CN114150853A - Stable industrial building scaffold and building method thereof - Google Patents

Stable industrial building scaffold and building method thereof Download PDF

Info

Publication number
CN114150853A
CN114150853A CN202111504142.8A CN202111504142A CN114150853A CN 114150853 A CN114150853 A CN 114150853A CN 202111504142 A CN202111504142 A CN 202111504142A CN 114150853 A CN114150853 A CN 114150853A
Authority
CN
China
Prior art keywords
frame
frame body
main frame
platform
chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111504142.8A
Other languages
Chinese (zh)
Inventor
郭锋
盛亚峰
宋东霞
盛舟
徐红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Laian Jinshengyuan Metal Products Co ltd
Original Assignee
Laian Jinshengyuan Metal Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Laian Jinshengyuan Metal Products Co ltd filed Critical Laian Jinshengyuan Metal Products Co ltd
Priority to CN202111504142.8A priority Critical patent/CN114150853A/en
Publication of CN114150853A publication Critical patent/CN114150853A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/17Comprising essentially pre-assembled three-dimensional elements, e.g. cubic elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/02Scaffold feet, e.g. with arrangements for adjustment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/145Toe boards therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/16Struts or stiffening rods, e.g. diagonal rods
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • E04G2001/155Platforms with an access hatch for getting through from one level to another
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ladders (AREA)

Abstract

The invention discloses a stable industrial building scaffold and a building method thereof, and relates to the technical field of scaffolds. Including the chassis underframe, the body frame body, throw and prop and operation platform, the body frame body is installed on the chassis underframe, throw and prop and install around body frame body lower part, operation platform installs in body frame body top, the body frame body includes end walking frame, well walking frame module, top walking frame, down diagonal draw bar and go up the diagonal draw bar, end walking frame, well walking frame module and top walking frame superpose in proper order to connect each other through down diagonal draw bar and last diagonal draw bar respectively, end walking frame is connected with the chassis underframe through down diagonal draw bar. This firm industrial scaffold of putting up and method of setting up thereof, the body frame body has adopted the modular assembly mode, can superpose to suitable high within range in proper order according to the construction needs to utilize down diagonal draw pole and last diagonal draw bar to strengthen the space stability of body frame body, come restraint simultaneously and be connected with chassis underframe and operation platform, guarantee the steadiness of assembly.

Description

Stable industrial building scaffold and building method thereof
Technical Field
The invention relates to the technical field of scaffolds, in particular to a stable industrial building scaffold and a building method thereof.
Background
The scaffold is various supports which are erected for workers to operate and solve vertical and horizontal transportation on a construction site, is commonly used in places where the height of an outer wall layer on a building site is high and direct construction cannot be achieved, regardless of which type of scaffold is erected, materials and processing quality used by the scaffold must meet the specified requirements, the scaffold is absolutely forbidden to be erected by using unqualified materials, so that accidents are prevented, a common scaffold must be erected according to the safety technical operation rules of the scaffold, and for a high-rise scaffold with the height of more than 15m, the scaffold must be designed, calculated, provided with detailed drawings, erected schemes, provided with the technical responsible persons of the previous level, approved and provided with written safety technologies, and then can be erected.
The existing scaffold has the defects that the height cannot be adjusted, an anti-tilting device is not arranged, the scaffold is inconvenient to use and not firm enough, potential safety hazards exist in the construction process of workers, the safety factor is not high, the scaffold is often easy to damage, and the construction cost is also increased.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a stable industrial building scaffold and a building method thereof, and aims to solve the problems in the background art.
In order to achieve the purpose, the invention provides the following technical scheme: a stable industrial building scaffold comprises a chassis frame, a main frame body, a throwing support and an operation platform, wherein the main frame body is arranged on the chassis frame, the throwing support is arranged on the periphery of the lower part of the main frame body, and the operation platform is arranged at the top of the main frame body;
the main frame body comprises a bottom walking frame, a middle walking frame module, a top walking frame, a lower inclined pull rod and an upper inclined pull rod, wherein the bottom walking frame, the middle walking frame module and the top walking frame are sequentially overlapped and are respectively connected with each other through the lower inclined pull rod and the upper inclined pull rod;
the throwing support comprises an inclined support rod, a first lock catch, a hinged rod and a second lock catch, the first lock catch is hinged to the top end of the inclined support rod, one end of the hinged rod is hinged to the inclined support rod, and the other end of the hinged rod is hinged to the second lock catch;
the operation platform bag comprises a chassis frame, a main frame body, a throwing support and an operation platform, wherein the main frame body is arranged on the chassis frame, the throwing support is arranged on the periphery of the lower part of the main frame body, and the operation platform is arranged at the top of the main frame body;
the main frame body comprises a bottom walking frame, a middle walking frame module, a top walking frame, a lower inclined pull rod and an upper inclined pull rod, wherein the bottom walking frame, the middle walking frame module and the top walking frame are sequentially overlapped and are respectively connected with each other through the lower inclined pull rod and the upper inclined pull rod;
the throwing support comprises an inclined support rod, a first lock catch, a hinged rod and a second lock catch, the first lock catch is hinged to the top end of the inclined support rod, one end of the hinged rod is hinged to the inclined support rod, and the other end of the hinged rod is hinged to the second lock catch;
the operation platform comprises a rotary support frame, a platform bottom frame, a perforated platform plate, a guardrail and skirting boards, wherein the platform bottom frame is installed on the rotary support frame, the perforated platform plate is installed on the platform bottom frame, the guardrail skirting boards are installed on the perforated platform plate, and the skirting boards are installed around the bottom end of the guardrail.
As a preferred technical scheme of the invention, the periphery of the chassis frame is sequentially provided with the trundles and the adjustable supporting feet, and the chassis frame is provided with the loop bar.
As a preferred technical scheme of the invention, the main frame body is arranged on the chassis frame through the sleeve rod, and the operation platform is sleeved at the top end of the main frame body.
As a preferred technical scheme of the invention, reinforcing rods are uniformly distributed on two sides of the bottom walking frame, the middle walking frame module and the top walking frame, and pedals are arranged on the reinforcing rods.
As a preferred technical solution of the present invention, the diagonal rod is locked to the main frame body by a first lock catch, and the hinge rod is locked to the main frame body by a second lock catch.
As a preferred technical scheme of the invention, the platform underframe is inserted on the rotary support, two ends of the rotary support are connected with the connecting rods, and the other ends of the connecting rods are connected with the platform underframe.
As a preferred technical scheme of the invention, a turnover cover is arranged at the inlet and outlet of the perforated platform plate through a door hinge, and a fence is arranged at the periphery of the inlet and outlet of the perforated platform plate.
As a preferable technical scheme of the invention, the upper part of the guardrail is inserted at the top end of the platform underframe, and the lower part of the guardrail is clamped at the upper part of the platform underframe.
A stable industrial scaffold building method comprises the following steps:
s1, inserting the chassis of the main frame body on the chassis frame through the loop bar, and hinging the chassis frame with the lower inclined pull rod;
s2, sequentially superposing a bottom step frame, a middle step frame module and a top step frame of the main frame body, and respectively connecting the bottom step frame, the middle step frame module and the top step frame through lower diagonal draw bars and upper diagonal draw bars;
s3, after the main frame is built, arranging throwing supports around the main frame, and adjusting the throwing supports to a proper support angle;
s4, erecting a rotary bearing frame of the operation platform on the top end of the main frame body, and reinforcing and connecting the rotary bearing frame through an upper diagonal draw bar;
s5, erecting a platform underframe of the operation platform on a bearing frame, and performing reinforced connection through a connecting rod;
s6, after the integral construction is completed, constructors enter the main frame body, climb upwards to the operation platform along the pedal of the main frame body, and open the turnover cover to get into the operation platform.
Compared with the prior art, the invention provides a stable industrial building scaffold and a building method thereof, and the stable industrial building scaffold has the following beneficial effects:
1. this firm industrial scaffold of putting up and method of setting up thereof, the body frame body has adopted the modular assembly mode, can superpose to suitable high within range in proper order according to the construction needs to utilize down diagonal draw pole and last diagonal draw bar to strengthen the space stability of body frame body, come restraint simultaneously and be connected with chassis underframe and operation platform, guarantee the steadiness of assembly.
2. This firm industrial scaffold of putting up and method of setting up thereof throws and props and has adopted adjustable design, can be according to the height adjustment who sets up its and the contained angle on ground in order to stabilize the scaffold, can prevent that the scaffold from inwards or outwards removing, the vertical bearing capacity of guarantee scaffold.
3. This firm industrial scaffold of putting up and method of setting up thereof, operation platform adopt the design of ready-package, through the bearing frame as the transit structure, conveniently dock, assemble the platform chassis of different specifications, and the guardrail adopts the design of quick detach formula, can do the adjustment according to construction environment to convenient operation.
Drawings
Fig. 1 is a schematic structural view of a stable industrial construction scaffold and a method for erecting the same according to the present invention;
figure 2 is a top view of a stable industrial building scaffold according to the present invention;
fig. 3 is a view showing a construction of a stable chassis frame of an industrial scaffolding according to the present invention;
fig. 4 is a structural view of a main frame of a stable industrial scaffolding according to the present invention;
FIG. 5 is a view of the construction of a stable industrial casting support for scaffolding according to the present invention;
fig. 6 is a structural view of a stable industrial scaffold construction work platform according to the present invention.
In the figure: 1. a chassis frame; 2. a main frame body; 3. throwing and supporting; 4. an operation platform; 5. a bottom step frame; 6. a middle step frame module; 7. a step frame is pushed; 8. a lower diagonal draw bar; 9. an upper diagonal member; 10. a diagonal brace; 11. a first lock catch; 12. a hinged lever; 13. a second lock catch; 14. a bearing frame; 15. a platform chassis; 16. a platform plate is provided with a hole; 17. a guardrail; 18. skirting boards; 19. a caster wheel; 20. an adjustable arm brace; 21. a loop bar; 22. a reinforcing bar; 23. a pedal; 24. a connecting rod; 25. a cover is turned; 26. and (7) fencing.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 6, a stable industrial scaffold includes a chassis frame 1, a main frame 2, a casting supporter 3 and a working platform 4, wherein the main frame 2 is installed on the chassis frame 1, the casting supporter 3 is installed around the lower portion of the main frame 2, and the working platform 4 is installed on the top of the main frame 2;
the main frame body 2 comprises a bottom walking frame 5, a middle walking frame module 6, a top walking frame 7, a lower inclined pull rod 8 and an upper inclined pull rod 9, wherein the bottom walking frame 5, the middle walking frame module 6 and the top walking frame 7 are sequentially superposed and are respectively connected with each other through the lower inclined pull rod 8 and the upper inclined pull rod 9, the bottom walking frame 5 is connected with the bottom plate frame 1 through the lower inclined pull rod 8, the top walking frame 7 is connected with the operation platform 4 through the upper inclined pull rod 9, the main frame body 2 adopts a modular assembly mode, can be sequentially superposed to an appropriate height range according to construction requirements, and utilizes the lower inclined pull rod 8 and the upper inclined pull rod 9 to strengthen the space stability of the main frame body 2 and simultaneously restrain the connection with the bottom plate frame 1 and the operation platform 4 so as to guarantee the assembly stability;
the throwing support 3 comprises an inclined stay bar 10, a first lock catch 11, a hinged rod 12 and a second lock catch 13, the first lock catch 11 is hinged to the top end of the inclined stay bar 10, one end of the hinged rod 12 is hinged to the inclined stay bar 10, the other end of the hinged rod 12 is hinged to the second lock catch 13, the throwing support 3 is designed in an adjustable mode, the included angle between the throwing support and the ground can be adjusted according to the built height to stabilize the scaffold, the scaffold can be prevented from moving inwards or outwards, and the longitudinal bearing capacity of the scaffold is guaranteed;
work platform 4 includes that the bolster frame 14, platform chassis 15, trompil landing slab 16, guardrail 17 and baseboard 18, platform chassis 15 is installed on bolster frame 14, trompil landing slab 16 installs on platform chassis 15, guardrail 17 baseboard 18 installs on trompil landing slab 16, baseboard 18 installs around 17 bottoms of guardrail, and work platform 4 adopts the design of ready-package formula, through bolster frame 14 as the transfer structure, conveniently docks, assembles the platform chassis 15 of different specifications, and guardrail 17 adopts the design of quick detach formula, can do the adjustment according to construction environment to convenient operation.
As a specific technical solution of this embodiment, casters 19 and adjustable supporting feet 20 are sequentially installed around the chassis frame 1, and a loop bar 21 is arranged on the chassis frame 1.
In this embodiment, the truckle 19 is used for removing after building the completion, improves holistic operation flexibility, and adjustable spike 20 is used for supporting to ground, stabilizes the scaffold frame.
As a specific technical solution of this embodiment, the main frame 2 is mounted on the chassis frame 1 through a sleeve rod 21, and the work platform 4 is sleeved on the top end of the main frame 2.
In this embodiment, the main frame body 2 is mounted on the chassis frame 1 through the loop bar 21, so that the positioning and the butt joint of the two are facilitated.
As a specific technical solution of this embodiment, reinforcing rods 22 are uniformly distributed on two sides of the bottom step 5, the middle step module 6 and the top step 7, and pedals 23 are arranged on the reinforcing rods 22.
In this embodiment, the body frame body 2 has adopted the modular assembly mode, can superpose to suitable high within range in proper order according to the construction needs to utilize down diagonal draw bar 8 and last diagonal draw bar 9 to strengthen the space stability of the body frame body 2, footboard 23 makes things convenient for constructor to scramble.
As a specific solution of this embodiment, the inclined strut 10 is locked to the main frame 2 through a first lock 11, and the hinge rod 12 is locked to the main frame 2 through a second lock 13.
In this embodiment, throw and prop 3 and adopted adjustable design, can be according to its contained angle with ground of the altitude mixture control of putting up in order to stabilize the scaffold, can prevent that the scaffold from inwards or outwards moving, the vertical bearing capacity of guarantee scaffold, it also is the ready-package design.
As a specific technical solution of this embodiment, the platform chassis 15 is inserted into the rotary support frame 14, two ends of the rotary support frame 14 are connected with the connecting rods 24, and the other ends of the connecting rods 24 are connected with the platform chassis 15.
In this embodiment, work platform 4 adopts the ready-package design, through the transfer structure of the bearing frame 14 conduct, conveniently docks, assembles the platform chassis 15 of different specifications, and connecting rod 24 is used for guaranteeing connection stability between them.
As a specific technical solution of this embodiment, a flip cover 25 is installed at the entrance of the opening platform plate 16 through a door hinge, and a surrounding barrier 26 is arranged at the periphery of the entrance of the opening platform plate 16.
