CN208201812U - A kind of diversion tunnel water inlet disappears whirlpool figure - Google Patents

A kind of diversion tunnel water inlet disappears whirlpool figure Download PDF

Info

Publication number
CN208201812U
CN208201812U CN201721640662.0U CN201721640662U CN208201812U CN 208201812 U CN208201812 U CN 208201812U CN 201721640662 U CN201721640662 U CN 201721640662U CN 208201812 U CN208201812 U CN 208201812U
Authority
CN
China
Prior art keywords
water inlet
whirlpool
diversion tunnel
lattice structure
portraitlandscape
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721640662.0U
Other languages
Chinese (zh)
Inventor
薛宝臣
吴时强
陈晴
王芳芳
罗宗伟
赵万青
郭兴
高昂
王剑涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
PowerChina Beijing Engineering Corp Ltd
Original Assignee
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
PowerChina Beijing Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources, PowerChina Beijing Engineering Corp Ltd filed Critical Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority to CN201721640662.0U priority Critical patent/CN208201812U/en
Application granted granted Critical
Publication of CN208201812U publication Critical patent/CN208201812U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of diversion tunnel water inlet and disappears whirlpool figure, belongs to hydraulic and hydroelectric engineering field.The structural style is specially, at the top of diversion tunnel water inlet and before gate shaft, criss-cross vertical lattice structure is set, lattice structure downstream is connect with gate shaft upstream, and the lattice structure includes longitudinal baffle and lateral partitions, and portraitlandscape partition forms plenum chamber, portraitlandscape partition angle is 90 °, lattice structure is set at the top of inlet of diversion tunnel, is fixedly connected with gate shaft, upstream face is flushed with inlet of diversion tunnel.Diversion structure import provided by the utility model disappear whirlpool, rectifier structure figure and lay mode, so that water flow is in diversion tunnel water inlet, when entering pressure tunnel by free flow, effectively adjustment entrance flow boundary condition and water flow three-dimensional flow structure, the primary condition that vertical-axis eddy is formed before destruction import, the formation for inhibiting whirlpool achievees the purpose that pressurized tunnel water inlet water flow is smooth, balanced transition.

