CN206330577U (en) | A kind of mobile integrated concrete measuring table | |
CN206570703U (en) | A kind of working job platform of pier stud reinforcing bar | |
CN206034630U (en) | Integrated transformer substation of 110kV steel construction prepackage type | |
CN217974064U (en) | Beam storage platform and construction system for steel box girder construction | |
CN206693600U (en) | Movable platform steel construction hanging basket | |
CN219808733U (en) | Passageway structure between construction elevator and floor | |
CN212897484U (en) | High-altitude operation platform for constructional engineering | |
CN205716244U (en) | A kind of ship launching is with rolling dolly | |
CN207089601U (en) | A kind of clip and the photovoltaic platform waterborne fixed with clip | |
CN211545703U (en) | Steel construction pole type component transportation installation device | |
CN206360073U (en) | A kind of three vertical rod shape steel brackets for concrete structure construction of encorbelmenting | |
CN219508580U (en) | Novel pile foundation pore-forming fills jacket | |
CN214249918U (en) | Cold station structure and integrated cold station | |
CN208120533U (en) | A kind of moveable super large precast slab hanging device | |
CN217950380U (en) | Movable type concrete defect treatment trolley suitable for middle and small section inclined shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190101 |