CN207832190U - A kind of construction engineering cost field surveys device based on BIM technology - Google Patents
A kind of construction engineering cost field surveys device based on BIM technology Download PDFInfo
- Publication number
- CN207832190U CN207832190U CN201820277909.5U CN201820277909U CN207832190U CN 207832190 U CN207832190 U CN 207832190U CN 201820277909 U CN201820277909 U CN 201820277909U CN 207832190 U CN207832190 U CN 207832190U
- Authority
- CN
- China
- Prior art keywords
- pedestal
- telescope
- support leg
- screw
- foot tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 29
- 238000005516 engineering process Methods 0.000 title claims abstract description 25
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 46
- 238000003466 welding Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 13
- 238000005259 measurement Methods 0.000 abstract description 12
- 230000008901 benefit Effects 0.000 abstract description 7
- 230000007812 deficiency Effects 0.000 abstract description 3
- 238000013461 design Methods 0.000 abstract description 3
- 230000006872 improvement Effects 0.000 abstract description 3
- 238000013507 mapping Methods 0.000 description 4
- 230000008602 contraction Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000012800 visualization Methods 0.000 description 2
- 230000002457 bidirectional effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000007858 starting material Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Measurement Of The Respiration, Hearing Ability, Form, And Blood Characteristics Of Living Organisms (AREA)
Abstract
The utility model is related to construction engineering cost technical field more particularly to a kind of construction engineering cost field surveys devices based on BIM technology, including:Handle slightly takes aim at device, body;The handle is located at the top of body, and handle is connected with body by fixing bolt;The telescope is located at the inside of body, and telescope is connected with body by shaft;The pipe horizon equipment is arranged in the lower section of telescope, and pipe horizon equipment is connected with body by mosaic mode;It is described it is thick take aim at device and be arranged on the outer wall of telescope, and thick take aim at device and be connected by mosaic mode with telescope;The object lens are arranged in the front end of telescope;The utility model through the above structure on improvement, it is good with structure design advantages of simple, support effect, the precision that stability is strong, can be suitable for different measuring environments, improve measurement result, highly practical advantage, to the problem of effective solution existing apparatus and deficiency.
Description
Technical field
The utility model is related to construction engineering cost technical field more particularly to a kind of architectural engineerings based on BIM technology
Cost field surveys device.
Background technology
BIM technology is to emulate mould by digital information based on every relevant information data of construction-engineering project
Real information possessed by quasi- building realizes project supervision, estate management, equipment management, number by three-dimensional building model
Change processing, the functions such as engineering management, it with information completeness, information relevance, consistency on messaging, visualization, harmony,
It simulation, optimization property and can go out eight big feature of figure, the projects such as construction unit, designing unit, unit in charge of construction, supervisor are joined
With side in identical platform, same building information model is shared.It is built conducive to project visualization, fining, BIM is no longer as CAD
Equally it is a software, but a kind of management means, it is to realize construction industry fining, the important tool of information system management.
Every relevant information data of construction-engineering project is received by various information acquisition and plotting board in BIM technology
What collection was completed, but existing construction engineering cost field surveys device is only to be propped up instrument of surveying and mapping by tripod
Support, support effect is poor when being used in severe measuring environment, and the stationarity of instrument of surveying and mapping does not reach requirement, and influences final
Measurement data.
Such as the problem of proposing among the above, this programme provides a kind of construction engineering cost field surveys dress based on BIM technology
It sets, and the solution problem and not among the above is reached by the construction engineering cost field surveys device based on BIM technology
Foot, makes it with more practical purpose.
Utility model content
The purpose of this utility model is to provide a kind of construction engineering cost field surveys device based on BIM technology, with
It is only to rely on tripod to mapping to solve existing construction engineering cost field surveys device mentioned above in the background art
Instrument is supported, and support effect is poor when being used in severe measuring environment, and the stationarity of instrument of surveying and mapping does not reach requirement,
The problem of influencing final measurement data and deficiency.
The purpose of this utility model and effect are reached by technical solution in detail below:
A kind of construction engineering cost field surveys device based on BIM technology, including:Handle, slightly take aim at device, body, object lens,
Pipe horizon equipment, vertical clamp screw, vertical final motion screw, battery compartment, display screen, operation console, level braking spiral, horizontal fine motion
Spiral, circular bubble, pedestal, pedestal lock-button, bottom plate, leveling foot screw, mounting base, foot tube, fixed ring, support arm, support
Leg, foot pad, fixed frame, telescope;The handle is located at the top of body, and handle is connected with body by fixing bolt;
The telescope is located at the inside of body, and telescope is connected with body by shaft;The pipe horizon equipment setting is being looked in the distance
The lower section of mirror, and pipe horizon equipment is connected with body by mosaic mode;It is described it is thick take aim at device and be arranged on the outer wall of telescope, and
Slightly device is taken aim at telescope to be connected by mosaic mode;The object lens are arranged in the front end of telescope, and object lens and telescope are logical
Mosaic mode is crossed to be connected;The battery compartment is located at the side of body, and battery compartment is an integral structure with body;It is described vertical
Clamp screw is located on the outer wall of body, and vertical clamp screw is connected with body by mosaic mode;The vertical fine motion
Spiral is located at the inside of vertical clamp screw, and vertical final motion screw is connected with vertical clamp screw by running through mode;Institute
The other side that level braking spiral is located at body is stated, and level braking spiral is connected with body by mosaic mode;The water
Flat final motion screw is located at the inside of level braking spiral, and horizontal final motion screw is threaded through with level braking and is connected through mode
It connects;The operation console is arranged on the outer wall of underpart, and operation console is connected with body by fixing bolt;The display
Screen, which is inlayed, to be arranged on the top of operation console;The pedestal is arranged in the bottom end of body, and pedestal is connected with body by shaft;
The circular bubble is arranged in the side of Chuck top, and circular bubble is connected with pedestal by mosaic mode;The pedestal
Lock-button is arranged in the bottom end of pedestal, and pedestal lock-button is connected with pedestal by mosaic mode;The bottom plate is located at pedestal
Lower section, and bottom plate is connected with pedestal by bolt;The junction in bottom plate and pedestal is arranged in the leveling foot screw;It is described
Mounting base is located at the top of foot tube, and mounting base is connected with foot tube by shaft;The body passes through fixation side with mounting base
Formula is connected;The fixed ring is located at the lower part of foot tube, and fixed ring is connected with foot tube by running through mode;The fixed frame
It is arranged in the lower section of fixed ring, and fixed frame is connected with foot tube by welding manner;The support leg is located at the one of fixed frame
Side, and support leg is connected with fixed frame by shaft;The support arm is arranged on the top of support leg, and support arm and support
Leg is connected by shaft;The other end of the support arm is connected with fixed ring by shaft;The foot pad is located at support leg
The other end, and foot pad is connected with support leg by shaft.
As advanced optimizing for the technical program, a kind of construction engineering cost based on BIM technology of the utility model is existing
Foot tube is provided with three, and the tapered shape in bottom end of foot tube altogether in the bottom end of mounting base described in the plotting board of field.
As advanced optimizing for the technical program, a kind of construction engineering cost based on BIM technology of the utility model is existing
Support leg described in the plotting board of field is provided with three altogether in the lower part of foot tube, and support leg is stretching structure by support arm.
As advanced optimizing for the technical program, a kind of construction engineering cost based on BIM technology of the utility model is existing
Screw thread is provided on the outer wall of foot tube lower part described in the plotting board of field and on the inner wall of fixed ring, and fixed ring passes through spiral shell with foot tube
Line twist-on is connected.
As advanced optimizing for the technical program, a kind of construction engineering cost based on BIM technology of the utility model is existing
The side of body described in the plotting board of field is provided with SD card slot and USB port.
As advanced optimizing for the technical program, a kind of construction engineering cost based on BIM technology of the utility model is existing
Support leg is stretching structure described in the plotting board of field, and puller bolt is provided on the outer wall of support leg.
Due to the application of the above technical scheme, the utility model has following advantages compared with prior art:
1, the utility model foot tube is provided with three altogether in the bottom end of mounting base, and the tapered shape in bottom end of foot tube is set
It sets, the stationarity of device can be improved when being used on more soft soil, improves the measurement accuracy of device.
2, the utility model support leg is provided with three altogether in the lower part of foot tube, and support leg is flexible knot by support arm
The setting of structure further enhances the support effect of support leg, improves the stability of device, and device can be suitable for different
Measuring environment, it is easy to carry after contraction, it is highly practical.
3, screw thread, and fixed ring and foot tube are provided on the outer wall of the utility model foot tube lower part and on the inner wall of fixed ring
The setting being connected by screw thread twist-on adjusts the angle of support leg by adjusting the position of fixed ring, support leg is avoided to incline
Rake angle is excessive or too small influences whole support effect.
4, the utility model through the above structure on improvement, have structure design advantages of simple, support effect good, consolidate
Property the strong, precision that different measuring environments can be suitable for, improve measurement result, highly practical advantage, to effective
Solve the problems, such as existing apparatus and deficiency.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the support leg structure schematic diagram of the utility model;
Fig. 3 is the system framework schematic diagram of the utility model.
In figure:Handle 1, it is thick take aim at device 2, body 3, object lens 4, pipe horizon equipment 5, vertical clamp screw 6, vertical final motion screw 7,
Battery compartment 8, display screen 9, operation console 10, level braking spiral 11, horizontal final motion screw 12, circular bubble 13, pedestal 14, pedestal
Lock-button 15, bottom plate 16, leveling foot screw 17, mounting base 18, foot tube 19, fixed ring 20, support arm 21, support leg 22, foot pad
23, fixed frame 24, telescope 25.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
The every other embodiment obtained, shall fall within the protection scope of the present invention.
It please refers to Fig.1 to Fig.3, the utility model provides a kind of construction engineering cost field surveys dress based on BIM technology
Set technical solution:
A kind of construction engineering cost field surveys device based on BIM technology, including:Handle 1 slightly takes aim at device 2, body 3, object
Mirror 4, pipe horizon equipment 5, vertical clamp screw 6, vertical final motion screw 7, battery compartment 8, display screen 9, operation console 10, level braking spiral shell
Rotation 11, horizontal final motion screw 12, circular bubble 13, pedestal 14, pedestal lock-button 15, bottom plate 16, leveling foot screw 17, mounting base
18, foot tube 19, fixed ring 20, support arm 21, support leg 22, foot pad 23, fixed frame 24, telescope 25;Handle 1 is located at body 3
Top, and handle 1 is connected with body 3 by fixing bolt;Telescope 25 is located at the inside of body 3, and telescope 25 with
Body 3 is connected by shaft;Pipe horizon equipment 5 is arranged in the lower section of telescope 25, and pipe horizon equipment 5 with body 3 by inlaying
Mode is connected;It slightly takes aim at device 2 to be arranged on the outer wall of telescope 25, and slightly takes aim at device 2 and be connected by mosaic mode with telescope 25
It connects;Object lens 4 are arranged in the front end of telescope 25, and object lens 4 are connected with telescope 25 by mosaic mode;Battery compartment 8 is located at
The side of body 3, and battery compartment 8 is an integral structure with body 3;Vertical clamp screw 6 is located on the outer wall of body 3, and perpendicular
It is connected to clamp screw 6 by mosaic mode with body 3;Vertical final motion screw 7 is located at the inside of vertical clamp screw 6, and
Vertical final motion screw 7 is connected with vertical clamp screw 6 by running through mode;Level braking spiral 11 is located at the another of body 3
Side, and level braking spiral 11 is connected with body 3 by mosaic mode;Horizontal final motion screw 12 is located at level braking spiral 11
Inside, and horizontal final motion screw 12 is connected with level braking spiral 11 by running through mode;Operation console 10 is arranged in body 3
On the outer wall of lower part, and operation console 10 is connected with body 3 by fixing bolt;Display screen 9, which is inlayed, to be arranged in operation console 10
Top;Pedestal 14 is arranged in the bottom end of body 3, and pedestal 14 is connected with body 3 by shaft;Circular bubble 13 is arranged in base
The side on 14 tops of seat, and circular bubble 13 is connected with pedestal 14 by mosaic mode;Pedestal lock-button 15 is arranged in pedestal
14 bottom end, and pedestal lock-button 15 is connected with pedestal 14 by mosaic mode;Bottom plate 16 is located at the lower section of pedestal 14, and bottom
Plate 16 is connected with pedestal 14 by bolt;Leveling foot screw 17 is arranged in the junction of bottom plate 16 and pedestal 14;Mounting base 18
Positioned at the top of foot tube 19, and mounting base 18 is connected with foot tube 19 by shaft;Body 3 passes through fixed form with mounting base 18
It is connected;Fixed ring 20 is located at the lower part of foot tube 19, and fixed ring 20 is connected with foot tube 19 by running through mode;Fixed frame 24
It is arranged in the lower section of fixed ring 20, and fixed frame 24 is connected with foot tube 19 by welding manner;Support leg 22 is located at fixed frame
24 side, and support leg 22 is connected with fixed frame 24 by shaft;Support arm 21 is arranged on the top of support leg 22, and props up
Brace 21 is connected with support leg 22 by shaft;The other end of support arm 21 is connected with fixed ring 20 by shaft;Foot pad
23 are located at the other end of support leg 22, and foot pad 23 is connected with support leg 22 by shaft.
Specifically, foot tube 19 is provided with three, and the tapered shape in bottom end of foot tube 19 altogether in the bottom end of mounting base 18, compared with
For the stationarity of device can be improved when being used on soft soil, the measurement accuracy of device is improved.
Specifically, support leg 22 is provided with three altogether in the lower part of foot tube 19, and support leg 22 is to stretch by support arm 21
Shrinking structure further enhances the support effect of support leg 22, improves the stability of device, and device can be suitable for different
Measuring environment, it is easy to carry after contraction, it is highly practical.
Specifically, being provided with screw thread, and fixed ring 20 and foot on the outer wall of 19 lower part of foot tube and on the inner wall of fixed ring 20
Pipe 19 is connected by screw thread twist-on, is adjusted the angle of support leg 22 by adjusting the position of fixed ring 20, is avoided support leg
22 angles of inclination are excessive or too small influence whole support effect.
Specifically, the side of body 3 is provided with SD card slot and USB port, it is convenient for real-time storage measurement data.
Specifically, support leg 22 is stretching structure, and puller bolt is provided on the outer wall of support leg 22.
Specifically used method and effect:
When using the device, foot tube 19 is strutted in measurement position and is adjusted to proper height, then puts support leg 22
Under, the position of fixed ring 20 is adjusted, so that foot pad 23 is contacted ground, and pass through the bolt of support arm 21 and 22 junction of support leg
(not marked in figure) tightens fixing supporting legs 22, completes the fixation of support construction, and then body 3 is lifted and pacified by handle 1
Be attached in the mounting base 18 on 19 top of foot tube, using leveling 17 leveling of foot screw, keep bubble in circular bubble 13 placed in the middle, then with
The method adjustment keep the bubble in pipe horizon equipment 5 placed in the middle, by 10 starter of operation console, then by vertical clamp screw 6,
Altitude circle and horizontal limb is arranged in vertical final motion screw 7, level braking spiral 11, horizontal final motion screw 12, according to required number
Scene is measured according to operating device, and measurement data is stored into the SD card in body 3, further according to needing to be transmitted to it
In its equipment such as computer, for further handling or utilizing, which can also be by the USB interface of 3 side of body and logical
Interrogate cable by the data stored in SD card input computer, or by computer data and information be transferred to dress through communication cable
It sets, realizes bidirectional transfer of information, the support that offers precise data is modeled for BIM.
In summary:A kind of construction engineering cost field surveys device based on BIM technology, by foot tube in mounting base
Bottom end be provided with three, and the setting of the tapered shape in bottom end of foot tube altogether, on more soft soil use when can improve
The stationarity of device improves the measurement accuracy of device;It is provided with three altogether in the lower part of foot tube by support leg, and support leg is logical
The setting that support arm is stretching structure is crossed, the support effect of support leg is further enhanced, improves the stability of device, device
It can be suitable for different measuring environments, it is easy to carry after contraction, it is highly practical;By on the outer wall of foot tube lower part and fixed ring
Inner wall on be provided with screw thread, and the setting that fixed ring is connected with foot tube by screw thread twist-on, pass through adjust fixed ring position
It sets and avoids support leg angle of inclination excessive to adjust the angle of support leg or the too small support effect for influencing entirety;By above
Improvement in structure has structure design advantages of simple, support effect good, and stability is strong, can be suitable for different measurement rings
Border, the precision for improving measurement result, highly practical advantage, to the problem of effective solution existing apparatus and
It is insufficient.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of construction engineering cost field surveys device based on BIM technology, including:Handle (1) slightly takes aim at device (2), body
(3), object lens (4), pipe horizon equipment (5), vertical clamp screw (6), vertical final motion screw (7), battery compartment (8), display screen (9),
Operation console (10), level braking spiral (11), horizontal final motion screw (12), circular bubble (13), pedestal (14), pedestal lock-button
(15), bottom plate (16), leveling foot screw (17), mounting base (18), foot tube (19), fixed ring (20), support arm (21), support leg
(22), foot pad (23), fixed frame (24), telescope (25);It is characterized in that:The handle (1) is located at the top of body (3),
And handle (1) is connected with body (3) by fixing bolt;The telescope (25) is located at the inside of body (3), and telescope
(25) it is connected by shaft with body (3);The pipe horizon equipment (5) is arranged in the lower section of telescope (25), and pipe horizon equipment
(5) it is connected by mosaic mode with body (3);The thick device (2) of taking aim at is arranged on the outer wall of telescope (25), and slightly takes aim at device
(2) it is connected by mosaic mode with telescope (25);The object lens (4) are arranged in the front end of telescope (25), and object lens (4)
It is connected by mosaic mode with telescope (25);The battery compartment (8) is located at the side of body (3), and battery compartment (8) and machine
Body (3) is an integral structure;The vertical clamp screw (6) is located on the outer wall of body (3), and vertical clamp screw (6) with
Body (3) is connected by mosaic mode;The vertical final motion screw (7) is located at the inside of vertical clamp screw (6), and vertical
Final motion screw (7) is connected with vertical clamp screw (6) by running through mode;The level braking spiral (11) is located at body
(3) the other side, and level braking spiral (11) is connected with body (3) by mosaic mode;The horizontal final motion screw
(12) it is located at the inside of level braking spiral (11), and horizontal final motion screw (12) passes through the side of running through with level braking spiral (11)
Formula is connected;The operation console (10) is arranged on the outer wall of body (3) lower part, and operation console (10) passes through admittedly with body (3)
Determine bolt to be connected;The display screen (9), which is inlayed, to be arranged on the top of operation console (10);The pedestal (14) is arranged in body
(3) bottom end, and pedestal (14) is connected with body (3) by shaft;Circular bubble (13) setting is pushed up in pedestal (14)
The side at end, and circular bubble (13) is connected with pedestal (14) by mosaic mode;Pedestal lock-button (15) setting exists
The bottom end of pedestal (14), and pedestal lock-button (15) is connected with pedestal (14) by mosaic mode;The bottom plate (16) is located at
The lower section of pedestal (14), and bottom plate (16) is connected with pedestal (14) by bolt;The leveling foot screw (17) is arranged the bottom of at
The junction of plate (16) and pedestal (14);The mounting base (18) is located at the top of foot tube (19), and mounting base (18) and foot tube
(19) it is connected by shaft;The body (3) is connected with mounting base (18) by fixed form;Fixed ring (20) position
Lower part in foot tube (19), and fixed ring (20) is connected with foot tube (19) by running through mode;Fixed frame (24) setting
Lower section in fixed ring (20), and fixed frame (24) is connected with foot tube (19) by welding manner;Support leg (22) position
Side in fixed frame (24), and support leg (22) is connected with fixed frame (24) by shaft;Support arm (21) setting
Top in support leg (22), and support arm (21) is connected with support leg (22) by shaft;The support arm (21) it is another
One end is connected with fixed ring (20) by shaft;The foot pad (23) is located at the other end of support leg (22), and foot pad (23)
It is connected by shaft with support leg (22).
2. a kind of construction engineering cost field surveys device based on BIM technology according to claim 1, feature exist
In:The foot tube (19) is provided with three, and the tapered shape in bottom end of foot tube (19) altogether in the bottom end of mounting base (18).
3. a kind of construction engineering cost field surveys device based on BIM technology according to claim 1 or 2, feature
It is:The support leg (22) is provided with three altogether in the lower part of foot tube (19), and support leg (22) is by support arm (21)
Stretching structure.
4. a kind of construction engineering cost field surveys device based on BIM technology according to claim 1, feature exist
In:It is provided with screw thread, and fixed ring (20) and foot tube on the outer wall of foot tube (19) lower part and on the inner wall of fixed ring (20)
(19) it is connected by screw thread twist-on.
5. a kind of construction engineering cost field surveys device based on BIM technology according to claim 1, feature exist
In:The side of the body (3) is provided with SD card slot and USB port.
6. a kind of construction engineering cost field surveys device based on BIM technology according to claim 1, feature exist
In:The support leg (22) is stretching structure, and is provided with puller bolt on the outer wall of support leg (22).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820277909.5U CN207832190U (en) | 2018-02-27 | 2018-02-27 | A kind of construction engineering cost field surveys device based on BIM technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820277909.5U CN207832190U (en) | 2018-02-27 | 2018-02-27 | A kind of construction engineering cost field surveys device based on BIM technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207832190U true CN207832190U (en) | 2018-09-07 |
Family
ID=63398699
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820277909.5U Expired - Fee Related CN207832190U (en) | 2018-02-27 | 2018-02-27 | A kind of construction engineering cost field surveys device based on BIM technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207832190U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110440117A (en) * | 2019-08-24 | 2019-11-12 | 高平 | A kind of construction engineering cost field surveys device based on BIM technology |
CN111829569A (en) * | 2020-08-04 | 2020-10-27 | 山东工业职业学院 | Intelligent construction site construction's accurate measuring device based on BIM |
-
2018
- 2018-02-27 CN CN201820277909.5U patent/CN207832190U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110440117A (en) * | 2019-08-24 | 2019-11-12 | 高平 | A kind of construction engineering cost field surveys device based on BIM technology |
CN111829569A (en) * | 2020-08-04 | 2020-10-27 | 山东工业职业学院 | Intelligent construction site construction's accurate measuring device based on BIM |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207832190U (en) | A kind of construction engineering cost field surveys device based on BIM technology | |
CN102184563B (en) | Three-dimensional scanning method, three-dimensional scanning system and three-dimensional scanning device used for plant organ form | |
CN104964647A (en) | Array photosensitive resistor laser collimation deformation measuring method and apparatus | |
CN204854641U (en) | Image coordinate measuring machine | |
CN204479023U (en) | A kind of power transmission line sag rapid measurement device | |
CN202634550U (en) | Plant image collection apparatus | |
CN105136070A (en) | Method for utilizing electronic device to measure plant leaf area | |
CN106895795A (en) | Monocular vision measurement apparatus and its 3 d modeling system | |
CN204535672U (en) | Autocollimator | |
CN114858140B (en) | Point cloud coordinate transformation method and device for deep-buried tunnel structural surface based on target device | |
CN206573048U (en) | Tree height measuring device | |
CN203837704U (en) | Instrument for photographing and surveying intersection of different stations | |
CN205090963U (en) | Rock shear failure face border drawing apparatus | |
CN106441037A (en) | Tree trunk included angle measuring device | |
CN207407861U (en) | A kind of RTK inclination measuring devices | |
CN204613405U (en) | A kind of building operation stadimeter | |
CN207215085U (en) | A kind of integrated GNSS and hydrostatic leveling device deviation of plumb line measurement apparatus | |
CN102183208A (en) | Method for gear tooth parameter measurement realized by software function instead of traditional rotary working table accessory | |
CN204925809U (en) | A lining and levelling device for workstation | |
CN113888651B (en) | Dynamic and static visual detection system | |
CN109540036A (en) | A kind of pond column measuring system and measurement method based on BIM and three-dimensional laser scanner | |
CN202133392U (en) | Spatial distance remote-viewing measuring instrument for works | |
CN204788376U (en) | Accuracy formula mapping device of making level | |
CN108120423A (en) | Prismosphere measures auxiliary tool | |
CN206930284U (en) | A kind of construction engineering cost plotting board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180907 |