CN207685959U - A kind of floor when construction for Super High intercepts water drainage arrangement - Google Patents

A kind of floor when construction for Super High intercepts water drainage arrangement Download PDF

Info

Publication number
CN207685959U
CN207685959U CN201721485857.2U CN201721485857U CN207685959U CN 207685959 U CN207685959 U CN 207685959U CN 201721485857 U CN201721485857 U CN 201721485857U CN 207685959 U CN207685959 U CN 207685959U
Authority
CN
China
Prior art keywords
floor
groove
plate
water
intercepts water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721485857.2U
Other languages
Chinese (zh)
Inventor
许立山
罗汾毅
蒋凯
艾月华
王坤
周千帆
张超
贺晓飞
寇清
***
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201721485857.2U priority Critical patent/CN207685959U/en
Application granted granted Critical
Publication of CN207685959U publication Critical patent/CN207685959U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

A kind of floor when construction for Super High intercepts water drainage arrangement setting between floor and building curtain wall;Include groove, vertical supporting, cushion block and the plate that intercepts water;The U-shaped profile of groove, along the elongated setting in the edge of floor;Vertical side top outward bending of the groove by proximal edge side forms flange, and the bottom surface upper edge length of groove is axial to be equipped at intervals with floor drain;Vertical supporting has one group, is supported between floor and flange along the edge interval of floor;Cushion block arranged for interval is between trench bottom surfaces and floor;The plate that intercepts water is inclined at the top in gap between building curtain wall and floor;The intercept water upper end of plate is closely affixed with building curtain wall;Intercept water plate lower end groove flange overlap joint connection.The gap that the utility model solves the curtain wall of conventional ultra high layer and floor edge is larger and cause the overboard infiltration in part in construction that cannot block discharge in time, the use for influencing the floor to put into effect in advance, the technical issues of causing economic loss and adversely affected to the duration.

Description

A kind of floor when construction for Super High intercepts water drainage arrangement
Technical field
The utility model belongs to construction floor drainage measure field in construction, especially a kind of to construct for Super High When floor intercept water drainage arrangement.
Background technology
With the development of domestic construction engineering construction industry and the increasingly maturation of construction technology, after the completion of main structure construction The traditional concept fitted up again is increasingly not suitable for modern industry construction applications.Especially in construction of super highrise building In, profession is more, the duration is tight, cross-operation is more, in the case of upper body structure construction, need to intert lower floor decoration, machine The engineer operations such as electricity also have the case where need to putting into effect in advance because of development plan lower floor.But not due to upper floor curtain wall Closing, there is a larger gap between edges of boards and curtain wall, rainwater, construction temporarily with water, suppress closed-water test water, fire water etc. and can pass through this Gap is trickled to lower floor, if do not taken corresponding measure, electromechanical, decorative finish will be had compared with havoc or shadow to lower floor The use for ringing the floor to put into effect in advance has very big adverse effect while causing economic loss to the duration.And in constructing Part infiltration, overboard situation it is difficult to predict, it is conventional cut off the water supply, gunnysack closure, the emergency measures such as artificial pump drainage cannot be timely Prevent the diffusion of water.Therefore, upper floor water how is blocked, and overboard centralized collection is discharged, becomes the one of Super High construction A heavy difficult point.
Utility model content
A kind of floor when the purpose of this utility model is to provide construction for Super High intercepts water drainage arrangement, to solve to pass The gap at curtain wall and floor edge is larger and cause the overboard infiltration in part in construction that cannot block discharge, shadow in time in system Super High The use of the floor to put into effect in advance is rung, economic loss is caused and has the technical issues of very big adverse effect to the duration.
To achieve the above object, the utility model adopts the following technical solution.
A kind of floor when construction for Super High intercepts water drainage arrangement, is arranged between floor and building curtain wall;Including There are groove, vertical supporting, cushion block and the plate that intercepts water;The U-shaped profile of the groove, and along the elongated setting in the edge of floor; Wherein, vertical side top outward bending of the groove by proximal edge side forms flange, is grown on the bottom surface of groove, along it between axial direction Every equipped with floor drain;The vertical supporting has one group, is arranged along the edge interval of floor;Wherein, the bottom end support of vertical supporting On floor, the apical support of vertical supporting is in the flange bottom of groove;The cushion block has one group, and arranged for interval is in trench bottom surfaces Between floor;The plate that intercepts water is inclined at the top in gap between building curtain wall and floor;Wherein, it intercepts water the upper end of plate Bending straight up is closely affixed with building curtain wall, and is sealed by building sealant;The intercept water lower end of plate extends to floor side The inside of edge, positioned at groove flange top, and with the flange of groove overlap connect.
Preferably, the groove is molded by steel plate bending, and the cross-sectional width of groove is 250mm ~ 350mm.
Preferably, the gap between the floor drain and groove is blocked with fluid sealant, floor drain and the setting drainpipe on floor It is connected.
Preferably, the vertical supporting is cut by shaped steel rod piece, and the spacing between adjacent vertical supporting is 2000mm ~3000mm.
Preferably, the lap of splice of the flange of the groove and the plate that intercepts water is 100mm ~ 150mm.
Preferably, the spacing between the cushion block is 3000mm~4000mm.
Preferably, the plate that intercepts water is made of galvanized steel plain sheet;Intercept water plate inclination angle be 30 ° ~ 60 °
The utility model has the characteristics that and advantageous effect compared with prior art.
1, the utility model intercepts water plate and groove carrying out electromechanical, decorative operation and installed curtain wall storey setting, works as top Floor emergency case have it is underwater fall or rainwater enters from the unclosed floor of building curtain wall in building, can fall along the gap on the outside of floor In groove on to lower layer's floor, water is discharged via the floor drain connection drainpipe of channel bottom.After layer is cut off the water supply in several roads, upper layer Water does not penetrate into electromechanical, decorative operation or the floor to put into effect in advance, avoids electromechanical, decorative finish and receives immersion destruction, Economy, the loss of duration caused by finished product soaks are also avoided, the use of the floor to put into effect in advance is not influenced.
2, one group of vertical supporting, wherein the bottom end support of vertical supporting is arranged along the edge interval of floor in the utility model On floor, the apical support of vertical supporting is in the flange bottom of groove;This design ensures the stability of device.
Cushion block is arranged in 3 the utility model between channel bottom and floor, and the spacing of cushion block is selected for 3000mm~4000mm It takes, the height of cushion block is adjusted with site operation situation, and slope is looked for floor drain direction convenient for entire groove.
Description of the drawings
The utility model is described in more detail below in conjunction with the accompanying drawings.
Fig. 1 is the cross-sectional structure schematic diagram being arranged between floor and building curtain wall of the utility model.
Fig. 2 is the stereoscopic schematic diagram being arranged between floor and building curtain wall of the utility model.
Fig. 3 is the feature cross-section schematic diagram that the plate that intercepts water of the utility model is connect with groove.
Fig. 4 is the structural plan schematic diagram that the plate that intercepts water of the utility model is connect with groove.
Reference numeral:1- intercept water plate, 2- grooves, 2.1- flange, 3- vertical supportings, 4- cushion blocks, 5- building sealing Glue, 6- floor drains, 7- building curtain walls, 8- floors, 9- drainpipes.
Specific implementation mode
Shown in the present embodiment combination Fig. 2, in the top for carrying out electromechanical, decorative operation mounting building curtain wall storey setting steel Plate groove 2(It can be according to on-site actual situations in multiple storey settings), formulated according to scene actual needs and floor design feature The angle of inclination of the width of groove 2, the plate 1 that intercepts water, groove 2 can be processed in over-the-counter or field, and can be used in turn upwards, and scene is first Vertical supporting 3 is installed, then carries out the installation of groove 2;It intercepts water and is sealed using building sealant 5 between plate 1 and building curtain wall 7, adjacent ditch Slot segment unit uses overlapping mode;When upper floor emergency case have it is underwater fall or rainwater from 7 unclosed floor of building curtain wall into Enter in building, can fall in the groove 2 on lower layer's floor 8 along the gap in 8 outside of floor, be connected via the floor drain 6 of 2 bottom of groove Water is discharged drainpipe 9.After layer is cut off the water supply in several roads, upper water does not penetrate into electromechanical, decorative operation or the building to put into effect in advance Layer avoids electromechanical, decorative finish and receives immersion destruction, also avoids economy, the loss of duration caused by finished product soaks, not shadow Ring the use of the floor to put into effect in advance.
Described picture 1-4, floor when this construction for Super High intercepts water drainage arrangement, and setting is in floor 8 and building Between curtain wall 7;Include groove 2, vertical supporting 3, cushion block 4 and the plate 1 that intercepts water;
The U-shaped profile of the groove 2, and along the elongated setting in the edge of floor 8;Wherein, groove 2 leans on proximal edge one The vertical side top outward bending of side forms flange 2.1, and floor drain 6, ground are equipped at intervals on the bottom surface of groove 2, along its length is axial Leakage 6 is connected with the setting drainpipe 9 on floor 8, and the gap between floor drain 6 and groove 2 is blocked with fluid sealant;
The vertical supporting 3 has one group, is arranged along the edge interval of floor 8, ensures the stability of device;Wherein, it erects It is supported on floor 8 to the bottom end of support 3, the apical support of vertical supporting 3 is in 2.1 bottom of flange of groove 2;
The cushion block 4 has one group, and arranged for interval paves groove 2 between 2 bottom surface of groove and floor 8, convenient for looking for slope, Cushion block 4 used herein can be that brick can also be that wooden unit can also be iron block;
The plate 1 that intercepts water is inclined at the top in gap between building curtain wall 7 and floor 8, the water to fall convenient for upper layer It flows into groove 2;Wherein, the intercept water upper end of plate 1 bends, is closely affixed with building curtain wall 7 straight up, and passes through and build sealing Glue 5 seals;Intercept water plate 1 lower end extend to 8 edge of floor inside, positioned at groove 2 flange 2.1 top, and with groove 2 Flange 2.1 overlap joint connection.
In the present embodiment, the groove 2 is molded by steel plate bending, and the cross-sectional width of groove 2 is 250mm ~ 350mm.
In the present embodiment, the vertical supporting 3 is cut by shaped steel rod piece, and the spacing between adjacent vertical supporting 3 can Think 2000mm~3000mm.
In the present embodiment, the lap of splice of the flange 2.1 of the groove 2 and the plate 1 that intercepts water is 100mm ~ 150mm.
In the present embodiment, the spacing between the cushion block 4 can be 3000mm~4000mm, highly with site operation situation It is adjusted, slope is looked for 6 direction of floor drain convenient for entire groove 2.
In the present embodiment, the plate 1 that intercepts water is made of galvanized steel plain sheet, and the inclination angle for the plate 1 that intercepts water is 30 ° ~ 60 °
In the present embodiment, the groove 2 is overlapped using one group of groove segment unit.
Above-described embodiment is not the exhaustion of specific implementation mode, can also have other embodiments, above-described embodiment purpose to exist In illustrating the utility model, and unrestricted the scope of protection of the utility model, it is all from the utility model simple change Using all falling in the scope of protection of the utility model.

Claims (7)

  1. The drainage arrangement 1. floor when a kind of construction for Super High intercepts water, is arranged in floor(8)With building curtain wall(7)Between; It is characterized in that:It include groove(2), vertical supporting(3), cushion block(4)With the plate that intercepts water(1);
    The groove(2)U-shaped profile, and along floor(8)The elongated setting in edge;Wherein, groove(2)By proximal edge The vertical side top outward bending of side forms flange(2.1), groove(2)Bottom surface on, along it, length is axial is equipped at intervals with ground Leakage(6);
    The vertical supporting(3)There is one group, along floor(8)Edge interval setting;Wherein, vertical supporting(3)Bottom end branch Support is in floor(8)On, vertical supporting(3)Apical support in groove(2)Flange(2.1)Bottom;
    The cushion block(4)There is one group, arranged for interval is in groove(2)Bottom surface and floor(8)Between;
    The plate that intercepts water(1)It is inclined at building curtain wall(7)With floor(8)Between gap top;Wherein, intercept water plate(1) Upper end bend straight up and building curtain wall(7)It is closely affixed, and passes through building sealant(5)Sealing;Intercept water plate(1)'s Lower end extends to floor(8)The inside at edge is located at groove(2)Flange(2.1)Top, and and groove(2)Flange (2.1)Overlap joint connection.
  2. The drainage arrangement 2. floor when construction according to claim 1 for Super High intercepts water, it is characterised in that:The ditch Slot(2)It is molded by steel plate bending, and groove(2)Cross-sectional width be 250mm ~ 350mm.
  3. The drainage arrangement 3. floor when construction according to claim 2 for Super High intercepts water, it is characterised in that:Describedly Leakage(6)With groove(2)Between gap blocked with fluid sealant, floor drain(6)With floor(8)On setting drainpipe(9)It is connected.
  4. The drainage arrangement 4. floor when construction according to claim 3 for Super High intercepts water, it is characterised in that:It is described perpendicular To support(3)It is cut by shaped steel rod piece, adjacent vertical supporting(3)Between spacing be 2000mm~3000mm.
  5. The drainage arrangement 5. floor when construction according to claim 4 for Super High intercepts water, it is characterised in that:The ditch Slot(2)Flange(2.1)With the plate that intercepts water(1)The lap of splice be 100mm ~ 150mm.
  6. The drainage arrangement 6. floor when construction according to claim 5 for Super High intercepts water, it is characterised in that:The pad Block(4)Between spacing be 3000mm~4000mm.
  7. The drainage arrangement 7. floor when construction according to claim 6 for Super High intercepts water, it is characterised in that:Described section Water plate(1)It is made of galvanized steel plain sheet;Intercept water plate(1)Inclination angle be 30 ° ~ 60 °.
CN201721485857.2U 2017-11-09 2017-11-09 A kind of floor when construction for Super High intercepts water drainage arrangement Active CN207685959U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721485857.2U CN207685959U (en) 2017-11-09 2017-11-09 A kind of floor when construction for Super High intercepts water drainage arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721485857.2U CN207685959U (en) 2017-11-09 2017-11-09 A kind of floor when construction for Super High intercepts water drainage arrangement

Publications (1)

Publication Number Publication Date
CN207685959U true CN207685959U (en) 2018-08-03

Family

ID=62988794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721485857.2U Active CN207685959U (en) 2017-11-09 2017-11-09 A kind of floor when construction for Super High intercepts water drainage arrangement

Country Status (1)

Country Link
CN (1) CN207685959U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409830A (en) * 2019-05-30 2019-11-05 广西建工集团第五建筑工程有限责任公司 A kind of construction method that high layer main body subregion intercepts water and U-shaped shuting used

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409830A (en) * 2019-05-30 2019-11-05 广西建工集团第五建筑工程有限责任公司 A kind of construction method that high layer main body subregion intercepts water and U-shaped shuting used

Similar Documents

Publication Publication Date Title
CN109707117A (en) A kind of construction technology of siphon type rainwater discharging system
CN205857551U (en) A kind of Jing Qiang anti-stone material common fault structure of orientation water drainage of bearing down on one
CN202718191U (en) Double-row type waterproof pipeline structure
CN112538989A (en) Integrated bathroom of ready-package assembled
CN111963214A (en) Tunnel molding waterproof construction process
CN103410318B (en) Washroom pipe well water-leakage construction method
CN207685959U (en) A kind of floor when construction for Super High intercepts water drainage arrangement
CN204551694U (en) A kind of pre-buried type balcony floor drain
KR20100054537A (en) Tunnel abutment precast block structure and drainage structure of new concept and method constructing abutment used by them
CN205024824U (en) Bathroom mounting structure
CN109797988A (en) A kind of co-layer draining hard-cover precast block toilet of outer wall provided pipe line groove hole
CN213358881U (en) Secondary drainage device for ground of sinking type toilet
CN215166180U (en) Caisson type tertiary drainage system
CN104455757A (en) Downcomer assembly and installation method thereof
CN101881041B (en) Floor drain sunk same-layer drainage construction method
CN114045880A (en) Basement post-cast strip treatment process
CN111058467B (en) Basement backwater surface waterproof drainage structure and construction method
CN210621879U (en) Steel construction vestibule drainage structures system
CN208072482U (en) A kind of stifled row suitable for construction of underground structure combines water-tight device
CN202000461U (en) Novel anti-seepage drainage system
CN220452940U (en) PVC sleeve pipe antiseep installation device
CN101812846A (en) Drainage structure of upstream wall of shore type hydropower station workshop and construction method thereof
CN110984308A (en) Anti-leakage process for removing deposited water in toilet
CN209397671U (en) A kind of structure using PVC waterstop joint installation sewer pipe
CN205688545U (en) A kind of plumbing integration module

Legal Events

Date Code Title Description
GR01 Patent grant