CN207888889U - Prefabricated components integrated production line - Google Patents

Prefabricated components integrated production line Download PDF

Info

Publication number
CN207888889U
CN207888889U CN201820225895.2U CN201820225895U CN207888889U CN 207888889 U CN207888889 U CN 207888889U CN 201820225895 U CN201820225895 U CN 201820225895U CN 207888889 U CN207888889 U CN 207888889U
Authority
CN
China
Prior art keywords
station
prefabricated components
production line
components integrated
integrated production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820225895.2U
Other languages
Chinese (zh)
Inventor
唐战良
陆立东
王卫民
向立军
王伟
安雄飞
陈浩
马进元
陆杰
张钊茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jianhua Construction Materials China Co Ltd
Original Assignee
Jianhua Construction Materials China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jianhua Construction Materials China Co Ltd filed Critical Jianhua Construction Materials China Co Ltd
Priority to CN201820225895.2U priority Critical patent/CN207888889U/en
Application granted granted Critical
Publication of CN207888889U publication Critical patent/CN207888889U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The utility model discloses a kind of prefabricated components integrated production lines, including at least one active line, at least one curing line and an at least mould trolley for circulating on active line, curing line controlled by production line control system, the active line includes multiple work stations, the curing line includes multiple maintenance stations, the mould trolley between multiple work stations, the conveying circulation of multiple maintainer interdigits, is connected by ferry bus respectively by transport mechanism between the both ends of the active line and the both ends of curing line.The utility model prefabricated components integrated production line rational and compact, can effectively improve production efficiency and production capacity, and small investment.

