CN208072905U - Construction support for shuttering - Google Patents
Construction support for shuttering Download PDFInfo
- Publication number
- CN208072905U CN208072905U CN201820410323.1U CN201820410323U CN208072905U CN 208072905 U CN208072905 U CN 208072905U CN 201820410323 U CN201820410323 U CN 201820410323U CN 208072905 U CN208072905 U CN 208072905U
- Authority
- CN
- China
- Prior art keywords
- upright bar
- plectane
- pright stanchion
- installation set
- adjusting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Moulds, Cores, Or Mandrels (AREA)
Abstract
Construction support for shuttering, including several end to end die carrier units, die carrier unit includes two upright bar parts and two cross bars, every upright bar part includes upper pright stanchion and lower upright bar, upper pright stanchion and lower upright bar are arranged in vertical, the lower end of lower upright bar is equipped with foot pad, the lower end of upper pright stanchion is connected to the upper end of lower upright bar by Quick connection part, the upper end of upper pright stanchion is equipped with adjusting rod, adjusting rod upper end is fixed with jacking, it is equipped with installation set in upper pright stanchion and lower upright bar, threaded hole is radially offered in installation set, installation set is equipped with the top pressure bolt being threaded in threaded hole;In conclusion the utility model structure novel, reduces the use of parts, construction cost is reduced, it is highly practical.
Description
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of construction support for shuttering.
Background technology
With the quickening of process of modernized city, batches of high buildings and large mansions are rised sheer from level ground, and the construction speed of engineering requires to get over
Come tighter, market competition is also more and more fierce.The support of template will largely use formwork scaffold in construction.It is existing
It is connected between support for construction upright bar and upright bar, generally requires and be locked using a large amount of bolt, and the use of bolt
Installation process is comparatively laborious, and parts are easily lost more, are undoubtedly the increase in construction cost.
Utility model content
The utility model provides a kind of easy for installation, reduction construction cost to solve shortcoming in the prior art
Construction support for shuttering.
In order to solve the above technical problems, the utility model adopts the following technical solution:Construction support for shuttering, including it is several
End to end die carrier unit, die carrier unit include two upright bar parts and two cross bars, and every upright bar part includes upper pright stanchion under
Upright bar, upper pright stanchion and lower upright bar are arranged in vertical, and the lower end of lower upright bar is equipped with foot pad, and the lower end of upper pright stanchion passes through fast
Fast connector is connected to the upper end of lower upright bar, and the upper end of upper pright stanchion is equipped with adjusting rod, and adjusting rod upper end is fixed with jacking, on
It is equipped with installation set in upright bar and lower upright bar, threaded hole is radially offered in installation set, installation set connects equipped with screw thread
The top pressure bolt being connected in threaded hole, wherein the both ends of a cross bar are plugged in respectively in the installation set of two root upper pright stanchions, separately
The both ends of an outer cross bar are plugged in respectively in the installation set of two lower upright bars, the inner end of the top pressure bolt in the installation set
In the end top pressure cooperation of cross bar.
Quick connection part includes upper plectane and lower plectane, and upper plectane coaxial line is fixed on the lower face of upper pright stanchion, upper plectane
Bottom surface be fixed with inserting column, inserting column is tetragonous rod structure, and lower plectane coaxial line is fixed on the upper surface of lower upright bar, lower plectane
Top surface be fixed with grafting set, grafting puts on the cavity equipped with open top, which is adapted with inserting column, upper plectane upper edge
Radial direction is opened up there are two bayonet, and two bayonets are about upper plectane center symmetric setting, and hinged on lower plectane there are two fastenings
Part, center symmetric setting of two fasteners about lower plectane, fastener includes fastening bolt, and the lower end of fastening bolt is hinged on
On lower plectane, the upper end of fastening bolt passes through bayonet, the upper end of fastening bolt to be threaded with nut, nut and upper plectane
The cooperation of upper surface top pressure.
Upper pright stanchion, lower upright bar and adjusting rod are all made of steel pipe and are made, and adjusting rod lower end is inserted into and is threaded in
Inside upright bar, the external wall of upper portion of adjusting rod is provided with spanner clamping portion.
Using above-mentioned technical proposal, the utility model has the advantages that:The utility model passes through several assembly mould frames
Unit joins end to end, wherein when mounted, lower upright bar is fixed on ground by foot pad first, then by upper pright stanchion
Inserting column is plugged in the grafting set of lower upright bar upper end, then stirs fastening bolt so that fastening bolt is threaded through in bayonet, rotation
Nutting makes nut top pressure on upper plectane, same method installation another set upright bar part is then installed, then by cross bar
It is plugged in the installation set of two upper pright stanchions, in addition a cross bar is plugged in the installation set of two lower upright bars, screws top pressure spiral shell
Bolt makes the inner end of top pressure bolt be contacted in cross bar top pressure, then installs same method and installs remaining die carrier unit i.e.
It can;Due in the utility model fastening bolt and top pressure bolt be all to be connected in the present apparatus, when not in use without
It all removes, without looking for many scattered bolts to be installed when installation, reduces the use of parts, reduce construction
Cost.
In conclusion the utility model structure novel, reduces the use of parts, construction cost, practicability are reduced
By force.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is enlarged drawing at I in Fig. 1;
Fig. 3 is the connection diagram between the lower end of upper pright stanchion and the upper end of lower upright bar;
Fig. 4 is the schematic diagram that the lower end of upper pright stanchion and the upper end of lower upright bar separate in Fig. 3;
Fig. 5 is the scheme of installation of upper plectane.
Specific implementation mode
As shown in Figs. 1-5, the construction support for shuttering of the utility model, including several end to end die carrier units, mould
Frame unit includes two upright bar parts and two cross bars 1, and every upright bar part includes upper pright stanchion 2 and lower upright bar 3, upper pright stanchion 2 and lower vertical
Bar 3 is arranged in vertical, and the lower end of lower upright bar 3 is equipped with foot pad 4, and the lower end of upper pright stanchion 2 is connected by Quick connection part 15
It is connected on the upper end of lower upright bar 3, the upper end of upper pright stanchion 2 is equipped with adjusting rod 16, and 16 upper end of adjusting rod is fixed with jacking 5, upper vertical
It is equipped with installation set 6 in bar 2 and lower upright bar 3, threaded hole is radially offered in installation set 6, installation set 6 is equipped with screw thread
The top pressure bolt 7 being connected in threaded hole, wherein the both ends of a cross bar 1 are plugged in the installation set 6 of two root upper pright stanchions 2 respectively
Interior, in addition the both ends of a cross bar 1 are plugged in respectively in the installation set 6 of two lower upright bars 3, the top pressure in the installation set 6
The inner end of bolt 7 is in the end top pressure cooperation of cross bar 1.
Quick connection part 15 includes upper plectane 8 and lower plectane 9, and 8 coaxial line of upper plectane is fixed on the lower face of upper pright stanchion 2,
The bottom surface of upper plectane 8 is fixed with inserting column 10, and inserting column 10 is tetragonous rod structure, and lower 9 coaxial line of plectane is fixed on lower upright bar 3
The top surface of upper surface, lower plectane 9 is fixed with grafting set 11, and grafting set 11 is equipped with the cavity of open top, the cavity and grafting
Column 10 is adapted, and two bayonets 12 is radially offered on upper plectane 8, two bayonets 12 are about 8 central symmetry of upper plectane
It is arranged, is hinged on lower plectane 9 there are two fastener, center symmetric setting of two fasteners about lower plectane 9, fastener includes
The lower end of fastening bolt 13, fastening bolt 13 is hinged on lower plectane 9, and the upper end of fastening bolt 13 passes through bayonet 12, fastening
The upper end of bolt 13 is threaded with nut 14, and nut 14 and the upper surface top pressure of upper plectane 8 coordinate.
Upper pright stanchion 2, lower upright bar 3 and adjusting rod 16 are all made of steel pipe and are made, and 16 lower end of adjusting rod is inserted into and screw thread connects
It is connected on inside upper pright stanchion 2, the external wall of upper portion of adjusting rod 16 is provided with spanner clamping portion.
The utility model is joined end to end by several groups die carrier unit, wherein when mounted, first leading to lower upright bar 3
It crosses foot pad 4 and is fixed on ground, then the inserting column 10 of upper pright stanchion 2 is plugged in the grafting set 11 of 3 upper end of lower upright bar, then
Stir fastening bolt 13 so that fastening bolt 13 is threaded through in bayonet 12, and screw on nut 14 makes 14 top pressure of nut in upper plectane 8
On, then same method installation another set upright bar part is installed, cross bar 1 is then plugged in the installation set 6 of two upper pright stanchions 2
Interior, in addition a cross bar 1 is plugged in the installation set 6 of two lower upright bars 3, screws the inner end that top pressure bolt 7 makes top pressure bolt 7
It is contacted in 1 top pressure of cross bar, same method is then installed, remaining die carrier unit is installed.
The present embodiment not makes any form of restriction the shape of the utility model, material, structure etc., every foundation
The technical essence of the utility model belongs to this reality to any simple modification, equivalent change and modification made by above example
With the protection domain of new technique scheme.
Claims (3)
1. construction support for shuttering, it is characterised in that:Including several end to end die carrier units, die carrier unit includes two vertical
Rod piece and two cross bars, every upright bar part include upper pright stanchion and lower upright bar, and upper pright stanchion and lower upright bar are arranged in vertical, under
The lower end of upright bar is equipped with foot pad, and the lower end of upper pright stanchion is connected to the upper end of lower upright bar by Quick connection part, upper pright stanchion
Upper end is equipped with adjusting rod, and adjusting rod upper end is fixed with jacking, installation set, installation set upper edge are equipped in upper pright stanchion and lower upright bar
Radial direction offers threaded hole, and installation set is equipped with the top pressure bolt being threaded in threaded hole, wherein cross bar
Both ends are plugged in respectively in the installation set of two root upper pright stanchions, and in addition the both ends of a cross bar are plugged in two lower upright bars respectively
In installation set, the inner end of the top pressure bolt in the installation set is in the end top pressure cooperation of cross bar.
2. construction support for shuttering according to claim 1, it is characterised in that:Quick connection part includes upper plectane and lower circle
Plate, upper plectane coaxial line are fixed on the lower face of upper pright stanchion, and the bottom surface of upper plectane is fixed with inserting column, and inserting column is quadrangular knot
Structure, lower plectane coaxial line are fixed on the upper surface of lower upright bar, and the top surface of lower plectane is fixed with grafting set, and grafting is put on equipped with top
Open cavity, the cavity are adapted with inserting column, radially offer two bayonets on upper plectane, two bayonets about
Upper plectane center symmetric setting, hinged there are two fastener on lower plectane, two fasteners are set about the central symmetry of lower plectane
It sets, fastener includes fastening bolt, and the lower end of fastening bolt is hinged on lower plectane, and the upper end of fastening bolt passes through bayonet,
The upper end of fastening bolt is threaded with nut, and the upper surface top pressure of nut and upper plectane coordinates.
3. construction support for shuttering according to claim 1, it is characterised in that:Upper pright stanchion, lower upright bar and adjusting rod are equal
It is made of steel pipe, adjusting rod lower end is inserted into and is threaded in inside upper pright stanchion, and the external wall of upper portion of adjusting rod, which is provided with, pulls
Hand clamping portion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820410323.1U CN208072905U (en) | 2018-03-26 | 2018-03-26 | Construction support for shuttering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820410323.1U CN208072905U (en) | 2018-03-26 | 2018-03-26 | Construction support for shuttering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208072905U true CN208072905U (en) | 2018-11-09 |
Family
ID=64046801
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820410323.1U Expired - Fee Related CN208072905U (en) | 2018-03-26 | 2018-03-26 | Construction support for shuttering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208072905U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110011234A (en) * | 2019-04-28 | 2019-07-12 | 国网河南省电力公司平顶山供电公司 | A kind of inside cable terminal assembly and disassembly auxiliary tool |
-
2018
- 2018-03-26 CN CN201820410323.1U patent/CN208072905U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110011234A (en) * | 2019-04-28 | 2019-07-12 | 国网河南省电力公司平顶山供电公司 | A kind of inside cable terminal assembly and disassembly auxiliary tool |
CN110011234B (en) * | 2019-04-28 | 2020-09-04 | 国网河南省电力公司平顶山供电公司 | Indoor cable termination installs and removes appurtenance |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206204995U (en) | The tall and big side wall one side formwork erection of open trench tunnel agent structure | |
CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
CN205804939U (en) | template assembly for subway station side wall | |
CN101624871A (en) | Instrumental operation platform for shear wall formwork of elevator shaft | |
CN105781100A (en) | Template component for sidewall of subway station | |
CN208072905U (en) | Construction support for shuttering | |
CN205421940U (en) | Concrete spreader | |
CN201228440Y (en) | Horizontal moving device for large steel formwork system | |
CN104372923A (en) | Scaffold | |
CN210289148U (en) | Be used for building aluminium template bracing piece iron pipe | |
CN207727978U (en) | Girderless floor bolumn cap template reinforcing device | |
CN214739838U (en) | Dish knot formula scaffold frame based on BIM | |
CN201447862U (en) | Instrumental operating platform used for elevator shaft shear wall shuttering erection | |
CN203977844U (en) | A kind of for the fixing steel pipe iron wire fastener of building trade | |
CN204920198U (en) | Floor falls regularization of board and hangs mould | |
CN204174915U (en) | Scaffold | |
CN205476444U (en) | Light -duty support post based on low level jacking die carrier system | |
CN209723624U (en) | A kind of cast-in-place mounted split pattern support construction | |
CN208870243U (en) | A kind of curtain wall installing structure | |
CN204174919U (en) | Scaffold | |
CN206815821U (en) | A kind of high-low bay hoisting die construction device | |
CN206655466U (en) | A kind of novel turning mould | |
CN205976473U (en) | Aluminum -wood formwork support device | |
CN211817787U (en) | Scaffold for steel structure factory building | |
CN204163358U (en) | Scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181109 Termination date: 20190326 |
|
CF01 | Termination of patent right due to non-payment of annual fee |