CN208041249U - Pilot-operated type booster shutoff valve - Google Patents

Pilot-operated type booster shutoff valve Download PDF

Info

Publication number
CN208041249U
CN208041249U CN201820111632.9U CN201820111632U CN208041249U CN 208041249 U CN208041249 U CN 208041249U CN 201820111632 U CN201820111632 U CN 201820111632U CN 208041249 U CN208041249 U CN 208041249U
Authority
CN
China
Prior art keywords
valve
pilot
pilot valve
main valve
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820111632.9U
Other languages
Chinese (zh)
Inventor
李鹏
孔令臣
朱旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Yangtze Power Co Ltd
Original Assignee
China Yangtze Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Yangtze Power Co Ltd filed Critical China Yangtze Power Co Ltd
Priority to CN201820111632.9U priority Critical patent/CN208041249U/en
Application granted granted Critical
Publication of CN208041249U publication Critical patent/CN208041249U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fluid-Driven Valves (AREA)

Abstract

The utility model discloses pilot-operated type booster shutoff valve, main valve is connected by connecting line with pilot valve;The pilot valve includes pilot valve body, the bottom of the pilot valve body is equipped with pilot valve end cap, the pilot valve body and pilot valve end cap constitute closed chamber, the closed chamber internal-internal is equipped with pilot valve spring and pilot valve spool, adjusting bolt is installed on the top of pilot valve body, the bottom end face of the adjusting bolt is in contact cooperation with the top of pilot valve spring;The bottom sides of the pilot valve body are machined with the first pilot valve trepanning, and the first pilot valve trepanning is connected with the water outlet side opening of main valve;The center of the pilot valve end cap is machined with pilot valve bottom opening, and pilot valve bottom opening is connected with the main valve trepanning of main valve;The second pilot valve trepanning being connected with air and third pilot valve trepanning are additionally provided on the side wall of the pilot valve body.This shutoff valve adapts to manifold pressure normal variation, and its operating pressure can be adjusted arbitrarily.

Description

Pilot-operated type booster shutoff valve
Technical field
The utility model is related to a kind of shutoff valve, more particularly to a kind of pilot-operated type booster shutoff valve.
Background technology
Caused a large amount of fluids leakages will give the production and living of people along the line cause larger after the generation of pressure conduit booster Loss.By itself control pilot-operated type booster shutoff valve can quick acting to fully closed, caused by pipeline leakage accident Consequence is reduced to minimum influence, quadratic loss is reduced, to improve safety and the economy of pipe network.
Booster shutoff valve is quick detection and can to block a kind of device of fluid conveying after pressure conduit booster, fit For a variety of water supply lines such as urban water supply engineering, industrial water-lifting engineering.The booster shutoff valve of pilot valve control does not need electric-controlled System, and pilot valve is only relied on to the pressure of valve front and rear pipes as Rule of judgment, automatic realization valve is closed, and booster shadow is suitable for Ring big, unattended, high degree of automation the occasion of needs.
Utility model patent:201310301183.6 booster shutoff valve is disclosed and a kind of is promptly blocked according to pressure change The valve of flow.When pressure drops to certain numerical value after booster valve occurs for valve water outlet side one end, valve disc is pre-tightening Under the action of spring, since inflow direction fluid impingement force gradually increases after closing, the power suffered by valve disc further increases, directly It is fully closed to valve.Its shortcoming is that 1. adjustment pressure set points need while adjusting several spring compression bolts, Adjustment precision It is low;2. for different nominal diameters, the booster shutoff valve of different pressures setting value needs to match the different spring of plurality of specifications, Product seriation degree is low, and manufacturing cost is high.
Utility model content
The purpose of this utility model is to provide pilot-operated type booster shutoff valves, and it is normal that this shutoff valve adapts to manifold pressure Variation, and its operating pressure can be adjusted arbitrarily.
In order to realize above-mentioned technical characteristic, what the purpose of this utility model was realized in:Pilot-operated type booster shutoff valve, It includes main valve, and the main valve is connected by connecting line with pilot valve;
The pilot valve includes pilot valve body, and the bottom of the pilot valve body is equipped with pilot valve end cap, the pilot valve body and pilot valve end Lid constitutes closed chamber, and the closed chamber internal-internal is equipped with pilot valve spring and pilot valve spool, pacifies on the top of pilot valve body Equipped with adjusting bolt, the bottom end face of the adjusting bolt is in contact cooperation with the top of pilot valve spring;
The bottom sides of the pilot valve body are machined with the first pilot valve trepanning, the water outlet side of the trepanning of the first pilot valve and main valve Trepanning is connected;
The center of the pilot valve end cap is machined with pilot valve bottom opening, the main valve trepanning of pilot valve bottom opening and main valve It is connected;
The second pilot valve trepanning being connected with air and third pilot valve trepanning are additionally provided on the side wall of the pilot valve body.
The adjusting bolt is fixed on by locking nut on pilot valve body.
The center of the pilot valve spool is machined with centre bore, the centre bore and first in pilot valve spool outer wall The annular gap that sealing ring and the second sealing ring are constituted is connected, and the pilot valve spool is also equipped with third sealing ring, described Gap between second sealing ring and third sealing ring is not in communication with the outside.
The main valve includes valve body of main valve, and main valve end cap, the valve body of main valve and master are equipped at the top of valve body of main valve Main valve chamber is formed between valve end cap, and valve disc, the valve disc and the step inside valve body of main valve are installed in main valve chamber interior Face matches, and can block the liquid flowed through from main valve.
It is bolted at the top of the main valve end cap and cylinder body is installed, the cylinder interior is slidably installed and has work The lower face of plug, the piston is installed with lower valve rod, and the lower valve rod passes through main valve end cap, another end solid with valve disc It is fixed to be connected, upper valve rod is installed at the top of the piston, the upper valve rod passes through the through-hole at the top of cylinder body.
The outside of the upper valve rod is simultaneously set with resetting spring positioned at one end of cylinder interior, and the resetting spring passes through cylinder Body and the position restraining portions part on upper valve rod apply main valve moving component downward elastic force.
The resetting spring is mounted on outside cylinder body applies elastic force to main valve moving component.
Indicator scale is installed, the indicator scale and the pointer being fixed on upper valve rod match at the top of the cylinder body It closes, and indicates the aperture of main valve.
The utility model has the advantages that:
1, by using above-mentioned structure, it can ensure after booster occurs for pipeline, automatically be detected by pilot valve It is leaked, and then quick detection and blocks fluid conveying;And electrical control is not needed by the booster shutoff valve that pilot valve controls, And pilot valve is only relied on to the pressure of valve front and rear pipes as Rule of judgment, automatic realization valve is closed, and booster can be suitable for Influence big, unattended, high degree of automation the occasion of needs.
2, it can adjust the pretightning force of pilot valve spring by rotating adjustment bolt.
3, it by the resetting spring, is mounted on upper valve rod axis, passes through cylinder body and the position on upper valve rod Limiting component applies main valve moving component downward elastic force.
4, when the pressure suffered by the pilot valve spool is more than the pretightning force of pilot valve spring, pilot valve spool is in top dead centre, and first The pressure of pilot valve trepanning is equal with cylinder body cavity of resorption chamber pressure, the cylinder body cavity of resorption chamber pressure of main valve, and pilot valve is in stable state, simultaneously The piston of main valve pushes main valve upper valve rod, lower valve rod, valve disc to form under the action of the cylinder body lower chambers fluid pressure of main valve Moving component moves downward, and overcomes the pretightning force of resetting spring, to keep main valve to be in open state.
5, when the pressure suffered by the pilot valve spool is less than the pretightning force of pilot valve spring, pilot valve spool downlink simultaneously contacts pilot valve end Lid is in lower dead center, and the gap of the annular between the first sealing ring and the second sealing ring is connected to the second pilot valve trepanning, and then will Cylinder body lower chambers and atmosphere, piston push main valve upper valve rod, lower valve rod, valve disc group under the preload force effect of resetting spring At moving component move downward, to close main valve.
Description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is the utility model first embodiment structural schematic diagram.
Fig. 2 is the utility model second embodiment structural schematic diagram.
Fig. 3 is the utility model 3rd embodiment structural schematic diagram.
In figure:Valve body of main valve 11, main valve end cap 12, cylinder body 13, indicator scale 14, upper valve rod 15, resetting spring 16, piston 17, lower valve rod 18, valve disc 19;
Pilot valve body 21, pilot valve end cap 22, adjusting bolt 23, locking nut 24, pilot valve spring 25, pilot valve spool 26, first Sealing ring 27, the second sealing ring 28, third sealing ring 29;
First pilot valve trepanning 31, pilot valve bottom opening 32, the second pilot valve trepanning 33, third pilot valve trepanning 34, main valve trepanning 35。
Specific implementation mode
The embodiment of the utility model is described further below in conjunction with the accompanying drawings.
Embodiment 1:
As shown in Figure 1, pilot-operated type booster shutoff valve, it includes main valve, and the main valve is connected by connecting line with pilot valve; The pilot valve includes pilot valve body 21, and the bottom of the pilot valve body 21 is equipped with pilot valve end cap 22, the pilot valve body 21 and pilot valve end Lid 22 constitutes closed chamber, and the closed chamber internal-internal is equipped with pilot valve spring 25 and pilot valve spool 26, in pilot valve body 21 Top adjusting bolt 23 is installed, the bottom end face of the adjusting bolt 23 is in contact cooperation with the top of pilot valve spring 25; The pretightning force of pilot valve spring 25 can be adjusted by adjusting bolt 23.
Further, the bottom sides of the pilot valve body 21 are machined with the first pilot valve trepanning 31, the first pilot valve trepanning 31 are connected with the water outlet side opening 37 of main valve;The center of the pilot valve end cap 22 is machined with pilot valve bottom opening 32, leads Valve bottom opening 32 is connected with the main valve trepanning 35 of main valve;Valve body of main valve is enabled to by the first pilot valve trepanning 31 The pressure of 11 outlet pressure, 21 base pressure of pilot valve body and cylinder body 13 is equal.
Further, the second pilot valve trepanning 33 being connected with air and are additionally provided on the side wall of the pilot valve body 21 Three pilot valve trepannings 34.Can be ensured after booster occurs by the second pilot valve trepanning 33, by the pressure of cylinder body 13 and Air is connected.
Further, the adjusting bolt 23 is fixed on by locking nut 24 on pilot valve body 21.
Further, the center of the pilot valve spool 26 is machined with centre bore, the centre bore be mounted on pilot valve spool The first sealing ring 27 on 26 outer walls is connected with the annular gap that the second sealing ring 28 is constituted, and the pilot valve spool 26 is also pacified Equipped with third sealing ring 29, the gap between second sealing ring 28 and third sealing ring 29 is not in communication with the outside.
Further, the main valve includes valve body of main valve 11, and main valve end cap 12, institute are equipped at the top of valve body of main valve 11 Formation main valve chamber between valve body of main valve 11 and main valve end cap 12 is stated, valve disc 19, the valve disc are installed in main valve chamber interior 19 match with the step surface inside valve body of main valve 11, and can block the liquid flowed through from main valve.
Further, the top of the main valve end cap 12, which is bolted, is equipped with cylinder body 13, inside the cylinder body 13 Being slidably installed has piston 17, and the lower face of the piston 17 is installed with lower valve rod 18, and the lower valve rod 18 passes through master Valve end cap 12, another end are fixedly linked with valve disc 19, and the top of the piston 17 is installed with upper valve rod 15, it is described on Valve rod 15 passes through the through-hole at the top of cylinder body 13.
Further, the outside of the upper valve rod 15 and one end inside the cylinder body 13 is set with resetting spring 16, institute Resetting spring 16 is stated to apply downwards main valve moving component by cylinder body 13 and the position restraining portions part on upper valve rod 15 Elastic force.
Further, the top of the cylinder body 13 is equipped with indicator scale 14, the indicator scale 14 and is fixed on upper valve Pointer on bar 15 matches, and indicates the aperture of main valve.
Embodiment 2:
Such as Fig. 2, in the present embodiment, the structure of the main valve and identical, the pilot valve in the present embodiment in implementing 1 Different in center hole structure and embodiment 1, in the present embodiment, centre bore is located at the center of pilot valve spool 26, and The centre bore is by being attached thereto the logical annular for extending transversely through hole and being constituted with the first sealing ring 27 and the second sealing ring 28 Gap is connected.
Embodiment 3:
Such as Fig. 3, in the present embodiment, the structure of the main valve is identical in implementation 1, in the present embodiment the reset bullet Spring 16 is mounted on outside cylinder body 13, and then applies elastic force to main valve moving component.
Embodiment 4:
The control method of pilot-operated type booster shutoff valve described in any one, by the control cavity pressure of pilot valve control bound, Realize being turned on and off for main valve;
To realize the above-mentioned course of work, relationship is between each parameter:
When normal operation:P1 × A1=K1+f1, P1 × A2 > K2+f2;
When emergency cut-off:P2 × A1=K1-f1, K2 > f2;
Wherein:P1 is the minimum water outlet side pressure for keeping main valve to open, and P2 is maximum water outlet side pressure when main valve is closed, A1 be pilot valve spool effective cross section product, K1 be pilot valve initial tension of spring, frictional force of the f1 between pilot valve spool and pilot valve body, A2 accumulates for piston effective cross section, and K2 is resetting spring pretightning force, and f2 is between main valve moving component and cylinder body, main valve end cap Frictional force;
Water outlet side pressure section is when main valve is kept it turning on(P2, ∞), water outlet side pressure section when main valve is closed is(0, P1), i.e., main valve is opened when pressure is more than P2, and main valve is closed when being less than P1.
When main valve normal water supply or other liquid, water outlet side pressure is located at section(0, P1)When, suffered by pilot valve spool 26 Pressure be more than the pretightning force of pilot valve spring 25, pilot valve spool 26 is in top dead centre, the pressure and cylinder body of the first pilot valve trepanning 31 21 cavity of resorption chamber pressures, 13 cavity of resorption chamber pressure of cylinder body are equal, and pilot valve is in stable state, while piston 17 is in 13 lower chambers liquid of cylinder body Under the action of body pressure, pushes the moving component that the upper valve rod 15, lower valve rod 18, valve disc 19 of main valve form to move downward, overcome The pretightning force of resetting spring 16, to keep main valve to be in open state;
After booster occurs, water outlet side drop of pressure to section(0, P2)When, the pressure suffered by pilot valve spool 26, which is less than, to be led When the pretightning force of valve spring 25,26 downlink of pilot valve spool simultaneously contacts pilot valve end cap 22, is in lower dead center, the first sealing ring 27 and the Annular gap between two sealing rings 28 is connected to the second pilot valve trepanning 33, and then by 13 lower chambers of cylinder body and atmosphere, is lived Plug 17 pushes the moving component that main valve upper valve rod 15, lower valve rod 18, valve disc 19 form under the preload force effect of resetting spring 16 It moves downward, to close main valve.
The course of work and operation principle of the utility model be:
Further, 25 pretightning force of pilot valve spring can be adjusted by rotating adjusting bolt 23, thus it is possible to vary main valve is opened Minimum water outlet side pressure P1 and main valve close when maximum water outlet side pressure P2;
Further, the range that can not be adjusted of valve closing pressure settings is located at section(P1-P2), difference P2- P1 is only dependent upon the frictional force f1 between pilot valve spool and pilot valve body, reduces this frictional force and valve closing pressure set may be implemented Value is located in the range of bigger.
Further, to realize above-mentioned principle, it need to only ensure that the pretightning force of main valve resetting spring 16 is more than main valve movement portion Part frictional force f2, and realizing this purpose only needs to expand 19 effective cross section of piston product A2.
Above-described embodiment is used for illustrating the utility model, rather than limits the utility model, in this practicality In novel spirit and scope of the claims, to any modifications and changes that the utility model is made, this reality is both fallen within With novel protection domain.

Claims (8)

1. pilot-operated type booster shutoff valve, it includes main valve, it is characterised in that:The main valve is connected by connecting line with pilot valve;
The pilot valve includes pilot valve body(21), the pilot valve body(21)Bottom pilot valve end cap is installed(22), the pilot valve body (21)With pilot valve end cap(22)Closed chamber is constituted, the closed chamber internal-internal is equipped with pilot valve spring(25)With pilot valve valve Core(26), in pilot valve body(21)Top adjusting bolt is installed(23), the adjusting bolt(23)Bottom end face and pilot valve Spring(25)Top be in contact cooperation;
The pilot valve body(21)Bottom sides be machined with the first pilot valve trepanning(31), the first pilot valve trepanning(31)With main valve Water outlet side opening(37)It is connected;
The pilot valve end cap(22)Center be machined with pilot valve bottom opening(32), pilot valve bottom opening(32)With main valve Main valve trepanning(35)It is connected;
The pilot valve body(21)Side wall on be additionally provided with the second pilot valve trepanning being connected with air(33)It is opened with third pilot valve Hole(34).
2. pilot-operated type booster shutoff valve according to claim 1, it is characterised in that:The adjusting bolt(23)Pass through locking Nut(24)It is fixed on pilot valve body(21)On.
3. pilot-operated type booster shutoff valve according to claim 1, it is characterised in that:The pilot valve spool(26)Center add Work has a centre bore, the centre bore be mounted on pilot valve spool(26)The first sealing ring on outer wall(27)With the second sealing ring (28)The annular gap constituted is connected, the pilot valve spool(26)It is also equipped with third sealing ring(29), described second is close Seal(28)With third sealing ring(29)Between gap be not in communication with the outside.
4. pilot-operated type booster shutoff valve according to claim 1, it is characterised in that:The main valve includes valve body of main valve (11), in valve body of main valve(11)Top main valve end cap is installed(12), the valve body of main valve(11)With main valve end cap(12)It Between formed main valve chamber, valve disc is installed in main valve chamber interior(19), the valve disc(19)With valve body of main valve(11)Internal Step surface matches, and can block the liquid flowed through from main valve.
5. pilot-operated type booster shutoff valve according to claim 4, it is characterised in that:The main valve end cap(12)Top it is logical It crosses bolt and is installed with cylinder body(13), the cylinder body(13)Sliding fit inside is equipped with piston(17), the piston(17) Lower face be installed with lower valve rod(18), the lower valve rod(18)Across main valve end cap(12), another end and valve disc (19)It is fixedly linked, the piston(17)Top be installed with upper valve rod(15), the upper valve rod(15)Across cylinder body (13)Top through-hole.
6. pilot-operated type booster shutoff valve according to claim 5, it is characterised in that:The upper valve rod(15)Outside and position In cylinder body(13)Internal one end is set with resetting spring(16), the resetting spring(16)Pass through cylinder body(13)With positioned at upper valve Bar(15)On position restraining portions part apply downward elastic force to main valve moving component.
7. pilot-operated type booster shutoff valve according to claim 6, it is characterised in that:The resetting spring(16)Mounted on cylinder Body(13)Outside applies elastic force to main valve moving component.
8. pilot-operated type booster shutoff valve according to claim 5, it is characterised in that:The cylinder body(13)Top be equipped with Indicator scale(14), the indicator scale(14)Be fixed on upper valve rod(15)On pointer match, and indicate opening for main valve Degree.
CN201820111632.9U 2018-01-23 2018-01-23 Pilot-operated type booster shutoff valve Active CN208041249U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820111632.9U CN208041249U (en) 2018-01-23 2018-01-23 Pilot-operated type booster shutoff valve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820111632.9U CN208041249U (en) 2018-01-23 2018-01-23 Pilot-operated type booster shutoff valve

Publications (1)

Publication Number Publication Date
CN208041249U true CN208041249U (en) 2018-11-02

Family

ID=63954098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820111632.9U Active CN208041249U (en) 2018-01-23 2018-01-23 Pilot-operated type booster shutoff valve

Country Status (1)

Country Link
CN (1) CN208041249U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331948A (en) * 2018-01-23 2018-07-27 中国长江电力股份有限公司 Pilot-operated type booster shutoff valve and control method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331948A (en) * 2018-01-23 2018-07-27 中国长江电力股份有限公司 Pilot-operated type booster shutoff valve and control method
CN108331948B (en) * 2018-01-23 2023-05-16 中国长江电力股份有限公司 Pilot-operated type pipe explosion shutoff valve and control method

Similar Documents

Publication Publication Date Title
CN108331948A (en) Pilot-operated type booster shutoff valve and control method
CN105545858B (en) A kind of special Pneumatic valve of pneumohydraulic pressure-cylinder and pneumohydraulic pressure-cylinder
CN101825191A (en) Piston sealed safety valve
CN108708999B (en) Low-pressure pilot-operated safety valve
CN208041249U (en) Pilot-operated type booster shutoff valve
CN205330946U (en) Compressor clearance tolerance governing system actuating mechanism's multiaction leak detection system
CN111911216B (en) Directional flow valve with continuous flow adjusting function and control method thereof
CN111981169A (en) Pilot operated safety valve for urban gas
CN110131240B (en) Hydraulic position and pressure closed-loop control dynamic and static simulation test system and method
CN106369200B (en) A kind of gas spring overflow valve
CN203223605U (en) Diaphragm pilot valve capable of detecting pressure and flow rate
CN218440002U (en) Pilot-operated type leakage-free safety pressure valve
CN108061030B (en) Clearance air quantity adjusting system on reciprocating compressor
CN106286927A (en) From pressure-loaded formula pressure regulator
CN204327992U (en) A kind of explosion-proof guide electromagnetic valve
CN211737617U (en) Direct-acting pressure positive feedback two-way proportional pressure reducing valve
CN201288882Y (en) Hydraulic controlled piston type water-attack discharging valve
CN202401521U (en) Flow controller with pressure holding function
CN210859416U (en) Hydraulic position and pressure closed-loop control dynamic and static simulation test system
CN201810837U (en) Piston sealing type safety valve
CN204083264U (en) A kind of piston is as the single-seat adjusting valve of balancing component
CN210566498U (en) Pressure reducing valve for water
CN203585471U (en) Direct flow piston type guide adjustable reducing valve
CN203348655U (en) Detonation tube shutoff valve
CN209856413U (en) Quick cut-off safety valve

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant