CN206467991U - The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated - Google Patents
The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated Download PDFInfo
- Publication number
- CN206467991U CN206467991U CN201621473112.XU CN201621473112U CN206467991U CN 206467991 U CN206467991 U CN 206467991U CN 201621473112 U CN201621473112 U CN 201621473112U CN 206467991 U CN206467991 U CN 206467991U
- Authority
- CN
- China
- Prior art keywords
- operating platform
- standard knot
- platform
- column standard
- main body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 210000003205 muscle Anatomy 0.000 claims description 11
- 239000004567 concrete Substances 0.000 claims description 10
- 230000003014 reinforcing effect Effects 0.000 claims description 8
- 238000005266 casting Methods 0.000 claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 230000001681 protective effect Effects 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 4
- 239000011449 brick Substances 0.000 abstract description 3
- 239000011521 glass Substances 0.000 abstract description 3
- 239000011505 plaster Substances 0.000 abstract description 3
- 239000000463 material Substances 0.000 description 8
- 229910000838 Al alloy Inorganic materials 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 239000011178 precast concrete Substances 0.000 description 2
- 230000007423 decrease Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model is related to the operation platform that a kind of building main body construction protection and exterior wall finishing are integrated, it includes Telescopic base, the column standard knot on Telescopic base, the drive device on column standard knot, installs operating platform on the drive means and installed in operating platform and the wall-attached supporting seat of column standard knot sidepiece, the column standard knot is 12 groups, the operating platform is 13 layers, the utility model operating platform can be combined by outside vertical surface of building different shape, simple and fast is installed, it is more convenient, fast in external wall construction;Available for exterior wall finishing work, such as repair, plaster, glass curtain wall is installed and laid bricks, improving utilization rate of the present utility model, using the utility model makes process simplification, time saving and energy saving, safe and reliable and speed of application is fast.
Description
Technical field
The utility model is related to the operation platform that a kind of building main body construction protection and exterior wall finishing are integrated, and belongs to building
Field of engineering technology.
Background technology
Constructed at present in China's prefabricated assembled concrete main structure body work progress with aluminum alloy mould plate project subject
During, protection operation, its cost of labor can only be carried out by means of attachment type raise scaffold and console mode, overhanging scaffold
Height, required material variety is more, improves construction costs, and cycle set-up time is long, causes main body construction speed slow, is applying
There are the major safety risks of work high above the ground during the dismounting operation carried out after the completion of work;In its secondary structure construction and fitment process
There is the defects such as security performance is low, human cost is high using equipment such as scaffold and driven hanging baskets.
Utility model content
Technical problem to be solved in the utility model is to provide that a kind of safe and reliable, speed of application is fast, the side of removing and installing
Just and suitable for the building main body construction of the precast concrete of building the operation platform being integrated with exterior wall finishing is protected.
The utility model is adopted the following technical scheme that:
The utility model includes Telescopic base, the column standard knot on Telescopic base, installed in column standard knot
On drive device, operating platform on the drive means is installed and installed in the attached of operating platform and column standard knot sidepiece
Wall bearing, the column standard knot is 1-2 groups, and the operating platform is 1-3 layers.
When operating platform described in the utility model is 3 layers, it includes spaced adjustable rectangle shielded frame, peace
Adjustable reinforcing connection frame and installed in rectangle shielded frame and strengthen connecting between on the outside of the rectangle shielded frame
Muscle form erecting operation operating platform, form for seal Job Operations platform and casting concrete operating platform are tied up in framework, it is described
Rectangle shielded frame is vertically arranged, described to tie up muscle form erecting operation operating platform, form for seal Job Operations platform and poured mixed
Solidifying soil operating platform is set gradually from top to bottom, between upper and lower two neighboring platform and ties up muscle form erecting operation operating platform
On outside protection screen sheet or protective fence are set;The drive device is fixedly mounted on form for seal Job Operations platform.
When column standard knot described in the utility model is 2 groups, Telescopic base includes left Telescopic base and right Telescopic base, institute
State left column standard knot and the right column on right Telescopic base that column standard knot includes being arranged on left Telescopic base
Standard knot, the operating platform is arranged between left column standard knot and right column standard knot and both sides, in the left column mark
Rack is set on quasi- section and right column standard knot, and the gear of drive device reductor is engaged with the rack on drive operating platform
Rise and decline.
Height when operating platform described in the utility model is 3 layers is 7.5-10 m, between upper and lower two neighboring platform
Distance is 2.8-4.2m;When column standard knot is 1 group, the length of the operating platform is 2.7-10 m;Column standard knot is 2 groups
When, the length of the operating platform is 10-40 m.
It is bolted between rectangle shielded frame described in the utility model and reinforcing connection frame;In template envelope
Close Job Operations platform lower end and triangular truss is installed.
Wall-attached supporting seat described in the utility model is included installed in column standard knot or corresponding rectangle shielded frame sidepiece
Fastener, the adjusting screw on the outside of fastener and the angle steel fixed installed in adjusting screw end and wall.
The utility model good effect is as follows:The utility model operating platform can be entered by outside vertical surface of building different shape
Row combination, installs simple and fast, more convenient, fast in external wall construction;Three layer operation platforms, are carried more than material and loading capacity
Greatly, and simultaneously material and workmen are transported, it is possible to increase operating efficiency;Protection screen sheet is set on the outside of operating platform
Prevent material falls from hurting sb.'s feelings, set protective fence to ensure the personal safety of workmen, Telescopic base can drive the utility model
Move, can be with Fast transforms job position;Platform wide coverage, can increase column standard knot to increase operating platform
Area coverage;Operating platform is lifted under the drive of drive device along rack, reliable and stable, safe;Treat prefabricated
Prefabricated concrete structure main body construction is finished or aluminum alloy mould plate main structure construction finish after by operating platform by original 2-3
Individual story height is removed to 0.5 story height, available for exterior wall finishing work, such as repair, plaster, install glass curtain wall and
Lay bricks, improve utilization rate of the present utility model, simplify process using the utility model, time saving and energy saving, safe and reliable and apply
Work speed is fast.
Brief description of the drawings
Accompanying drawing 1 is the utility model structural representation;
Accompanying drawing 2 is the utility model operating platform structural representation;
Accompanying drawing 3 is that the utility model operating platform installs protection screen sheet structural representation;
Accompanying drawing 4 is the utility model wall-attached supporting seat structural representation.
In the accompanying drawings:1 drive device, 2 operating platforms, 3 wall-attached supporting seats, 4 rectangle shielded frames, 5 reinforcing connection frames, 6
Tie up muscle form erecting operation operating platform, 7 form for seal Job Operations platforms, 8 casting concrete operating platform, 9 protection screen sheets,
101 left Telescopic bases, 102 right Telescopic bases, 111 left column standard knots, 112 right column standard knots, 12 racks, 13 triangle purlins
Frame, 14 fasteners, 15 adjusting screws, 16 angle steel.
Embodiment
As shown in Figure 1, the utility model includes Telescopic base, the column standard knot on Telescopic base, installed
Drive device 1 on column standard knot, the operating platform 2 in drive device 1 and installed in operating platform 2 and vertical
The wall-attached supporting seat 3 of post standard knot sidepiece, the column standard knot is 1-2 groups, and the operating platform 2 is 1-3 layers.
As shown in accompanying drawing 1,2,3, when operating platform 2 described in the utility model is 3 layers, it includes spaced adjustable
Rectangle shielded frame 4, adjustable reinforcing connection frame 5 and installed in square between the outside of rectangle shielded frame 4
Muscle form erecting operation operating platform 6, form for seal Job Operations platform 7 and are tied up in shape shielded frame 4 and reinforcing connection frame 5
Casting concrete operating platform 8, the rectangle shielded frame 4 is vertically arranged, and the rectangle of the present embodiment rectangle shielded frame 4 is length
It is square, it is bolted between the rectangle shielded frame 4 and reinforcing connection frame 5;It is described that to tie up the operation of muscle form erecting operation flat
Platform 6, form for seal Job Operations platform 7 and casting concrete operating platform 8 is set gradually from top to bottom;Tie up muscle form erecting operation
Protection when operating platform 6 provides operation protection for operating personnel and can provide precast concrete lifting operation, template
It is dirt operation protection that closed operation operating platform 7 provides form removal for operating personnel, and casting concrete operating platform 8 is behaviour
Make personnel and the operation protection for having bad luck material is provided;Triangular truss 13 is installed in the lower end of form for seal Job Operations platform 7,
Between upper and lower two neighboring platform and tie up outside on muscle form erecting operation operating platform 6 protection screen sheet 9 or anti-pad are set
Column;The drive device 2 is fixedly mounted on form for seal Job Operations platform 7.
As shown in accompanying drawing 1,2, when column standard knot described in the utility model is 2 groups, Telescopic base includes left Telescopic base
101 and right Telescopic base 102, the column standard knot includes the He of left column standard knot 111 being arranged on left Telescopic base 101
Right column standard knot 112 on right Telescopic base 102, the operating platform 2 is arranged on left column standard knot 111 and the right side
Between column standard knot 112 and both sides, i.e. left column standard knot 111 and right column standard knot 112 be arranged on 2 liang of operating platform
In side, rack 12, the gear of the reductor of drive device 1 are set on the left column standard knot 111 and right column standard knot 112
The drive raising and lowering of operating platform 2 is engaged with the rack 12.
As shown in accompanying drawing 1,2, height when operating platform 2 described in the utility model is 3 layers is 7.5-10 m, upper and lower phase
The distance between adjacent two platforms are 2.8-4.2m;When column standard knot is 1 group, the length of the operating platform 2 is 2.7-10
m;When column standard knot is 2 groups, the length of the operating platform 2 is 10-40 m;
As shown in accompanying drawing 1,4, wall-attached supporting seat 3 described in the utility model includes being arranged on column standard knot or corresponding rectangle
The fastener 14 of the sidepiece of shielded frame 4, the adjusting screw 15 installed in the outside of fastener 14 and installed in the end of adjusting screw 15
The angle steel 16 that portion is fixed with wall.
The utility model operating platform 2 can be combined by outside vertical surface of building different shape, install simple and fast, outside
Wall construction is more convenient, fast;Three layer operation platforms, carrying material is more and loading capacity is big, and simultaneously to material and workmen
Transported, it is possible to increase operating efficiency;Set protection screen sheet to prevent material falls from hurting sb.'s feelings on the outside of operating platform, protection is set
Fence ensures the personal safety of workmen, and Telescopic base can drive the utility model to move, can be with Fast transforms operation
Position;Platform wide coverage, can increase column standard knot to increase the area coverage of operating platform;Operating platform is in driving
Lifted under the drive of device along rack, it is reliable and stable, it is safe;Treat prefabricated assembled concrete main structure body construction and
Operating platform 2 is removed to 0.5 building by original 2-3 story height after being finished using the main structure construction of aluminum alloy mould plate
Layer height, constructs and fits up applied to secondary structure work, repair, plaster, installing glass curtain wall and lay bricks, improving
Utilization rate of the present utility model, using the utility model makes process simplification, time saving and energy saving, safe and reliable and speed of application is fast.
Above example is only to illustrate the technical solution of the utility model, rather than its limitations;Although with reference to foregoing reality
Example is applied the utility model is described in detail, it will be understood by those within the art that:It still can be to preceding
State the technical scheme described in embodiment to modify, or equivalent substitution is carried out to which part technical characteristic;And these are repaiied
Change or replace, the essence of appropriate technical solution is departed from the spirit and scope of the utility model embodiment technical scheme.
Claims (6)
1. the operation platform that a kind of building main body construction protection and exterior wall finishing are integrated, it is characterised in that it includes flexible bottom
Seat, the column standard knot on Telescopic base, the drive device on column standard knot(1), installed in driving dress
Put(1)On operating platform(2)And installed in operating platform(2)With the wall-attached supporting seat of column standard knot sidepiece(3), it is described vertical
Post standard knot is 1-2 groups, the operating platform(2)For 1-3 layers.
2. the operation platform that a kind of building main body construction protection according to claim 1 and exterior wall finishing are integrated, it is special
Levy and be the operating platform(2)For 3 layers when, it includes spaced adjustable rectangle shielded frame(4), installed in square
Shape shielded frame(4)Adjustable reinforcing connection frame between outside(5)And installed in rectangle shielded frame(4)Connect with reinforcement
Connect framework(5)Interior ties up muscle form erecting operation operating platform(6), form for seal Job Operations platform(7)Casting concrete is grasped
Make platform(8), the rectangle shielded frame(4)It is vertically arranged, it is described to tie up muscle form erecting operation operating platform(6), form for seal make
Industry operating platform(7)Casting concrete operating platform(8)Set gradually from top to bottom, upper and lower two neighboring platform it
Between and tie up muscle form erecting operation operating platform(6)On outside set protection screen sheet(9)Or protective fence;
The drive device(1)It is fixedly mounted on form for seal Job Operations platform(7)On.
3. the operation platform that a kind of building main body construction protection according to claim 1 or 2 and exterior wall finishing are integrated, its
Be characterised by the column standard knot be 2 groups when, Telescopic base include left Telescopic base(101)With right Telescopic base(102), institute
Stating column standard knot includes being arranged on left Telescopic base(101)On left column standard knot(111)With installed in right Telescopic base
(102)On right column standard knot(112), the operating platform(2)Installed in left column standard knot(111)With right column standard
Section(112)Between and both sides, in the left column standard knot(111)With right column standard knot(112)Upper setting rack(12), drive
Dynamic device(1)The gear of reductor and the rack(12)Engagement drives operating platform(2)Raising and lowering.
4. the operation platform that a kind of building main body construction protection according to claim 3 and exterior wall finishing are integrated, it is special
Levy and be the operating platform(2)For 3 layers when height be 7.5-10 m, the distance between upper and lower two neighboring platform is
2.8-4.2m;
When column standard knot is 1 group, the operating platform(2)Length be 2.7-10 m;
When column standard knot is 2 groups, the operating platform(2)Length be 10-40 m.
5. the operation platform that a kind of building main body construction protection according to claim 2 and exterior wall finishing are integrated, it is special
Levy and be the rectangle shielded frame(4)And reinforcing connection frame(5)Between be bolted;In the form for seal operation
Operating platform lower end is installed by triangular truss(13).
6. the operation platform that a kind of building main body construction protection according to claim 5 and exterior wall finishing are integrated, it is special
Levy and be the wall-attached supporting seat(3)Including installed in column standard knot or corresponding rectangle shielded frame(4)The fastener of sidepiece
(14), installed in fastener(14)The adjusting screw in outside(15)And installed in adjusting screw(15)End is fixed with wall
Angle steel(16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621473112.XU CN206467991U (en) | 2016-12-30 | 2016-12-30 | The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621473112.XU CN206467991U (en) | 2016-12-30 | 2016-12-30 | The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206467991U true CN206467991U (en) | 2017-09-05 |
Family
ID=59712401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621473112.XU Expired - Fee Related CN206467991U (en) | 2016-12-30 | 2016-12-30 | The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206467991U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109025230A (en) * | 2018-06-21 | 2018-12-18 | 浙江广顺建设有限公司 | Operation platform for building |
CN110219451A (en) * | 2019-07-10 | 2019-09-10 | 河北亿安工程技术股份有限公司 | Main body construction and finishing synchronization job lifting protective platform and operational method |
WO2019206350A1 (en) * | 2018-04-25 | 2019-10-31 | Wilhelm Layher Verwaltungs-Gmbh | Method for anchoring a scaffolding structure to a scaffolded device, and device for carrying out such a method |
CN110565929A (en) * | 2019-07-26 | 2019-12-13 | 江苏兴厦建设工程集团有限公司 | Scaffold for construction of large-specification wall paving piece of building outer wall |
-
2016
- 2016-12-30 CN CN201621473112.XU patent/CN206467991U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019206350A1 (en) * | 2018-04-25 | 2019-10-31 | Wilhelm Layher Verwaltungs-Gmbh | Method for anchoring a scaffolding structure to a scaffolded device, and device for carrying out such a method |
CN109025230A (en) * | 2018-06-21 | 2018-12-18 | 浙江广顺建设有限公司 | Operation platform for building |
CN109025230B (en) * | 2018-06-21 | 2021-04-27 | 百子建设有限公司 | Construction platform for building |
CN110219451A (en) * | 2019-07-10 | 2019-09-10 | 河北亿安工程技术股份有限公司 | Main body construction and finishing synchronization job lifting protective platform and operational method |
CN110219451B (en) * | 2019-07-10 | 2024-02-27 | 河北亿安工程技术股份有限公司 | Lifting protection platform for main body construction and decoration synchronous operation and operation method |
CN110565929A (en) * | 2019-07-26 | 2019-12-13 | 江苏兴厦建设工程集团有限公司 | Scaffold for construction of large-specification wall paving piece of building outer wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206467991U (en) | The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated | |
CN106958346B (en) | Intelligent attached lifting scaffold equipment for curved surface super high-rise building and construction method | |
CN201826525U (en) | Climbing shuttering system device for buildings | |
CN1028556C (en) | Building construction system | |
CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
CN206053274U (en) | The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose | |
CN206408952U (en) | A kind of construction adhesion type lifts discharging platform | |
CN206487087U (en) | A kind of scissor stairs of sectional | |
CN111255217A (en) | Elevator shaft shaping operation platform and operation method thereof | |
CN206255777U (en) | Self-propelled multipurpose is adjustable double lifting point truss straddle truck | |
CN102337782A (en) | Lift system for constructing truss platform on top of tall and large space and construction method for lift system | |
CN202064281U (en) | Slip form frame | |
CN110185247A (en) | Mobile outrigger platform | |
WO2003048469A1 (en) | Method for constructing tier building and special jack equipment thereof | |
CN207277192U (en) | Portable overhanging lifting platform for crash barrier template construction | |
CN202401753U (en) | Sliding die device | |
CN209568688U (en) | A kind of elevating construction platform | |
CN205955160U (en) | Antiskid lattice formula elevartor shaft removes operation platform | |
CN108005373A (en) | Integrated lifting platform system and assembling method thereof | |
CN202441045U (en) | Rail-type electric attached lifting scaffold | |
CN106639328A (en) | Concrete beam steel reinforcement framework construction device and method | |
US3818084A (en) | Method and apparatus for the construction of multi-storey buildings | |
CN206769351U (en) | A kind of regularization hoistway operation platform hoisting frame | |
CN206646795U (en) | Housing construction is greatly across double-deck moving operation car device | |
CN201649607U (en) | Overhung-type outer wall scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170905 |
|
CF01 | Termination of patent right due to non-payment of annual fee |