In this embodiment, when the constructor climbs to the operation platform 4, the constructor can enter the operation platform 4 by opening the flip cover 25, and after entering, the flip cover 25 is closed, and the enclosure 26 is used for ensuring the safety in the construction.
As a specific technical solution of this embodiment, the upper portion of the guardrail 17 is inserted into the top end of the platform bottom frame 15, and the lower portion of the guardrail 17 is clamped to the upper portion of the platform bottom frame 15.
In this embodiment, the guardrail 17 is designed to be quick-detachable, and can be adjusted according to the construction environment (for example, when some materials are conveyed, the guardrail 17 can be temporarily detached to avoid interference and influence on the delivery of the materials), so as to facilitate the operation
A stable industrial scaffold building method comprises the following steps:
s1, inserting the bottom step frame 5 of the main frame body 2 on the bottom plate frame 1 through the loop bar 21, and hinging the bottom step frame 5 on the bottom plate frame 1 by using the lower inclined pull rod 8;
s2, sequentially superposing the bottom step frame 5, the middle step frame module 6 and the top step frame 7 of the main frame body 2, and respectively connecting the bottom step frame, the middle step frame module and the top step frame by a lower inclined pull rod 8 and an upper inclined pull rod 9;
s3, after the main frame body 2 is built, the throwing supports 3 are installed on the periphery of the main frame body, and the throwing supports 3 are adjusted to be at proper support angles;
s4, erecting the bearing frame 14 of the working platform 4 on the top end of the main frame body 2, and reinforcing and connecting the bearing frame by the upper diagonal draw bar 9;
s5, erecting the platform underframe 15 of the working platform 4 on the bearing frame 14, and reinforcing and connecting the platform underframe by the connecting rod 24;
s6, after the integral construction is completed, constructors enter the main frame body 2, climb upwards to the operation platform 4 along the pedal 23 of the main frame body 2, and open the turnover cover 25 to get onto the operation platform 4.
The working principle and the using process of the invention are as follows: when in use, the bottom step frame 5 of the main frame body 2 is inserted on the bottom plate frame 1 through the loop bar 21 and is hinged on the bottom plate frame 1 by the lower inclined pull rod 8, the bottom step frame 5, the middle step frame module 6 and the top step frame 7 of the main frame body 2 are sequentially superposed and are mutually connected through the lower inclined pull rod 8 and the upper inclined pull rod 9 respectively, after the main frame body 2 is built, the throwing supports 3 are arranged on the periphery of the main frame body, the throwing supports 3 are adjusted to proper supporting angles, the bearing frame 14 of the operation platform 4 is erected at the top end of the main frame body 2, and reinforced and connected by the upper diagonal draw bar 9, the platform underframe 15 of the operation platform 4 is erected on the bearing frame 14, and is reinforced and connected through the connecting rod 24, after the integral construction is completed, the constructor enters the main frame body 2, the pedal 23 along the main frame body 2 climbs up to the operation platform 4, and then the turnover cover 25 is opened, so that the operation platform 4 can be reached.
In conclusion, according to the stable industrial scaffold building and the building method thereof, the main frame body 2 adopts a modularized assembling mode, can be sequentially overlapped to a proper height range according to construction needs, and utilizes the lower inclined pull rod 8 and the upper inclined pull rod 9 to strengthen the space stability of the main frame body 2 and restrain the connection with the chassis frame 1 and the operation platform 4, so that the assembling stability is guaranteed; the throwing support 3 is designed in an adjustable mode, the included angle between the throwing support and the ground can be adjusted according to the built height so as to stabilize the scaffold, the scaffold can be prevented from moving inwards or outwards, and the longitudinal bearing capacity of the scaffold is guaranteed; the operation platform 4 adopts the design of ready-package, through the transfer structure of the bearing frame 14 conduct, conveniently docks, assembles the platform chassis 15 of different specifications, and the guardrail 17 adopts the design of quick detach formula, can do the adjustment according to the construction environment to convenient operation.
It should be noted that, in this document, terms such as "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides a firm industrial scaffold of putting up, includes chassis underframe (1), the body frame body (2), throws and props (3) and operation platform (4), its characterized in that: the main frame body (2) is arranged on the chassis frame (1), the throwing supports (3) are arranged on the periphery of the lower part of the main frame body (2), and the operation platform (4) is arranged on the top of the main frame body (2);
the main frame body (2) comprises a bottom walking frame (5), a middle walking frame module (6), a top walking frame (7), a lower inclined pull rod (8) and an upper inclined pull rod (9), wherein the bottom walking frame (5), the middle walking frame module (6) and the top walking frame (7) are sequentially superposed and are respectively connected with each other through the lower inclined pull rod (8) and the upper inclined pull rod (9), the bottom walking frame (5) is connected with the bottom plate frame (1) through the lower inclined pull rod (8), and the top walking frame (7) is connected with the operation platform (4) through the upper inclined pull rod (9);
the throwing support (3) comprises an inclined strut (10), a first lock catch (11), a hinged rod (12) and a second lock catch (13), the first lock catch (11) is hinged to the top end of the inclined strut (10), one end of the hinged rod (12) is hinged to the inclined strut (10), and the other end of the hinged rod (12) is hinged to the second lock catch (13);
operation platform (4) include bearing frame (14), platform chassis (15), trompil landing slab (16), guardrail (17) and baseboard (18), install on bearing frame (14) platform chassis (15), trompil landing slab (16) are installed on platform chassis (15), guardrail (17) baseboard (18) are installed on trompil landing slab (16), baseboard (18) are installed around guardrail (17) bottom.
2. A stable industrial building scaffold according to claim 1, characterized in that: the adjustable support frame is characterized in that the periphery of the chassis frame (1) is sequentially provided with trundles (19) and adjustable supporting feet (20), and the chassis frame (1) is provided with loop bars (21).
3. A stable industrial building scaffold according to claim 2, characterized in that: the main frame body (2) is arranged on the chassis frame (1) through a sleeve rod (21), and the operation platform (4) is sleeved at the top end of the main frame body (2).
4. A stable industrial building scaffold according to claim 1, characterized in that: reinforcing rods (22) are uniformly distributed on two sides of the bottom walking frame (5), the middle walking frame module (6) and the top walking frame (7), and pedals (23) are arranged on the reinforcing rods (22).
5. A stable industrial building scaffold according to claim 1, characterized in that: the inclined stay bar (10) is locked on the main frame body (2) through a first lock catch (11), and the hinged rod (12) is locked on the main frame body (2) through a second lock catch (13).
6. A stable industrial building scaffold according to claim 1, characterized in that: the platform underframe (15) is inserted into the rotary support frame (14), the two ends of the rotary support frame (14) are connected with connecting rods (24), and the other ends of the connecting rods (24) are connected with the platform underframe (15).
7. A stable industrial building scaffold according to claim 1, characterized in that: the business turn over mouth department of trompil landing slab (16) installs flip (25) through the hinge, and the business turn over mouth department periphery of trompil landing slab (16) is equipped with encloses fender (26).
8. A stable industrial building scaffold according to claim 1, characterized in that: the upper portion of guardrail (17) is pegged graft in the top of platform chassis (15), the lower part joint in the upper portion of platform chassis (15) of guardrail (17).
9. A stable industrial scaffold building method is characterized by comprising the following steps:
s1, inserting the bottom step frame (5) of the main frame body (2) on the bottom plate frame (1) through the loop bar (21) and hinging the bottom step frame on the bottom plate frame (1) by the lower inclined pull rod (8);
s2, sequentially superposing a bottom step frame (5), a middle step frame module (6) and a top step frame (7) of the main frame body (2), and respectively connecting the bottom step frame, the middle step frame module and the top step frame through a lower inclined pull rod (8) and an upper inclined pull rod (9);
s3, after the main frame body (2) is built, the throwing supports (3) are installed on the periphery of the main frame body, and the throwing supports (3) are adjusted to be at a proper supporting angle;
s4, erecting a bearing frame (14) of the operation platform (4) at the top end of the main frame body (2), and reinforcing and connecting the bearing frame through an upper diagonal draw bar (9);
s5, erecting a platform underframe (15) of the operation platform (4) on a rotary support frame (14), and reinforcing and connecting through a connecting rod (24);
s6, after the integral construction is completed, constructors enter the main frame body (2), climb upwards to the operation platform (4) along the pedals (23) of the main frame body (2), and open the turnover cover (25) to enter the operation platform (4).
CN202111504142.8A 2021-12-10 2021-12-10 Stable industrial building scaffold and building method thereof Pending CN114150853A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111504142.8A CN114150853A (en) 2021-12-10 2021-12-10 Stable industrial building scaffold and building method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111504142.8A CN114150853A (en) 2021-12-10 2021-12-10 Stable industrial building scaffold and building method thereof

Publications (1)

Publication Number Publication Date
CN114150853A true CN114150853A (en) 2022-03-08

Family

ID=80453947

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111504142.8A Pending CN114150853A (en) 2021-12-10 2021-12-10 Stable industrial building scaffold and building method thereof

Country Status (1)

Country Link
CN (1) CN114150853A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114856143A (en) * 2022-05-17 2022-08-05 中国长江电力股份有限公司 Hydropower station flood discharge flow passage self-adaptive fast-assembling maintenance platform and installation method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2616468A1 (en) * 1987-06-11 1988-12-16 Saby Gerard Modular construction element, particularly for a ladder or scaffolding
JPH11107517A (en) * 1997-09-30 1999-04-20 Nakao:Kk Scaffold unit, scaffold structure using the same, and building frame
US20070045048A1 (en) * 2005-09-01 2007-03-01 Wyse Steven J Scaffold frame section with integral guard rail post
CN102777020A (en) * 2012-07-27 2012-11-14 樊荣 Scaffold convenient to install
JP2012241446A (en) * 2011-05-20 2012-12-10 Tokushu Hashigo Seisakusho Kk Scaffold structure for high place work
CN202831588U (en) * 2012-08-08 2013-03-27 广州番禺职业技术学院 Novel scaffold
CN204552040U (en) * 2015-04-17 2015-08-12 江西鸿昊建设有限公司 A kind of building buckle formula scaffold
CN205935617U (en) * 2016-07-19 2017-02-08 中建七局建筑装饰工程有限公司 Simple and easy scaffold frame removes chassis
CN207988459U (en) * 2018-03-07 2018-10-19 扬州旭乐基脚手架有限公司 A kind of aluminium alloy scaffold
CN111648577A (en) * 2020-06-30 2020-09-11 国网陕西省电力公司铜川供电公司 Insulating scaffold

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2616468A1 (en) * 1987-06-11 1988-12-16 Saby Gerard Modular construction element, particularly for a ladder or scaffolding
JPH11107517A (en) * 1997-09-30 1999-04-20 Nakao:Kk Scaffold unit, scaffold structure using the same, and building frame
US20070045048A1 (en) * 2005-09-01 2007-03-01 Wyse Steven J Scaffold frame section with integral guard rail post
JP2012241446A (en) * 2011-05-20 2012-12-10 Tokushu Hashigo Seisakusho Kk Scaffold structure for high place work
CN102777020A (en) * 2012-07-27 2012-11-14 樊荣 Scaffold convenient to install
CN202831588U (en) * 2012-08-08 2013-03-27 广州番禺职业技术学院 Novel scaffold
CN204552040U (en) * 2015-04-17 2015-08-12 江西鸿昊建设有限公司 A kind of building buckle formula scaffold
CN205935617U (en) * 2016-07-19 2017-02-08 中建七局建筑装饰工程有限公司 Simple and easy scaffold frame removes chassis
CN207988459U (en) * 2018-03-07 2018-10-19 扬州旭乐基脚手架有限公司 A kind of aluminium alloy scaffold
CN111648577A (en) * 2020-06-30 2020-09-11 国网陕西省电力公司铜川供电公司 Insulating scaffold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114856143A (en) * 2022-05-17 2022-08-05 中国长江电力股份有限公司 Hydropower station flood discharge flow passage self-adaptive fast-assembling maintenance platform and installation method

Similar Documents

Publication Publication Date Title
US5156235A (en) Set-up bracket for scaffolding
US11612797B2 (en) Fast-rope training apparatus
US5653459A (en) Transportable modular landing assembly for a trailer
ES2703790T3 (en) A set of reusable ladder
US5388663A (en) Portable walkway systems
CN114150853A (en) Stable industrial building scaffold and building method thereof
GB2459181A (en) Safety work platform
US20100096216A1 (en) Scaffolding
WO2016131839A1 (en) Collapsible elevated platforms
CN210622260U (en) Ladder type scaffold capable of being built quickly and efficiently
US6932194B1 (en) Safety rail for scaffolding
US20050061582A1 (en) Movable and repositionable safety guard rails for scaffolding
US20040200668A1 (en) Scaffolding system
CN214246528U (en) Scaffold for building construction
GB2157755A (en) Roof scaffolding
CN219952621U (en) Scaffold frame
JP2582842Y2 (en) Curing net for construction work
CN213710261U (en) Scaffold with safety protection structure for building construction
JP2004044298A (en) Built-up scaffolding and method of building up the same
CN215671309U (en) Prefabricated temporary stair of going up people
CN219491671U (en) Foldable PC stair construction operation platform
CN218581120U (en) Collapsible construction scaffolding
CN220769345U (en) Telescopic and folding guardrail ladder
JP3084246B2 (en) Temporary scaffolding of spiral stairs
CN213837623U (en) Multipurpose combined scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20220308