CN207714372U - Pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail - Google Patents

Pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail Download PDF

Info

Publication number
CN207714372U
CN207714372U CN201721884102.XU CN201721884102U CN207714372U CN 207714372 U CN207714372 U CN 207714372U CN 201721884102 U CN201721884102 U CN 201721884102U CN 207714372 U CN207714372 U CN 207714372U
Authority
CN
China
Prior art keywords
buried
piping lane
prefabricated piping
nail
hanging nail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721884102.XU
Other languages
Chinese (zh)
Inventor
史继元
谭欣
王元清
李勇
方兵
姜志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201721884102.XU priority Critical patent/CN207714372U/en
Application granted granted Critical
Publication of CN207714372U publication Critical patent/CN207714372U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of pre-embedded bolt, the pre-buried prefabricated piping lanes for hanging nail, including prefabricated piping lane ontology (1), it is provided on the top plate of the prefabricated piping lane ontology (1) and pre-buried hangs nail (2), and it is provided with short slot (1a) at every pre-buried position for hanging nail (2), so that the pre-buried T-shape end for hanging nail (2) just it is exposed outside, and the pre-buried top surface for hanging nail (2) is just flushed with the top surface of prefabricated piping lane ontology (1);It is respectively arranged with pre-embedded bolt (3) in the left and right sidewall of the prefabricated piping lane ontology (1).The pre-buried nail that hangs can reduce the damage transported up and down to structure in transportational process, and bolt deviation can be prevented using set shaped steel formwork pre-embedded bolt, avoid squeezing into and be bolted phenomena such as mounting bracket generates destruction to structure, infiltration, leak occurs.

Description

Pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail
Technical field
The utility model is related to the piping lane technical fields of Urban Buried Pipeline Network Systems, and in particular to a kind of pre-embedded bolt, pre- Bury the prefabricated piping lane for hanging nail.
Background technology
Piping lane refers to the municipal public use tunnel built below urban road, by electric power, communication, water supply, combustion gas etc. A variety of municipal pipelines concentrate in together, and " unified planning, unified construction, unified management " are carried out, to accomplish the synthesis of the underground space Using shared with resource.
Piping lane uses armored concrete pouring molding, therefore also becomes " prefabricated piping lane ".Now currently, prefabricated piping lane is by steel Muscle, concreting form, and lack the installation of built-in fitting.First, after the completion of later stage assembly, by mounting bracket in piping lane When laying a variety of municipal pipelines such as electric power, communication, water supply, combustion gas, needs to squeeze into bolt on piping lane, be easily destroyed piping lane knot Structure increases piping lane infiltration risk.In addition, being hung again using the binding of fabric bandage in transportational process above and below prefabricated piping lane Dress is easy to generate damage to structure.
Utility model content
The utility model is intended to provide a kind of prefabricated piping lane for facilitating lifting and connecting mounting bracket, avoids beating on piping lane Enter bolt and destroy Pipe rack and cause to seep water, and transport does not need fabric bandage and ties up and lifted.
For this purpose, technical solution used by the utility model is:A kind of pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail, in advance Bolt, the pre-buried prefabricated piping lane for hanging nail, including prefabricated piping lane ontology are buried, is provided on the top plate of the prefabricated piping lane ontology pre-buried Hang nail, and short slot be provided at every pre-buried position for hanging nail so that the pre-buried T-shape end for hanging nail just it is exposed outside, And the pre-buried top surface for hanging nail is just flushed with the top surface of prefabricated piping lane ontology;In the left and right sidewall of the prefabricated piping lane ontology respectively It is provided with pre-embedded bolt.
The short slot is hemispherical as a preferred embodiment of the above solution, and hemispherical rubber is equipped in hemispheric short slot, When prefabricated piping lane ontology pouring molding, hemispherical rubber just covers the pre-buried T-shape end for hanging nail, when removing hemispherical rubber After glue, the pre-buried T-shape end ability for hanging nail is exposed outside.The pre-buried T-shape end for hanging nail is covered by presetting hemispherical rubber Firmly, it is ensured that casting concrete will not enter the space of hemispherical short slot, and when form removal again removes hemispherical rubber, make pre-buried to hang nail T-shape end it is exposed outside, facilitate suspender to enter hemispherical short slot and clamp T-shape end and lift.
Further, pre-buried hang follows closely totally four, and in rectangular layout, ensures that lifting is steady, avoids going out in hoisting process Existing beat.
The utility model has the beneficial effects that:Before prefabricated piping lane concreting, on the top plate of prefabricated piping lane ontology Pre-buried hemispherical rubber and pre-buried hang nail;After the completion of steel form molds, pre-embedded bolt is put into the reserved hole position of steel form It sets, tightening nuts, then casting concrete.After the completion of pouring, after removing hemispherical rubber, the pre-buried T-shape end for hanging nail is exposed Outside, facilitate suspender to enter hemispherical short slot and clamp T-shape end to lift.The pre-buried nail that hangs can reduce transportational process In the damage transported up and down to structure, can prevent bolt deviation using set shaped steel formwork pre-embedded bolt, avoid squeezing into bolt Connect phenomena such as mounting bracket generates destruction to structure, infiltration, leak occurs.
Description of the drawings
Fig. 1 is the front view of the utility model.
Fig. 2 is the vertical view of Fig. 1.
Fig. 3 is the A-A sectional views of Fig. 1.
Fig. 4 is the state that default hemispherical rubber covers the pre-buried T-shape end for hanging nail.
Specific implementation mode
By way of example and in conjunction with the accompanying drawings, the utility model is described in further detail:
In conjunction with shown in Fig. 1-Fig. 4, a kind of pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail, mainly by prefabricated piping lane ontology 1, Pre-buried nail 2, pre-embedded bolt 3, the hemispherical rubber 4 of hanging forms.
The pre-buried nail 2 that hangs is arranged on the top plate of prefabricated piping lane ontology 1.It is pre-buried at every on the top plate of prefabricated piping lane ontology 1 Hang nail 2 position at be provided with short slot 1a so that it is pre-buried hang nail 2 T-shape end just it is exposed outside, it is pre-buried hang nail 2 top Face is just flushed with the top surface of prefabricated piping lane ontology 1.It is respectively arranged with pre-embedded bolt 3 in the left and right sidewall of prefabricated piping lane ontology 1, A variety of municipal pipelines such as electric power, communication, water supply, combustion gas are laid for connecting mounting bracket.
Preferably, short slot 1a is hemispherical, and hemispherical rubber 4, prefabricated piping lane sheet are equipped in hemispheric short slot 1a When 1 pouring molding of body, hemispherical rubber 4 just covers the pre-buried T-shape end for hanging nail 2.After removing hemispherical rubber 4, The pre-buried T-shape end ability for hanging nail 2 is exposed outside.
Preferably, pre-buried to hang nail 2 totally four and in rectangular layout, but it is not limited to four.
The method for prefabricating of above-mentioned prefabricated piping lane, step are:
(a) steel bar meter is bound;
(b) steel form and formwork are made;
(c) concreting;
(d) it conserves;
(e) form removal.The above, identical as traditional method for prefabricating of prefabricated piping lane, details are not described herein, and difference exists In:
In step (b), several bolt through-holes are reserved on steel form, pre-embedded bolt 3 passes through corresponding on steel form Bolt through-hole simultaneously tighten by support screw cap;Hemispherical rubber 4 is sleeved on corresponding pre-buried T-shape end for hanging nail 2, then solid It is scheduled on concreting mold.
In step (e), form removal is carried out after nut corresponding with pre-embedded bolt 3 on steel form is unscrewed, after the completion of form removal, Hemispherical rubber 4 is removed, keeps the pre-buried T-shape end for hanging nail 2 exposed outside.

Claims (3)

1. a kind of pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail, including prefabricated piping lane ontology (1), it is characterised in that:It is described prefabricated Be provided on the top plate of piping lane ontology (1) it is pre-buried hang nail (2), and be provided with short slot at every pre-buried position for hanging nail (2) (1a) so that the pre-buried T-shape end for hanging nail (2) just it is exposed outside, and the pre-buried top surface for hanging nail (2) just with prefabricated piping lane The top surface of ontology (1) flushes;It is respectively arranged with pre-embedded bolt (3) in the left and right sidewall of the prefabricated piping lane ontology (1).
2. pre-embedded bolt according to claim 1, the pre-buried prefabricated piping lane for hanging nail, it is characterised in that:The short slot (1a) It is hemispherical, hemispherical rubber (4) is installed, when prefabricated piping lane ontology (1) pouring molding, just in the hemispheric short slot (1a) Good to cover the pre-buried T-shape end for hanging nail (2), after removing hemispherical rubber (4), the pre-buried T-shape end for hanging nail (2) is It is exposed outside.
3. pre-embedded bolt according to claim 2, the pre-buried prefabricated piping lane for hanging nail, it is characterised in that:It is described pre-buried to hang nail (2) totally four, and it is in rectangular layout.
CN201721884102.XU 2017-12-28 2017-12-28 Pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail Active CN207714372U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721884102.XU CN207714372U (en) 2017-12-28 2017-12-28 Pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721884102.XU CN207714372U (en) 2017-12-28 2017-12-28 Pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail

Publications (1)

Publication Number Publication Date
CN207714372U true CN207714372U (en) 2018-08-10

Family

ID=63050970

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721884102.XU Active CN207714372U (en) 2017-12-28 2017-12-28 Pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail

Country Status (1)

Country Link
CN (1) CN207714372U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576727A (en) * 2020-05-29 2020-08-25 中国十七冶集团有限公司 PC component that contains anchor shape and hangs nail

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576727A (en) * 2020-05-29 2020-08-25 中国十七冶集团有限公司 PC component that contains anchor shape and hangs nail

Similar Documents

Publication Publication Date Title
CN104947719B (en) The rear pouring tape construction method of formwork erecting structure is hung in basement roof post-cast strip
CN100510280C (en) Method for the earthwork of a foundation sunk for a wind energy facility
CN107023032A (en) A kind of cast-in-place method of pipe gallery
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN106088148B (en) Pipe gallery template and its application
CN205530344U (en) Utility tunnel is pour to split type no mould
CN210507523U (en) Construction structure of city utility tunnel and road
CN107989069A (en) Pre-embedded bolt, the pre-buried prefabricated piping lane and method for prefabricating for hanging nail
CN105971007A (en) Split type non-formwork pouring underground comprehensive pipe gallery
CN207714372U (en) Pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN207419778U (en) A kind of free removal wall body casting template device
CN110541567A (en) Plugging die for pipeline hanging hole gap and construction method
CN217130556U (en) Porch pipeline fixing device
CN207846469U (en) One kind pre-buried C-shaped channel steel device on piping lane internal model trolley formwork
CN214994278U (en) Prefabricated yard water cyclic utilization system
CN207526109U (en) Hole device is blocked up around through the erect riser of floor
CN206267520U (en) A kind of self-supporting post-cast strip is poured with hanging mould
CN202530518U (en) Embedded device at sewer line in toilet
CN203729419U (en) Quick-mounting mould plate of wall urinals
CN208633518U (en) Prestressed concrete laminated floor slab hangs mould pouring construction structure
CN206396790U (en) A kind of comprehensive pipe gallery structure for being easy to rainwater to discharge
CN104975572B (en) A kind of high ferro both wired quick prefabricated devices of ditch lid plate
CN103821143B (en) A kind of full recovery prestressed anchor and preparation method thereof
CN209063282U (en) A kind of piping lane being used to form dabbing pours mold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant