CN207739388U - It builds prefabricated house - Google Patents

It builds prefabricated house Download PDF

Info

Publication number
CN207739388U
CN207739388U CN201820054667.3U CN201820054667U CN207739388U CN 207739388 U CN207739388 U CN 207739388U CN 201820054667 U CN201820054667 U CN 201820054667U CN 207739388 U CN207739388 U CN 207739388U
Authority
CN
China
Prior art keywords
wallboard
pedestal
sleeve
wall
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820054667.3U
Other languages
Chinese (zh)
Inventor
何文龙
郭庆亮
秦振
郭常臻
赵华龙
薄利菠
刁海韬
吴相明
赵锟
邱春雨
刘清斌
赵春新
马德景
考书媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Longhe Energy Saving Technology Co ltd
Wanhua Modular Projects Yantai Co ltd
Original Assignee
Shandong Longhe Energy Saving Technology Co ltd
Wanhua Modular Projects Yantai Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Longhe Energy Saving Technology Co ltd, Wanhua Modular Projects Yantai Co ltd filed Critical Shandong Longhe Energy Saving Technology Co ltd
Priority to CN201820054667.3U priority Critical patent/CN207739388U/en
Application granted granted Critical
Publication of CN207739388U publication Critical patent/CN207739388U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides prefabricated house building a kind of easy for installation, efficient, at low cost.A kind of prefabricated house building, including pedestal, the roofing board that floor or roof inclined plate are constituted is equipped with above pedestal, it is wallboard between pedestal and roofing board, pedestal, wallboard and roofing board surround an enclosure space, enclosure space divides one layer or more residence space by floor and beam, door and window are equipped on wallboard as needed, roofing board and wallboard, floor and beam, it is to be detachably connected between floor and wallboard and pedestal and wallboard, wallboard one or both sides are equipped with groove, groove makes to form grouting band between adjacent wall board, it is connected as one by wall wall connector between adjacent wall board, wall wall connector includes two beard muscle, two beard muscle are connect with two adjacent wall boards respectively, joint bar runs through two beard muscle.

Description

It builds prefabricated house
Technical field
The utility model is related to a kind of building construction, the utility model is built more particularly to a kind of prefabricated house, Belong to technical field of buildings.
Background technology
Integrated house refers to being produced and being integrated with industrialized mode under the principle of standardization, modularization and seriation The systems such as structure, component, equipment, and scene can realize the building of prefabricated construction.With the hair of China's economic strength Exhibition, traditional architecture quantity increases in addition, land resource is gradually deficient, municipal pollution is increasingly severe, climate warming and building The aggravation for the problems such as rubbish is difficult, integrated house are gradually being recognized, many development zones, realtor, tourist attraction, new agriculture Village's construction, individual etc. have valued this very advantageous product, and Rapid Popularization integrated house has been this century new material With a spotlight of building field.
The integrated house of low layer is highly suitable for being built in the case that environment is changeable, adaptable, as the disaster relief For housing for survivor, the house that anti-seismic performance is good, installation speed is fast, life comfort level is high is badly in need of in country's post-disaster reconstruction at present, and low The integrated house of layer can exactly meet this demand, by advanced design, processing, manufacture and mounting technique and moderate Price with perfect house is mating urban and community redevelopment to play a great role after calamity.
Oil recovery, mine locating, well-digging, military campsite, Construction of Civil Engineering etc. need safe, economic, quick, comfortable assembled House, assembled integrated house be able to meet this demand.In the near future, prefabricated buildings will also be built as office building, Shop, school, kindergarten etc..
The development of assembled integrated house has obtained the support energetically of national policy, and 2016 Nian9Yue14 State Council hold Executive Meeting of the State Council, proposition will greatly develop assembled architecture and push industry restructuring upgrading.Meeting determines, with Beijing-Tianjin Ji, the Yangtze River Delta, Pearl River Delta group of cities and permanent resident population are more than that 3,000,000 other cities are attached most importance to, and accelerate to improve assembled architecture The ratio of new building area is accounted for, Integration Design, industrialized production, prefabricated construction, integration finishing is promoted, improves assembly Formula building materials application percentage.
Integrated house all improves a lot by development in recent years, standardization, modularization, facilitation, but there are still Following deficiency:1)Existing most of integrated houses are still divided into structural system, floor system, wall system, and scene needs to construct, group At the unit of each system.Assembly process is complicated, long in time limit;2)Existing integrated house is used only once, and can not be repeated more Secondary use, results in waste of resources, and improves cost;3)Existing prefabricated housing, the connection type between interlayer and wallboard, frequently with existing The mode poured is realized, during realization, is needed formwork and is poured into a mould concrete, and wet construction quantities is big, and installation efficiency of construction is low, Installation speed is slow, of high cost.In order to accelerate to realize assembled industrialization, need to make a change with regard to the above deficiency.
Utility model content
In order to overcome the deficiencies in the prior art, the utility model offer is a kind of easy for installation, efficient, at low cost It builds prefabricated house.
The utility model to achieve the above object, is achieved through the following technical solutions:
A kind of prefabricated house building, including pedestal, pedestal top are equipped with the roof that floor or roof inclined plate are constituted Plate is wallboard between pedestal and roofing board, and pedestal, wallboard and roofing board surround an enclosure space, and enclosure space passes through floor And beam divides one layer or more residence space, is equipped with door and window, roofing board and wallboard, floor and beam, building on wallboard as needed It is to be detachably connected between plate and wallboard and pedestal and wallboard, wallboard one or both sides are equipped with groove, and groove makes adjacent wall Grouting band is formed between plate, is connected as one by wall wall connector between adjacent wall board, and wall wall connector includes two beards Muscle, two beard muscle are connect with two adjacent wall boards respectively, and joint bar runs through two beard muscle.
On above-mentioned prefabricated house building foundation, pedestal is connect with wallboard by wall bottom connection component, the connection of wall bottom The first structure of component includes that three or more the pedestal sleeves being embedded on pedestal and three or more are embedded in the perpendicular of wallboard bottom To sleeve, wallboard, which corresponds to, is equipped with mounting groove above vertical sleeve, pedestal sleeve is bolted with vertical sleeve, and is in the milk; Wall bottom second of structure of connection component is that three or more the pedestal sleeves being embedded on pedestal and three or more are embedded in wallboard bottom The grout sleeve in portion, pedestal sleeve is bolted with grout sleeve, and is in the milk;Wall bottom connection component the third
Structure is the transverse direction that three or more the L-type fasteners being distributed on pedestal and three or more are horizontally installed on wallboard bottom Sleeve, vertical portion and the transverse sleeves of L-type fastener are bolted.
On above-mentioned prefabricated house building foundation, floor is connect with wallboard by wall top connection component, connection component The vertical sleeve being embedded on wallboard including three or more;The first structure of wall top connection component is embedded in bottom including three or more The sleeve II of the sleeve I of layer residence space wallboard upper end and three or more pre-buried upper layer residence space wallboard bottom, sleeve I and set Cylinder II is bolted, and is in the milk, and wherein bolt passes through floor;Second of structure of wall top connection component includes three or more pre- It is embedded in the grouting set of the branch sleeve and three or more pre-buried upper layer residence space wallboard bottoms of bottom residence space wallboard upper end Cylinder, branch sleeve and grout sleeve are bolted, and are in the milk, and wherein bolt passes through floor.
On above-mentioned prefabricated house building foundation, wallboard includes common plate, rotary corner plate and reinforcing plate, wallboard up and down Built-in fitting is equipped in end and lateral grooves, the corner on basis is arranged in rotary corner plate, and reinforcing plate is arranged below beam, rotary corner plate packet It includes and is connected with each other the first plate body and the second plate body in 90 °, reinforcing plate includes the reinforced steel being arranged in plate body.
On above-mentioned prefabricated house building foundation, wallboard includes the styrofoam set gradually from inside to outside, steel wire Frame and concrete slab, the concrete slab left and right sides and/or up and down both sides set built-in fitting, and styrofoam is EPS styrofoams, steel wire net rack For galvanized steel, by horizontal and vertical reinforcement welding, concrete slab is poured by self-compacting concrete, and built-in fitting is galvanized steel.
On above-mentioned prefabricated house building foundation, the side that floor is in contact with beam is inclined-plane, and cross section is upper short The trapezium structure of lower length, front and back both sides are embedded with wall board connector.
On above-mentioned any one prefabricated house building foundation, roofing board is roof inclined plate, and roof inclined plate bottom surface is equipped with Roof truss is equipped with gable board on the outside of the roof truss, is provided with wingceltis item between roof truss, roof truss and Side fascia, purlin and gable board with And roof truss uses L-shaped connector with purlin, and ribs is equipped among L-shaped connector.
The utility model has the advantage of:
1. reinforcing plate is arranged in wallboard, beam is set between floor, this structure concealed beam sleeper makes full use of the high intensity of plank special Property, ensure the security performance and anti-seismic performance of structure, no longer partition structure system, floor system, wall system, can directly apply Work, without assembling;
2. beard muscle on two plates uses elliptic design, prevent when being inserted into fixed steel bars can not capturing position, spelling It is tamped using high strength cement grouting material after the completion of plate, to improve structural safety performance;
3. live dry operation, greatly reduces the intensity of live handwork, the mechanization of building operation degree of use is higher, Working procedure advanced management;Influenced by seasonal climate small, wetland operation is few, short time limit;
4. house thermal property is good, compare conventional house, 75% or more building energy conservation, can effectively avoid " winter moisture condensation ", " summer gets damp ", it is ensured that indoor cool in summer and warm in winter;
5. the degradation of building materials major part recoverable, low cost used in integrated house, environmentally protective;Reconstruction and appearance of removing It easily, can secondary use.
Description of the drawings
Attached drawing is used to provide a further understanding of the present invention, and a part for constitution instruction, with this practicality Novel embodiment for explaining the utility model, does not constitute limitations of the present invention together.
In figure:Fig. 1 is the dimensional structure diagram of the utility model;
Fig. 2 is the schematic diagram of base structure of the utility model;
Fig. 3 is pedestal and wallboard scheme of installation;
Fig. 4 is wallboard junction joint bar grouting schematic diagram;
Fig. 5 is the schematic diagram of mounting rail;
Fig. 6 is the schematic diagram for installing floor;
Fig. 7 beam seam crossing schematic diagrames;
Fig. 8 is the schematic diagram for installing upper layer house;
Fig. 9 is installation wingceltis item, roof truss and gable plate structure schematic diagram;
The first structural schematic diagram of Figure 10 rotary corner plates;
Second of structural schematic diagram of Figure 11 rotary corner plates;
The third structural schematic diagram of Figure 12 rotary corner plates;
Figure 13 reinforces plate structure schematic diagram;
Figure 14 floors and the first connection diagram of wallboard
Figure 15 floors and second of connection diagram of wallboard;
Two floor connection diagrams of Figure 16;
The first structural schematic diagram of Figure 17 walls bottom connection component;
Figure 18 walls bottom second of structural schematic diagram of connection component;
The third structural schematic diagram of Figure 19 walls bottom connection component;
Figure 20 roof trusses and wingceltis connection diagram;
Figure 21 gable boards and wingceltis connection diagram;
1. roofing board in figure, 2. wallboards, 21. reinforcing plates, 22. rotary corner plates, 23. common plates, 3. pedestals, 4. windows, 5. Door, 31. pedestal sleeves, 6. joint bars, 7. beams, 8. floors, 9. notches, 10. roof trusses, 11. gable boards, 12. wingceltis items, 13. beards Muscle, 14. reinforced steels, 15.L shape connectors.
Specific implementation mode
The preferred embodiment of the utility model is illustrated below in conjunction with attached drawing, it should be understood that described herein excellent It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
All gussets of a kind of prefabricated house building, including pedestal 3, pedestal 3 are equipped with multiple wallboards 2,2 top of wallboard Equipped with the roofing board 1 that floor 8 or roof inclined plate are constituted, pedestal 3, wallboard 2 and roofing board 1 surround an enclosure space, and closing is empty Between one layer or more residence space divided by floor 8 and beam 7, be equipped with door 5 and window 4, roofing board 1 and wall as needed on wallboard It is to be detachably connected between plate 2, floor 8 and wallboard 2, wallboard 2 and beam 7 and pedestal 3 and wallboard 2.
All parts and connection are specifically introduced below in conjunction with the accompanying drawings:
One, wallboard 2
Wallboard 2 includes styrofoam, steel wire net rack and the concrete slab set gradually from inside to outside, and styrofoam is EPS polyphenyl Plate, its material of EPS styrofoams have heat preservation, are by the expandable polystyrene bead containing volatile fluid foaming agent, through adding The white solid with micro hole construction of hot briquetting in a mold after hot pre- hair, steel wire net rack is galvanized steel, by transverse direction It is welded with longitudinal reinforcement, concrete slab is poured by self-compacting concrete.
2 one or both sides of wallboard are equipped with groove, and groove makes to form grouting band, concrete slab or so two between adjacent wall board 2 Side and/or upper and lower both sides set built-in fitting, and built-in fitting is sleeve made of galvanized steel, and sleeve is along 2 vertical direction of wallboard or transverse direction Direction is arranged.
Wallboard 2 includes common plate 23, rotary corner plate 22 and reinforcing plate 21;The corner on basis is arranged in rotary corner plate 22, reinforces Plate 21 is arranged below beam 7, and rotary corner plate 22 includes being connected with each other the first plate body and the second plate body in 90 °, the first plate body and the Two plate body connection structures are divided into three kinds:1. integral structure is connect with common plate 23 by beard muscle 13,2. will be pre- by bolt It is embedded in the lateral connection sleeve connection of the branch sleeve and another end side of wherein one plate body groove, a 3. wherein plate bodys The branch sleeve for being embedded in groove and the lateral connection sleeve of another plate body end side install beard muscle 13 respectively, pass through beard muscle 13 connections;Reinforcing plate 21 includes the reinforced steel 14 being arranged in plate body.
Be connected as one by wall wall connector between adjacent wall board 2, wall wall connector include two beard muscle 13, two Beard muscle 13 is connect with two adjacent wall boards 2 respectively, and joint bar 6 runs through two beard muscle 13, and beard muscle is that screw-thread steel is bent Ellipsoidal structure.
Two, pedestal
Pedestal 3 is concrete structure, connector is arranged on pedestal 3, there are two types of forms for connector:A kind of pre-buried pedestal sleeve 31;The fixed L-type connector of another kind.
Three, pedestal 3 is connect with wallboard 2
Pedestal 3 is connect with wallboard 2 by wall bottom connection component, and connection component the first structure in wall bottom includes three or more pre- The vertical sleeve that pedestal sleeve 31 on the base 3 and three or more are embedded in 2 bottom of wallboard is buried, wallboard 2 corresponds to vertical sleeve Top is equipped with mounting groove, and pedestal sleeve 31 is bolted with vertical sleeve, and is in the milk.
Wall bottom second of structure of connection component be three or more pre-buried pedestal sleeves 31 on the base 3 and three or more in advance It is embedded in the grout sleeve of 2 bottom of wallboard, pedestal sleeve 31 is bolted with grout sleeve, and is in the milk;
Connection component the third structure in wall bottom is that three or more the L-type fasteners being evenly distributed on the base 3 and three or more are lateral Transverse sleeves in 2 bottom of wallboard are set, and vertical portion and the transverse sleeves of L-type fastener are bolted.
Four, floor 8 is connect with wallboard 2
Floor 8 is connect with wallboard 2 by wall top connection component, the first structure of wall top connection component includes three or more pre- It is embedded in the sleeve II of the sleeve I and three or more pre-buried 2 bottoms of upper layer residence space wallboard of 2 upper end of bottom residence space wallboard, Sleeve I and sleeve II are bolted, and are in the milk, and wherein bolt passes through floor 8.
Second of structure of wall top connection component includes three or more the connector sleeves for being embedded in 2 upper end of bottom residence space wallboard The grout sleeve of cylinder and three or more pre-buried 2 bottoms of upper layer residence space wallboard, branch sleeve and grout sleeve are connected by bolt It connects, and is in the milk, wherein bolt passes through floor 8.
Five, floor 8
The side that floor 8 is in contact with beam 7 is inclined-plane, and cross section is the trapezium structure of upper short lower length, and front and back both sides are pre-buried There is 2 connector of wallboard, the present embodiment central sill 7 is I-beam, and by being connected into cross girders 7 between floor, floor bottom edge is overlapped on beam 7 Lower flange, and formed at notch 9 and be in the milk in two floor sides.
Six, roofing board 1
Roofing board 1 is roof inclined plate, and roof inclined plate bottom surface is equipped with roof truss 10, and 10 outside of roof truss is equipped with gable board 11, roof truss Wall top connection structure is equipped between 10 and between gable board 11 and roof truss 10, wall top connection structure is L-shaped connector 15, L-shaped Ribs is equipped among connector 15.
A kind of method of construction of prefabricated house building, includes the following steps:
A, pedestal 3 is first attached to precalculated position level to fix;
B, pedestal and wallboard 2 connect
B1, in 31 upper fastening bolt of pedestal sleeve, wallboard 2 is taken, by bottom on the vertical sleeve of 2 lower end of wallboard alignment pedestal 3 Cover for seat cylinder 31, simultaneously tightening nuts of being in the milk make its keep interim stabilization with jury strut support wallboard 2;
B2, wallboard 2 is taken, by the L-type fastener on sleeve alignment pedestal 3 of 2 lower end of wallboard, blending bolt connection, use is auxiliary Help strut support wallboard 2 that it is made to keep interim stabilization;
C, wallboard 2 connects
C1, adjacent two wallboard 2 is connected by wall wall connection structure, wall wall connection structure uses beard muscle 13 and joint bar 6 Cooperation clamping, the mode of Reperfu- sion concrete connect;
When c2, corner are connected using tee T, first the fastening bolt in the branch sleeve of wherein one wallboard 2, passes through The transverse sleeves of another wallboard 2, in other side tightening nuts;
D, the fastening bolt in square socket on wallboard 2 corresponds to mounting rail 7 at sleeve in 21 upper end of reinforcing plate, lays floor 8, bolt passes through and floor 8 and connects the sleeve on floor 8 and wallboard 2, in sleeve and 7 junction concrete perfusion of beam, and Tighten nut;
F, wallboard 2 is connect with gable board 11
F1, the fastening bolt in sleeve above the exterior wall, install gable board 11, by the bottom girder mounting hole and wall of gable board 11 2 upper end embedded sleeve barrel of plate corresponds to, and is bolted;
F2, the fastening bolt in sleeve above the exterior wall, install gable board 11, by grout sleeve at the bottom girder of gable board with 2 upper end embedded sleeve barrel of wallboard corresponds to, concrete perfusion, and tightens nut;
G, roof truss 10 is installed, connect with wallboard 2 by L-shaped connector 15;
Wingceltis item 12 and roof truss 10, wingceltis item 12 and gable board 11 are attached by h, mounting purlines by L-shaped connector 15;
I, it is laid with roof boarding.
Finally it should be noted that:The above descriptions are merely preferred embodiments of the present invention, is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it still can be with technical scheme described in the above embodiments is modified, or to which part technical characteristic Carry out equivalent replacement.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (8)

1. a kind of prefabricated house building, it is characterised in that:Including pedestal, floor or roof inclined plate structure are equipped with above pedestal At roofing board, between pedestal and roofing board be wallboard, pedestal, wallboard and roofing board surround an enclosure space, enclosure space Divide one layer or more residence space by floor and beam, is equipped with door and window, roofing board and wallboard, floor on wallboard as needed It is to be detachably connected between beam, floor and wallboard and pedestal and wallboard, wallboard one or both sides are equipped with groove, and groove makes Grouting band is formed between adjacent wall board, is connected as one by wall wall connector between adjacent wall board, and wall wall connector includes two A beard muscle, two beard muscle are connect with two adjacent wall boards respectively, and joint bar runs through two beard muscle.
2. prefabricated house is built according to claim 1, it is characterised in that:Pedestal connect group with wallboard by wall bottom Part connects, and wall bottom the first structure of connection component includes that three or more the pedestal sleeves being embedded on pedestal and three or more are pre-buried Vertical sleeve in wallboard bottom, wallboard correspond to and are equipped with mounting groove above vertical sleeve, and pedestal sleeve passes through spiral shell with vertical sleeve It tethers and connects, and be in the milk;Wall bottom second of structure of connection component be three or more the pedestal sleeves being embedded on pedestal and three with On be embedded in the grout sleeve of wallboard bottom, pedestal sleeve is bolted with grout sleeve, and is in the milk;Wall bottom connection group The third structure of part is the transverse direction that three or more the L-type fasteners being distributed on pedestal and three or more are horizontally installed on wallboard bottom Sleeve, vertical portion and the transverse sleeves of L-type fastener are bolted.
3. prefabricated house is built according to claim 1, it is characterised in that:Floor connect group with wallboard by wall top Part connects, and connection component includes three or more the vertical sleeves being embedded on wallboard;The first structure of wall top connection component includes Three or more the sleeve I for being embedded in bottom residence space wallboard upper end and three or more pre-buried upper layer residence space wallboard bottom Sleeve II, sleeve I and sleeve II are bolted, and are in the milk, and wherein bolt passes through floor;Second of knot of wall top connection component Structure includes three or more the branch sleeves for being embedded in bottom residence space wallboard upper end and three or more pre-buried upper layer residence space The grout sleeve of wallboard bottom, branch sleeve and grout sleeve are bolted, and are in the milk, and wherein bolt passes through floor.
4. prefabricated house is built according to claim 1, it is characterised in that:Wallboard include common plate, rotary corner plate and Reinforcing plate, the upper and lower side and lateral grooves of wallboard are interior to be equipped with built-in fitting, and the corner on basis, reinforcing plate setting is arranged in rotary corner plate Below beam, rotary corner plate includes being connected with each other the first plate body and the second plate body in 90 °, and reinforcing plate includes being arranged in plate body Reinforced steel.
5. prefabricated house is built according to claim 1, it is characterised in that:Wallboard includes setting gradually from inside to outside Styrofoam, steel wire net rack and concrete slab, both sides set built-in fitting, styrofoam EPS at left and right sides of concrete slab and/or up and down Styrofoam, steel wire net rack are galvanized steel, and by horizontal and vertical reinforcement welding, concrete slab is poured by self-compacting concrete, in advance Embedded part is galvanized steel.
6. prefabricated house is built according to claim 1, it is characterised in that:The side that floor is in contact with beam is oblique Face, cross section are the trapezium structure of upper short lower length, and front and back both sides are embedded with wall board connector, pass through I-beam between two floors It is attached, floor bottom edge is overlapped on I-beam lower flange, and is formed at notch and be in the milk in two floor sides.
7. being built according to any one of claim 1 to 6 prefabricated house, it is characterised in that:Roofing board is that roof is oblique Plate, roof inclined plate bottom surface are equipped with roof truss, and gable board is equipped on the outside of the roof truss, are provided with wingceltis item between roof truss, roof truss with it is outer Wallboard, purlin and gable board and roof truss and purlin use L-shaped connector, and ribs is equipped among L-shaped connector.
8. being built according to any one of claim 1 to 6 prefabricated house, it is characterised in that:Beard muscle is ellipse Structure.
CN201820054667.3U 2018-01-14 2018-01-14 It builds prefabricated house Expired - Fee Related CN207739388U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820054667.3U CN207739388U (en) 2018-01-14 2018-01-14 It builds prefabricated house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820054667.3U CN207739388U (en) 2018-01-14 2018-01-14 It builds prefabricated house

Publications (1)

Publication Number Publication Date
CN207739388U true CN207739388U (en) 2018-08-17

Family

ID=63122912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820054667.3U Expired - Fee Related CN207739388U (en) 2018-01-14 2018-01-14 It builds prefabricated house

Country Status (1)

Country Link
CN (1) CN207739388U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035433A (en) * 2018-01-14 2018-05-15 万华集成房屋(烟台)有限公司 Prefabricated house is built and its method of construction
CN109281395A (en) * 2018-08-20 2019-01-29 中民筑友科技投资有限公司 A kind of assembly method of assembly concrete truss building
CN109322510A (en) * 2018-10-24 2019-02-12 西安建筑科技大学 It is a kind of to move changeable assembled service facility
CN112942912A (en) * 2021-02-03 2021-06-11 成都职业技术学院 Civil school house with assembled steel structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035433A (en) * 2018-01-14 2018-05-15 万华集成房屋(烟台)有限公司 Prefabricated house is built and its method of construction
CN109281395A (en) * 2018-08-20 2019-01-29 中民筑友科技投资有限公司 A kind of assembly method of assembly concrete truss building
CN109322510A (en) * 2018-10-24 2019-02-12 西安建筑科技大学 It is a kind of to move changeable assembled service facility
CN112942912A (en) * 2021-02-03 2021-06-11 成都职业技术学院 Civil school house with assembled steel structure

Similar Documents

Publication Publication Date Title
CN108035433A (en) Prefabricated house is built and its method of construction
CN207739388U (en) It builds prefabricated house
CN206157897U (en) Assembled steel construction of high -rise structure system
CN103821276B (en) A kind of assembled, modular architectural system
US7913469B2 (en) Concrete load-bearing wall with compound heat-insulating layer
WO2017076070A1 (en) Integrated-assembly steel structure building
US20100218446A1 (en) Structure system of concrete building for self-heat insulation
CN202866321U (en) Slope roof lightweight steel construction mobile home
CN106121107A (en) Assemble type concrete slab and plate dry type method of attachment thereof
CN105863112A (en) Modular cold-bent thin-wall type steel combined wall and connection method thereof
WO2000077314A1 (en) Structure formed of foaming cement and lightweight steel, and a structure system and method of forming the structure system
CN108277887A (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame connecting node
CN103352569A (en) Construction method of integrally-poured architecture building
CN108385884A (en) A kind of bolted and welded connection steel reinforced concrete special-shape column-stealth beam floor assembly system
CN106869539A (en) A kind of assembled factory building
CN105089177B (en) Prefabrication type steel truss concrete shear wall and manufacture method
CN1888344B (en) Composite thermal insulation concrete load-bearing wall
CN206189685U (en) Integrated floor of modularization and house
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN100441793C (en) Composite thermal insulation concrete shear wall
CN108590025A (en) A kind of bamboo matter green prefabricated buildings and its method of construction
CN203188368U (en) Light-weight steel composite plate assembly house
CN210768011U (en) Light steel system prefabricated house
CN103485538A (en) Construction method of energy-saving insulation waterproof wood-trussed roof system
CN207419699U (en) A kind of energy-saving and environment-friendly industrialization prefabricated buildings structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180817

CF01 Termination of patent right due to non-payment of annual fee