CN208167666U - A kind of high narrow big aperture inlet gate drainage arrangement - Google Patents

A kind of high narrow big aperture inlet gate drainage arrangement Download PDF

Info

Publication number
CN208167666U
CN208167666U CN201820519907.2U CN201820519907U CN208167666U CN 208167666 U CN208167666 U CN 208167666U CN 201820519907 U CN201820519907 U CN 201820519907U CN 208167666 U CN208167666 U CN 208167666U
Authority
CN
China
Prior art keywords
gate
inlet gate
inlet
bulkhead
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820519907.2U
Other languages
Chinese (zh)
Inventor
王兴恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201820519907.2U priority Critical patent/CN208167666U/en
Application granted granted Critical
Publication of CN208167666U publication Critical patent/CN208167666U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Barrages (AREA)

Abstract

The utility model discloses a kind of high narrow big aperture inlet gate drainage arrangements, including inlet gate(1)Be located at inlet gate(1)The bulkhead gate of upstream(5);Inlet gate(1)Top is equipped with inlet gate filling valve(7), bulkhead gate(5)Top is equipped with bulkhead gate filling valve(8);In inlet gate(1)With bulkhead gate(5)Between ground sill(10)It is equipped with interim immersible pump(9), interim immersible pump(9)Outlet and inlet gate filling valve(7)Water inlet connection.The water pressure that the utility model reduces inlet gate receiving then reduces Qi Menli, the headstock gear capacity for meeting normal operation opens inlet gate requirement, and without increasing inlet gate headstock gear capacity, so that it may meet the needs used, to reduce the cost of investment of inlet gate.

Description

A kind of high narrow big aperture inlet gate drainage arrangement
Technical field
The utility model relates to a kind of high narrow big aperture inlet gate drainage arrangements, belong to hydraulic and hydroelectric engineering metal structure Technical field.
Background technique
For water inlet stop gate or axis stream unit water inlet emergency gate(Hereinafter referred to as inlet gate), generally use One machine arrangement considers that inlet gate maintenance needs, bulkhead gate generally is arranged in the front.In construction time or maintenance Phase considers that water blocking installation or maintenance unit need, and inlet gate, which is in, closes water blocking state, terminates in construction or turn(a)round, needs When opening inlet gate progress unit has water debugging, unit guide vane, which cannot be in close state inlet gate sometimes and can not achieve, to be filled Level pressure.The prior art generally closes water blocking using decentralization bulkhead gate, excludes water-filling using the filling valve at the top of inlet gate Dynamic water unlatching inlet gate after water body more than valve water inlet, the prior art inlet gate little for conventional aperture height, Because the water pressure that 2~4m differential water pressures that the water pressure that dynamic water opens door is operated normally with inlet gate generate is not much different, therefore intake What gate operated normally open, and Men Li is able to satisfy moves water under the filling valve water inlet to gate ground sill head and open inlet gate and want It asks.But for high narrow big aperture inlet gate, filling valve water inlet is higher to inlet gate ground sill head, some engineerings reach 20m, the Qi Menli operated normally well beyond inlet gate, need to increase headstock gear capacity can just open door, this will increase engineering Investment, particularly with the more aobvious protrusion of hydroelectric project of porous mouth, and the probability very little that this kind of operating condition occurs when operating normally, it is One unconventional operating condition, which increases opening and closing capacity, then seems very uneconomical, therefore the prior art is there is also deficiency, up for into one It walks perfect.
Utility model content
The purpose of this utility model is that:A kind of high narrow big aperture inlet gate drainage arrangement is provided, by temporarily diving under water Pump can exclude the water body between inlet gate and bulkhead gate substantially, open power to reduce inlet gate, meet and operate normally Headstock gear capacity open inlet gate requirement, no replacement is required biggish inlet gate headstock gear capacity reduces cost of investment, from And overcome the deficiencies in the prior art.
What the technical solution of the utility model was realized in:
A kind of high narrow big aperture inlet gate drainage arrangement of the utility model, including inlet gate and be located at inlet gate The bulkhead gate of upstream;It is equipped with inlet gate filling valve at the top of inlet gate, is equipped with bulkhead gate filling valve at the top of bulkhead gate; Interim immersible pump, the outlet of interim immersible pump and inlet gate water-filling are equipped on ground sill between inlet gate and bulkhead gate The water inlet of valve connects.
In aforementioned device, the gate pier at the top of the inlet gate is equipped with inspection platform;Inspection platform is close to bulkhead gate Side is equipped with rectangular recess, and the inspection platform of rectangular recess bottom is equipped with round hole, round hole and bulkhead gate and intake gate It is communicated at the top of runner between door;Hook is equipped on the gate pier at the top of round hole, hook is connect through iron chains with interim immersible pump.
In aforementioned device, the inspection platform is equipped with service aisle.
By adopting the above-described technical solution, the utility model is compared with prior art, the utility model is in inlet gate Inspection platform upstream side in the middle part of open a rectangular recess, rectangular recess lower part be arranged a round hole pass to lower part bulkhead gate with At the top of runner between inlet gate.In inlet gate and bulkhead gate water filling process, it can be placed by round hole interim latent Water pump is by water outlet.This method can substantially reduce inlet gate and open power, and the headstock gear capacity for meeting normal operation opens water inlet Gate requirement, without increasing inlet gate headstock gear capacity, effectively saves investment;It is equipped with hook at the top of rectangular recess, is used for The iron chains of interim immersible pump is hung, the interim immersible pump of execute-in-place is convenient for;It is logical that rectangular recess is located at the work of inspection platform upstream side Road top, do not influence the walking of operations staff, the effective guarantee safety of operations staff;Round hole pass to lower part bulkhead gate with At the top of runner between inlet gate, exhaust velocity when bulkhead gate water-filling concora crush can be increased.
Detailed description of the invention
Fig. 1 is that the utility model is drained using inlet gate filling valve to its filling valve import schematic diagram;
Fig. 2 is the A-A cross-sectional view of Fig. 1;
Fig. 3 is that the utility model utilizes the interim immersible pump exclusion following water body schematic diagram of inlet gate filling valve import;
Fig. 4 is the B-B cross-sectional view of Fig. 3.
In figure:1- inlet gate, 2- inspection platform, 3- rectangular recess, 4- round hole, 5- bulkhead gate, at the top of 6- runner, 7- inlet gate filling valve, 8- bulkhead gate filling valve, the interim immersible pump of 9-, 10- ground sill, 11- iron chains, 12- service aisle, 13- hook.
Specific embodiment
The utility model is described in further detail below, but not as any restrictions to the utility model.
The utility model is constituted according to a kind of following high narrow big aperture inlet gate water discharge methods, and this method is such as Shown in Fig. 1~4, this method is the setting rectangular recess 3 in the middle part of 2 upstream side of inspection platform of inlet gate 1, in rectangular recess 3 Bottom round hole 4 is set, 6 communicate at the top of runner between round hole 4 and bulkhead gate 5 and inlet gate 1;In inlet gate When its top draining of filling valve 7 to 7 water inlet of filling valve of 1 utilization, interim immersible pump 9 is placed on by maintenance lock by round hole 4 On ground sill 10 between door 5 and inlet gate 1, by interim immersible pump 9 by water remaining between bulkhead gate 5 and inlet gate 1 Body is evacuated to 1 filling valve of inlet gate, 7 water inlet, and water is drained into dam body downstream by 7 water outlet of the filling valve of inlet gate 1; To reduce the Qi Menli of inlet gate 1, the headstock gear capacity for meeting normal operation opens the requirement of inlet gate 1, without increasing 1 headstock gear capacity of inlet gate, to reduce the cost of investment of inlet gate 1.
In the aforementioned narrow big aperture inlet gate water discharge method of height, the bore of the round hole 4 is greater than interim immersible pump 9 most Large scale;The gate pier at 4 top of round hole is equipped with hook 13, and interim immersible pump 9 is transferred through iron chains 11 to bulkhead gate 5 and water inlet Ground sill 10 between gate 1, and iron chains 11 is hung on hook 13, interim immersible pump 9 is received from ground sill 10 when not need It returns.
According to a kind of high narrow big aperture inlet gate drainage arrangement of the utility model that the above method is constituted, including water inlet Gate 1 and bulkhead gate 5 positioned at 1 upstream of inlet gate;Inlet gate filling valve 7, bulkhead gate are equipped at the top of inlet gate 1 5 tops are equipped with bulkhead gate filling valve 8;Interim immersible pump 9 is equipped on ground sill 10 between inlet gate 1 and bulkhead gate 5, The outlet of interim immersible pump 9 is connect with the water inlet of inlet gate filling valve 7.
In aforementioned device, the gate pier at 1 top of inlet gate is equipped with inspection platform 2;Inspection platform 2 is close to maintenance lock 5 sides of door are equipped with rectangular recess 3, and the inspection platform 2 of 3 bottom of rectangular recess is equipped with round hole 4, round hole 4 and bulkhead gate 5 6 communicate at the top of runner between inlet gate 1;Hook 13 is equipped on the gate pier at 4 top of round hole, hook 13 is through iron chains 11 It is connect with interim immersible pump 9.
In aforementioned device, the inspection platform 2 is equipped with service aisle 12.
Embodiment
The embodiments of the present invention as shown in figures 1-4, open a square in the middle part of 2 upstream side of inspection platform of inlet gate 1 Connected in star 3 is arranged a round hole 4 in 3 lower part of rectangular recess and passes to the runner top between lower part bulkhead gate 5 and inlet gate 1 Portion 6.When inlet gate 1 is using the draining of filling valve 7 to 7 water inlet of filling valve at the top of it, by round hole 4 by interim immersible pump 9 are placed on the ground sill 10 between bulkhead gate 5 and inlet gate 1, by interim immersible pump 9 by bulkhead gate 5 and intake gate Remaining water body is evacuated to 1 filling valve of inlet gate, 7 water inlet between door 1, and by 7 water outlet of filling valve of inlet gate 1 by water Drain into dam body downstream;Rectangular recess 3 is set to the top in 2 upstream side aisle 12 of inspection platform;3 top of rectangular recess setting hook 13;Hook 13 is for hanging the iron chains 14 of interim immersible pump 9.
This example can exclude substantially the water body between bulkhead gate 5 and inlet gate 1, greatly reduce inlet gate 1 and open Men Li, what inlet gate 1 operated normally opens a power satisfaction unlatching requirement, effective to save without increasing inlet gate headstock gear capacity Investment is saved.

Claims (3)

1. a kind of high narrow big aperture inlet gate drainage arrangement, including inlet gate(1)Be located at inlet gate(1)The inspection of upstream Repair gate(5);Inlet gate(1)Top is equipped with inlet gate filling valve(7), bulkhead gate(5)Top is filled equipped with bulkhead gate Water valve(8);It is characterized in that:In inlet gate(1)With bulkhead gate(5)Between ground sill(10)It is equipped with interim immersible pump (9), interim immersible pump(9)Outlet and inlet gate filling valve(7)Water inlet connection.
2. high narrow big aperture inlet gate drainage arrangement according to claim 1, it is characterised in that:The inlet gate(1) The gate pier at top is equipped with inspection platform(2);Inspection platform(2)Close to bulkhead gate(5)Side is equipped with rectangular recess(3), square Connected in star(3)The inspection platform of bottom(2)It is equipped with round hole(4), round hole(4)With bulkhead gate(5)And inlet gate(1) Between runner at the top of(6)It communicates;In round hole(4)The gate pier at top is equipped with hook(13), hook(13)Through iron chains(11) With interim immersible pump(9)Connection.
3. high narrow big aperture inlet gate drainage arrangement according to claim 2, it is characterised in that:The inspection platform(2) It is equipped with service aisle(12).
CN201820519907.2U 2018-04-12 2018-04-12 A kind of high narrow big aperture inlet gate drainage arrangement Active CN208167666U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820519907.2U CN208167666U (en) 2018-04-12 2018-04-12 A kind of high narrow big aperture inlet gate drainage arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820519907.2U CN208167666U (en) 2018-04-12 2018-04-12 A kind of high narrow big aperture inlet gate drainage arrangement

Publications (1)

Publication Number Publication Date
CN208167666U true CN208167666U (en) 2018-11-30

Family

ID=64370360

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820519907.2U Active CN208167666U (en) 2018-04-12 2018-04-12 A kind of high narrow big aperture inlet gate drainage arrangement

Country Status (1)

Country Link
CN (1) CN208167666U (en)

Similar Documents

Publication Publication Date Title
CN201473933U (en) Combination layout structure of tail water emergency gate and tail water surge shaft in pumped storage power station
CN106284240A (en) A kind of power station is in construction time downstream interim water-supply structure and method
CN108330921A (en) A kind of high narrow big aperture inlet gate water discharge method and device
CN101302763B (en) Self-elevating drilling platform pile punching apparatus
CN208167666U (en) A kind of high narrow big aperture inlet gate drainage arrangement
CN207092033U (en) A kind of flood discharging tunnel
CN204626349U (en) Gate of hydropower station top Accrete clearing device
CN105040648A (en) Reservoir emptying tunnel for over 200-meter ultrahigh dam and arrangement method and application thereof
CN209891288U (en) Drainage pump station
CN208088251U (en) Ecological flow discharge structure during lower lock water storage
CN204982820U (en) A lock chamber arrangement structure that is used for high arch dam water conservancy diversion bottom outlet
CN103114838B (en) High-pressure automatic sand discharge device
CN207314279U (en) It is a kind of to take into account small river flood control water drainage pump brake system integrated with moisturizing demand in city
CN209620172U (en) A kind of novel aqueduct of falling rainbow spoil disposal emptying structure
CN212336278U (en) Large-scale underground type hydropower station factory building leakage drainage system combined with slope shaft
CN211057931U (en) Tunnel fire control water supply double-supply system
CN205314233U (en) Multi -functional sump pit structure in power station
CN105268574B (en) One kind spraying main frame and its method of work
CN200946262Y (en) High-water head ship lock
CN203412625U (en) Underground coal mine drainage facility
CN209603077U (en) Two dam structures of runtime not pump drainage turn(a)round interim pump drainage
CN103741703B (en) A kind of radial pumped well formula siphon drainage device
CN207376762U (en) A kind of flood control electricity row station
CN207701337U (en) Deep well pump sand control check three-port structure
CN207297109U (en) Steam turbine jetting case overflow recovery control system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant