CN207691330U - A kind of cable laying cable paying out reel - Google Patents
A kind of cable laying cable paying out reel Download PDFInfo
- Publication number
- CN207691330U CN207691330U CN201721737311.1U CN201721737311U CN207691330U CN 207691330 U CN207691330 U CN 207691330U CN 201721737311 U CN201721737311 U CN 201721737311U CN 207691330 U CN207691330 U CN 207691330U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- support column
- paying out
- out reel
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model is related to technical field of electric power, and a kind of cable laying cable paying out reel, including pedestal are disclosed, it is fixedly connected with the first support column and the second support column at the top of pedestal, the right side of second support column is fixedly connected with fixed plate, and the top of fixed plate is fixedly connected with motor.Cable laying cable paying out reel, under the action of threaded sleeve, solar panels left end can be pushed to be risen, to change the light angle of solar panels, it can be adjusted according to the variation of sun angle, it ensure that solar panels effectively absorb luminous energy, it ensure that effective electric power storage to accumulator, improve the efficiency of worker's work, under the action of the spring, when encountering the section jolted, unwrapping wire shaft body can effectively be slowed down, pass through the idler wheel of setting, movement of the staff to unwrapping wire shaft body can be facilitated, several workers are needed to lift together when avoiding mobile, consume the situation of the muscle power of staff.
Description
Technical field
The utility model is related to technical field of electric power, specially a kind of cable laying cable paying out reel.
Background technology
Wires and cables industry is the second largest industry that China is only second to automobile industry, product variety Service Efficiency and domestic market
Occupation rate is more than 90%.Worldwide, the Chinese electric wire gross output value has been more than the U.S., becomes the first big electricity in the world
Line cable producing country.Along with Chinese wires and cables industry high speed development, creation of new enterprise quantity constantly rises, industry overall technology
Level is largely increased.
In the construction of cable laying, paying out reel can be used and carry out setting-out work to cable, currently, existing unwrapping wire
Axis, it is simple in structure, all it is to carry out unwrapping wire using manual when winding unwrapping wire, there are also motor-driven paying out reels, but need
The charging of artificial timing, is busy with one's work sometimes, and electric power is not enough, will utilize artificial progress setting-out work, cause work into
Journey greatly reduces, and efficiency becomes very slow, bothersome laborious, and the paying out reel weight after cable winding is very heavy, when mobile
It needs several workers to lift together, consumes very much the muscle power of staff.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of cable laying cable paying out reel, has too
It is positive to power, the advantages that avoiding electric power and not enough use, be moved easily the muscle power for saving staff, it is inadequate to solve electric power
With, setting-out work will be carried out using artificial, the process of work is caused greatly to reduce, efficiency becomes very slow, bothersome laborious,
And the paying out reel weight after cable winding is very heavy, needs several workers to lift together when mobile, consumes very much staff
Muscle power problem.
(2) technical solution
It is above-mentioned solar powered to realize, it avoids electric power and not enough uses, be moved easily the physical mesh for saving staff
, the utility model provides the following technical solutions:A kind of cable laying cable paying out reel, including pedestal, the pedestal
Top is fixedly connected with the first support column and the second support column, and the right side of second support column is fixedly connected with fixed plate,
The top of the fixed plate is fixedly connected with motor, and the output shaft of the motor is fixedly connected with rotation axis, the rotation axis
The left side of the second support column, the one end of the rotation axis far from motor and the first support are run through and extended in one end far from motor
The left side of column is flexibly connected, and the appearance fixing sleeve of the rotation axis is connected to paying out reel ontology, the top of second support column
It is fixedly connected with transverse slat, the bottom of the transverse slat is installed with accumulator, strut, institute are fixedly connected at the top of the transverse slat
The outer surface movable sleeve for stating strut upper end is connected to threaded sleeve, and the inner ring of the threaded sleeve is threaded with threaded rod, described
The lower end of threaded sleeve inner ring is fixedly connected with spacing collar, and spacing collar is between strut and threaded rod, the threaded rod
Top is hinged with the first fixed block by embolism extinguishing, and solar panels, the sun are installed at the top of first fixed block
It can be fixedly connected with the second fixed block on the right side of board bottom portion, the bottom of second fixed block is hinged with supporting rod by embolism extinguishing,
It is fixedly connected at the top of the bottom of the supporting rod and transverse slat.
Four edges of the base bottom have been fixedly connected with fixed seat, and peace is fixed in the both sides of the fixed seat inner wall
Equipped with sliding rail, the bottom movable sleeve of the fixed seat is connected to pillar, and one end that the pillar is located inside fixed seat is fixedly connected
There is connecting plate, the both ends of the connecting plate are fixedly connected with sliding block, and sliding block is connected on sliding rail, and the top of the connecting plate is solid
There are two symmetrical springs for fixed connection, and the lower end of the pillar is hinged with idler wheel by embolism extinguishing.
Preferably, the vertical length value of the threaded sleeve is equal with the vertical length of threaded rod value, and threaded sleeve with
Threaded rod is adapted.
Preferably, between the both sides and the first support column and the second support column of the unwrapping wire shaft body there are it is certain away from
From, and there are gaps between unwrapping wire shaft body and the top of pedestal.
Preferably, the internal activity of the spring is socketed with telescopic rod, the top and bottom of the telescopic rod respectively with it is solid
It is fixedly connected at the top of the inner roof wall of reservation and connecting plate.
Preferably, the top and bottom of the sliding rail are fixedly connected with the inner roof wall of fixed seat and inner bottom wall, and sliding rail with
There are gaps between spring.
Preferably, it is in contact between the top of the strut and the bottom of spacing collar, and strut is located at the left side of supporting rod.
(3) advantageous effect
Compared with prior art, the utility model provides a kind of cable laying cable paying out reel, and having following has
Beneficial effect:
1, the cable laying cable paying out reel under the action of threaded sleeve, can be pushed away by the threaded rod of setting
Dynamic solar panels left end is risen, and to change the light angle of solar panels, can be carried out according to the variation of sun angle
It adjusts, ensure that solar panels effectively absorb luminous energy, ensure that effective electric power storage to accumulator, improve the effect of worker's work
Rate.
2, cable laying cable paying out reel under the action of the spring, is jolted by the connecting plate of setting encountering
Section when, unwrapping wire shaft body can effectively be slowed down, by the idler wheel of setting, staff can be facilitated to unwrapping wire
The movement of shaft body needs several workers to lift together when avoiding mobile, consume the situation of the muscle power of staff.
Description of the drawings
Fig. 1 is the utility model unwrapping wire shaft body front view;
Fig. 2 is the sectional view of the utility model fixed seat front view;
Fig. 3 is the enlarged structure schematic diagram at A in the utility model Fig. 1.
In figure:1 pedestal, 2 first support columns, 3 second support columns, 4 fixed plates, 5 motors, 6 rotation axis, 7 unwrapping wire shaft bodies,
8 transverse slats, 9 accumulators, 10 struts, 11 threaded sleeves, 12 threaded rods, 13 spacing collars, 14 first fixed blocks, 15 solar panels, 16
Second fixed block, 17 supporting rods, 18 fixed seats, 19 sliding rails, 20 pillars, 21 connecting plates, 22 sliding blocks, 23 springs, 24 idler wheels, 25
Strut.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, a kind of cable laying cable paying out reel, including pedestal 1, the top of pedestal 1 are fixedly connected
There are the first support column 2 and the second support column 3, the right side of the second support column 3 to be fixedly connected with fixed plate 4, the top of fixed plate 4
Be fixedly connected with motor 5, the output shaft of motor 5 is fixedly connected with rotation axis 6, and the one end of rotation axis 6 far from motor 5 is through simultaneously
The left side of the second support column 3 is extended to, the one end of rotation axis 6 far from motor 5 is flexibly connected with the left side of the first support column 2,
The appearance fixing sleeve of rotation axis 6 is connected to paying out reel ontology 7, the both sides of unwrapping wire shaft body 7 and the first support column 2 and the second support column
There are a certain distance between 3, and there are gap between unwrapping wire shaft body 7 and the top of pedestal 1, paying out reel when avoiding rotation
It rubs between ontology 7 and the first support column 2, the second support column 3 and pedestal 1, ensure that unwrapping wire shaft body 7 effectively carries out
The top of setting-out work, the second support column 3 is fixedly connected with transverse slat 8, and the bottom of transverse slat 8 is installed with accumulator 9, accumulator
9 are electrically connected by photovoltaic controller and solar panels 15 and motor 5, are powered for accumulator 9, and accumulator 9 provides dynamic for motor 5
The top of power, transverse slat 8 is fixedly connected with strut 10, is in contact between the top and the bottom of spacing collar 13 of strut 10, and strut
10 are located at the left side of supporting rod 17, and the outer surface movable sleeve of 10 upper end of strut is connected to threaded sleeve 11, threaded sleeve 11 it is vertical
Length value is equal with the vertical length of threaded rod 12 value, and threaded sleeve 11 is adapted with threaded rod 12, ensure that solar energy
The angle that plate 15 is adjusted maximizes, and has been applicable in the use of various times in season, the direct projection angle of the sun ensure that solar panels
The effective supply of 15 pairs of 9 electric power of accumulator makes in prolonged work, still keeps the electric power of accumulator 9 sufficient, improves
The efficiency that unwrapping wire shaft body 7 works, has saved largely time and labour, the inner ring of threaded sleeve 11 is threaded with screw thread
The lower end of bar 12,11 inner ring of threaded sleeve is fixedly connected with spacing collar 13, can be limited to strut 10, ensure that thread bush
Pipe 11 is by the support of strut 10, the effective raising and lowering for driving threaded rod 12, and spacing collar 13 is located at strut 10 and screw thread
Between bar 12, the top of threaded rod 12 is hinged with the first fixed block 14 by embolism extinguishing, and the top of the first fixed block 14 is fixedly mounted
There are solar panels 15, the second fixed block 16 is fixedly connected on the right side of 15 bottom of solar panels, the bottom of the second fixed block 16 is logical
It crosses embolism extinguishing and is hinged with supporting rod 17, the bottom of supporting rod 17 is fixedly connected with the top of transverse slat 8.
Four edges of 1 bottom of pedestal have been fixedly connected with fixed seat 18, and the both sides of 18 inner wall of fixed seat are fixedly mounted
There are sliding rail 19, the top and bottom of sliding rail 19 to be fixedly connected with the inner roof wall of fixed seat 18 and inner bottom wall, avoids the cunning of sliding block 22
Dynamic the case where being detached from sliding rail 19, and there are gap between sliding rail 19 and spring 23, avoids spring 23 when shrinking and sliding rail
It rubs between 19, stops the case where sliding block 22 slides, ensure that effective work of spring 23 and sliding block 22, fixed seat 18
Bottom movable sleeve be connected to pillar 20, one end that pillar 20 is located inside fixed seat 18 is fixedly connected with connecting plate 21, connecting plate
21 both ends are fixedly connected with sliding block 22, and sliding block 22 is connected on sliding rail 19, there are two the top of connecting plate 21 is fixedly connected
Symmetrical spring 23, the internal activity of spring 23 are socketed with telescopic rod 25, the top and bottom of telescopic rod 25 respectively with fixation
The inner roof wall of seat 18 is fixedly connected with the top of connecting plate 21, is avoided spring 23 and is detached from fixed seat 18 and connecting plate at work
21 the case where, unwrapping wire shaft body 7 slows down when ensure that spring 23 effectively to jolting, and facilitates staff to paying out reel
The lower end of the movement of ontology 7, pillar 20 is hinged with idler wheel 24 by embolism extinguishing.
When work, the adjusting to solar panels 15 is carried out according to the direct projection angle of the sun, threaded sleeve 11 is rotated, is limiting
Position encloses 13 under the action of strut 10, and threaded rod 12 rises, and drives and is moved up on the left end of solar panels 15, to be regulated to conjunction
When suitable angle, when mobile unwrapping wire shaft body 7, worker pushes unwrapping wire shaft body 7, under the action of idler wheel 24, paying out reel
Ontology 7 is moved, when bumpy sections the contraction of spring 23 unwrapping wire shaft body 7 is slowed down.
The electric elements occurred in this article are electrically connected with extraneous main controller and 220V alternating currents, and main controller can be meter
Calculation machine etc. plays the conventionally known equipment of control.
In conclusion cable laying cable paying out reel, by the threaded rod 12 of setting, in the work of threaded sleeve 11
Under, 15 left end of solar panels can be pushed to be risen, it, can be according to too to change the light angle of solar panels 15
The variation of external corner degree is adjusted, and ensure that solar panels 15 effectively absorb luminous energy, ensure that effective storage to accumulator 9
Electricity, the efficiency for improving worker's work under the action of spring 23, are encountering the section jolted by the connecting plate 21 of setting
When, unwrapping wire shaft body 7 can effectively be slowed down, by the idler wheel 24 of setting, staff can be facilitated to paying out reel
The movement of ontology 7 needs several workers to lift together when avoiding mobile, consume the situation of the muscle power of staff, solve
Electric power is not enough, will carry out setting-out work using artificial, the process of work is caused greatly to reduce, and efficiency becomes very slow,
It is bothersome laborious, and the paying out reel weight after cable winding is very heavy, needs several workers to lift together when mobile, consumes very much
The problem of the muscle power of staff.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of cable laying cable paying out reel, including pedestal (1), it is characterised in that:The top of the pedestal (1) is fixed
It is connected with the first support column (2) and the second support column (3), the right side of second support column (3) is fixedly connected with fixed plate
(4), the top of the fixed plate (4) is fixedly connected with motor (5), and the output shaft of the motor (5) is fixedly connected with rotation
The left side of the second support column (3), the rotation are run through and extended in axis (6), the one end of the rotation axis (6) far from motor (5)
The one end of axis (6) far from motor (5) is flexibly connected with the left side of the first support column (2), and the appearance of the rotation axis (6) is fixed
It is socketed with unwrapping wire shaft body (7), transverse slat (8), the bottom of the transverse slat (8) are fixedly connected at the top of second support column (3)
Portion is installed with accumulator (9), and strut (10) is fixedly connected at the top of the transverse slat (8), strut (10) upper end
Outer surface movable sleeve is connected to threaded sleeve (11), and the inner ring of the threaded sleeve (11) is threaded with threaded rod (12), described
The lower end of threaded sleeve (11) inner ring is fixedly connected with spacing collar (13), and spacing collar (13) is located at strut (10) and threaded rod
(12) between, the top of the threaded rod (12) is hinged with the first fixed block (14), first fixed block (14) by embolism extinguishing
Top be installed with solar panels (15), be fixedly connected with the second fixed block on the right side of solar panels (15) bottom
(16), the bottom of second fixed block (16) is hinged with supporting rod (17) by embolism extinguishing, the bottom of the supporting rod (17) with
Transverse slat is fixedly connected at the top of (8);
Four edges of pedestal (1) bottom have been fixedly connected with fixed seat (18), and the two of fixed seat (18) inner wall
Side is installed with sliding rail (19), and the bottom movable sleeve of the fixed seat (18) is connected to pillar (20), and the pillar (20) is located at
The internal one end of fixed seat (18) is fixedly connected with connecting plate (21), and the both ends of the connecting plate (21) are fixedly connected with sliding block
(22), and sliding block (22) is connected on sliding rail (19), is fixedly connected at the top of the connecting plate (21) there are two symmetrical bullet
The lower end of spring (23), the pillar (20) is hinged with idler wheel (24) by embolism extinguishing.
2. a kind of cable laying cable paying out reel according to claim 1, it is characterised in that:The threaded sleeve
(11) vertical length value is equal with the vertical length of threaded rod (12) value, and threaded sleeve (11) is mutually fitted with threaded rod (12)
Match.
3. a kind of cable laying cable paying out reel according to claim 1, it is characterised in that:The unwrapping wire shaft body
(7) there are a certain distance between both sides and the first support column (2) and the second support column (3), and unwrapping wire shaft body (7) and bottom
There are gaps between the top of seat (1).
4. a kind of cable laying cable paying out reel according to claim 1, it is characterised in that:The spring (23)
Internal activity is socketed with telescopic rod (25), the top and bottom of the telescopic rod (25) respectively with the inner roof wall of fixed seat (18) and
Connecting plate is fixedly connected at the top of (21).
5. a kind of cable laying cable paying out reel according to claim 1, it is characterised in that:The sliding rail (19)
Top and bottom are fixedly connected with the inner roof wall of fixed seat (18) and inner bottom wall, and between sliding rail (19) and spring (23) there are
Gap.
6. a kind of cable laying cable paying out reel according to claim 1, it is characterised in that:The strut (10)
It is in contact between top and the bottom of spacing collar (13), and strut (10) is located at the left side of supporting rod (17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721737311.1U CN207691330U (en) | 2017-12-14 | 2017-12-14 | A kind of cable laying cable paying out reel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721737311.1U CN207691330U (en) | 2017-12-14 | 2017-12-14 | A kind of cable laying cable paying out reel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207691330U true CN207691330U (en) | 2018-08-03 |
Family
ID=62997308
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721737311.1U Expired - Fee Related CN207691330U (en) | 2017-12-14 | 2017-12-14 | A kind of cable laying cable paying out reel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207691330U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112735232A (en) * | 2021-01-06 | 2021-04-30 | 广东金融学院 | Learning device is used in international financial law and trade teaching |
CN114374172A (en) * | 2022-02-11 | 2022-04-19 | 山东西城电力建设有限公司 | Intelligent inspection equipment and method for high-voltage transmission line |
-
2017
- 2017-12-14 CN CN201721737311.1U patent/CN207691330U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112735232A (en) * | 2021-01-06 | 2021-04-30 | 广东金融学院 | Learning device is used in international financial law and trade teaching |
CN114374172A (en) * | 2022-02-11 | 2022-04-19 | 山东西城电力建设有限公司 | Intelligent inspection equipment and method for high-voltage transmission line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207691330U (en) | A kind of cable laying cable paying out reel | |
CN206070371U (en) | A kind of hanging ladder for bridge maintenance | |
CN205985981U (en) | Cable pay -off rack of adjustable size | |
CN206546664U (en) | Rotating display stand frame is used in a kind of management teaching | |
CN103904521B (en) | A kind of current-collector of trolley automatic electricity taking device | |
CN208257359U (en) | A kind of apparatus for fixing cord of power transmission and transformation line | |
CN106764886A (en) | A kind of solar street light with self-cleaning function | |
CN207251520U (en) | A kind of foldable anticorrosion solar energy aluminum frame of high-performance | |
CN206419870U (en) | A kind of solar street light with self-cleaning function | |
CN205077989U (en) | Electric fence | |
CN108248420A (en) | A kind of electric vehicle photovoltaic charge station | |
CN209196722U (en) | A kind of solar energy Chinese lamp foundation structure | |
CN208424279U (en) | Generation of electricity by new energy device | |
CN209146953U (en) | A kind of photovoltaic street lamp | |
CN203826741U (en) | Current collector of automatic trolley conductor power-acquiring apparatus | |
CN208220291U (en) | A kind of New energy electric bicycle shed | |
CN209369782U (en) | A kind of double counter weight devices of walking beam on pumping units sliding | |
CN206419838U (en) | A kind of energy-conserving road lamp being easily installed | |
CN217000736U (en) | House wall body fitment is with whitewashing strutting arrangement | |
CN205805026U (en) | A kind of novel wall support means | |
CN206462622U (en) | Elastic foldable same table | |
CN204462863U (en) | A kind of novel solar photovoltaic generation system bracing frame | |
CN221146495U (en) | Low-power consumption annular light filling lamp | |
CN210558325U (en) | Six-roller compound machine traction frame | |
CN109179081A (en) | A kind of fire resistant electric wire cable production machines |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180803 Termination date: 20181214 |