CN207980535U - A kind of bottom pyramidal flocculation sedimentation tank and flocculation sedimentation system - Google Patents

A kind of bottom pyramidal flocculation sedimentation tank and flocculation sedimentation system Download PDF

Info

Publication number
CN207980535U
CN207980535U CN201820243697.9U CN201820243697U CN207980535U CN 207980535 U CN207980535 U CN 207980535U CN 201820243697 U CN201820243697 U CN 201820243697U CN 207980535 U CN207980535 U CN 207980535U
Authority
CN
China
Prior art keywords
flocculation sedimentation
sedimentation tank
bottom pyramidal
heavy bucket
pyramidal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820243697.9U
Other languages
Chinese (zh)
Inventor
王东风
许文杰
姚杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Rain Water Ecological Science And Technology Co Ltd
Original Assignee
Chongqing Rain Water Ecological Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Rain Water Ecological Science And Technology Co Ltd filed Critical Chongqing Rain Water Ecological Science And Technology Co Ltd
Priority to CN201820243697.9U priority Critical patent/CN207980535U/en
Application granted granted Critical
Publication of CN207980535U publication Critical patent/CN207980535U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

The utility model is related to technical field of sewage, provide a kind of bottom pyramidal flocculation sedimentation tank, including pond ontology, heavy bucket, water inlet pipe and central tube, pond ontology is located above heavy bucket and is connected to heavy bucket, the longitudinal section of heavy bucket is less than the trapezoidal of upper bottom length in up-side down triangle or length of going to the bottom, water inlet pipe is connected to central tube, and central tube is set to the center position of pond ontology, and heavy bucket is provided with sludge pipe.Its floor space is small, and effluent quality is good.The utility model additionally provides a kind of flocculation sedimentation system comprising bottom pyramidal flocculation sedimentation tank provided by the utility model equally has the advantages that above-mentioned.

Description

A kind of bottom pyramidal flocculation sedimentation tank and flocculation sedimentation system
Technical field
The utility model is related to technical field of sewage, in particular to a kind of bottom pyramidal flocculation sedimentation tank and Flocculation sedimentation system.
Background technology
Flocculation sediment is the process that particulate matter makees flocculation sediment in water.In water after dosing coagulant, wherein suspended matter Colloid and flock is generated under the interaction of molecular force for discrete particles and they collide with each other cohesion in infall process, Its size and quality constantly become larger, and settling velocity is continuously increased.The alumen ustum formed after dosing coagulant in the surface water, in sanitary sewage The phenomenon that flocculation sediment can all occur in precipitation process in organic suspended matter, activated sludge, that is, select inorganic flocculating agent and organic Anion is configured to aqueous solution and is added in waste water, will generate compression double electric layer, make the suspended particulates loss of stability in waste water, Micelle object, which agglomerates, makes particle increase, and forms floccule body, alumen ustum.Floccule body grow up to certain volume after i.e. under the effect of gravity It is detached from aqueous phase precipitation, to remove a large amount of suspended matters in waste water, to achieve the effect that water process.
Sedimentation basin is a kind of structures that suspended matter in water removal is removed using precipitation, the equipment to purify water.Utilize water Natural sedimentation or the effect of coagulating sedimentation remove the suspended matter in water.Sedimentation basin by water (flow) direction be divided into horizontal sedimentation basin and Vertical sedimentation basin.Sedimentation effect is decided by the residence time of the flow velocity of water and water in pond in sedimentation basin, and existing sedimentation basin Floor space is larger, and effluent quality is general.
Utility model content
The utility model provides a kind of bottom pyramidal flocculation sedimentation tank, it is intended to improve existing sedimentation basin floor space Greatly, the general problem of effluent quality.
The utility model additionally provides a kind of flocculation sedimentation system, and floor space is small, and effluent quality is good, and spoil disposal is convenient.
The utility model is realized in this way:
A kind of bottom pyramidal flocculation sedimentation tank, including pond ontology, heavy bucket, water inlet pipe and central tube, pond ontology are located at heavy It being connected to above bucket and with heavy bucket, the longitudinal section of heavy bucket is less than the trapezoidal of upper bottom length in up-side down triangle or length of going to the bottom, Water inlet pipe is connected to central tube, and central tube is set to the center position of pond ontology, and heavy bucket is provided with sludge pipe.
Further, in the utility model preferred embodiment, water distributor is provided with below central tube.
Further, in the utility model preferred embodiment, the projection of the top of water distributor in the horizontal plane is located at In the projection of central tube in the horizontal plane, projected area of the water distributor from its top to bottom end in the horizontal plane is increasing.
Further, in the utility model preferred embodiment, downflow weir is provided at the top of the ontology of pond, pond ontology Outer wall is provided with scum trough with downflow weir corresponding position.
Further, in the utility model preferred embodiment, baffle is provided in scum trough.
Further, in the utility model preferred embodiment, sludge pipe includes interconnected inner and outer tubes, interior Pipe is located in heavy bucket, and inner tube and the side wall of heavy bucket are affixed, and the one end of inner tube far from outer tube is located at the bottom of heavy bucket.
Further, in the utility model preferred embodiment, the diameter of sludge pipe is greater than or equal to 200mm.
Further, in the utility model preferred embodiment, bottom pyramidal flocculation sedimentation tank further includes blender, is stirred The bottom end for mixing device is located in the ontology of pond.
Further, in the utility model preferred embodiment, bottom pyramidal flocculation sedimentation tank further includes sludge pump, dirty Dredge pump is connected to sludge pipe.
A kind of flocculation sedimentation system, including above-mentioned bottom pyramidal flocculation sedimentation tank.
The utility model has the beneficial effects that:The bottom pyramidal flocculation sediment that the utility model is obtained by above-mentioned design Sedimentation effect is improved in pond in use, the shape design due to heavy bucket can effectively reduce floor space, and central tube is in pond The design of body position enables to water that can be evenly distributed in sedimentation basin and further increases sedimentation effect.
The flocculation sedimentation system that the utility model is obtained by above-mentioned design, since it includes provided by the utility model Bottom pyramidal flocculation sedimentation tank, therefore its sedimentation effect is good, so that effluent quality is good.
Description of the drawings
It, below will be to required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment The attached drawing used is briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore not The restriction to range is should be considered as, for those of ordinary skill in the art, without creative efforts, It can also be obtained according to these attached drawings other relevant attached drawings.
Fig. 1 is the structural schematic diagram for the sewage disposal system that the utility model embodiment provides;
Fig. 2 is the structural schematic diagram of bottom pyramidal flocculation sedimentation tank in Fig. 1;
Fig. 3 is the vertical view of Fig. 2;
Fig. 4 is the structural schematic diagram of Fig. 1 wing centre section horses.
Icon:1- sewage disposal systems;10- flocculation sedimentation systems;200- straight arranging mixers;300- star fins flocculate Pond;311- partition boards;312- fin framves;313- fins;400-pH regulating reservoirs;100- bottom pyramidal flocculation sedimentation tanks;The ponds 110- sheet Body;111- downflow weirs;112- scum troughs;113- baffles;120- sinks bucket;121- sludge pipes;122- inner tubes;123- outer tubes; 130- water inlet pipes;140- central tubes;150- water distributors;160- blenders;170- sludge pumps;2- filter presses.
Specific implementation mode
To keep the purpose, technical scheme and advantage of the utility model embodiment clearer, below in conjunction with this practicality The technical solution in the utility model embodiment is clearly and completely described in attached drawing in novel embodiment, shows So, described embodiment is a part of embodiment of the utility model, rather than whole embodiments.Based on this practicality Embodiment in novel, those of ordinary skill in the art are obtained every other without creative efforts Embodiment shall fall within the protection scope of the present invention.Therefore, the implementation to the utility model provided in the accompanying drawings below The detailed description of mode is not intended to limit claimed the scope of the utility model, but is merely representative of the utility model Selected embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making creative labor The every other embodiment obtained under the premise of dynamic, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be understood that term "center", " longitudinal direction ", " transverse direction ", " length ", " width Degree ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside", The orientation or positional relationship of the instructions such as " clockwise ", " counterclockwise " be based on the orientation or positional relationship shown in the drawings, be only for Described convenient for description the utility model and simplifying, do not indicate or imply the indicated equipment or element must have it is specific Orientation, with specific azimuth configuration and operation, therefore should not be understood as limiting the present invention.
In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more this feature.The meaning of " plurality " is two or two in the description of the present invention, More than, unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " Gu It is fixed " etc. terms shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;Can be Mechanical connection can also be electrical connection;It can be directly connected, can also can be indirectly connected through an intermediary two The interaction relationship of connection or two elements inside element.It for the ordinary skill in the art, can basis Concrete condition understands the concrete meaning of above-mentioned term in the present invention.
In the present invention unless specifically defined or limited otherwise, fisrt feature the "upper" of second feature or it "lower" may include that the first and second features are in direct contact, and can also not be to be in direct contact but lead to including the first and second features Cross the other characterisation contact between them.Moreover, fisrt feature second feature " on ", " top " and " above " include the One feature is right over second feature and oblique upper, or is merely representative of fisrt feature level height and is higher than second feature.First is special Sign second feature " under ", " lower section " and " below " include fisrt feature immediately below second feature and obliquely downward, or only Indicate that fisrt feature level height is less than second feature.
As shown in Figure 1, the utility model embodiment, provides a kind of bottom pyramidal flocculation sedimentation tank 100, and including bottom The flocculation sedimentation system 10 of taper flocculation sedimentation tank 100, and the sewage disposal system 1 including flocculation sedimentation system 10.
As shown in Figures 2 and 3, bottom pyramidal flocculation sedimentation tank 100 includes pond ontology 110, heavy bucket 120, water inlet pipe 130 With central tube 140, pond ontology 110 is located at 120 top of heavy bucket and is connected to heavy bucket 120, and the longitudinal section of heavy bucket 120 is in fall Triangle or bottom length are less than the trapezoidal of upper bottom length, and water inlet pipe 130 is connected to central tube 140, and central tube 140 is set to pond The center position of ontology 110, heavy bucket 120 are provided with sludge pipe 121.
The design of 100 bottom of bottom pyramidal flocculation sedimentation tank, 120 shape of heavy bucket can effectively reduce floor space, improve Sedimentation effect, and design of the central tube 140 in 110 position of pond ontology enables to water that can be evenly distributed in sedimentation basin, and by Making bottom pyramidal flocculation sedimentation tank 100 in the design of heavy bucket 120, depth is larger in practical applications, the spoil disposal of bottom setting The pressure that pipe 121 is subject to is with regard to big, then so that spoil disposal is convenient.
Further, the lower section of central tube 140 is provided with water distributor 150.Water distributor 150 is mainly used for making central tube 140 The water being passed through in bottom pyramidal flocculation sedimentation tank 100, which is evenly distributed to bottom pyramidal flocculation sedimentation tank 100, obtains each position.
Specifically, the projection of the top of water distributor 150 in the horizontal plane is located at the projection of central tube 140 in the horizontal plane Interior, projected area of the water distributor 150 from its top to bottom end in the horizontal plane is increasing.
The big setting in lower end enables flow to be slided to separate along the side of water distributor 150 under 150 upper end of water distributor In the region in centre position, allow the water to be uniformly distributed in after bottom pyramidal flocculation sedimentation tank 100 along the entire cross-section of river it is slow on It rising, 0.5~0.7mm/s is generally to sanitary sewage, the sedimentation time uses 1~1.5h,.
Further, the top of pond ontology 110 is provided with downflow weir 111, and the outer wall and downflow weir 111 of pond ontology 110 are right It answers and is provided with scum trough 112 at position.Scum trough 112, which is arranged, can make the part flowed out from downflow weir 111 float on the water surface Dross be trapped in scum trough 112, further increase effluent quality.
Further, it is provided with baffle 113 in scum trough 112.One end of baffle 113 is contacted with the wall surface of scum trough 112, It can effectively stop that dross is flowed out from scum trough 112, can effectively improve effluent quality.
Further, sludge pipe 121 includes interconnected inner tube 122 and outer tube 123, and inner tube 122 is located at heavy bucket 120 It is interior, and inner tube 122 and the side wall of heavy bucket 120 are affixed, the one end of inner tube 122 far from outer tube 123 is located at the bottom of heavy bucket 120 Portion.
Due to 100 unique structure design of bottom pyramidal flocculation sedimentation tank make its for meet precipitation need depth design compared with Greatly, therefore bottom hydraulic pressure is larger, then inner tube 122 is sticked in the inner wall of heavy bucket 120 by the pressure that inner tube 122 is born with regard to larger Inner tube 122 can be effectively avoided to bear high pressure for a long time and damage.
Further, the diameter of sludge pipe 121 is greater than or equal to 200mm.Sludge viscosity is higher, is bound to during spoil disposal Understand the inner wall that some sludge is adhered to sludge pipe 121, sludge pipe is likely to result in if the diameter of sludge pipe 121 is too small 121 blocking can ensure that spoil disposal is unobstructed when the diameter of sludge pipe 121 is greater than or equal to 200mm.
Further, bottom pyramidal flocculation sedimentation tank 100 further includes sludge pump 170, the connection of 170 sludge pipe 121 of sludge pump. Usual sludge is periodically discharged by influent pressure, since 100 unique structure design of bottom pyramidal flocculation sedimentation tank makes it Projected depth is deeper, therefore spoil disposal is easy.If desired more rapidly spoil disposal then can carry out spoil disposal by starting sludge pump 170.
Further, bottom pyramidal flocculation sedimentation tank 100 further includes blender 160, and the bottom end of blender 160 is located at pond sheet In body 110.It is had been added into water when workshop section of the flocculant before bottom pyramidal flocculation sedimentation tank 100, blender 160 is set Be in order to ensure enter bottom pyramidal flocculation sedimentation tank 100 in water and flocculant it is more fully mixed.
As shown in Figure 1 and Figure 4, flocculation sedimentation system 10 includes straight arranging mixer 200,300 and of star fin flocculation basin Multiple bottom pyramidal flocculation sedimentation tanks 100, straight arranging mixer 200 are connected to star fin flocculation basin 300, the flocculation of star fin Pond 300 is connected to multiple bottom pyramidal flocculation sedimentation tanks 100, and partition board 311 and fin frame are provided in star fin flocculation basin 300 312, partition board 311 is arranged along water (flow) direction, is provided with fin 313 on fin frame 312, fin 313 is perpendicular to water (flow) direction.
During the work time, coagulant PAC is added from the dosing mouth of straight arranging mixer 200, due to straight arranging mixer 200 introduce the micro- principles of hydrodynamics of fluid to control mixing microprocess and Macroscopic Process, under identical head loss, greatly Its mixed effect is improved greatly so that coagulant is more fully mixed with sewage.
Flocculation aid PAM is added into star fin flocculation basin 300, since the design of partition board 311 and fin 313 makes flow High spectrum is generated when flowing through partition board 311 and fin 313 to be vortexed, increases particles collision number, improves effective collision rate, star fin Flocculation basin 300 comes into full contact with the particle in water for medicament and provides good micro- hydrodynamic conditions, can be produced in flocculation basin end The raw closely knit alumina blossom particles easily precipitated.Partition board 311 and fin 313 in star fin flocculation basin 300 it is easy for installation so that Sewage flocculation effect is good, and low energy consumption, and flocculation time is short.
The Unique physical design of bottom pyramidal flocculation sedimentation tank 100 can weaken settling apparatus lower part one in sedimentation basin and position The large eddy intensity in flow is set, the pulsation of settling zone flow is reduced.After flow is in entrance equipment, the particularity of this structure It is inscribed in equipment to improve alumina blossom particles during constantly changing velocity flow pattern for the process that contact flocculation can further be controlled The probability hit is touched, each other absorption connection, only scale and density are enough to overcome the alumen ustum of the correlative factors such as flow jacking force Grain can just sink, and the alumina blossom particles of nominal particle size are constantly adsorbed during continuous sinking, until being detached from settling apparatus.Work as alum When colored gravity maintains dynamic equilibrium with flow jacking force and dependent interaction power, contact flocculation and sedimentation effect is more enhanced, is being set Standby interior certain position forms closely knit, strong shock resistance, automatically updated and short update cycle dynamic suspension slime layer, this Sample makes the suspension slime layer moment keep very strong filtering, absorption, pollutant carrying capacity, sedimentation effect more preferable.
Flocculation sedimentation system 10 is due to including straight arranging mixer 200, star fin flocculation basin 300 and multiple bottom pyramidals Flocculation sedimentation tank 100, above-mentioned three's mutual cooperation effect, enables to have preferable flocculation sediment through flocculation sedimentation system 10 Ability, the sewage effluent quality after being processed are more preferable.
Further, flocculation sedimentation system 10 further includes pH regulating reservoirs 400, pH regulating reservoirs 400 and straight arranging mixer 200 Connection.When handling sourer sewage, in order to make flocculating effect more preferably need sewage pH being adjusted to alkalinity, therefore can will be dirty Water, which is adjusted to be passed through again in straight arranging mixer 200 after suitable pH in pH regulating reservoirs 400, adds flocculant.
Further, pH regulating reservoirs 400 are also equipped with blender 160.Setting blender 160 enables pH regulating agents more It is sufficiently mixed soon with sewage so that the pH of sewage faster reaches in suitable range.
The utility model additionally provides a kind of sewage disposal system 1, which provides including the utility model Flocculation sedimentation system 10 and filter press 2, filter press 2 be connected to sludge pipe 121, from sludge pipe 121 be discharged sludge through press filtration Volume greatly reduces after 2 press filtration of machine, is convenient for subsequent processing.Sewage disposal system 1 provided by the utility model is due to including this reality With the flocculation sedimentation system 10 of novel offer, therefore the sewage effluent quality after being processed is good.
In conclusion bottom pyramidal flocculation sedimentation tank provided by the utility model, since the shape design of heavy bucket can Floor space is effectively reduced, sedimentation effect is improved, and central tube enables to water that can be uniformly distributed in the design of pond body position To further increasing sedimentation effect in sedimentation basin.
Sewage disposal system provided by the utility model, since it includes bottom pyramidal flocculation provided by the utility model Sedimentation basin, therefore its sedimentation effect is good, so that effluent quality is good.
Above description is merely a prefered embodiment of the utility model, is not intended to limit the utility model, for For those skilled in the art, various modifications and changes may be made to the present invention.All spirit and original in the utility model Within then, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (10)

1. a kind of bottom pyramidal flocculation sedimentation tank, which is characterized in that described including pond ontology, heavy bucket, water inlet pipe and central tube Pond ontology is located above the heavy bucket and is connected to the heavy bucket, and the longitudinal section of the heavy bucket is in up-side down triangle or bottom Length is less than the trapezoidal of upper bottom length, and the water inlet pipe is connected to the central tube, and the central tube is set to the pond ontology Center position, the heavy bucket is provided with sludge pipe.
2. bottom pyramidal flocculation sedimentation tank according to claim 1, which is characterized in that be provided with below the central tube Water distributor.
3. bottom pyramidal flocculation sedimentation tank according to claim 2, which is characterized in that the top of the water distributor is in level On face projection be located at the projection of the central tube in the horizontal plane in, the water distributor from its top to bottom end in the horizontal plane Projected area it is increasing.
4. bottom pyramidal flocculation sedimentation tank according to claim 1, which is characterized in that be provided at the top of the pond ontology Downflow weir, the outer wall of the pond ontology are provided with scum trough with the downflow weir corresponding position.
5. bottom pyramidal flocculation sedimentation tank according to claim 4, which is characterized in that be provided with gear in the scum trough Plate.
6. bottom pyramidal flocculation sedimentation tank according to claim 1, which is characterized in that the sludge pipe includes being interconnected Inner and outer tubes, said inner tube is located in the heavy bucket, and said inner tube and the side wall of the heavy bucket are affixed, it is described in The one end of pipe far from the outer tube is located at the bottom of the heavy bucket.
7. bottom pyramidal flocculation sedimentation tank according to claim 1, which is characterized in that the diameter of the sludge pipe be more than or Equal to 200mm.
8. bottom pyramidal flocculation sedimentation tank according to claim 1, which is characterized in that the bottom pyramidal flocculation sedimentation tank Further include blender, the bottom end of the blender is located in the pond ontology.
9. bottom pyramidal flocculation sedimentation tank according to claim 1, which is characterized in that the bottom pyramidal flocculation sedimentation tank Further include sludge pump, the sludge pump is connected to the sludge pipe.
10. a kind of flocculation sedimentation system, which is characterized in that flocculate including such as claim 1-9 any one of them bottom pyramidal Sedimentation basin.
CN201820243697.9U 2018-02-09 2018-02-09 A kind of bottom pyramidal flocculation sedimentation tank and flocculation sedimentation system Active CN207980535U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820243697.9U CN207980535U (en) 2018-02-09 2018-02-09 A kind of bottom pyramidal flocculation sedimentation tank and flocculation sedimentation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820243697.9U CN207980535U (en) 2018-02-09 2018-02-09 A kind of bottom pyramidal flocculation sedimentation tank and flocculation sedimentation system

Publications (1)

Publication Number Publication Date
CN207980535U true CN207980535U (en) 2018-10-19

Family

ID=63823484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820243697.9U Active CN207980535U (en) 2018-02-09 2018-02-09 A kind of bottom pyramidal flocculation sedimentation tank and flocculation sedimentation system

Country Status (1)

Country Link
CN (1) CN207980535U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110386689A (en) * 2019-07-09 2019-10-29 中电建水环境治理技术有限公司 Pretreatment system for bed mud residual water treatment equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110386689A (en) * 2019-07-09 2019-10-29 中电建水环境治理技术有限公司 Pretreatment system for bed mud residual water treatment equipment

Similar Documents

Publication Publication Date Title
CN205774033U (en) A kind of compound efficient depositing reservoir
CN201485304U (en) Membrane strengthened air floatation precipitation device
CN104291497B (en) A kind of copolymerizing and air-float settling pond
CN212246585U (en) Back flush wastewater backflow flocculation filter equipment
CN108328786B (en) Water treatment device and water treatment method
CN210133923U (en) Novel high-efficient sedimentation tank
CN207980535U (en) A kind of bottom pyramidal flocculation sedimentation tank and flocculation sedimentation system
CN208250006U (en) A kind of high efficient aeration sedimentation integrated device
CN109293079B (en) Low-energy-consumption aeration circulation clarification tank
CN208104083U (en) A kind of flocculation sedimentation system and sewage disposal system
CN205391828U (en) Integral type pipe chute deposits filtering ponds
CN104310653A (en) Method for sewage treatment through co-agglomeration gas flotation method
CN210419541U (en) Pretreatment system for bottom mud residual water treatment equipment
CN204752409U (en) Nonmetal ore deposit beneficiation wastewater water purifier
CN111547898A (en) Back flush wastewater backflow flocculation filter equipment
CN108203148A (en) A kind of flocculation sedimentation system and sewage disposal system
CN214141900U (en) Multistage coagulating sedimentation device
CN214141717U (en) Feed water treatment system based on add medicine flocculation and precipitation
CN210480920U (en) Air floatation system with sludge backflow function
CN216549781U (en) Advanced wastewater treatment tank
CN105585090B (en) A kind of heavy auxiliary flocculation clarifier and method
CN205398188U (en) Heavily assist flocculation clarification device
CN216005422U (en) Novel coagulating sedimentation tank
CN205115116U (en) Integrated form pipe chute depositing reservoir
CN220376443U (en) Water distribution device of integrated magnetic coagulation sedimentation tank

Legal Events

Date Code Title Description
GR01 Patent grant