CN107989069A - Pre-embedded bolt, the pre-buried prefabricated piping lane and method for prefabricating for hanging nail - Google Patents

Pre-embedded bolt, the pre-buried prefabricated piping lane and method for prefabricating for hanging nail Download PDF

Info

Publication number
CN107989069A
CN107989069A CN201711452788.XA CN201711452788A CN107989069A CN 107989069 A CN107989069 A CN 107989069A CN 201711452788 A CN201711452788 A CN 201711452788A CN 107989069 A CN107989069 A CN 107989069A
Authority
CN
China
Prior art keywords
buried
piping lane
prefabricated piping
nail
hanging nail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711452788.XA
Other languages
Chinese (zh)
Inventor
史继元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201711452788.XA priority Critical patent/CN107989069A/en
Publication of CN107989069A publication Critical patent/CN107989069A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/08Producing shaped prefabricated articles from the material by vibrating or jolting
    • B28B1/087Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/04Discharging the shaped articles
    • B28B13/06Removing the shaped articles from moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Manufacturing & Machinery (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The invention discloses a kind of pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail, including prefabricated piping lane body (1), it is provided with the top plate of the prefabricated piping lane body (1) and pre-buried hangs nail (2), and it is provided with short slot (1a) at every pre-buried position for hanging nail (2), so that the pre-buried T-shape termination for hanging nail (2) just it is exposed outside, and top surface of the pre-buried top surface for hanging nail (2) just with prefabricated piping lane body (1) flushes;Pre-embedded bolt (3) is respectively arranged with the left and right sidewall of the prefabricated piping lane body (1).Meanwhile the invention also discloses the method for prefabricating of above-mentioned prefabricated piping lane.The pre-buried nail that hangs can reduce the damage transported up and down to structure in transportational process, and bolt off normal can be prevented using set shaped steel formwork pre-embedded bolt, avoid squeezing into and be bolted phenomena such as mounting bracket produces destruction to structure, infiltration, leak occurs.

Description

Pre-embedded bolt, the pre-buried prefabricated piping lane and method for prefabricating for hanging nail
Technical field
The present invention relates to the piping lane technical field of Urban Buried Pipeline Network Systems, and in particular to a kind of pre-embedded bolt, pre-buried hang The prefabricated piping lane and method for prefabricating of nail.
Background technology
Piping lane refers to the municipal public use tunnel built below urban road, by electric power, communication, water supply, combustion gas etc. A variety of municipal pipelines concentrate in together, and " unified planning, unified construction, unified management " are carried out, to accomplish the synthesis of the underground space Using shared with resource.
Piping lane uses armored concrete pouring molding, therefore also becomes " prefabricated piping lane ".At present now, prefabricated piping lane is by steel Muscle, concreting form, and lack the installation of built-in fitting.First, after the completion of later stage assembly, by mounting bracket in piping lane Electric power, communication, water supply, combustion gas are laid when a variety of municipal pipelines, it is necessary to squeeze into bolt on piping lane, is easily destroyed piping lane knot Structure, increase piping lane infiltration risk.In addition, hung again using the binding of fabric bandage in transportational process above and below prefabricated piping lane Dress, easily produces damage to structure.
The content of the invention
The present invention is intended to provide the prefabricated piping lane of a kind of convenient lifting and connection mounting bracket, avoids squeezing into spiral shell on piping lane Bolt and destroy Pipe rack and cause to seep water, and transport and be not required fabric bandage to tie up and lifted.
For this reason, the technical solution adopted in the present invention is:A kind of pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail, pre-buried spiral shell Bolt, the pre-buried prefabricated piping lane for hanging nail, including prefabricated piping lane body, are provided with pre-buried hang on the top plate of the prefabricated piping lane body Nail, and is provided with short slot at every pre-buried position for hanging nail so that the pre-buried T-shape termination for hanging nail just it is exposed outside, and Top surface of the pre-buried top surface for hanging nail just with prefabricated piping lane body flushes;Set respectively in the left and right sidewall of the prefabricated piping lane body It is equipped with pre-embedded bolt.
As the preferred of such scheme, the short slot is hemispherical, and hemispherical rubber is provided with hemispheric short slot, During prefabricated piping lane body pouring molding, hemispherical rubber just covers the pre-buried T-shape termination for hanging nail, when removing hemispherical rubber After glue, it is pre-buried hang nail T-shape termination just it is exposed outside.The pre-buried T-shape termination for hanging nail is covered by presetting hemispherical rubber Firmly, it is ensured that casting concrete will not enter the space of hemispherical short slot, and when form removal again removes hemispherical rubber, make pre-buried to hang nail T-shape termination it is exposed outside, facilitate suspender to enter hemispherical short slot and clamp T-shape termination and lifted.
Further, pre-buried hang follows closely totally four, and in rectangular layout, ensures that lifting is steady, avoids going out in hoisting process Existing beat.
Meanwhile present invention also offers a kind of method for prefabricating of above-mentioned prefabricated piping lane, its step is that (a) makes concrete to pour Build mould and steel form molding;(b) concreting and vibrate;(c) demoulded after concrete setting, wherein,
In step (a), some bolt through-holes are reserved with the steel form, pre-embedded bolt is passed through on steel form each Corresponding bolt through-hole simultaneously tighten by support screw cap;By hemispherical rubber sleeve on corresponding pre-buried T-shape termination for hanging nail, It is fixed on again on concreting mould;
In step (c), demoulded after nut corresponding with pre-embedded bolt on steel form is unscrewed, after the completion of the demoulding, Hemispherical rubber is removed, makes the pre-buried T-shape termination for hanging nail exposed outside.
The beneficial effects of the invention are as follows:It is pre-buried on the top plate of prefabricated piping lane body before prefabricated piping lane concreting Hemispherical rubber and pre-buried hang nail;After the completion of steel form molding, pre-embedded bolt is put into the hole location that steel form reserves, is twisted Tight nut, then casting concrete.After the completion of pouring, after removing hemispherical rubber, it is pre-buried hang nail T-shape termination it is exposed outside, Facilitate suspender to enter hemispherical short slot and clamp T-shape termination to be lifted.The pre-buried nail that hangs can be reduced in transportational process Damage of the transport to structure up and down, bolt off normal can be prevented using set shaped steel formwork pre-embedded bolt, avoided squeezing into and be bolted Phenomena such as mounting bracket produces structure destruction, and generation is seeped water, leak.
Brief description of the drawings
Fig. 1 is the front view of the present invention.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the A-A sectional views of Fig. 1.
Fig. 4 is the state that default hemispherical rubber covers the pre-buried T-shape termination for hanging nail.
Embodiment
By way of example and in conjunction with the accompanying drawings, the invention will be further described:
With reference to shown in Fig. 1-Fig. 4, a kind of pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail, mainly by prefabricated piping lane body 1, Pre-buried nail 2, pre-embedded bolt 3, the hemispherical rubber 4 of hanging forms.
The pre-buried nail 2 that hangs is arranged on the top plate of prefabricated piping lane body 1.It is pre-buried at every on the top plate of prefabricated piping lane body 1 Hang nail 2 position at be provided with short slot 1a so that it is pre-buried hang nail 2 T-shape termination just it is exposed outside, it is pre-buried hang nail 2 top Top surface of the face just with prefabricated piping lane body 1 flushes.Pre-embedded bolt 3 is respectively arranged with the left and right sidewall of prefabricated piping lane body 1, A variety of municipal pipelines such as electric power, communication, water supply, combustion gas are laid for connecting mounting bracket.
Preferably, short slot 1a is hemispherical, and hemispherical rubber 4, prefabricated piping lane sheet are provided with hemispheric short slot 1a During 1 pouring molding of body, hemispherical rubber 4 just covers the pre-buried T-shape termination for hanging nail 2.After hemispherical rubber 4 is removed, It is pre-buried hang nail 2 T-shape termination just it is exposed outside.
Preferably, it is pre-buried to hang nail 2 totally four, and in rectangular layout, but it is not limited to four.
The method for prefabricating of above-mentioned prefabricated piping lane, its step are:
(a) steel bar meter is bound;
(b) steel form and formwork are made;
(c) concreting;
(d) conserve;
(e) form removal.The above, identical with the method for prefabricating of traditional prefabricated piping lane, details are not described herein, distinguishes In:
In step (b), some bolt through-holes are reserved on steel form, pre-embedded bolt 3 passes through corresponding on steel form Bolt through-hole simultaneously tighten by support screw cap;Hemispherical rubber 4 is sleeved on corresponding pre-buried T-shape termination for hanging nail 2, then it is solid It is scheduled on concreting mould.
In step (e), form removal is carried out after unscrewing on steel form with 3 corresponding nut of pre-embedded bolt, after the completion of form removal, Hemispherical rubber 4 is removed, makes the pre-buried T-shape termination for hanging nail 2 exposed outside.

Claims (4)

1. a kind of pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail, including prefabricated piping lane body (1), it is characterised in that:It is described prefabricated Be provided with the top plate of piping lane body (1) it is pre-buried hang nail (2), and be provided with short slot at every pre-buried position for hanging nail (2) (1a) so that the pre-buried T-shape termination for hanging nail (2) just it is exposed outside, and the pre-buried top surface for hanging nail (2) just with prefabricated piping lane The top surface of body (1) flushes;Pre-embedded bolt (3) is respectively arranged with the left and right sidewall of the prefabricated piping lane body (1).
2. pre-embedded bolt according to claim 1, the pre-buried prefabricated piping lane for hanging nail, it is characterised in that:The short slot (1a) It is hemispherical, hemispherical rubber (4) is installed, during prefabricated piping lane body (1) pouring molding, just in the hemispheric short slot (1a) Good to cover the pre-buried T-shape termination for hanging nail (2), after hemispherical rubber (4) are removed, the pre-buried T-shape termination for hanging nail (2) is It is exposed outside.
3. pre-embedded bolt according to claim 2, the pre-buried prefabricated piping lane for hanging nail, it is characterised in that:It is described pre-buried to hang nail (2) totally four, and in rectangular layout.
4. a kind of method for prefabricating of prefabricated piping lane as any one of claim 1-3, its step is (a) steel bar meter Binding;(b) steel form and formwork are made;(c) concreting;(d) conserve;(e) form removal, is characterized in that:
In step (b), some bolt through-holes are reserved on the steel form, pre-embedded bolt (3) passes through each right on steel form The bolt through-hole and support screw cap answered are tightened;Hemispherical rubber (4) is sleeved on corresponding pre-buried T-shape end for hanging nail (2) On head, then it is fixed on concreting mould;
In step (e), form removal is carried out after nut corresponding with pre-embedded bolt (3) on steel form is unscrewed, will after the completion of form removal Hemispherical rubber (4) is removed, and makes the pre-buried T-shape termination for hanging nail (2) exposed outside.
CN201711452788.XA 2017-12-28 2017-12-28 Pre-embedded bolt, the pre-buried prefabricated piping lane and method for prefabricating for hanging nail Pending CN107989069A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711452788.XA CN107989069A (en) 2017-12-28 2017-12-28 Pre-embedded bolt, the pre-buried prefabricated piping lane and method for prefabricating for hanging nail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711452788.XA CN107989069A (en) 2017-12-28 2017-12-28 Pre-embedded bolt, the pre-buried prefabricated piping lane and method for prefabricating for hanging nail

Publications (1)

Publication Number Publication Date
CN107989069A true CN107989069A (en) 2018-05-04

Family

ID=62042058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711452788.XA Pending CN107989069A (en) 2017-12-28 2017-12-28 Pre-embedded bolt, the pre-buried prefabricated piping lane and method for prefabricating for hanging nail

Country Status (1)

Country Link
CN (1) CN107989069A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108481541A (en) * 2018-06-01 2018-09-04 杨昱 A kind of round end hangs the pre-buried fixed structure of nail
CN109440819A (en) * 2018-12-25 2019-03-08 上海公路桥梁(集团)有限公司 Prefabricated pipe gallery
CN113510838A (en) * 2021-06-29 2021-10-19 新疆交建市政工程有限责任公司 Construction method of prefabricated road slab for assembled pavement

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203284040U (en) * 2013-06-13 2013-11-13 储成霞 Cement building prefabricated hoisting part
JP2015074886A (en) * 2013-10-07 2015-04-20 清水建設株式会社 Box culvert and method of constructing the same
CN206748720U (en) * 2017-03-21 2017-12-15 中铁工程装备集团有限公司 Underground pipe gallery groove profile concrete tube coupling mould

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203284040U (en) * 2013-06-13 2013-11-13 储成霞 Cement building prefabricated hoisting part
JP2015074886A (en) * 2013-10-07 2015-04-20 清水建設株式会社 Box culvert and method of constructing the same
CN206748720U (en) * 2017-03-21 2017-12-15 中铁工程装备集团有限公司 Underground pipe gallery groove profile concrete tube coupling mould

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
[匈]L.莫克等: "《钢筋混凝土装配式建筑》", 28 February 1985, 中国建筑工业出版社 *
石立国等: "上下分体装配式预制管廊施工技术", 《施工技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108481541A (en) * 2018-06-01 2018-09-04 杨昱 A kind of round end hangs the pre-buried fixed structure of nail
CN109440819A (en) * 2018-12-25 2019-03-08 上海公路桥梁(集团)有限公司 Prefabricated pipe gallery
CN113510838A (en) * 2021-06-29 2021-10-19 新疆交建市政工程有限责任公司 Construction method of prefabricated road slab for assembled pavement

Similar Documents

Publication Publication Date Title
CN104947719B (en) The rear pouring tape construction method of formwork erecting structure is hung in basement roof post-cast strip
CN107989069A (en) Pre-embedded bolt, the pre-buried prefabricated piping lane and method for prefabricating for hanging nail
CN205530344U (en) Utility tunnel is pour to split type no mould
CN107023032A (en) A kind of cast-in-place method of pipe gallery
CN106088148B (en) Pipe gallery template and its application
CN103061504A (en) Concrete board pipeline installation reserved hole construction mould and construction method
CN103174095B (en) Box girder concrete pouring structure with rear-expanding flanges and construction method thereof
CN108797362A (en) One kind pouring mass concrete heat sink
CN105971007A (en) Split type non-formwork pouring underground comprehensive pipe gallery
CN208777176U (en) One kind pouring mass concrete cooling device
CN207714372U (en) Pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail
CN103615075B (en) The continuous casting forming method of concrete sloping roof
CN205446961U (en) Threading pipe fixing device , prefabricated component mould, prefabricated component and mounting structure
CN102434005A (en) Precast beam unit construction technology
CN102352690A (en) Construction method of anti-floating locating system of cast-in-place concrete hollow floorslab steel tube
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN207419778U (en) A kind of free removal wall body casting template device
CN207920083U (en) Hot-water heating casing during typical floor pours reserves positioning device
CN110541567A (en) Plugging die for pipeline hanging hole gap and construction method
CN206158192U (en) Concrete pump pipe's simple easily fixable device on concrete face
CN109914476A (en) A kind of construction technology of cast-in-place city integrated piping lane
CN207526109U (en) Hole device is blocked up around through the erect riser of floor
CN212249252U (en) Concrete pouring and vibrating device assembly for closed space
CN203729419U (en) Quick-mounting mould plate of wall urinals
KR101448610B1 (en) Concret pour mold for pipe connection part of pc manhole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180504