CN207739605U - Elevator shaft three-dimensional construction protection system - Google Patents

Elevator shaft three-dimensional construction protection system Download PDF

Info

Publication number
CN207739605U
CN207739605U CN201721531934.3U CN201721531934U CN207739605U CN 207739605 U CN207739605 U CN 207739605U CN 201721531934 U CN201721531934 U CN 201721531934U CN 207739605 U CN207739605 U CN 207739605U
Authority
CN
China
Prior art keywords
elevator
horizontal
protection system
montant
protective plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721531934.3U
Other languages
Chinese (zh)
Inventor
马立功
王全逵
周立涛
蒲永斌
李治远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201721531934.3U priority Critical patent/CN207739605U/en
Application granted granted Critical
Publication of CN207739605U publication Critical patent/CN207739605U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model provides an elevartor shaft three-dimensional construction protection system, includes the elevartor shaft, follows floor and setting that the elevartor shaft horizontal interval set up are in protection platform in the elevartor shaft, protection platform includes the horizontal guard plate of rectangle, sets up rings that horizontal guard plate top surface four corners portion is used for the hoist and mount, set up and be in the support and the logical length of horizontal guard plate bottom surface articulate turn over the board at horizontal guard plate top surface outside border. The support is including setting up the montant at the both ends in the horizontal protection board outside and setting are in the inboard both ends of horizontal protection board with the down tube between the montant bottom. And a protective net is arranged between the two vertical rods. The protective net is a steel protective net. The utility model provides an among the elevartor shaft construction horizontal to entrance to a cave and vertical entrance to a cave safety protection not in place, have the problem of potential safety hazard.

Description

A kind of elevator solid construction protection system
Technical field
The utility model is related to the realm of building construction, especially a kind of elevator solid construction protection system.
Background technology
In house construction engineering work progress, the security protection work of the vertical door opening of elevator, horizontal vertical hole is not easy to fall Actual arrival position, when frame body is removed, vertical openings position is easy to happen falling accident, is often set up always from lowest part inside elevator For floor stand to top layer, scaffolding height is excessively high, and preloading problem is not easy to prevent at the top of frame body, and there are severe compromises, and influences electricity Stair shaft peripheral structure is constructed, and construction efficiency is reduced.
Utility model content
The purpose of this utility model is to provide a kind of elevator solid construction protection system, to solve water in construction of lift well Put down it is not in place to hole and vertical hole security protection, there are problems that security risk.
To achieve the above object, the utility model adopts the following technical solution:
A kind of elevator solid construction protection system, including elevator, the floor that is horizontally spaced about along the elevator And the protective platform in the elevator is set, the protective platform includes the horizontal protective plate of rectangle, is arranged in the water Flat protection plate top surface quadrangle portion for lifting hanging ring, be arranged horizontal protective board bottom face support and elongated be hinged on institute State the turnover panel on horizontal protective plate top surface outer side edges edge.
Preferably, the support includes the montant at the both ends being arranged on the outside of the horizontal protective plate and is arranged in the water Brace on the inside of flat protective plate between both ends and the montant bottom end.
Preferably, protection network is equipped between two montants.
Preferably, the protection network is steel protective mesh.
Preferably, the horizontal protective plate is located at the corresponding position of upper layer floor, and its inner side edge edge is against the elevator On the inner wall of the back position of well.
Preferably, the outer side edges for being connected to the turnover panel on the outer side edges edge of the horizontal protective plate ride upon the elevator On the inner wall of openings position.
Preferably, the bottom end of the montant and the bottom end of the brace intersect to form scissors support, and correspondence is supported on institute It states on lower layer's floor;The Basolateral face of the wherein described montant leans against on the medial surface of lower layer's floor, the bottom of the brace Face is against the top surface of lower layer's floor.
Preferably, the montant is inclined outwardly setting, and angle of inclination is 5 °~10 °
The utility model has the characteristics that and advantageous effect compared with prior art:The protection system of the utility model is real The dual function of constructing operation and elevator stereoscopic protective is showed, the horizontal protective plate of protective platform removes the work for playing horizontal protective With outer, the platform of construction operation is also provided for construction personnel, the turnover panel on protective platform outer side edges edge is connected to, realizes level The closing in direction is protected, and is the constructions such as the installation of elevator periphery shear force wall reinforcing steel bar, template installation, concreting, form removable Safe and reliable operating platform is provided, the protection network on protective platform corresponds to protection in elevator openings position, is effectively erected To protection, prevent construction personnel walk and form removal during fall down from the building accident.
Protective platform lifts movement with main body construction progress by hanging ring in elevator, protective platform during downslide The scissors support zone automatic clamping formed between support is on lower layer's floor, protective platform lifting and simple installation, quick, raising Construction efficiency.
The use of protective platform, the job safety that greatly ensure that construction personnel while, also assure administrative staff's Check safety, making material is easy to obtain, and is building site common used material, and manufacturing cost is low, and shear wall various processes can applied It is completed on work platform, worker does not have to worry that falling risk, speed of application are significantly faster than that in the past, shear wall each process construction quality is bright It is aobvious to improve.
The utility model can be widely applied in construction.
Description of the drawings
The utility model is described in more detail below in conjunction with the accompanying drawings.
Fig. 1 is the planar structure schematic diagram of the utility model.
Fig. 2 is the schematic view of facade structure of the utility model.
Reference numeral:1-elevator, 2-horizontal protective plates, 3-hanging rings, 4-supports, 4.1-montants, 4.2-braces, 5-turnover panels, 6-protection networks, 7-upper layer floors, 8-lower layer's floors.
Specific implementation mode
Embodiment referring to Fig. 1 and Fig. 2 shown in, a kind of elevator solid construction protection system, including elevator 1, along described The floor that elevator 1 is horizontally spaced about and the protective platform being arranged in the elevator 1, the protective platform include rectangle Horizontal protective plate 2, be arranged in 2 top surface of horizontal protective plate, four corner for the hanging ring 3 of lifting, setting described horizontal anti- The support 4 of 2 bottom surface of backplate and the elongated turnover panel 5 for being hinged on 2 top surface outer side edges edge of the horizontal protective plate;The turnover panel passes through conjunction Page is connect with horizontal protective plate;The support 4 includes that the montant 4.1 at the both ends on the outside of the horizontal protective plate 2 is arranged and sets Set the brace 4.2 between 2 inside both ends of the horizontal protective plate and 4.1 bottom end of the montant;The montant 4.1 of the support 4 It is 10# channel steels with brace 4.2, material is easy to get and live surplus material can be used, and saves material cost;The hanging ring 3 is vertical The horizontal protective plate 2 is arranged, and the hanging ring takes the shape of the letter U, both ends are welded with the horizontal protective plate 2, the width of the hanging ring 3 Degree is 16mm;The horizontal protective plate 2 is made by the embossed steel plates of 2~5mm thickness;It is equipped between two montants 4.1 anti- Protecting wire net 6;The protection network 6 is steel protective mesh, and is welded by protective net frame and the montant 4.1 that the protective net frame is The matrix pattern rack being welded by steel plate strip;The horizontal protective plate 2 is located at the corresponding position of upper layer floor 7, and its inside Edge is against on the inner wall of the back position of the elevator 1;It is connected to the turnover panel 5 on the outer side edges edge of the horizontal protective plate Outer side edges ride upon on the inner wall of the openings position of the elevator 1;The bottom of the bottom end of the montant 4.1 and the brace 4.2 End intersects to form scissors support, and the bottom surface of the brace 4.2 is equipped with protection gasket, and correspondence is supported on lower layer's floor 8; The Basolateral face of the wherein montant 4.1 leans against on the medial surface of lower layer's floor 8, and the bottom surface of the brace 4.2 is against The top surface of lower layer's floor 8;The montant 4.1 is inclined outwardly setting, and angle of inclination is 5 °.
The course of work of the utility model:After the completion of floor concreting, the protective platform being welded is utilized into tower crane Lifting enters inside elevator, and the support automatic clamping of whereabouts rear protecting platform is on lower layer's floor, the horizontal protective of protective platform Plate is concordant with upper layer floor, puts down turnover panel, ensures horizontal direction protection safety, can during the shear wall construction of elevator periphery Simple frame body is directly set up on protective platform, for reinforcing bar binding, template installation, concreting and form removable, elevator A little later due to striking time, the system influence supported of elevator edge protection is not easy to install, is protected at this time in elevator for well periphery The protection network on protective platform at hole ensure that the protection safety of vertical direction, prevent from occurring during walking or form removable Falling accident in elevator completes this layer of elevator protection, then slings protective platform with tower crane and bring Forward, carries out upper layer electricity The protection of stair shaft.

Claims (7)

1. a kind of elevator solid construction protection system, including elevator(1), along the elevator(1)It is horizontally spaced about Floor and setting are in the elevator(1)Interior protective platform, it is characterised in that:The protective platform includes that the level of rectangle is anti- Backplate(2), be arranged in the horizontal protective plate(2)Hanging ring of four corner of top surface for lifting(3), be arranged in the horizontal protective Plate(2)The support of bottom surface(4)And elongated it is hinged on the horizontal protective plate(2)The turnover panel on top surface outer side edges edge(5);
The support(4)Including being arranged in the horizontal protective plate(2)The montant at the both ends in outside(4.1)And it is arranged in the water Flat protective plate(2)Inside both ends and the montant(4.1)Brace between bottom end(4.2).
2. elevator solid construction protection system according to claim 1, it is characterised in that:Two montants(4.1)Between Equipped with protection network(6).
3. elevator solid construction protection system according to claim 2, it is characterised in that:The protection network(6)For steel Protection network.
4. elevator solid construction protection system according to claim 3, it is characterised in that:The horizontal protective plate(2)If In upper layer floor(7)Corresponding position, and its inner side edge is along being against the elevator(1)Back position inner wall on.
5. elevator solid construction protection system according to claim 3, it is characterised in that:It is connected to the horizontal protective plate Outer side edges edge turnover panel(5)Outer side edges ride upon the elevator(1)Openings position inner wall on.
6. elevator solid construction protection system according to claim 3, it is characterised in that:The montant(4.1)Bottom end With the brace(4.2)Bottom end intersect to form scissors support, and correspondence be supported on lower layer's floor(8)On;
The wherein described montant(4.1)Basolateral face lean against lower layer's floor(8)Medial surface on, the brace(4.2) Bottom surface be against lower layer's floor(8)Top surface.
7. according to elevator solid construction protection system described in claim 4-6 any one, it is characterised in that:The montant (4.1)It is inclined outwardly setting, and angle of inclination is 5 °~10 °.
CN201721531934.3U 2017-11-16 2017-11-16 Elevator shaft three-dimensional construction protection system Expired - Fee Related CN207739605U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721531934.3U CN207739605U (en) 2017-11-16 2017-11-16 Elevator shaft three-dimensional construction protection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721531934.3U CN207739605U (en) 2017-11-16 2017-11-16 Elevator shaft three-dimensional construction protection system

Publications (1)

Publication Number Publication Date
CN207739605U true CN207739605U (en) 2018-08-17

Family

ID=63115752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721531934.3U Expired - Fee Related CN207739605U (en) 2017-11-16 2017-11-16 Elevator shaft three-dimensional construction protection system

Country Status (1)

Country Link
CN (1) CN207739605U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610860A (en) * 2018-12-21 2019-04-12 中建三局第三建设工程有限责任公司 Elevator well opening simultaneous protection device in a kind of main structure construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610860A (en) * 2018-12-21 2019-04-12 中建三局第三建设工程有限责任公司 Elevator well opening simultaneous protection device in a kind of main structure construction
CN109610860B (en) * 2018-12-21 2021-03-23 中建三局第三建设工程有限责任公司 Synchronous protector of elevartor shaft entrance to a cave in major structure construction

Similar Documents

Publication Publication Date Title
CN202324571U (en) Overhanging type double-row scaffold
CN106400691B (en) Anti-collision wall mould bases integrated construction technique
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN206467991U (en) The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated
CN206722368U (en) One kind is used to protect frame system outside the working regularization of assembled architecture
CN207739605U (en) Elevator shaft three-dimensional construction protection system
CN203374008U (en) Elevator shaft inclined plane protective structure
CN210084736U (en) A portable lifting hook for installation of people's air defense door
CN208363666U (en) It is a kind of for build face side construction safety protection frame
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN213572927U (en) Movable steel platform with adjustable size and capable of being circulated
CN110005182A (en) A kind of expanded type construction of lift well operation protective platform
CN211714541U (en) Special handling frame for installing shear wall template in elevator shaft
CN210013362U (en) Assembled oblique roofing construction structures
CN204357138U (en) Simple steel structure hoisting frame
CN211037760U (en) Novel instrument formula elevartor shaft construction operation platform
CN204492173U (en) Elevator shaft integral lifting template operation platform
CN109537445A (en) Mobile overhanging lifting platform for crash barrier template construction
CN107035037A (en) High building top layer curtain wall frame and its installation method
CN207348787U (en) One kind maintenance cat ladder platform
CN208122352U (en) A kind of balcony partition installation protection system
CN207032835U (en) A kind of construction lifting platform
CN208039787U (en) High-altitude edge-facing operation assembly operation platform
CN206158136U (en) But decorate facade construction mobile scaffold
CN206337800U (en) Elevator shaft operating platform frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180817