CN207988459U - A kind of aluminium alloy scaffold - Google Patents
A kind of aluminium alloy scaffold Download PDFInfo
- Publication number
- CN207988459U CN207988459U CN201820308494.3U CN201820308494U CN207988459U CN 207988459 U CN207988459 U CN 207988459U CN 201820308494 U CN201820308494 U CN 201820308494U CN 207988459 U CN207988459 U CN 207988459U
- Authority
- CN
- China
- Prior art keywords
- brace
- bar
- support bar
- pedal
- aluminium alloy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a kind of aluminium alloy scaffolds of building scaffold technical field of construction.The scaffold includes scaffold strut, and scaffold strut includes two framings;Link, the first brace and the second brace are detachably connected between two framings, link is separately positioned between two neighboring upper pedal and at the top of upright bar, it is obliquely installed the first brace between two neighboring upper pedal, multiple second braces are set between lower pedal and adjacent upper pedal, two the second braces arranged up and down are obliquely installed positioned at two framing front ends, the higher-end of one of them the second brace is obliquely installed two the second braces of the arrangement that intersects positioned at two framing rear ends close to the lower end of another second brace;Link includes two connecting rods for being laterally arranged and being mutually parallel, and is provided with the montant being vertically arranged between two connecting rods, the montant is placed equidistant with multiple along connecting rod axial length.The utility model is simple in structure, overall stability improves.
Description
Technical field
The utility model is related to building scaffold technical field of construction, more particularly to a kind of aluminium alloy scaffold.
Background technology
Scaffold refers to construction site as operation and solves vertically and horizontally to transport the various holders set up.Existing skill
Art discloses a kind of utility model, and application No. is 200720147144.5, Authorization Notice No. is CN 201053198Y, is authorized public
Announcement day is 2007.4.20, and patent name is foldable scaffold, it is formed by several unit matchings, and each unit is
By the slash and ladder between cross bar, workbench, cross bar and the Extension support between left and right two groups of collapsible Extension supports, Extension supports
Assemble, flexible scaffold folded although providing in the prior art, inclined ladder is arranged in scaffold complicated integral structure
Assembled difficulty, transport trouble are increased, also, scaffold stability is inadequate, it is to be improved that worker climbs safety coefficient in operation.
Utility model content
The purpose of this utility model is to provide a kind of aluminium alloy scaffold that simple in structure, overall stability improves.
In order to realize above-mentioned purpose of utility model, the following technical solution that the utility model aluminium alloy scaffold uses:
A kind of aluminium alloy scaffold, including the scaffold strut made of aluminum alloy material, the scaffold strut include
Two framings of left and right settings include two upright bars being vertically arranged per framing, transverse direction are fixedly connected between two upright bars
It is arranged and for the cross bar of climbing, cross bar is placed equidistant with multiple along upright bar axial length, and the bottom of the scaffold strut is provided with
Pedal at least two is arranged in the top of lower pedal, the lower pedal;It is detachably connected with connection between two framing
Frame, the first brace and the second brace, the link are separately positioned between two neighboring upper pedal and at the top of upright bar, phase
It is obliquely installed the first brace between adjacent two upper pedals, multiple second braces are set between lower pedal and adjacent upper pedal,
Two the second braces arranged up and down are obliquely installed positioned at two framing front ends, the higher-end of one of them the second brace is leaned on
The lower end of nearly another second brace, two the second oblique pulls of the arrangement that intersects are obliquely installed positioned at two framing rear ends
Bar;The link includes two connecting rods for being laterally arranged and being mutually parallel, and is provided with and is vertically arranged between two connecting rods
Montant, the montant is placed equidistant with multiple along connecting rod axial length;Symmetrical supporting rack is arranged in two framing outer,
Support frame as described above includes the first support bar being obliquely installed, and one end of the first support bar is hinged in the middle part of upright bar, the other end
Against ground, the lower section setting of the first support bar compresses the second support bar of first support bar, the second support bar
One end is hinged with the connector being assemblied in first support bar, and the other end of second support bar is hinged in upright bar, and described second
Supporting rod is obliquely installed, and one end that the second supporting rack is hinged upright bar is higher-end.The utility model passes through in two neighboring upright bar
Between multiple cross bars be set climbed for worker, without in addition assembled hanging ladder, whole structural strength is reinforced in the setting of cross bar, whole
Body is simple in structure, and stability improves;Meanwhile link, the first brace and the second brace are set between two framings, even
It connects arrangement of the frame by connecting rod and montant, enhancing structure intensity, also, the second brace and passes through tilted upward arrangement and phase
Mutual interlaced arrangement is arranged between two framings, and supporting role is strong, further increases bearing capacity, stable structure.
Preferably, the upper pedal includes frame, bottom plate and baffle, and the lower pedal includes frame and bottom plate;The side
Frame both ends are equipped with the hook being mounted on cross bar, and the bottom plate is horizontally installed on frame, and bottom plate is by the assembly of at least two panels
Fixed, wherein a panel is movably articulated on frame, the movable end of the panel offers the opening convenient for lifting, and the baffle is perpendicular
To being arranged at four edges of bottom plate.By the setting of upper pedal, lower pedal, provides while worker stands and improve whole knot
Structure intensity, also, upper pedal improves the safety in altitude effect by the setting of baffle.
Preferably, the first support bar includes the outer sleeve hinged with upright bar, and the lower end of the outer sleeve is socketed with work
The dynamic inner sleeve to stretch in outer sleeve cavity, the inner sleeve equidistantly offer multiple compatible with D-shaped pin logical along axial length
Hole, the inner sleeve and outer sleeve are fixed by D-shaped pin.Inner sleeve movable telescopic is high according to building in the cavity of outer sleeve
The demand of degree adjusts the flexible of inner sleeve, ensures the supporting force of supporting rack, simple in structure, easy to use.
Preferably, the bottom of the first support bar is hinged with pedestal, and the base bottom is arranged to increasing friction force
Concaveconvex structure.Pedestal is hinged with first support bar, and stabilization is bonded with ground convenient for pedestal, meanwhile, it is tied by base bottom bumps
The setting of structure improves support strength, stable structure.
Preferably, the spacing phase between the spacing between the lower pedal and adjacent upper pedal and two neighboring upper pedal
Deng.Uniform force ensures stable structure.
Preferably, each upright bar is fixed by socket by least two fixed links.Assembly is carried out according to building height, it is convenient
Transport.
Preferably, the both ends of first brace, the second brace and connecting rod are equipped with grabbing on cross bar
Hand.By the setting of handgrip, the dismounting of the first brace, the second brace and connecting rod is facilitated to install, it is practical and convenient.
Preferably, the bottom of upright rod is provided with idler wheel easy to remove.It is moved when facilitating construction.
Compared with prior art, the beneficial effects of the utility model are:
1, the utility model is climbed by the way that multiple cross bars are arranged between two neighboring upright bar for worker, without in addition spelling
Hanging ladder is filled, whole structural strength is reinforced in the setting of cross bar, and overall structure is simple, and stability improves;Meanwhile two framings it
Between setting link, the first brace and the second brace, for link by the arrangement of connecting rod and montant, enhancing structure is strong
Degree, also, the second brace is arranged by tilted upward and interlaced arrangement is arranged between two framings, supporting role
By force, bearing capacity, stable structure are further increased;
2, the utility model ensures the steady of scaffold bottom by the way that symmetrical supporting rack is arranged in two framing outers
It is qualitative, be particularly suitable for the scaffold that skyscraper uses, wherein supporting rack include against ground first support bar and compress
The second support bar of first support bar is compressed by the support of second support bar, improves the bearing capacity of supporting rack, and structure is steady
It is fixed, meanwhile, by hinged fixation, second support bar compresses first by connector activity for first support bar and second support bar
Supporting rod further increases support force by adjusting support angle, simple in structure, is easily installed.
Description of the drawings
Fig. 1 is the stereogram of the utility model;
Fig. 2 is the front view of the utility model;
Fig. 3 is the portions the A enlarged drawing in Fig. 1;
Fig. 4 is the portions the B enlarged drawing in Fig. 1;
Fig. 5 is the portions the C enlarged drawing in Fig. 1.
Wherein, 1 cross bar, 2 fixed links, 3 upright bars, 4 first support bars, 41 outer sleeves, 42 inner sleeves, 43 through-holes, 44 pedestals,
45 concaveconvex structures, 5 second support bars, 6D shape pins, 7 hooks, 8 idler wheels, 9 bottom plates, 10 times pedals, 11 frames, 12 panels, 13 second
Brace, 14 are open, pedal on 15,16 baffles, 17 links, 18 first braces, 19 connecting rods, 20 montants, 21 handgrips, and 22
Connector.
Specific implementation mode
With reference to the accompanying drawings and detailed description, the utility model is furtherd elucidate, it should be understood that these embodiments are only
For illustrating the utility model rather than limitation the scope of the utility model, after having read the utility model, this field
Technical staff falls within the application range as defined in the appended claims to the modification of the various equivalent forms of the utility model.
As shown in Figs. 1-5, a kind of aluminium alloy scaffold, including the scaffold strut made of aluminum alloy material, scaffold
Strut includes two framings of left and right settings, includes two upright bars 3 being vertically arranged per framing, 3 bottom of upright bar is provided with just
In mobile idler wheel 8, each upright bar 3 is fixed by socket by least two fixed links 2, and transverse direction is fixedly connected between two upright bars 3
It is arranged and for the cross bar 1 of climbing, cross bar 1 is placed equidistant with multiple along 3 axial length of upright bar, and the bottom of scaffold strut is provided with down
Pedal 10, pedal 15 in the top setting at least two of lower pedal 10, spacing between lower pedal 10 and adjacent upper pedal 15 with
Spacing between two neighboring upper pedal 15 is equal;Upper pedal 15 includes frame 11, bottom plate 9 and baffle 16, and lower pedal 10 includes
Frame 11 and bottom plate 9;11 both ends of frame are equipped with the hook 7 being mounted on cross bar 1, and bottom plate 9 is horizontally installed on frame 11, bottom plate
9 is assembled fixed by least two panel 12, wherein a panel 12 is movably articulated on frame 11, the movable end of the panel 12 opens up
There are the opening 14 convenient for lifting, baffle 16 to be vertically provided at four edges of bottom plate 9;It is detachably connected between two framings
Link 17, the first brace 18 and the second brace 13, the first brace 18, the second brace 13 and connecting rod 19 both ends
The handgrip 21 being equipped on cross bar 1;Link 17 is separately positioned between two neighboring upper pedal 15 and upright bar 3 is pushed up
Portion is obliquely installed the first brace 18 between two neighboring upper pedal 15, is arranged between lower pedal 10 and adjacent upper pedal 15 more
A second brace 13 is obliquely installed two the second braces 13 arranged up and down positioned at two framing front ends, one of them
The higher-end of two braces 13 is obliquely installed mutual friendship close to the lower end of another second brace 13 positioned at two framing rear ends
Pitch two the second braces 13 of arrangement;Link 17 includes two connecting rods 19 for being laterally arranged and being mutually parallel, two companies
The montant 20 being vertically arranged is provided between extension bar 19, montant 20 is placed equidistant with multiple along 19 axial length of connecting rod;Outside two framings
Along symmetrical supporting rack is arranged, supporting rack includes the first support bar 4 being obliquely installed, and first support bar 4 includes and upright bar 3
The lower end of hinged outer sleeve 41, outer sleeve 41 is socketed with inner sleeve 42 of the movable telescopic in 41 cavity of outer sleeve, inner sleeve
42 equidistantly offer multiple through-holes 43 compatible with D-shaped pin 6, inner sleeve 42 and outer sleeve 41 along axial length is consolidated by D-shaped pin 6
It is fixed;One end of first support bar 4 is hinged on 3 middle part of upright bar, and the other end is hinged with bottom against ground, the bottom of first support bar 4
Seat 44,44 bottom of pedestal is arranged to the concaveconvex structure 45 of increasing friction force;The lower section setting of first support bar 4 compresses the first support
The second support bar 5 of bar 4, one end of second support bar 5 are hinged with the connector 22 being assemblied in first support bar 4, second
The other end of strut 5 is hinged in upright bar 3, and second support bar 5 is obliquely installed, the second supporting rack be hinged upright bar 3 one end be compared with
It is high-end.
The specific work process and principle of the utility model:It is fixed by socket into two by the multiple fixed links 2 being mutually socketed
Framing, frame include that upright bar 3 and cross bar 1 form, and the setting of multiple cross bars 1 is climbed for worker to be used, meanwhile, it further increases
Structural strength, at this point, fit on pedal 15, lower pedal 10, link 17, the first brace 18, second between two framings
Brace 13, link 17 is by the arrangement of connecting rod 19 and montant 20, enhancing structure intensity, meanwhile, the setting of link 17
The effect of handrail is provided when to worker's working at height, also, plays the effect of security protection;First brace 18 is arranged adjacent
Between two upper pedals 15, the second brace 13 is arranged by tilted upward and interlaced arrangement be arranged two framings it
Between, supporting role is strong, further increases bearing capacity, stable structure;Also, it is symmetrical by being arranged in two framing outers
Supporting rack, ensure the stability of scaffold bottom, be particularly suitable for the scaffold that skyscraper uses, wherein supporting rack packet
The first support bar 4 against ground and the second support bar 5 for compressing first support bar 4 are included, is supported for by the branch of second support bar 5
Pressure, improves the bearing capacity of supporting rack, stable structure, meanwhile, first support bar 4 and second support bar 5 by hinged fixation,
Second support bar 5 compresses first support bar 4 by 22 activity of connector, by adjusting support angle, further increases support force,
It is simple in structure, it is easily installed;Meanwhile the setting of upper pedal 15, lower pedal 10 is stood when constructing for worker, upper pedal 15 is by setting
Baffle 16 is set, improves the safety in worker's working at height, and by the way that hinged panel 12 is arranged, it is logical when convenient for worker's climbing
It crosses 14 overturning of lifting opening and opens panel 12, be pierced by supreme pedal 15 consequently facilitating worker opens mouth 14 from panel 12, it is convenient
Worker's working at height.
Claims (8)
1. a kind of aluminium alloy scaffold, it is characterised in that:Including the scaffold strut made of aluminum alloy material, the scaffold
Strut includes two framings of left and right settings, includes two upright bars being vertically arranged per framing, fixed between two upright bars to connect
It is connected to the cross bar for being laterally arranged and being used for climbing, cross bar is placed equidistant with multiple, the bottom of the scaffold strut along upright bar axial length
Portion is provided with lower pedal, and pedal at least two is arranged in the top of the lower pedal;Removably connect between two framing
It is connected to link, the first brace and the second brace, the link is separately positioned between two neighboring upper pedal and vertical
At the top of bar, it is obliquely installed the first brace between two neighboring upper pedal, multiple the are arranged between lower pedal and adjacent upper pedal
Two braces are obliquely installed two the second braces arranged up and down, one of them second brace positioned at two framing front ends
Higher-end close to the lower end of another second brace, be obliquely installed two of the arrangement that intersects positioned at two framing rear ends
Second brace;The link includes two connecting rods for being laterally arranged and being mutually parallel, and is provided between two connecting rods
The montant being vertically arranged, the montant are placed equidistant with multiple along connecting rod axial length;The setting of two framing outer is symmetrical
Supporting rack, support frame as described above includes the first support bar being obliquely installed, and one end of the first support bar is hinged in upright bar
Portion, for the other end against ground, the lower section setting of the first support bar compresses the second support bar of first support bar, and described second
One end of supporting rod is hinged with the connector being assemblied in first support bar, and the other end of second support bar is hinged in upright bar,
The second support bar is obliquely installed, and one end that the second supporting rack is hinged upright bar is higher-end.
2. a kind of aluminium alloy scaffold according to claim 1, it is characterised in that:The upper pedal includes frame, bottom plate
And baffle, the lower pedal includes frame and bottom plate;The frame both ends are equipped with the hook being mounted on cross bar, and the bottom plate is horizontal
To being arranged on frame, bottom plate is fixed by least two panel assembly, wherein a panel is movably articulated on frame, the panel
Movable end offers the opening convenient for lifting, and the baffle is vertically provided at four edges of bottom plate.
3. a kind of aluminium alloy scaffold according to claim 1, it is characterised in that:The first support bar includes and upright bar
The lower end of hinged outer sleeve, the outer sleeve is socketed with inner sleeve of the movable telescopic in outer sleeve cavity, the inner sleeve
Multiple through-holes compatible with D-shaped pin are equidistantly offered along axial length, the inner sleeve and outer sleeve are fixed by D-shaped pin.
4. a kind of aluminium alloy scaffold according to claim 1, it is characterised in that:The bottom of the first support bar is hinged
There are pedestal, the base bottom to be arranged to the concaveconvex structure of increasing friction force.
5. a kind of aluminium alloy scaffold according to claim 1, it is characterised in that:The lower pedal and adjacent upper pedal it
Between spacing it is equal with the spacing between two neighboring upper pedal.
6. a kind of aluminium alloy scaffold according to claim 1, it is characterised in that:Each upright bar is consolidated by least two
Fixed pole is fixed by socket.
7. a kind of aluminium alloy scaffold according to claim 1, it is characterised in that:First brace, the second oblique pull
The both ends of bar and connecting rod are equipped with the handgrip on cross bar.
8. a kind of aluminium alloy scaffold according to claim 1, it is characterised in that:The bottom of upright rod is provided with to move
Dynamic idler wheel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820308494.3U CN207988459U (en) | 2018-03-07 | 2018-03-07 | A kind of aluminium alloy scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820308494.3U CN207988459U (en) | 2018-03-07 | 2018-03-07 | A kind of aluminium alloy scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207988459U true CN207988459U (en) | 2018-10-19 |
Family
ID=63826355
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820308494.3U Active CN207988459U (en) | 2018-03-07 | 2018-03-07 | A kind of aluminium alloy scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207988459U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110805253A (en) * | 2019-11-04 | 2020-02-18 | 宏光建设有限公司 | A remove operation platform for indoor building by laying bricks or stones, plastering construction |
CN111335608A (en) * | 2020-04-21 | 2020-06-26 | 中信国安建工集团有限公司 | High-rise building construction scaffold and operation method |
CN112854704A (en) * | 2021-03-22 | 2021-05-28 | 王泽伟 | Quick-insertion combined scaffold for building engineering |
CN114150853A (en) * | 2021-12-10 | 2022-03-08 | 来安县金盛源金属制品有限公司 | Stable industrial building scaffold and building method thereof |
-
2018
- 2018-03-07 CN CN201820308494.3U patent/CN207988459U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110805253A (en) * | 2019-11-04 | 2020-02-18 | 宏光建设有限公司 | A remove operation platform for indoor building by laying bricks or stones, plastering construction |
CN111335608A (en) * | 2020-04-21 | 2020-06-26 | 中信国安建工集团有限公司 | High-rise building construction scaffold and operation method |
CN112854704A (en) * | 2021-03-22 | 2021-05-28 | 王泽伟 | Quick-insertion combined scaffold for building engineering |
CN114150853A (en) * | 2021-12-10 | 2022-03-08 | 来安县金盛源金属制品有限公司 | Stable industrial building scaffold and building method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207988459U (en) | A kind of aluminium alloy scaffold | |
CN111648577A (en) | Insulating scaffold | |
CN202000643U (en) | Lifting foldable simple construction frame | |
CN211850682U (en) | Scaffold for building construction | |
CN212406009U (en) | Triangular scaffold | |
CN206784876U (en) | Indoor construction scaffold is built in room | |
CN211998568U (en) | Standard knot and tower crane | |
CN206031120U (en) | Equal adjustable of height and track prevents smooth right angle tower wagon of preventing inclining | |
CN2529945Y (en) | Mobile scaffold | |
CN216042488U (en) | Novel scaffold for multi-use architecture construction | |
CN112627480A (en) | Laminated safety bearing frame for building construction | |
CN206971699U (en) | Combination hanging basket for the construction of wet seam | |
CN219931539U (en) | Scaffold for urban construction | |
CN207260537U (en) | A kind of scaffold for construction | |
CN215631516U (en) | Hanging flower basket device is used in construction of roof slope roofing platform curtain | |
CN214575466U (en) | Operation shelf for construction | |
CN210457254U (en) | Tower crane frame | |
CN221053134U (en) | Cantilever scaffold | |
CN218406331U (en) | Anti-tilting scaffold | |
CN212027063U (en) | Scaffold prevents device that topples | |
CN210508307U (en) | Scaffold for building engineering | |
CN220267156U (en) | Construction scaffold based on house construction safety | |
CN212835930U (en) | Outrigger supporting structure of small-size formula steel construction ceiling of choosing | |
CN216305313U (en) | Scaffold for architectural decoration construction | |
CN215594851U (en) | Combined type movable hanging basket for steel structure construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |