CN208038981U - A kind of concrete row formula vibrator assisting guide frame - Google Patents

A kind of concrete row formula vibrator assisting guide frame Download PDF

Info

Publication number
CN208038981U
CN208038981U CN201820501602.9U CN201820501602U CN208038981U CN 208038981 U CN208038981 U CN 208038981U CN 201820501602 U CN201820501602 U CN 201820501602U CN 208038981 U CN208038981 U CN 208038981U
Authority
CN
China
Prior art keywords
guide frame
concrete
assisting guide
assisting
formula vibrator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820501602.9U
Other languages
Chinese (zh)
Inventor
张洁玙
许少强
杨印旺
武培哲
罗庆杰
张义青
谢俊平
王鸿飞
贾国帅
孙德生
孟保军
李晓霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Mechanization Construction Group Co Ltd
Original Assignee
Shanxi Mechanization Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Mechanization Construction Group Co Ltd filed Critical Shanxi Mechanization Construction Group Co Ltd
Priority to CN201820501602.9U priority Critical patent/CN208038981U/en
Application granted granted Critical
Publication of CN208038981U publication Critical patent/CN208038981U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)

Abstract

The utility model belongs to concrete pavement construction equipment technical field, formula vibrator assisting guide frame is arranged more particularly to a kind of concrete, it solves the problems, such as to cannot be satisfied using row's formula vibrator when concrete pavement construction and vibrate completely to one-time-concreting concrete, it include the assisting guide frame connected with concrete road surface formwork for placing, assisting guide frame is symmetricly set on the both ends lengthwise position of concrete road surface formwork for placing and the overhead height of the two is identical, assisting guide frame includes saddle track, saddle track is the channel steel that Open Side Down, saddle rail inferior portion spaced set has several supporting legs, two supporting rods are connected between symmetrically arranged assisting guide frame.The utility model is equivalent to the additional track that row's formula is vibrated, and the quality of vibrating after there is stronger regulating power and self-stability, significantly high pavement concrete to pour is easy to promote the use of a large area.

Description

A kind of concrete row formula vibrator assisting guide frame
Technical field
The utility model belongs to concrete pavement construction equipment technical field, and in particular to a kind of concrete row formula vibrator Assisting guide frame.
Background technology
Concrete road surface is the rigid pavement for making face layer with cement concrete slab, and construction technology is more mature at present, i.e., logical It crosses and carries out punching block support in the road surface region that need to be constructed, and pre-buried stretch is set and stitches plate, reinforcing bar and transmission rod, further carry out road surface The pouring construction of concrete.The construction of concrete road surface be block placement construction, piecemeal position stay set lateral construction joint in case Later stage road surface pouring and connecting.Most common equipment of vibrating is row's formula vibrator in pouring construction, and row's formula vibrator setting exists It is longitudinally moved and is vibrated on steel form and along road surface.When row's formula vibrator moves to piecemeal steel form end, vibrator Institute's casting concrete end is not reached to vibrating for concrete road surface, spacing between the two is up to 1 meter, due to arranging formula at this time also Vibrator is moved without extra track, is made it that can not continue to complete and is vibrated, cause the quality of vibrating of concrete road surface without Method is met.
Invention content
It cannot be satisfied using row's formula vibrator when the utility model is in order to solve concrete pavement construction and block placement mixed The problem of solidifying soil vibrates completely provides a kind of concrete row formula vibrator assisting guide frame.
The utility model is achieved by the following technical solution:A kind of concrete row formula vibrator assisting guide frame, including The assisting guide frame connected with concrete road surface formwork for placing, assisting guide frame are symmetricly set on concrete road surface formwork for placing The overhead height of both ends lengthwise position and the two is identical, and assisting guide frame includes saddle track, and saddle track is the slot that Open Side Down Steel, saddle rail inferior portion spaced set have several supporting legs, and two supporting rods are connected between symmetrically arranged assisting guide frame.
Supporting leg is in Figure of eight structure, and stull is both provided between single supporting leg, is connected in the middle part of the stull of same assisting guide frame vertical To connecting rod, supporting leg, stull and longitudinal rod are all made of a diameter of 25~32 millimeters of steel bar meter.
Supporting rod includes connector sleeve and two support links being threadedly coupled with connector sleeve, and one end of support link is fixed There are two round limit steel plate and be set in positioning sleeve, the other end of support link be provided with can coordinate with connector sleeve outside Screw thread.
Positioning sleeve is hollow cylinder, and positioning sleeve one end is fixed on saddle track side, and the positioning sleeve other end is provided with annular Baffle, the outer diameter of ring baffle are more than the diameter of positioning sleeve, and the internal diameter of ring baffle is more than 1~1.5 millimeter of support link diameter.
The length of assisting guide frame is 2~4 meters.
The utility model has an advantageous effect in that compared with prior art:
The utility model simple structure and reasonable design, dismantling is flexible, and device is light, and controllability is high, according to what is poured Concrete road surface steel form it is longitudinally wide, by adjusting supporting rod, make symmetrically arranged saddle interorbital away from can effectively control In reasonable range, screw thread locking positioning is realized after the completion of supporting rod distance adjustment, can effectively prevent assisting guide frame Spacing change;The utility model is equivalent to the additional track of row's formula vibrator, has stronger regulating power and from surely Property.The significantly high pavement concrete of the use of the utility model pour after quality of vibrating, be easy to promote the use of a large area.
Description of the drawings
Fig. 1 is the structural schematic diagram under the utility model use state;
Fig. 2 is the structural schematic diagram of the utility model;
Fig. 3 is the structural schematic diagram of supporting rod in Fig. 1;
Fig. 4 is the structural schematic diagram of support link in Fig. 3.
In figure:1- assisting guide frames, the concrete road surfaces 2- formwork for placing, 3- row's formula vibrators, 4- supporting rods, 5- connector sleeves, 6- saddle tracks, 7- supporting legs, 8- stulls, 9- longitudinal rods, 10- positioning sleeves, 11- circles limit steel plate, 12- ring baffles, 13- Support link.
Specific implementation mode
The utility model is further elaborated in referring to Fig.1~Fig. 4, a kind of concrete row formula vibrator assisting guide frame, Include the assisting guide frame 1 connected with concrete road surface formwork for placing 2, assisting guide frame 1 is symmetricly set on concrete road surface and pours The both ends lengthwise position of the building mould 2 and overhead height of the two is identical, assisting guide frame 1 include saddle track 6, and saddle track 6 is The channel steel that Open Side Down, 6 lower part spaced set of saddle track have several supporting legs 7, are connected between symmetrically arranged assisting guide frame 1 Two supporting rods 4.
Supporting leg 7 is in Figure of eight structure, and stull 8, the 8 middle part connection of stull of same assisting guide frame 1 are both provided between single supporting leg 7 There are longitudinal rod 9, supporting leg 7, stull 8 and longitudinal rod 9 to be all made of a diameter of 25~32 millimeters of steel bar meter.Wherein, stull 8 Use with longitudinal rod 9 helps to improve the stability of single assisting guide frame 1.
Supporting rod 4 includes connector sleeve 5 and two support links 13 being threadedly coupled with connector sleeve 5, support link 13 One end is fixed there are two round limit steel plate 11 and is set in positioning sleeve 10, and the other end of support link 13 is provided with can be with The external screw thread that connector sleeve 5 coordinates.Positioning sleeve 10 is hollow cylinder, and 10 one end of positioning sleeve is fixed on 6 side of saddle track, positioning sleeve 10 other ends are provided with ring baffle 12, and the outer diameter of ring baffle 12 is more than the diameter of positioning sleeve 10, the internal diameter of ring baffle 12 More than 1~1.5 millimeter of 13 diameter of support link.
Wherein, one end of support link 13 is respectively fixed with round limit steel plate 11, circle limit 11 clearance fit of steel plate It is arranged in positioning sleeve 10,10 one end of positioning sleeve is fixed on the side of saddle track 6, and 10 other end of positioning sleeve is fixed with annular gear Circle limit steel plate 11 can be stuck in positioning sleeve 10 by plate 12, ring baffle 12;When support link 13 between connector sleeve 5 by turning When moving to adjust extension elongation, support link 13 realizes its rotation relative to positioning sleeve 10 by round limit steel plate 11.
In view of final effect of vibrating, it need to ensure that the vibrator of row's formula vibrator 3 is capable of all areas of oversite concrete The length processing of assisting guide frame 1 can be 2~4 meters by domain.
When using row's formula vibrator 3 vibrate construction when, row's formula vibrator 3 is arranged in concrete road surface formwork for placing 2 Vertical framework on, and as concreting is constantly moved;When row's formula vibrator 3 is moved to concrete road surface formwork for placing 2 It when tail portion, can continuously move on assisting guide frame 1 so that tail portion young concrete is at vibrating for row's formula vibrator 3 Range;Further, the construction of vibrating of all concrete is completed using row's formula vibrator 3.

Claims (5)

1. a kind of concrete arranges formula vibrator assisting guide frame, including with concrete road surface formwork for placing(2)The auxiliary of contact connectio Saddle(1), it is characterised in that:Assisting guide frame(1)It is symmetricly set on concrete road surface formwork for placing(2)Both ends lengthwise position and The overhead height of the two is identical, assisting guide frame(1)Including saddle track(6), saddle track(6)For the channel steel that Open Side Down, lead Mounted track(6)Lower part spaced set has several supporting legs(7), symmetrically arranged assisting guide frame(1)Between be connected with two supporting rods (4).
2. a kind of concrete according to claim 1 arranges formula vibrator assisting guide frame, it is characterised in that:Supporting leg(7)In eight Word structure, single supporting leg(7)Between be both provided with stull(8), same assisting guide frame(1)Stull(8)Middle part is connected with longitudinal connect Bar(9), supporting leg(7), stull(8)And longitudinal rod(9)It is all made of a diameter of 25~32 millimeters of steel bar meter.
3. a kind of concrete according to claim 1 arranges formula vibrator assisting guide frame, it is characterised in that:Supporting rod(4)Packet Include connector sleeve(5)And and connector sleeve(5)Two support links being threadedly coupled(13), support link(13)One end be fixed with Two round limit steel plates(11)And it is set to positioning sleeve(10)It is interior, support link(13)The other end be provided with can with connect Set(5)The external screw thread of cooperation.
4. a kind of concrete according to claim 3 arranges formula vibrator assisting guide frame, it is characterised in that:Positioning sleeve(10)For Hollow cylinder, positioning sleeve(10)One end is fixed on saddle track(6)Side, positioning sleeve(10)The other end is provided with ring baffle (12), ring baffle(12)Outer diameter be more than positioning sleeve(10)Diameter, ring baffle(12)Internal diameter be more than support link (13)1~1.5 millimeter of diameter.
5. a kind of concrete of any one according to claims 1 to 4 arranges formula vibrator assisting guide frame, it is characterised in that: Assisting guide frame(1)Length be 2~4 meters.
CN201820501602.9U 2018-04-10 2018-04-10 A kind of concrete row formula vibrator assisting guide frame Active CN208038981U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820501602.9U CN208038981U (en) 2018-04-10 2018-04-10 A kind of concrete row formula vibrator assisting guide frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820501602.9U CN208038981U (en) 2018-04-10 2018-04-10 A kind of concrete row formula vibrator assisting guide frame

Publications (1)

Publication Number Publication Date
CN208038981U true CN208038981U (en) 2018-11-02

Family

ID=63944307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820501602.9U Active CN208038981U (en) 2018-04-10 2018-04-10 A kind of concrete row formula vibrator assisting guide frame

Country Status (1)

Country Link
CN (1) CN208038981U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113719127A (en) * 2021-09-08 2021-11-30 中国建筑土木建设有限公司 Rail slidable type cast-in-place concrete slab vibrating leveling device and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113719127A (en) * 2021-09-08 2021-11-30 中国建筑土木建设有限公司 Rail slidable type cast-in-place concrete slab vibrating leveling device and construction method thereof

Similar Documents

Publication Publication Date Title
CN102294741B (en) Construction method for prefabricating hollow slab beams using hinged draw type steel internal mould
CN102660925B (en) Moveable formwork for variable-width curved bridge
CN203081466U (en) Integrated moving framework for inverted arch of tunnel
CN105365036A (en) Process for mounting template for manufacturing sectional box girders
CN105269664A (en) Installation technique for segment box beam manufacturing formwork
CN208038981U (en) A kind of concrete row formula vibrator assisting guide frame
CN202658533U (en) Movable formwork of curved bridge with variable width
CN209687505U (en) Reinforced concrete frame tunnel, which pours, uses hydraulic template trolley
CN109505271A (en) A kind of complete construction of mobile hydraulic trolley arch culvert
CN206173899U (en) Trapezoidal ditch of slipform method template
CN202946193U (en) Tunnel center gutterway formwork
CN209686260U (en) A kind of crown formwork jumbo for the construction of diplopore arch culvert
CN209368658U (en) A kind of precast beam with locating piece
CN206048468U (en) A kind of horizontal piping lane mould
CN207295476U (en) One kind moves integrally landing mould bases
CN217327341U (en) Self-propelled long-span variable cross-section hydraulic formwork trolley
CN202347397U (en) Pavement cover-die construction complete device for slip-form pavers
CN209025675U (en) It is a kind of can a rotational forming inverted arch filling template
CN205876345U (en) Platform truck system that transports of template is pour to tunnel lateral sulcus cable duct
CN206999241U (en) Possess the beam prefabricated modular systems of self-vibration compact-type T that mirror surface concrete pours effect
CN211037270U (en) Fixed knot of assembled concrete frame roof beam post-cast area instrument formula template constructs
CN204001714U (en) The concrete mould of building of V-type cylinder
CN210370689U (en) Can freely adjust apron culvert platform body construction platform truck of culvert construction span
CN209025674U (en) It is a kind of can rotational forming twice inverted arch filling template
CN208777175U (en) A kind of overlapping constructing device of I-shaped steel reinforced concrete combination beam concrete

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant