CN204551694U - A kind of pre-buried type balcony floor drain - Google Patents

A kind of pre-buried type balcony floor drain Download PDF

Info

Publication number
CN204551694U
CN204551694U CN201420607692.1U CN201420607692U CN204551694U CN 204551694 U CN204551694 U CN 204551694U CN 201420607692 U CN201420607692 U CN 201420607692U CN 204551694 U CN204551694 U CN 204551694U
Authority
CN
China
Prior art keywords
outer tube
balcony
floor drain
floor
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420607692.1U
Other languages
Chinese (zh)
Inventor
陆文革
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN GLTC SAME-FLOOR DRAIN TECHNOLOGY Co.,Ltd.
Original Assignee
陆文革
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 陆文革 filed Critical 陆文革
Priority to CN201420607692.1U priority Critical patent/CN204551694U/en
Application granted granted Critical
Publication of CN204551694U publication Critical patent/CN204551694U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sink And Installation For Waste Water (AREA)
  • Building Environments (AREA)

Abstract

The utility model discloses a kind of pre-buried type balcony floor drain, comprise outer tube, base, outer tube be contained on base, pipe in liftable is set in described outer tube.During cast floorslab concrete, pre-buried outer tube is arranged on balcony floor relevant position, outer tube and floor link together, once-cast.Outer tube and cement floor compact siro spinning technology, seamless, during blank room, in lifting, pipe need not cover, and balcony ponding is discharged by outer tube; During finishing, in liftable, pipe is installed within the outer tube, can according to the position of pipe in the thickness free adjustment of balcony finishing material, and this floor drain both can be used for the balcony draining in blank room, also can be directly used in renovated house balcony draining.Saving of labor, save time, it is convenient to install, and saves decoration cost.Because floor drain outer tube and balcony floorslab concrete are poured into a mould simultaneously, good airproof performance, uses for a long time, can not produce and leak.

Description

A kind of pre-buried type balcony floor drain
Technical field:
The utility model relates to building field, specifically refers to a kind of floor pre-buried type balcony floor drain.
Background technology:
At present, in building a building, the installation of balcony floor drain normally first reserves a hole when balcony floor fluid concrete at balcony corresponding site, is blocked by reserved hole when waiting balcony floor drain to install through secondary installing soffit formwork cast pea gravel concreten again.The mode of this installation balcony floor drain has following defect: leave gap between floor drain and reserving hole, and because concrete is not once-cast, second pouring is difficult to the sealing of reserved hole; Though or can temporarily seal, the time has been grown, and expands with heat and contract with cold and causes the concrete cracking of floor prepared hole second pouring, causes water on floor toward seepage downstairs.Next is the balcony draining after the balcony floor drain of conventional mounting can not solve the draining of blank room balcony and finishing simultaneously.During new house finishing balcony, concrete leveling is filled out, tile fixing in ground, can raise, the balcony floor drain originally installed must be abolished and install new floor drain again.Time-consuming, take a lot of work, increase decoration cost.
Utility model content:
The technical problem that the utility model mainly solves is to provide a kind of floor pre-buried type balcony liftable floor drain, solves Railway Project below: 1, the floor floor seepage water problem that needs second pouring concrete to produce because of reserving hole.2, solving the house balcony drainage problem after blank room and finishing by being arranged on pipe in the liftable in pre-buried type balcony floor drain simultaneously, saving of labor, to save time, to save decoration cost.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is: this pre-buried type balcony floor drain, comprises outer tube, base, outer tube be contained on base, arrange pipe in liftable in described outer tube.
The outer Side wall of described outer tube is provided with many muscle ribs.
Due to this floor pre-buried type balcony floor drain, pipe in liftable is set in described outer tube.During cast floorslab concrete, pre-buried outer tube is arranged on balcony floor relevant position, outer tube and floor link together, once-cast.Outer tube and cement floor compact siro spinning technology, seamless, during blank room, in lifting, pipe need not cover, and balcony ponding is discharged by outer tube; During finishing, in liftable, pipe is installed within the outer tube, can according to the position of pipe in the thickness free adjustment of balcony finishing material, and this floor drain both can be used for the balcony draining in blank room, also can be directly used in renovated house balcony draining.Saving of labor, save time, it is convenient to install, and saves decoration cost.Because floor drain outer tube and balcony floorslab concrete are poured into a mould simultaneously, good airproof performance, uses for a long time, can not produce and leak.
The outer Side wall of outer tube is provided with many muscle ribs, after once-cast, strengthens floor drain and concrete floor bonding strength and sealing performance.
Accompanying drawing illustrates:
Fig. 1 is pipe, outer pipe-jointing structure schematic diagram in the lifting of pre-buried type balcony floor drain
Fig. 2 is pipe, outer tube isolating construction schematic diagram in the lifting of pre-buried type balcony floor drain
Detailed description of the invention:
With reference to figure 1, Fig. 2, this pre-buried type balcony floor drain, comprises outer tube 1, base 6, and outer tube 1 is contained on base 6, arranges pipe 3 in liftable in described outer tube 1.
The outer Side wall of described outer tube 1 is provided with many muscle ribs 5, after outer tube 1 and balcony concrete are poured into a mould simultaneously, strengthens outer tube 1 and cement floor bonding strength and sealing performance.
During cast floorslab concrete, floor drain base 6 is followed closely in balcony floor relevant position, disposal pouring, floor drain outer tube 1 and concrete floor compact siro spinning technology, during blank room, in lifting, pipe 3 need not cover, the grid cover of pipe 3 upper cover plate 4 in lifting can be taken off to cover avoids large article to fall down plugging on outer tube 1, and balcony ponding is discharged by outer tube 1; During finishing, in lifting, pipe 3 is contained in outer tube 1, joint portion 2 keeps suitable length, can seal by gluing, outer tube 1 lower end is connected with trap, can according to the position of pipe 3 in the thickness free adjustment of balcony finishing material, and the height of outer tube 1 is h, the height adding pipe 3 in lifting is H, can increase adjustable range H-h.

Claims (2)

1. a pre-buried type balcony floor drain, comprises outer tube, base, outer tube is contained on base, it is characterized in that: arrange pipe in liftable in described outer tube.
2. pre-buried type balcony floor drain as claimed in claim 1, is characterized in that: described outer tube lateral wall is provided with many muscle ribs.
CN201420607692.1U 2014-10-21 2014-10-21 A kind of pre-buried type balcony floor drain Active CN204551694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420607692.1U CN204551694U (en) 2014-10-21 2014-10-21 A kind of pre-buried type balcony floor drain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420607692.1U CN204551694U (en) 2014-10-21 2014-10-21 A kind of pre-buried type balcony floor drain

Publications (1)

Publication Number Publication Date
CN204551694U true CN204551694U (en) 2015-08-12

Family

ID=53826825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420607692.1U Active CN204551694U (en) 2014-10-21 2014-10-21 A kind of pre-buried type balcony floor drain

Country Status (1)

Country Link
CN (1) CN204551694U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106801465A (en) * 2017-03-24 2017-06-06 重庆尚业科技有限公司 Anti-pollution anti-water leakage embedded floor drain adapter sleeve method and device and floor drain apparatus
CN107421599A (en) * 2017-08-15 2017-12-01 上海外经集团控股有限公司 Anti- recharge groundwater level monitoring device and operating method
CN109610618A (en) * 2018-12-17 2019-04-12 泰州永兴合金材料科技有限公司 A kind of high-strength nickel evanohm pre-buried structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106801465A (en) * 2017-03-24 2017-06-06 重庆尚业科技有限公司 Anti-pollution anti-water leakage embedded floor drain adapter sleeve method and device and floor drain apparatus
CN107421599A (en) * 2017-08-15 2017-12-01 上海外经集团控股有限公司 Anti- recharge groundwater level monitoring device and operating method
CN107421599B (en) * 2017-08-15 2020-06-02 上海外经集团控股有限公司 Anti-recharge underground water level monitoring device and operation method
CN109610618A (en) * 2018-12-17 2019-04-12 泰州永兴合金材料科技有限公司 A kind of high-strength nickel evanohm pre-buried structure
CN109610618B (en) * 2018-12-17 2021-03-02 泰州永兴合金材料科技有限公司 High strength nichrome embedded structure

Similar Documents

Publication Publication Date Title
CN106013471B (en) A kind of construction method of expansion joint antiseep
CN104947921A (en) Flue structure and mounting construction method thereof
CN204551694U (en) A kind of pre-buried type balcony floor drain
CN207194619U (en) A kind of assembled regeneration concrete enclosure wall
CN103410318B (en) Washroom pipe well water-leakage construction method
CN202227694U (en) Embedded sleeve for concrete pouring construction of bathroom floor
CN207499451U (en) Outer wall of basement single-face support mold apparatus
CN207268009U (en) A kind of underground pipe gallery drainage system based on existing blowdown canal
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN210712963U (en) Drainage structure of basement bottom plate post-cast strip
CN208717952U (en) A kind of reserved passage construction device of basement post-pouring zone
CN103835421B (en) Leakage-proof floor and anti-seepage construction method
CN102900144A (en) Undermining floor drain automatic drainage structure capable of preventing leakage of toilet
CN104455757A (en) Downcomer assembly and installation method thereof
CN211775777U (en) A waterproof embedded structure for exhaust passage
CN109797988A (en) A kind of co-layer draining hard-cover precast block toilet of outer wall provided pipe line groove hole
CN109518769A (en) A kind of method and structure using PVC waterstop joint installation sewer pipe
CN202882098U (en) In-pit floor drain automatic drainage structure capable of preventing toilet from leaking
CN204531409U (en) A kind of floor pre-buried type soil stack connector
CN204059555U (en) Building finishing tap
CN207685959U (en) A kind of floor when construction for Super High intercepts water drainage arrangement
CN104060677B (en) A kind of skyscraper has construction method and the composite floor drain used of floor drain between boiled water room
CN112628477A (en) Drain pipe pre-embedding device with stretching and water drainage preventing functions and installation method
CN2814074Y (en) Device for sealing up pipe in the wall
CN206943599U (en) Floor drainage pipeline service sleeve

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Lu Wenge

Document name: Notification to Pay the Fees

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200402

Address after: 410000 Hunan Changsha City, Changsha City, Tianxin District, Furong South Road, No. 249 set up in Hibiscus industry service 4 608 room

Patentee after: HUNAN GLTC SAME-FLOOR DRAIN TECHNOLOGY Co.,Ltd.

Address before: 410000, Hunan province Changsha Yuhua District new West Road City Express Road 15 floor, Hunan provincial high level Drainage Technology Co., Ltd.

Patentee before: Lu Wenge