Description

Prefabricated components integrated production line
Technical field
The utility model is related to prefabricated components production technical field, more particularly to it is a kind of for produce PC plate class component, with Die station is bed die, planar plate members of edged mould production, using die station as waggon, particular manufacturing craft be placed on the component produced in die station and The prefabricated components integrated production line of special-shaped component with mould.
Background technology
Existing concrete component type is various, and with the raising of environmental requirement, a large amount of concrete components require factory pre- Inhibition and generation.Enterprise's undertaking precast concrete product category, specification are more and more, and simple die station production is unable to meet production effect The requirement of rate;And concrete product production line is pre- both for the concrete of single product or some single kind currently on the market Component processed.
Requirement with client to enterprise's hardware facility is more and more high(Die station pours);High production efficiency and product matter Amount, the competitiveness of low production cost(Manual operations);Employee is in short supply, and recruitment is difficult, to labor intensity, safety, working environment It is required that higher.
Therefore, Diversified Products production requirement can be met at this stage by how designing a kind of adaptation, and investment is less, while again It is compared with the prefabricated components integrated production line that high, recruitment is few, labor intensity is low, site safety, working environment are good with production efficiency The project that the utility model people concentrates on studies.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated components integrated production line, rational and compact, Ke Yiyou Effect improves production efficiency and production capacity, and small investment.
To achieve the goals above, the utility model provides a kind of prefabricated components integrated production line, including by producing Line control system control at least one active line, at least one curing line and for circulate on active line, curing line to A few mould trolley, the active line includes multiple work stations, and the curing line includes multiple maintenance stations, the mould trolley By transport mechanism between multiple work stations, the conveying circulation of multiple maintainer interdigits, the both ends of the active line and curing line Both ends between connected respectively by ferry bus.
Preferably, multiple work stations include clear die worker position, oil spout station, mold erector successively from the front to the back Vibrate station for position, cage muscle installation station, installation of embedded parts station and cloth, and the transport mechanism is through clear die worker position, oil spout work Vibrate station for position, mold installation station, cage muscle installation station, installation of embedded parts station and cloth.
Preferably, multiple work stations include clear die worker position, oil spout station, cage muscle erector successively from the front to the back Position, installation of embedded parts station, molding station and cloth vibrate station.
Preferably, further include plugging and pounding feed supplement station, it is described plug and pound feed supplement station and be set to cloth vibrate after station.
Preferably, the cage muscle installation station occupies 2-3 mould trolley position with installation of embedded parts station.
Preferably, the transport mechanism is the first track through the production line and the through the curing line Two tracks, the mould trolley are set on the first track or the second track.
Preferably, the mould trolley is moved by actuating unit on the first track or the second track, the actuating unit Mode is drawn using hydraulic pressure jacking or sprocket wheel to be driven, timing set a distance moves the mould trolley.
Preferably, the cloth vibrate station include driven by big stroke lifting device can complete the work of three-dimensional cloth can Automatic distributing machine and the shake table positioned at automatic distributing machine workspace lower part are lifted, vibrator is installed in the shake table bottom, when The mould trolley enter cloth vibrate station when, the shake table jacks mold, after cloth starts, the shake table vibration.
Preferably, the automatic distributing machine sliding is set on sliding rail, and the automatic distributing machine is moved to described by sliding rail Start cloth above mold cloth material mouth in mould trolley.
Preferably, multiple maintenance stations include quiet stopping troweling station, plucking station, into kiln stacking successively from the front to the back Station, secondary material distributing station close steam-cured station and/or without fencing lawn station and kiln discharge station.
Preferably, multiple maintenance stations include successively from the front to the back it is quiet stop troweling station, the steam-cured station of closing and/or Without fencing lawn station and kiln discharge station.
Preferably, the steam-cured station of closing includes heating station, constant temperature station and cooling station, institute successively from the front to the back It states the steam-cured station of closing and occupies more mould trolley positions.
Preferably, cage muscle processing stations are provided at the top of the steam-cured station of closing.
Preferably, at the curing line outlet end independent form removal station is equipped with positioned at the other side of ferry bus.
Preferably, the active line is arranged in parallel with curing line, between multiple active lines, multiple curing lines it Between to be arranged in parallel.
Preferably, it is provided with component conveying station on the outside of the active line input terminal, the component conveying station is provided with The Flat Car for Transshipment for transporting the prefabricated components.
After adopting the above scheme, the utility model prefabricated components integrated production line has following excellent beneficial effect:
1, the utility model prefabricated components integrated production line controls at least one active line, extremely by production line control system A few curing line and the work at least one mould trolley to circulate on active line, curing line, the working time is adjustable, According to the production technology beat woven, operation employee directly sets completion, operation letter using PLC touch screens human interface It is single, the overall work time is saved, is improved work efficiency;
2, the utility model prefabricated components integrated production line is laid out using above-mentioned standard production line, by different prefabricated The production technology of component is integrated, rearrangement station position, realize prefabricated components factorial praluction, multi items order, Diversification production;
3, the utility model realizes the batch life of prefabricated components batch production by the layout design of above-mentioned integrated production line Production, production line is simple in structure, easy to operate, can be used for mass producing, and can supply in time, while can meet complex component Batch production requirements;
4, the utility model prefabricated components integrated production line can not only make the prefabricated structure for largely meeting size range Part also improves production efficiency, reduces labor intensity;
5, the material distributing machine of the utility model uses big stroke lifting device, effective adjustable height to reach 2 meters, much larger than current The conventional structure material distributing machine of 300mm height.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model prefabricated components integrated production line embodiment one;
Fig. 2 be the utility model prefabricated components integrated production line embodiment one cloth vibrate station stereochemical structure signal Figure;
Fig. 3 is the structural schematic diagram of the utility model prefabricated components integrated production line embodiment two;
Fig. 4 is the structural schematic diagram of the utility model prefabricated components integrated production line embodiment three.
Specific implementation mode
The utility model is illustrated below according to attached drawing illustrated embodiment.This time disclosed embodiment can consider in institute It is to illustrate to have aspect, without limitation.The scope of the utility model is not illustrated to be limited by following implementation, only by right Shown in the range of claim, and include all changes having with right in the same meaning and right Shape.
The structure of the utility model prefabricated components integrated production line is illustrated with reference to specific embodiment.
The structural schematic diagram of the utility model prefabricated components integrated production line embodiment one as shown in Figure 1, including by producing Line control system control at least one active line, at least one curing line and for circulate on active line, curing line to The working time of a few mould trolley 1, production line control system control is adjustable, according to the production technology beat woven, operation Employee directly sets completion using PLC touch screens human interface.The present embodiment active line is set as one, and curing line is set as one Item, active line are set in parallel with curing line.Production activity loads transport using mould trolley 1, and mould trolley 1 can produce size and be 3.5×6×2(Rice)Within component.It is fixed using the panel of mould trolley 1 as element mold bed die, or using particular manufacturing craft In mould trolley 1, small members also can load multimode on single mode platform.The present embodiment is for producing:(1)PC plate class [size 3.5 ×6(Rice)It is interior]:Such as superimposed sheet, inside and outside wall board component;(2)Using die station as bed die, the planar plate members of edged mould production:As spelled The components such as dress formula inspection shaft, splice type cable well, pin-connected panel pipe gallery;(3)Using die station as waggon, particular manufacturing craft is placed on mould The component produced on platform:Such as L-type barricade, U-shaped water channel, sleeper.
Active line includes multiple work stations for meeting production technology demand, and multiple work stations are from arrival end to outlet end Direction includes clear die worker position 2, oil spout station 3, mold installation station 4, steel cage muscle installation station 5, installation of embedded parts station successively 6, cloth, which vibrates, station 7 and plugs and pounds feed supplement station 8, plugs and pounds feed supplement station 8 and is set to cloth and vibrates after station 7.
Clear die worker position 2 is according to the difference of product, using the equipment cleanings mold such as hand fit's wire brush, formwork cleaner;
Oil spout station 3 uses releasing agent sprayer, after spraying releasing agent, uses the tools such as round brush, rag, sponge, this reality Example is applied to smoothen releasing agent on mold using oil-injection machine 29;
Whether mold installation station 4 is mold assembling or is needed to install the auxiliary moulds such as side mould additional according to the prefabricated components of processing And the station installed;
Steel reinforcement cage installs station 5 and installation of embedded parts station 6 occupies 2-3 mould trolley position, and setting in this way is easily installed Steel reinforcement cage and built-in fitting manually place steel reinforcement cage, install built-in fitting;
Refering to what is shown in Fig. 2, cloth vibrates, station 7 includes that the superposed liftable for completing three-dimensional cloth work is automatic Material distributing machine 25 and shake table 9 positioned at lower part for generating vibration, the sliding of automatic distributing machine 25, which is set to, to be located above mould trolley 1 Sliding rail 10 on, automatic distributing machine 25 is slided by control system on sliding rail 10, and automatic distributing machine 25 can be slided by sliding rail 10 Above the dynamic mold cloth material mouth moved in mould trolley 1.Material distributing machine uses big stroke lifting device, effective adjustable height to reach 2 meters, Much larger than the conventional structure material distributing machine of current 300mm height.The bottom of shake table 9 is installed by vibrator 32, feature high frequency, strong oscillating It is dynamic;It is different from existing equipment both sides installation vibrator, rocking vibration.
According to product and die size, when mould trolley 1 enters on shake table 9 and automatic distributing machine 25 moves to shake table 9 Top, shake table 9 jack mold, and after cloth starts, shake table 9 vibrates work under the driving of vibrator 32;
Plug and pound feed supplement station 8, concrete plugged and pounded using vibrating head on mold by worker, solve it is large-scale, overweight etc. can not The component vibrated using shake table is vibrated problem.
Curing line includes multiple maintenance stations for meeting production technology demand, and multiple maintenance stations are from from arrival end to outlet Extreme direction successively include it is quiet stop troweling station 11, plucking station 12, into kiln piling station 13, secondary material distributing station 14, closing steam Support station 15 and kiln discharge station 17.
It closes steam-cured station 15 and steaming kiln mode is closed using tunnel type, closing steam-cured station 15 includes successively from the front to the back Heat up station 18, constant temperature station 19 and cooling station 20, closes the position that steam-cured station 15 occupies more mould trolleys 1.Cool down work Position 20 is located at the middle and back for closing steam-cured station 15, i.e., is not passed through steam in the station, first carries out cooling down indoors, prevent Internal-external temperature difference is excessive, component surface crack.
No fencing lawn station can also be increased on curing line, it is low or the case where die size transfinites for production requirement, No fencing lawn station may be used it is quiet stop conserve or cover the steam-cured operating mode of canvas.
The top setting cage muscle processing stations 16 of steam-cured station 15 are closed, setting in this way can save place, space, directly It is die-filling, improve efficiency.
It is quiet to stop troweling station 11, plucking station 12 and producing the plate class members such as wallboard, superimposed sheet into kiln piling station 13 When with the small-sized water channel lower component of contour degree, mould trolley 1, component are used to the operating mode of stacking, superposition using stacking machine, Steam is saved, production efficiency is improved.Stacking machine is special stacking machine, can integrally capture mould trolley, successively stacking.
Mould trolley 1 conveys circulation by transport mechanism between multiple work stations of active line, and mould trolley 1 is in production line traffic control Circulation is conveyed in multiple maintainer interdigits of curing line by transport mechanism under the control of system processed, transport mechanism is through life First track 21 of producing line and the second track 22 through curing line, the sliding of mould trolley 1 are set to the first track 21 or the second rail On road 22.First track 21 is through clear die worker position 2, oil spout station 3, mold installation station 4, cage muscle installation station 5, built-in fitting peace Dress station 6 and cloth vibrate station 7.Second track 22 stops troweling station 11, plucking station 12, into kiln piling station through quiet 13, secondary material distributing station 14, the steam-cured station 15 of closing, cage muscle processing stations 16 and kiln discharge station 17.Mould trolley 1 passes through engine Structure moves on the first track 21 or the second track 22, and hydraulic pressure jacking may be used in actuating unit or sprocket wheel is drawn mode and is driven, Timing set a distance moves mould trolley 1, and mobile cadence time calculates according to the production technology time, determined according to each component production technology Fixed each station executes activity time, automatic running.
Between the output end of active line and the input terminal of curing line, between the output end of curing line and the input terminal of active line It is linked together respectively by the ferry bus 23 controlled by production line control system.Mould trolley 1, translation are carried by ferry bus 23 It is transferred to active line or curing line, ferry bus 23 uses independent power transmission system.
At curing line outlet end form removal station 24 is equipped with positioned at the other side of ferry bus 23.Mould trolley 1 goes out curing line output When end, form removal station 24 is entered by ferry bus 23, setting in this way efficiently avoids the problem of complicated die demoulding time length, Can also avoid component that from can not demoulding influences circulating production line job schedule.After component demoulds, 23 carrying of ferry bus demoulding Mould trolley afterwards enters active line, cycle operation.
It is provided with component conveying station 26 on the outside of active line input terminal, component conveying station 26 is provided with prefabricated for transporting The Flat Car for Transshipment 27 of component.
When work, for mould trolley 1 under the manipulation of production line control system, carrying mold enters active line, in clear die worker position 2 By the equipment cleanings molds such as worker's wire brush, formwork cleaner, die station face, after completing the corresponding process of per pass;Mould trolley 1 is along One track 21 is moved to oil spout station 3, sprays releasing agent using oil-injection machine 29 or human assistance, releasing agent is smoothened in mold On, it is slid on mold installation station 4 by mould trolley 1 later, mold assembly is completed according to rhythm of production, then pass through mould trolley 1 Steel reinforcement cage installation station 5 is slid into, completes the installation of steel reinforcement cage in the station, then pre- inner part is slid by mould trolley 1 and is installed Station 6, herein by installation of embedded parts on steel reinforcement cage;It slides into cloth by mould trolley 1 again to vibrate station 7, automatic distributing machine Prepare cloth above the 25 mold cloth material mouths slided in mould trolley 1 along sliding rail 10 under production line control system control, vibrates Platform 9 jacks mold, and shake table 9 vibrates after 25 cloth of automatic distributing machine starts, and completes the jolt ramming to prefabricated components and processes.When adding Work large size can not be vibrated by cloth station 7 vibration component when, slided in mould trolley 1 and plug and pound cloth station 8, by worker in mould Concrete is plugged and pounded using vibrating head on tool, the jolt ramming to prefabricated components is completed and processes;Mould trolley 1 is moved by ferry bus 23 later To the second track 22 of curing line, mould trolley 1 slip into first it is quiet stop troweling station 11, so that the prefabricated components of processing is carried out It is quiet to stop conserving;The prefabricated components of processing are slid by plucking station 12 by mould trolley 1 again, by napper 30 to the pre- of processing Component processed carries out brushing process processing;Enter later into kiln piling station 13, when plate class members such as production wallboard, superimposed sheet and small When a lower height of components such as type water channel, template, prefabricated components are used to the work of stacking, superposition in the station using stacking machine 31 Operation mode;Secondary material distributing station 14 is subsequently entered, which is special to part-structure, and product needs the structure that gradation cloth is processed Part.It is continued to move to using automatic distributing machine 25, is slid onto the mould upstream of steam-cured line, carry out cloth, cooperation is manually vibrated;Later Into steam-cured station 15 is closed, in this station, prefabricated components are successively by heating station 18, constant temperature station 19 and cooling station 20 Steam curing conservation is carried out;Enter kiln discharge station 17 later, tears the mould trolley 1 of more mold stackings using stacking machine open in this station Pile, and by ferry bus 23 enter maintenance line output terminal on the outside of form removal station 24, the station by prefabricated components from mold It removes, the mould trolley 1 for prefabricated components of dismantling is moved into active line input terminal by ferry bus 23 later, it is made to be slideably positioned in On first track 21, cycle carries out the processing of above-mentioned prefabricated components.And the prefabricated components on form removal station 24 pass through loop wheel machine It is hoisted on the Flat Car for Transshipment 27 of component conveying station 26, is transported to stockyard transport station.
The structural schematic diagram of the utility model prefabricated components integrated production line embodiment two as shown in Figure 3, it is most of to tie Structure is identical as the structure of above-described embodiment one, and something in common repeats no more, and is a difference in that:The present embodiment is for producing with mould Special-shaped component:Such as section of jurisdiction, stair, box shore protection, balcony component.
Multiple work stations of this implementation line include clear die worker position 2, oil spout successively from arrival end to outlet extreme direction Station 3, steel cage muscle installation station 5, installation of embedded parts station 6, molding station 28, cloth, which vibrate, station 7 and plugs and pounds feed supplement station 8, it plugs and pounds feed supplement station 8 and is set to cloth and vibrate after station 7.Clear die worker position 2, oil spout station 3, steel reinforcement cage peace in those stations Dress station 5, installation of embedded parts station 6, cloth plug and pound station 7 and plug and pound feed supplement station 8 all with the setting phase of above-described embodiment one Together, details are not described herein again, is not provided with mold installation station on the present embodiment active line after oil spout station 3, but pre- Molding station 28 is arranged after installing station 6 in embedded part, this is the processing characteristic of abnormity component.
Multiple maintenance stations of the present embodiment curing line stop troweling station including quiet successively from arrival end to outlet extreme direction 11, steam-cured station 15 and kiln discharge station 17 are closed.Four stations are identical as the correspondence station setting of above-described embodiment one, herein It repeats no more.
When work, for mould trolley 1 under the manipulation of production line control system, carrying mold enters active line, in clear die worker position 2 By the equipment cleanings molds such as worker's wire brush, formwork cleaner, die station face, after completing the corresponding process of per pass;Mould trolley 1 is along One track 21 is moved to oil spout station 3, sprays releasing agent using oil-injection machine or human assistance, releasing agent is smoothened on mold; Steel reinforcement cage is slid by mould trolley 1 later, station 5 is installed, completes the installation of steel reinforcement cage in the station, then slide by mould trolley 1 It moves to pre- inner part and station 6 is installed, herein by installation of embedded parts on steel reinforcement cage;Molding station 28 is slid by mould trolley 1 again, Complete the molding installation of mold;It slides into cloth by mould trolley 1 again to vibrate station 7, automatic distributing machine 25 is in production line traffic control Preparation cloth above the mold cloth material mouth in mould trolley 1 is slided on along sliding rail 10 under system control, shake table 9 jacks mold, when 25 cloth of automatic distributing machine starts the vibration of rear shake table 9, completes the jolt ramming to prefabricated components and processes.When processing large size can not pass through Cloth vibrate station 7 vibration component when, slided in mould trolley 1 and plug and pound cloth station 8, by worker on mold use vibrating head Concrete is plugged and pounded, the jolt ramming to prefabricated components is completed and processes;Mould trolley 1 is moved to by ferry bus 23 the second of curing line later On track 22, mould trolley 1 slip into first it is quiet stop troweling station 11, make the prefabricated components of processing carry out quiet stopping conserving;Lead to again It crosses mould trolley 1 and the prefabricated components of processing is moved to the steam-cured station 15 of closing, in this station, prefabricated components are successively by heating work Position 18, constant temperature station 19 and cooling station 20 have carried out steam curing conservation;Later enter kiln discharge station 17, and by ferry bus 23 into Enter the form removal station 24 conserved on the outside of line output terminal, prefabricated components are removed from mold in the station, will be dismantled later pre- The mould trolley 1 of component processed moves to active line input terminal by ferry bus 23, it is made to be slideably positioned on the first track 21, recycle into The processing of the above-mentioned prefabricated components of row.And the prefabricated components on form removal station 24 are hoisted to component conveying station 26 by loop wheel machine The Flat Car for Transshipment 27 on, be transported to stockyard transport station.
The structural schematic diagram of the utility model prefabricated components integrated production line embodiment three as shown in Figure 4, including by producing Line control system control at least one active line, at least one curing line and for circulate on active line, curing line to The working time of a few mould trolley 1, production line control system control is adjustable, according to the production technology beat woven, operation Employee directly sets completion using PLC touch screens human interface.The present embodiment active line is set as two, and curing line is set as two Item, active line are set in parallel with curing line, between two active lines, parallel respectively between two curing lines, form two and follow Ring production line.The structure for the circulating production line that the present embodiment wherein production line, curing line and ferry bus 23 form and Fig. 1 institutes State that one structure of embodiment is identical, and details are not described herein again.What another production line of the present embodiment, curing line and ferry bus 23 formed follows The structure of ring production line is identical as two structure of embodiment described in Fig. 3, also repeats no more herein, which is a difference in that:Two Between the output end and the input terminal of two curing lines of active line, the input of the output end and two active lines of two curing lines It is linked together respectively by ferry bus 23 between end.
In use, the circulating production line that a wherein active line, curing line and ferry bus 23 form is for producing:(1)PC [size is 3.5 × 6 to plate class(Rice)It is interior]:Such as superimposed sheet, inside and outside wall board component;(2)Using die station as bed die, the production of edged mould Planar plate members:Such as assembling type device for detecting manhole, splice type cable well, pin-connected panel pipe gallery component;(3)Using die station as waggon, Particular manufacturing craft is placed on the component produced in die station:Such as L-type barricade, U-shaped water channel, sleeper, in addition an active line, curing line and The circulating production line that ferry bus 23 forms is for producing the special-shaped component with mould:Such as section of jurisdiction, stair, box shore protection, balcony structure Part.Two circulating production lines can be carried out respectively, mutually unaffected, and rhythm of production elastic can adjust, and this practicality The structure of the novel steam-cured station of closing closes mode using tunnel type, it is ensured that first in first out passes in and out steaming kiln independence work Make.
Those skilled in the art will readily occur to this practicality after considering specification and putting into practice utility model disclosed herein Novel other embodiments.This application is intended to cover any variations, uses, or adaptations of the utility model, these Variations, uses, or adaptations follow the general principle of the utility model and include it is undocumented in the art Common knowledge or conventional techniques.The description and examples are only to be considered as illustrative, the true scope of the utility model and Spirit is pointed out by claim.
It should be understood that the utility model is not limited to embodiment method, the structure being described above, and attached Precision architecture shown in figure, and various modifications and changes may be made without departing from the scope thereof.The scope of the utility model Only it is limited by the accompanying claims.

Claims (16)

1. a kind of prefabricated components integrated production line, which is characterized in that include at least one work controlled by production line control system Making line, at least one curing line and at least a mould trolley, the active line for circulating on active line, curing line includes Multiple work stations, the curing line include multiple maintenance stations, and the mould trolley is by transport mechanism in multiple work stations Between, multiple maintainer interdigits conveying circulation, connected respectively by ferry bus between the both ends of the active line and the both ends of curing line It connects.
2. prefabricated components integrated production line according to claim 1, which is characterized in that multiple work stations are by forward direction Include that clear die worker position, oil spout station, mold installation station, cage muscle installation station, installation of embedded parts station and cloth shake successively afterwards Station is smash, the transport mechanism is through clear die worker position, oil spout station, mold installation station, cage muscle installation station, installation of embedded parts Station and cloth vibrate station.
3. prefabricated components integrated production line according to claim 1, which is characterized in that multiple work stations are by forward direction Include clear die worker position successively afterwards, oil spout station, cage muscle installation station, installation of embedded parts station, mold station and cloth and vibrate work Position.
4. prefabricated components integrated production line according to claim 2 or 3, which is characterized in that further include plugging and pounding feed supplement station, It is described plug and pound feed supplement station and be set to cloth vibrate after station.
5. prefabricated components integrated production line according to claim 4, which is characterized in that cage muscle installation station with it is pre-buried 2-3 mould trolley position of part erector bit occupancy.
6. prefabricated components integrated production line according to claim 1, which is characterized in that the transport mechanism is through institute The first track of production line and the second track through the curing line are stated, the mould trolley is set to the first track or second On track.
7. prefabricated components integrated production line according to claim 6, which is characterized in that the mould trolley passes through actuating unit It is moved on the first track or the second track, the actuating unit is drawn mode using hydraulic pressure jacking or sprocket wheel and is driven, and timing is fixed The mobile mould trolley of distance.
8. prefabricated components integrated production line according to claim 2 or 3, which is characterized in that the cloth vibrates station packet It includes and drives the liftable automatic distributing machine that can complete three-dimensional cloth work by big stroke lifting device and be located at automatic distributing machine work Make the shake table of area lower part, vibrator is installed in the shake table bottom, when the mould trolley enter cloth vibrate station when, it is described Shake table jacks mold, after cloth starts, the shake table vibration.
9. prefabricated components integrated production line according to claim 8, which is characterized in that the automatic distributing machine sliding is set to On sliding rail, the automatic distributing machine, which is moved to by sliding rail above the mold cloth material mouth in the mould trolley, starts cloth.
10. prefabricated components integrated production line according to claim 2, which is characterized in that multiple maintenance stations are by preceding Include successively backward it is quiet stop troweling station, plucking station, into kiln piling station, secondary material distributing station, the steam-cured station of closing and/or Without fencing lawn station and kiln discharge station.
11. prefabricated components integrated production line according to claim 3, which is characterized in that multiple maintenance stations are by preceding Stop troweling station, the steam-cured station of closing and/or without fencing lawn station and kiln discharge station including quiet successively backward.
12. the prefabricated components integrated production line according to claim 10 or 11, which is characterized in that the steam-cured station of closing Include heating station, constant temperature station and cooling station successively from the front to the back, the steam-cured station of closing occupies Duo Liang mould trolleys area Position.
13. prefabricated components integrated production line according to claim 12, which is characterized in that the top of the steam-cured station of closing Portion is provided with cage muscle processing stations.
14. prefabricated components integrated production line according to claim 12, which is characterized in that at the curing line outlet end position It is equipped with independent form removal station in the other side of ferry bus.
15. prefabricated components integrated production line according to claim 1, which is characterized in that the active line is flat with curing line Row is arranged, and is to be arranged in parallel between multiple active lines, between multiple curing lines.
16. prefabricated components integrated production line according to claim 1, which is characterized in that on the outside of the active line input terminal It is provided with component conveying station, the component conveying station is provided with the Flat Car for Transshipment for transporting the prefabricated components.
CN201820225895.2U 2018-02-08 2018-02-08 Prefabricated components integrated production line Active CN207888889U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820225895.2U CN207888889U (en) 2018-02-08 2018-02-08 Prefabricated components integrated production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820225895.2U CN207888889U (en) 2018-02-08 2018-02-08 Prefabricated components integrated production line

Publications (1)

Publication Number Publication Date
CN207888889U true CN207888889U (en) 2018-09-21

Family

ID=63543828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820225895.2U Active CN207888889U (en) 2018-02-08 2018-02-08 Prefabricated components integrated production line

Country Status (1)

Country Link
CN (1) CN207888889U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108058266A (en) * 2018-02-08 2018-05-22 建华建材(中国)有限公司 Prefabricated components integrated production line
CN112248208A (en) * 2020-11-04 2021-01-22 郑州玛纳房屋装备有限公司 General non-standard part or three-dimensional part modular automatic production process arrangement system
CN115401783A (en) * 2022-08-31 2022-11-29 上海电气研砼(徐州)重工科技有限公司 Preparation process of concrete bridge deck

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108058266A (en) * 2018-02-08 2018-05-22 建华建材(中国)有限公司 Prefabricated components integrated production line
CN112248208A (en) * 2020-11-04 2021-01-22 郑州玛纳房屋装备有限公司 General non-standard part or three-dimensional part modular automatic production process arrangement system
CN112248208B (en) * 2020-11-04 2022-04-01 郑州玛纳房屋装备有限公司 General non-standard part or three-dimensional part modular automatic production process arrangement system
CN115401783A (en) * 2022-08-31 2022-11-29 上海电气研砼(徐州)重工科技有限公司 Preparation process of concrete bridge deck
CN115401783B (en) * 2022-08-31 2024-06-07 上海电气研砼(徐州)重工科技有限公司 Preparation process of concrete bridge deck

Similar Documents

Publication Publication Date Title
CN108058266A (en) Prefabricated components integrated production line
CN207888889U (en) Prefabricated components integrated production line
CN101508144B (en) Concrete casting production technique with energy-saving environmental-protection function
CN208788805U (en) A kind of concrete precast pile automatic production line
CN109203215A (en) Concrete prefabricated element production line
CN104723449A (en) Automatic production line of building industrialization concrete precast members
WO2020232745A1 (en) Prefabricated component production line with bench formwork temporary storage unit
CN103029212A (en) Production process of automatic assembly line in factory for pre-fabricating and assembling wall panel of integral shear wall structure
CN107538601A (en) A kind of assembled architecture precast stair combines universal mold with pin-connected panel
WO2020232744A1 (en) Prefabricated component production line having temporary storage function
CN109262823A (en) Repeat assembling PC component production system and production method
CN111186011A (en) Automatic assembly line arrangement structure for factory prefabrication of laminated slab beams and production method
CN109822736A (en) A kind of production technology of assembled wallboard
CN109333800A (en) A kind of prefabricated components production line
CN205219401U (en) Wallboard flexible production line
CN105437364A (en) Wallboard flexible production line
CN209699477U (en) A kind of component production line
CN209350532U (en) Concrete prefabricated element production line
CN111186009A (en) Preparation method of PC prefabricated part double-circulation production line
CN209718053U (en) Multistage feeding oscillatory type concrete precast block process equipment
CN109291229A (en) Modularization movable multi-layer piles up steam-cured PC component production system and production method
CN209491933U (en) A kind of prefabricated components production line
CN102729327A (en) Wall plate automatic cyclic production system
CN209381044U (en) Modularization movable multi-layer piles up steam-cured PC component production system
CN104002374A (en) Plaster concrete building block forming machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant