CN208203348U CN201820310643.XU CN201820310643U CN208203348U CN 208203348 U CN208203348 U CN 208203348U CN 201820310643 U CN201820310643 U CN 201820310643U CN 208203348 U CN208203348 U CN 208203348U
Authority
CN
China
Prior art keywords
shield tunnel
pumping plant
drainage pumping
collecting
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820310643.XU
Other languages
Chinese (zh)
Inventor
崔家琪
时钟鸣
罗仕恒
张远东
陈耀升
王世君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Design and Research Institute Co Ltd
Original Assignee
Guangzhou Metro Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Metro Design and Research Institute Co Ltd filed Critical Guangzhou Metro Design and Research Institute Co Ltd
Priority to CN201820310643.XU priority Critical patent/CN208203348U/en
Application granted granted Critical
Publication of CN208203348U publication Critical patent/CN208203348U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of drainage pumping plant of shield tunnel, the drainage pumping plant is set to inside shield tunnel, and including the collecting-tank being set to inside underground railway track railway roadbed, the collecting-tank is located at immediately below sleeper;It is set to the pump hole for bottom of pond portion of catchmenting;The water pump being placed in inside pump hole;Several setting pots, water flow are discharged into collecting-tank by the setting pot, and the water pump extracts ponding inside plash out shield tunnel.By the way that drainage pumping plant is set up directly on inside shield tunnel, completion time of project and the construction cost of additional construction drainage pumping plant can be greatly reduced, many conveniences are brought for subway work, and drainage pumping plant design structure disclosed by the utility model is simple, eliminates the location problem of service channel in conventional discharge pumping plant.

Description

A kind of drainage pumping plant of shield tunnel
Technical field
The utility model relates to Subway Facilities field more particularly to a kind of drainage pumping plants of shield tunnel.
Background technique
Subway tunnel often restores the infiltration in moisture in construction and in the future metro operation, in Shield-bored tunnels Possible rain penetrates into when entering, such as raining, and underground water may also enter inside shield tunnel.Inside entrance shield tunnel Ponding, traditionally, for discharge shield tunnel inside ponding, for two tunnels of subway line, usually by two shield tunnels Road water is focused on, and builds the plash of a centralized collection water again in two shield tunnel middle positions, this to set What meter can be convenient is collected together water and water pump is utilized to be discharged, but builds plash again among two shield tunnels, On the one hand it needs to spend a large amount of human and material resources, causes the substantial increase of subway construction cost, catchment due to additionally building Pond causes the elongation of subway construction duration, may be difficult construction task of finishing on schedule;On the other hand, currently, drainage pumping plant The setting construction of section service channel is often combined, pumping plant lower part is collecting-tank, and top is service channel, and pumping plant is necessarily placed at The minimum point of shield tunnel interval circuit actual grade, this just greatly limits the addressing of service channel, service channel is caused to set Seated position can not be configured in conjunction with its practical use.
Utility model content
In order to overcome the above technical defects, the utility model provides a kind of drainage pumping plant of shield tunnel, the draining pump Station structure is simple, without individually building the pumping equipment of shield tunnel, in the expense of reduction and while the time, can effectively by The discharge of tunnel internal ponding.
To solve the above-mentioned problems, the utility model is achieved by following technical scheme:
A kind of drainage pumping plant of shield tunnel, the drainage pumping plant is set to inside shield tunnel, including is set to subway Collecting-tank inside ballast bed of track, the collecting-tank are located at immediately below sleeper;It is set to the pump hole for bottom of pond portion of catchmenting;It is placed in pump Water pump inside hole;Several setting pots, water flow are discharged into collecting-tank by the setting pot, and the water pump is by ponding inside plash Extract shield tunnel out.
Further, several sinks are provided on the railway roadbed, the setting pot is between the sink.
Further, it is provided with cover board at the top of the collecting-tank, the cover board is located at sleeper or less.
Further, the shield tunnel is internally provided with the tube seat for placing drainage pipeline.
Further, the shield bottom is assemblied with several steel pipe sheets.
Further, the polyurethane water-stop glue of water-swellable is coated between the railway roadbed and steel pipe sheet.
Further, the sulphoaluminate micro-expansive cement for not mixing aggregate is filled inside the steel pipe sheet.
Further, the grid for intercepting impurity is provided between the setting pot and sink.
Further, the collecting-tank inner wall and bottom are coated with the polymerization of penetration crystallization type water proofing paint and cement mortar Object.
Compared with prior art, the utility model has the beneficial effects that
The utility model discloses a kind of drainage pumping plants of shield tunnel, by the way that drainage pumping plant is set up directly on shield tunnel Inside road, completion time of project and the construction cost of additional construction drainage pumping plant can be greatly reduced, brought very for subway work More conveniences, and drainage pumping plant design structure disclosed by the utility model is simple, eliminates service channel in conventional discharge pumping plant Location problem.
Detailed description of the invention
Specific embodiment of the present utility model is described in further detail with reference to the accompanying drawing, in which:
Fig. 1 is a kind of structural schematic diagram of the drainage pumping plant of shield tunnel provided by the utility model;
Fig. 2 is the schematic diagram of the section structure of the drainage pumping plant of shield tunnel provided by the utility model.
In figure:
1- collecting-tank;2- pump hole;3- shield tunnel;4- setting pot;41- sink;
5- underground railway track;6- tube seat;7- water pump;8- cover board;9- railway roadbed;10- steel pipe sheet.
Specific embodiment
It is illustrated below in conjunction with preferred embodiment of the attached drawing to the utility model, it should be understood that described herein excellent It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
As shown in FIG. 1 to FIG. 2, the utility model discloses a kind of 7 stations of draining pump of shield tunnel 3, can from Fig. 1 and Fig. 2 To find out, 7 station of draining pump is set to inside shield tunnel 3, including the collecting-tank 1 being set to inside 5 railway roadbed 9 of underground railway track, collection Pond 1 is located at immediately below sleeper;It is set to the pump hole 2 of 1 bottom of collecting-tank;The water pump 7 being placed in inside pump hole 2;Several sand settings Pond 4, water flow are discharged into collecting-tank 1 by setting pot 4, and water pump 7 extracts ponding inside plash out shield tunnel 3.By that will drain It pumps 7 stations to be set up directly on inside shield tunnel 3, while reducing time and the expense of subway work, realizes simple structure Design of Pump Station.
Preferably, several sinks 41 are provided on railway roadbed 9, setting pot 4 is between sink 41.For convenient for by shield tunnel Ponding inside road 3 introduces inside catch basin 41, by multiple sinks 41 on the railway roadbed 9 of subway tunnel, first by ponding Setting pot 4 is introduced, by precipitating in setting pot 4, collecting-tank 1 can be flowed into after simple impurity treatment.Preferably, sand setting It is provided with the grid for intercepting impurity between pond 4 and sink 41, ensure that volume can not greater than the impurity of grid net meshe Into inside collecting-tank 1.Preferably, to prevent other sundries inside shield tunnel 3 from entering collecting-tank 1, water pump 7 is interfered to exist The interference of impurity is generated when extracting ponding, it is preferable that cover board 8 is provided at the top of collecting-tank 1, cover board 8 is located at sleeper hereinafter, cover board 8 are mounted on stull, wherein at interval of stull at two sleepers setting one in 1 range of collecting-tank, it is adjacent that stull is located at two Sleeper middle, stull upper surface are slightly below 9 face of railway roadbed, meet the evacuation of 9 face of railway roadbed while facilitating installation cover board 8 again and want It asks.
To guarantee the Clearance requirement under track, it is preferable that shield tunnel 3 is internally provided with the pipe for placing drainage pipeline Slot 6, by draining be using drainpipe be built among tube seat 6, and then ponding is discharged, wherein can also pacify inside tube seat 6 Put subway partial cables.
Preferably, 3 bottom of shield tunnel is assemblied with several steel pipe sheets 10, wherein steel pipe sheet 10 is made by special material, steel Section of jurisdiction 10 is partially recessed to meet the minimum water suction liquid level of water pump 7, and recessed planar dimension meets 7 installation requirement of water pump.Further, steel The sulphoaluminate micro-expansive cement for not mixing aggregate is filled inside section of jurisdiction 10, further improves the firmness degree of steel pipe sheet 10.For Prevent 3 inside ponding of shield tunnel from having an impact to railway roadbed 9, it is preferred that be coated with water-swellable between railway roadbed 9 and steel pipe sheet 10 Polyurethane water-stop glue cause railway roadbed 9 after operation to generate disease to avoid under 3 inside ponding inlet channel bed 9 of shield tunnel. To prevent the ponding inside collecting-tank 1 from penetrating into inside subgrade of metro 9, it is preferable that 1 inner wall of collecting-tank and bottom are coated with infiltration The polymer of saturating crystalline waterproof coating and cement mortar.
A kind of other structures of the drainage pumping plant of shield tunnel described in the present embodiment are no longer superfluous herein referring to the prior art It states.
The above descriptions are merely preferred embodiments of the present invention, not makees in any form to the utility model Limitation, therefore it is all without departing from the content of the technical scheme of the utility model, implement according to the technical essence of the utility model to above Any modification, equivalent variations and modification, are still within the scope of the technical solutions of the present invention made by example.

Claims (9)

1. a kind of drainage pumping plant of shield tunnel, which is characterized in that the drainage pumping plant is set to inside shield tunnel, including is set The collecting-tank being placed in inside underground railway track railway roadbed, the collecting-tank are located at immediately below sleeper;It is set to the pump hole for bottom of pond portion of catchmenting; The water pump being placed in inside pump hole;Several setting pots, water flow are discharged into collecting-tank by the setting pot, and the water pump is by plash Internal ponding extracts shield tunnel out.
2. the drainage pumping plant of shield tunnel according to claim 1, which is characterized in that be provided with several on the railway roadbed Sink, the setting pot is between the sink.
3. the drainage pumping plant of shield tunnel according to claim 1, which is characterized in that be provided with lid at the top of the collecting-tank Plate, the cover board are located at sleeper or less.
4. the drainage pumping plant of shield tunnel according to claim 1, which is characterized in that the shield tunnel is internally provided with For placing the tube seat of drainage pipeline.
5. the drainage pumping plant of shield tunnel according to claim 1, which is characterized in that the shield bottom is assemblied with several Steel pipe sheet.
6. the drainage pumping plant of shield tunnel according to claim 1 or 5, which is characterized in that the railway roadbed and steel pipe sheet it Between be coated with the polyurethane water-stop glue of water-swellable.
7. the drainage pumping plant of shield tunnel according to claim 5, which is characterized in that filling is not mixed inside the steel pipe sheet The sulphoaluminate micro-expansive cement of aggregate.
8. the drainage pumping plant of shield tunnel according to claim 2, which is characterized in that set between the setting pot and sink It is equipped with the grid for intercepting impurity.
9. the drainage pumping plant of shield tunnel according to claim 1, which is characterized in that the collecting-tank inner wall and bottom apply It is wiped with the polymer of penetration crystallization type water proofing paint and cement mortar.
CN201820310643.XU 2018-03-07 2018-03-07 A kind of drainage pumping plant of shield tunnel Active CN208203348U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820310643.XU CN208203348U (en) 2018-03-07 2018-03-07 A kind of drainage pumping plant of shield tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820310643.XU CN208203348U (en) 2018-03-07 2018-03-07 A kind of drainage pumping plant of shield tunnel

Publications (1)

Publication Number Publication Date
CN208203348U true CN208203348U (en) 2018-12-07

Family

ID=64535465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820310643.XU Active CN208203348U (en) 2018-03-07 2018-03-07 A kind of drainage pumping plant of shield tunnel

Country Status (1)

Country Link
CN (1) CN208203348U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287309A (en) * 2020-03-06 2020-06-16 佛山轨道交通设计研究院有限公司 Subway interval separation type wastewater pump house structure and construction method thereof
CN111719344A (en) * 2020-06-30 2020-09-29 南阳理工学院 Ballast bed water-proof and drainage structure
CN114319432A (en) * 2021-12-21 2022-04-12 济南金曰公路工程有限公司 Semi-underground subway station construction process and semi-underground subway station
CN115075875A (en) * 2022-07-21 2022-09-20 广州地铁设计研究院股份有限公司 Interval drainage pump station of track traffic

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287309A (en) * 2020-03-06 2020-06-16 佛山轨道交通设计研究院有限公司 Subway interval separation type wastewater pump house structure and construction method thereof
CN111719344A (en) * 2020-06-30 2020-09-29 南阳理工学院 Ballast bed water-proof and drainage structure
CN114319432A (en) * 2021-12-21 2022-04-12 济南金曰公路工程有限公司 Semi-underground subway station construction process and semi-underground subway station
CN115075875A (en) * 2022-07-21 2022-09-20 广州地铁设计研究院股份有限公司 Interval drainage pump station of track traffic

Similar Documents

Publication Publication Date Title
CN208203348U (en) A kind of drainage pumping plant of shield tunnel
CN206360050U (en) A kind of collection at the non-traditional water source in job site is with utilizing device
CN202745335U (en) Sunken type toilet water-resistant deodorization settling basin structure
CN206971039U (en) Draining, road sidewalk greening's band structure of permeable combination
CN108412034B (en) Building method of water guide system for house balcony and terrace and water guide system
CN205857551U (en) A kind of Jing Qiang anti-stone material common fault structure of orientation water drainage of bearing down on one
CN103696481B (en) A kind of rainwater storage reclaiming system
CN206545257U (en) A kind of novel greening band water storage structure
CN204435496U (en) A kind of building co-layer draining structure
CN206360055U (en) Di Ku tops H types gutter
CN106968317A (en) A kind of construction site rainwater recycle reutilization system
CN209082651U (en) A kind of toilet with drainage system three times
CN206844095U (en) Grid type rain-water drainage and collection system
CN206396771U (en) Building basement ground construction conserves discharge structure
CN207499071U (en) toilet
CN205935442U (en) Building roof drainage structures
CN101881041B (en) Floor drain sunk same-layer drainage construction method
CN213233574U (en) A embedded structure that is used for subway station to prevent basement infiltration
CN205653877U (en) Drainage device between building of adjacent underground
CN108442649A (en) The underground space can white-out infiltration ground structure and its construction method
CN106703057A (en) Basement ground construction maintenance drainage structure of large building and method for constructing basement concrete layer
CN208136951U (en) A kind of retaining wall for hydraulic engineering
CN207987984U (en) A kind of basement waterproofing structure
CN207436077U (en) Foundation pit drainage structure
CN207685959U (en) A kind of floor when construction for Super High intercepts water drainage arrangement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 510010 No. 204 Huanshi West Road, Guangzhou City, Guangdong Province

Patentee after: Guangzhou Metro Design and Research Institute Co., Ltd.

Address before: 510010 No. 204 Huanshi West Road, Guangzhou City, Guangdong Province

Patentee before: Guangzhou Metro Design & Research Institute Co., Ltd.

CP01 Change in the name or title of a patent holder