Description

A kind of diversion tunnel water inlet disappears whirlpool figure
Technical field
The invention belongs to hydraulic and hydroelectric engineering fields, are related to a kind of whirlpool figure that disappears for eliminating diversion tunnel water inlet whirlpool.
Background technique
In hydraulic and hydroelectric engineering, water conservancy project diversion tunnel, flood discharging tunnel etc. have pressure type to draw, occur often before sluice pipe water inlet Vertical-axis eddy phenomenon.This whirlpool, especially through air-breathing whirlpool, job facilities can be generated with following harm: (1) whirlpool is taken After the air of band enters diversion tunnel, area of passage is reduced, increases overcurrent resistance, to reduce diversion tunnel conveyance capacity; (2) air bag is formed, waterflow stabilization in diversion tunnel is influenced, increases barrel fluctuation pressure, easily leads to negative pressure and cavitation phenomenon hair in hole It is raw, it will cause the destruction to diversion tunnel when serious;(3) water-absorption surface floating material, blocking or destruction diversion tunnel are rolled up.Therefore, it is necessary to Take measures to avoid or weaken the harm of diversion tunnel water inlet whirlpool.Currently, common counteracting vortex mainly has three classes: (1) adjusting Whole engineering operation mode guarantees certain depth of the water submerging etc. before water inlet.(2) it rationally designs breastwork, lead wall displacement and form, Optimize water inlet leading edge landform etc.;(3) special structures, such as anti-whirlpool beam, floatation type raft, the vortex shield of fenestrated, gold are installed Belong to net etc..It is above-mentioned disappear whirlpool mode to a certain extent with the intensity that can cut down import whirlpool under some actual conditions, but with The influence of import SEA LEVEL VARIATION or the method for operation, the whirlpool effect that disappears it is undesirable.These whirlpool beam slabs that disappear, it is especially horizontal positioned The whirlpool grid that the disappears whirlpool effect that disappears it is undesirable, often limited by landform or the method for operation, it is difficult to implement.
Summary of the invention
Gate shaft is usually arranged in position among inlet of diversion tunnel, and open waters is formed between gate shaft and admission section, Diversion tunnel is open-channel flow under normal conditions, but when meeting great flood also can flowing full flood discharge, at this time by depth of the water submerging is insufficient and import Terrain influences, and usually forms the vertical-axis eddy of the biggish Plane Rotation of scale when influent stream to this water disturbance.
Disappear whirlpool, rectifier structure figure and cloth technical problem to be solved by the invention is to provide a kind of diversion structure import If mode, so that water flow in diversion tunnel water inlet, when entering pressure tunnel by free flow, effectively adjusts entrance water flow perimeter strip Part and water flow three-dimensional flow structure destroy the primary condition of vertical-axis eddy formation before import, inhibit the formation of whirlpool, reaching has pressure The purpose of smooth, the balanced transition of tunnel water inlet water flow.For the above-mentioned technical problem of solution, the invention discloses a kind of diversion tunnels Water inlet disappears whirlpool figure, specifically adopts the following technical scheme that
A kind of diversion tunnel water inlet whirlpool figure that disappears is arranged criss-cross at the top of diversion tunnel water inlet and before gate shaft Vertical lattice structure, lattice structure downstream are connect with gate shaft upstream, the lattice structure include longitudinal baffle and laterally every Plate, portraitlandscape partition form plenum chamber, and portraitlandscape partition angle is 90 °.
Preferably, the lattice structure is set at the top of import, is fixedly connected with gate shaft, upstream face and diversion tunnel into Mouth flushes, wherein for portraitlandscape partition room away from that can be adjusted according to specific streamflow regime, plenum chamber is vertical continuously distributed.
Preferably, the portraitlandscape partition uses concrete slab or steel plate, and concrete slab can be used prefabricated or cast-in-place.
Preferably, the portraitlandscape block board thickness according to structure safety and stability it needs to be determined that, preferably 0.1m~1m, Described, the vertical height of longitudinal baffle is higher than design water level, and lateral partitions horizontal width and the slope terrain that two sides are excavated are smooth Connection, to increase the contact area with the preceding waters water body of import.Preferably, the plenum chamber that the portraitlandscape partition is formed is met The water surface is connected to the water body in the preceding waters of import, and single cavity chamber size is the 1/2~1/ of maximum depth of the water submerging on depth of water direction 10, horizontal direction having a size of water inlet overall width 1/2~1/10.
Preferably, the water inlet is more than two and when being closer, and integrally lays the concatenated whirlpool that disappears to water inlet group Structure, better effect.
If regarding the water body of whirlpool easy to form before import as an entirety, water boundary part is inserted embedded in of the invention Disappear in the plenum chamber of vortex lattice lattice, effectively increase boundary resistance, weakens the shearing force in boundary layer.Inhibit a wide range of vertical-axis eddy nascent With development, and as the rising of water level, lattice structure are greatly increased with water body contact surface, effect is more obvious.
The beneficial effect that grid type of the present invention disappears whirlpool figure and three-dimensional laying mode reaches is embodied in:
(1) formation condition and movement characteristic based on whirlpool, the longitudinal lattice structure laid can lead to change and easily form whirlpool The boundary condition of eddy water body, increases boundary resistance, and the shearing force in smoothization boundary layer can inherently inhibit the nascent and hair of whirlpool Exhibition, to the abatement significant effect of the vertical-axis eddy of large scale.(2) grid-like pattern is arranged above water inlet leading edge to disappear whirlpool figure, And it can effectively inhibit whirlpool in different import water levels using longitudinal array laying mode and be formed, and with dampening The raising of position, lattice structure greatly increases with water body contact surface, inhibition volute at effect it is more significant.Therefore, to water inlet SEA LEVEL VARIATION is adaptable before mouthful.(3) lattice structure is set to diversion tunnel water inlet top leading edge, connects gate shaft and import Top plate, structural stability are strong.(4) there are multiple water inlets, as needed, series connection cloth can be carried out to water inlet group More preferable than an independent water inlet conditional effect if the eddy clearing structure between different water inlets plays synergistic action effect, this is also The feature that other counteracting vortex do not have.(5) this lattice structure uses vertical characteristics mode, relative to lateral eddy clearing structure (in the waters plane before being arranged in water inlet), it is small to water inlet turbulent water, and project amount is small, operation expense is low, warp Ji remarkable benefit.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the side diagram of the embodiment of the present invention;
Fig. 3 is the positive diagram of the embodiment of the present invention;
The perspective view of the position Fig. 4 embodiment of the present invention;
Wherein, diversion tunnel water inlet 1, diversion tunnel water inlet top 2, gate shaft 6, gate shaft upstream 5, longitudinal baffle 3, cross To partition 4, plenum chamber 7.
Specific embodiment
The present invention is further described below in conjunction with attached drawing.The present embodiment is merely to illustrate the present invention rather than limitation originally The range of invention.In the following examples, the experimental methods for specific conditions are not specified, usually according to normal condition or according to manufactory Condition proposed by quotient.Unless otherwise defined, all professional and scientific terms as used herein and one skilled in the art institute Known meaning is identical.In addition, any method similar to or equal to what is recorded and material all can be applied to present invention side In method.In fact, those skilled in the art can be easily referring to description above and attached drawing other than content as described herein It grasps to a variety of improvement of the invention.The improvement is also fallen within the scope of the appended claims.It is described in the text preferable Implementation method is for illustrative purposes only with material.
Diversion tunnel water inlet eddy eliminating structure figure of the invention is used in some hydropower station diversion tunnel water inlet, such as Fig. 1 institute Show, the top of diversion tunnel water inlet 12 with before gate shaft 6, the staggered vertical lattice structure of setting portraitlandscape, under lattice structure Trip is connect with gate shaft upstream 5, and lattice structure includes longitudinal baffle 3 and lateral partitions 4, and portraitlandscape partition forms plenum chamber 7, Longitudinal diaphragm plate angle is 90 °, and lattice structure is set at the top of import, is fixedly connected with gate shaft, upstream face and diversion tunnel into Mouth flushes, and portraitlandscape partition uses concrete slab or steel plate.Portraitlandscape block board thickness needs true according to structure safety and stability It is fixed, the present embodiment block board thickness 0.2m.The vertical height of longitudinal baffle is higher than design water level, the hillside that lateral partitions and two sides are excavated Landform smoothly connects, to increase the contact area with the preceding waters water body of import.Shown in as shown in Figure 2, Figure 3 and Figure 4, specific setting is vertical The perpendicular whirlpool portraitlandscape partition that disappears of three cross three, structure crest level is 2435.0m, lowest part horizontal baffle elevation 2412.0m;Partition edge The long 6m in diversion tunnel influent stream direction, portraitlandscape partition room according to specific streamflow regime away from can adjust;What portraitlandscape partition was formed Plenum chamber is connected to the water body in the preceding waters of import, and single cavity chamber size floods water on depth of water direction for inlet of diversion tunnel maximum Deep 1/2~1/10 is 7m in the present embodiment;Horizontal direction having a size of water inlet overall width 1/2~1/10, the present embodiment In be 10m.As a result, not formed whirlpool, disappear whirlpool significant effect under different operating water levels;Water inlet leading edge reservoir area water flow is steady It is fixed, other unfavorable fluidised forms are not generated because the eddy clearing structure is arranged, and water flow more can smoothly enter diversion tunnel;Disappear whirlpool Structural style is simple, and it is convenient to lay.
Working principle, if regarding the water body of whirlpool easy to form before water inlet as an entirety, water boundary part is inserted In the plenum chamber for disappearing vortex lattice lattice of the invention, boundary resistance is effectively increased, weakens the shearing force in boundary layer.Inhibit a wide range of Vertical-axis eddy is nascent and develops, and as the rising of water level, lattice structure are greatly increased with water body contact surface, effect is brighter It is aobvious.Formation condition and movement characteristic based on whirlpool, the longitudinal lattice structure laid, which can lead to change, easily forms whirlpool water body Boundary condition increases boundary resistance, and the shearing force distribution in smoothization boundary layer can inherently inhibit the nascent and development of whirlpool, To the abatement significant effect of the vertical-axis eddy of large scale.Grid-like pattern is arranged above water inlet leading edge to disappear whirlpool figure, and uses Longitudinal array lays mode and can effectively inhibit whirlpool in different import water levels and be formed, and with the liter of water level Height, lattice structure are greatly increased with water body contact surface, inhibit volute at effect it is more significant.Therefore, to water before water inlet Position changes adaptable.Lattice structure is set to diversion tunnel water inlet top leading edge, connection gate shaft and import top plate, structure Stability is strong.This lattice structure uses vertical characteristics mode, and relative to lateral eddy clearing structure, (waters before being arranged in water inlet is flat On face), it is small to water inlet turbulent water, and project amount is small, operation expense is low, remarkable in economical benefits.

Claims (5)

  1. The whirlpool figure 1. a kind of diversion tunnel water inlet disappears, which is characterized in that at the top of diversion tunnel water inlet (1) (2) and gate shaft (6) Before, criss-cross vertical lattice structure is set, and lattice structure downstream is connect with gate shaft upstream (5), the lattice structure Including longitudinal baffle (3) and lateral partitions (4), portraitlandscape partition forms plenum chamber (7), and portraitlandscape partition angle is 90 °.
  2. The whirlpool figure 2. diversion tunnel water inlet according to claim 1 disappears, which is characterized in that the lattice structure is set to At the top of import, it is fixedly connected with gate shaft, upstream face is flushed with inlet of diversion tunnel.
  3. The whirlpool figure 3. diversion tunnel water inlet according to claim 1 disappears, which is characterized in that the portraitlandscape partition is adopted With concrete slab or steel plate.
  4. The whirlpool figure 4. diversion tunnel water inlet according to claim 1 disappears, which is characterized in that the portraitlandscape partition is thick Degree according to structure safety and stability it needs to be determined that;The vertical height of the longitudinal baffle is higher than design water level, lateral partitions and two sides The slope terrain of excavation smoothly connects, to increase the contact area with the preceding waters water body of import.
  5. The whirlpool figure 5. diversion tunnel water inlet according to claim 1 disappears, which is characterized in that the portraitlandscape partition shape At plenum chamber upstream face be connected to the water body in the preceding waters of import, single plenum chamber (7) size is that maximum is flooded on depth of water direction Do not have the 1/2~1/10 of the depth of water, 1/2~1/10 in the horizontal direction having a size of water inlet overall width.
CN201721640662.0U 2017-11-30 2017-11-30 A kind of diversion tunnel water inlet disappears whirlpool figure Expired - Fee Related CN208201812U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721640662.0U CN208201812U (en) 2017-11-30 2017-11-30 A kind of diversion tunnel water inlet disappears whirlpool figure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721640662.0U CN208201812U (en) 2017-11-30 2017-11-30 A kind of diversion tunnel water inlet disappears whirlpool figure

Publications (1)

Publication Number Publication Date
CN208201812U true CN208201812U (en) 2018-12-07

Family

ID=64489932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721640662.0U Expired - Fee Related CN208201812U (en) 2017-11-30 2017-11-30 A kind of diversion tunnel water inlet disappears whirlpool figure

Country Status (1)

Country Link
CN (1) CN208201812U (en)

Similar Documents

Publication Publication Date Title
CN206157683U (en) High water head, many silt, overburden basis sluice dissipation structure
CN207003391U (en) A kind of water gate energy-dissipating installation
CN108824381B (en) Stepped fishway with adjustable local water retaining height and design method thereof
WO2014201742A1 (en) Debris flow drainage trough planning and designing method and application thereof
CN102966082A (en) Aeration facility with downward-bent base slab
CN109778798B (en) Multistage hole pipe weir flow dividing and silt discharging method
CN104695390B (en) A kind of combined type is super to be let out energy dissipating and to overflow big vast unit and method
CN109610405A (en) Half lunar crater shape water pond and its construction method
CN104563267A (en) Compound key overflow weir type siphon well and method implemented by same
CN109145457B (en) River type division method based on longitudinal river potential adjustment transfer and obstruction mechanism
CN204982814U (en) Power that disappears structure in low water head dam low reaches riverbed
CN104404928B (en) Jet energy dissipating method is fallen in a kind of gravity dam table hole flood discharge
CN208201812U (en) A kind of diversion tunnel water inlet disappears whirlpool figure
CN106638504B (en) The dissipation and scouring structure of energy dissipation by hydraulic jump in a kind of hydraulic engineering
CN109356097B (en) A drainage tunnel import structure for ditch water treatment
CN106013009B (en) A kind of more counter-slope formula stiling basins
Allahyonesi et al. A study of the effects of the longitudinal arrangement sediment behavior near intake structures
CN102828489B (en) System for arranging piles to fix riverbed main stream
JP3231805U (en) Pipe canal water supply system
CN203878542U (en) W-shaped ecological gabion submerged dam
JP2005220610A (en) Continuous flow type slit sand control dam
CN106930242A (en) Pile foundation overfall dam and galvanized wire gabion protection-apron
Li et al. Effects of a Permeable Hydraulic Flashboard Spur Dike on Scour and Deposition
CN107503327B (en) Aileron type blocking dam
KR101045998B1 (en) Dike for guiding the rapids of river bends that change the direction of the flow velocity of the flood

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181207

Termination date: 20201130