CN207659982U - A kind of roofing tower crane based process structure - Google Patents

A kind of roofing tower crane based process structure Download PDF

Info

Publication number
CN207659982U
CN207659982U CN201721784215.2U CN201721784215U CN207659982U CN 207659982 U CN207659982 U CN 207659982U CN 201721784215 U CN201721784215 U CN 201721784215U CN 207659982 U CN207659982 U CN 207659982U
Authority
CN
China
Prior art keywords
steel
linking beam
oeuveres
bors
bed course
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721784215.2U
Other languages
Chinese (zh)
Inventor
方新
龙进辉
陈文曲
陈伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Pangyuan Engineering Machinery Co ltd
Original Assignee
Guangdong Pangyuan Engineering Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Pangyuan Engineering Machinery Co ltd filed Critical Guangdong Pangyuan Engineering Machinery Co ltd
Priority to CN201721784215.2U priority Critical patent/CN207659982U/en
Application granted granted Critical
Publication of CN207659982U publication Critical patent/CN207659982U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of roofing tower crane based process structures, including switch rack, the switch rack includes the first I-steel Two bors d's oeuveres and the second I-steel Two bors d's oeuveres, be provided with linking beam A, linking beam B, linking beam C and linking beam D on the outside of switch rack, linking beam A, linking beam B, linking beam C and linking beam D two side ends be both provided with embedded part.The embedded part of this roofing tower crane based process structure can be taken does the connection type of anchor ear carrying out drilling after completion structure, convenient for selecting best positioning as far as possible according to the lift heavy performance and roofing form of roofing tower crane, embedded part can select pre-buried direction and trend according to the flexible form of live structural beams, so that structural stability is high, it is easy to demolition;Overall structure stability is high, easy to demolition, high financial profit.

Description

A kind of roofing tower crane based process structure
Technical field
The utility model is related to construction equipment technical field, specially a kind of roofing tower crane based process structure.
Background technology
With the fast development of national economy, more and more skyscrapers are rised sheer from level ground, and the quantity of high-rise building is such as Growth as spring bamboo after rain, the tower crane that external hanging type is climbed within are also more with more frequent;Under this background, using outer to climb in removing The roofing tower crane for hanging tower crane is also more and more, the height above sea level in view of roofing tower crane installation and the lift heavy performance of itself Influence, roofing tower crane is often all bigger to the counter-force of structure, is exactly the stress in these roofing tower cranes according to Normal practice The intermediary that directly welding stirrup is transmitted as stress at supporting leg is passed directly to power in building structure;Because roofing tower crane is special Property, all it is often that consideration is mounted on frame structure beam and because the size for the basic bottom girder that roofing tower crane itself configures is solid Fixed, the span etc. of structural beams is also substantially stationary, so just produces several contradictions:First, when roofing tower crane positions It is possible that it is just to be pressed in structural beams to need to add interim girder steel to have individual supporting legs not;Second is that a supporting leg is to structure One joints, it is easy to appear problems so as to cause the measures such as a series of reinforcing are generated for the local pressure of structure;To subtract The various unnecessary troubles that few forced belt to structure comes, therefore need a kind of roofing tower crane based process structure.
Utility model content
The purpose of this utility model is to provide a kind of roofing tower crane based process structures, have structural stability height, just It is torn open in peace, the advantages of high financial profit, the joints for solving building structure in the prior art are insufficient, and peace tears inconvenient ask open Topic.
To achieve the above object, the utility model provides the following technical solutions:A kind of roofing tower crane based process structure, packet Switch rack is included, the switch rack includes the first I-steel Two bors d's oeuveres and the second I-steel Two bors d's oeuveres, the first I-steel Two bors d's oeuveres and the second work Word steel Two bors d's oeuveres is provided with first leg pad by being in crosswise splicing and fixing by welding on the first I-steel Two bors d's oeuveres Symmetrically fixation is connected to the two of the first I-steel Two bors d's oeuveres for plate and the second support leg liner plate, first leg backing plate and the second support leg liner plate Side is provided with third support leg liner plate and the 4th support leg liner plate, third support leg liner plate and the 4th leg pads on the second I-steel Two bors d's oeuveres Plate symmetrically fixes the both sides for being connected to the second I-steel Two bors d's oeuveres;It is provided with linking beam A on the outside of the switch rack, linking beam B, connects It fixes and welds with the left-hand end of the first I-steel Two bors d's oeuveres on the downside of the middle-end of binder C and linking beam D, linking beam A, in linking beam B It fixes and welds with the right-hand end of the first I-steel Two bors d's oeuveres on the downside of end, on the downside of the middle-end of a linking beam C and left side for the second I-steel Two bors d's oeuveres Welding is fixed in side, and the middle-end downside of linking beam D and the right-hand end of the second I-steel Two bors d's oeuveres are fixed and welded;The linking beam A, connect The two side ends of binder B, linking beam C and linking beam D are both provided with embedded part, and embedded part includes pre-embedded steel slab, bed course channel steel, bed course steel plate And screw rod, the quantity of bed course channel steel and bed course steel plate is two, is offered on pre-embedded steel slab, bed course channel steel and bed course steel plate logical Hole, the quantity of through-hole is four on pre-embedded steel slab, and four through-holes are symmetrically opened in four side corner of pre-embedded steel slab, on bed course channel steel The quantity of through-hole is two, and two through-holes are symmetrically opened in the center of bed course channel steel;The quantity of through-hole is two on bed course steel plate, Two through-holes are symmetrically opened in the center of bed course steel plate;The quantity of the screw rod is four, and four screw rods sequentially pass through pre-buried steel Plate, bed course channel steel and bed course steel plate are simultaneously fixed by nut.
Preferably, the first leg backing plate, the second support leg liner plate and the first I-steel Two bors d's oeuveres and third leg pads It is installed with triangle gusset on the downside of the connecting pin of plate, the 4th support leg liner plate and the second I-steel Two bors d's oeuveres.
Preferably, the linking beam A, linking beam B, linking beam C and linking beam D are all made of the form of anchor ear and embedded part is fixed Connection.
Compared with prior art, the beneficial effects of the utility model are as follows:
This roofing tower crane based process structure passes through in switch rack and linking beam A, linking beam B, linking beam C and linking beam D The corresponding position of reselection carries out holes drilled through to pre-embedded steel slab, bed course channel steel and bed course steel plate after connection, makes embedded part and linking beam A, linking beam B, linking beam C are connected with linking beam D by the way of anchor ear, this form greatly reduce structure individual node by Power, improves stability, and embedded part can be taken after completion structure in the connection type for carrying out drilling and doing anchor ear, avoid significantly Peace is caused to tear open and can not carry out because roofing ground form is not accordant to the old routine, facilitating outside tower crane can be narrow in roofing surface layer Select best positioning, embedded part that can be tied according to scene as far as possible according to the lift heavy performance of roofing tower crane and roofing form in small space The flexible form of structure beam selects pre-buried direction and trend, is detached from traditional roof tower crane stress supporting leg and is pressed in the limitation in structural beams, Avoid a large amount of cumbersome reinforcement measures, high financial profit;The mounting means of embedded part is selected by the lift heavy performance of tower crane so that The form of roofing tower crane based process structure is convenient for being adjusted adjustment according to service condition;Overall structure stability is high, is convenient for Peace is torn open, high financial profit.
Description of the drawings
Fig. 1 is the heavily loaded tower crane based process structure top view of the utility model;
Fig. 2 is the heavily loaded tower crane based process structural side view of the utility model;
Fig. 3 is the embedded part scheme of installation of the utility model;
Fig. 4 is the pre-embedded steel slab, bed course channel steel and bed course steel plate vertical view of the utility model;
Fig. 5 is that the first leg backing plate of the utility model connect vertical view with the first I-steel Two bors d's oeuveres;
Fig. 6 is that the first leg backing plate of the utility model connect side view with the first I-steel Two bors d's oeuveres;
Fig. 7 is the underloading tower crane based process structure top view of the utility model;
Fig. 8 is the underloading tower crane based process structural side view of the utility model.
In figure:1 switch rack, 2 first I-steel Two bors d's oeuveres, 3 second I-steel Two bors d's oeuveres, 4 first leg backing plates, 5 second supporting legs Backing plate, 6 third support leg liner plates, 7 the 4th support leg liner plates, 8 linking beam A, 9 linking beam B, 10 linking beam C, 11 linking beam D, 12 are buried Part, 121 pre-embedded steel slabs, 122 bed course channel steels, 123 bed course steel plates, 124 screw rods, 13 through-holes, 14 triangle gussets.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
Embodiment one:
- 6 are please referred to Fig.1, a kind of roofing tower crane based process structure, including switch rack 1, switch rack 1 include the first I-shaped Steel Two bors d's oeuveres 2 and the second I-steel Two bors d's oeuveres 3, the first I-steel Two bors d's oeuveres 2 and the second I-steel Two bors d's oeuveres 3 are by being in that crosswise splices and leads to The mode for crossing welding is fixed, and first leg backing plate 4 and the second support leg liner plate 5, first leg are provided on the first I-steel Two bors d's oeuveres 2 Backing plate 4 and the second support leg liner plate 5 symmetrically fix the both sides for being connected to the first I-steel Two bors d's oeuveres 2, are arranged on the second I-steel Two bors d's oeuveres 3 There are third support leg liner plate 6 and the 4th support leg liner plate 7, symmetrically fixation is connected to second for third support leg liner plate 6 and the 4th support leg liner plate 7 The both sides of I-steel Two bors d's oeuveres 3, first leg backing plate 4 and the second support leg liner plate 5 and the first I-steel Two bors d's oeuveres 2 and third leg pads It is installed with triangle gusset 14 on the downside of plate 6 and the connecting pin of the 4th support leg liner plate 7 and the second I-steel Two bors d's oeuveres 3;Switch rack 1 Outside be provided with linking beam A8, linking beam B9, linking beam C10 and linking beam D11, on the downside of the middle-end of linking beam A8 with the first work The left-hand end of word steel Two bors d's oeuveres 2 fixes welding, and the middle-end downside of linking beam B9 and the right-hand end of the first I-steel Two bors d's oeuveres 2 are fixed and welded Connect, fix and weld with the left-hand end of the second I-steel Two bors d's oeuveres 3 on the downside of the middle-end of linking beam C10, on the downside of the middle-end of linking beam D11 with The right-hand end of second I-steel Two bors d's oeuveres 3 fixes welding;The both sides of linking beam A8, linking beam B9, linking beam C10 and linking beam D11 End is both provided with embedded part 12, and linking beam A8, linking beam B9, linking beam C10 and linking beam D11 are all made of the form and embedded part of anchor ear 12 are fixedly connected, and embedded part 12 includes pre-embedded steel slab 121, bed course channel steel 122, bed course steel plate 123 and screw rod 124, bed course channel steel 122 Quantity with bed course steel plate 123 is two, and through-hole is offered on pre-embedded steel slab 121, bed course channel steel 122 and bed course steel plate 123 13, the quantity of through-hole 13 is four on pre-embedded steel slab 121, and four through-holes 13 are symmetrically opened in 121 4 side corner of pre-embedded steel slab, The quantity of through-hole 13 is two on bed course channel steel 122, and two through-holes 13 are symmetrically opened in the center of bed course channel steel 122;Bed course steel The quantity of through-hole 13 is two on plate 123, and two through-holes 13 are symmetrically opened in the center of bed course steel plate 123;The quantity of screw rod 124 It it is four, four screw rods 124 sequentially pass through pre-embedded steel slab 121, bed course channel steel 122 and bed course steel plate 123 and fixed by nut; First I-steel Two bors d's oeuveres 2 and the second I-steel Two bors d's oeuveres 3 are fixed weldering by the roofing tower crane based process structure first in assembling It connects, then first leg backing plate 4 and the second support leg liner plate 5 is fixedly mounted on the first I-steel Two bors d's oeuveres 2 again, by third supporting leg Backing plate 6 and the 4th support leg liner plate 7 are fixedly mounted on the second I-steel Two bors d's oeuveres 3, and first leg backing plate 4, the second support leg liner plate 5, Third support leg liner plate 6 and the 4th support leg liner plate 7 are further reinforced by triangle gusset 14;It linking beam A8 and will link again Beam C10 is fixedly welded on the two side ends of the first I-steel Two bors d's oeuveres 2, and linking beam B9 and linking beam D11 are fixedly welded on the second work Each embedded part 12 is fixedly mounted on by the two side ends of word steel Two bors d's oeuveres 3 by the form of anchor ear again after above structure, which is installed, to complete Linking beam A8, linking beam B9, linking beam C10 and the both sides linking beam D11 lower end, then first on the outside of structural beams on roofing before installing End floor drills, and the ornaments position of pre-embedded steel slab 121 is then selected according to bore position and floor upper end bumps situation, then It selects corresponding position to carry out holes drilled through 13 to pre-embedded steel slab 121, bed course channel steel 122 and bed course steel plate 123, screw rod 124 is passed through Pre-embedded steel slab 121, floor, bed course channel steel 122 and bed course steel plate 123 are worn, bed course channel steel 122 and bed course steel plate 123 pass through The lower end of screw on nut and floor connects, and pre-embedded steel slab 121 is fastenedly connected by the upper end of screw on nut and floor, you can The installation of roofing tower crane based process structure is completed, this form greatly reduces the stress of structure individual node, and embedded part 12 can It takes and does the connection type of anchor ear carrying out drilling after completion structure, largely avoided because roofing ground form is not met often It advises and peace is caused to tear open and can not carry out, after the based process of this form, facilitating outside tower crane can be in roofing surface layer Select best positioning, embedded part 12 can be according to existing as far as possible according to the lift heavy performance and roofing form of roofing tower crane in crawl space The flexible form of field structure beam selects pre-buried direction and trend, is detached from traditional roof tower crane stress supporting leg and is pressed in the office in structural beams Limit avoids a large amount of cumbersome reinforcement measures, high financial profit.
Embodiment two:
Fig. 7-8, a kind of roofing tower crane based process structure, including switch rack 1 are please referred to, switch rack 1 includes the first I-shaped Steel Two bors d's oeuveres 2 and the second I-steel Two bors d's oeuveres 3, the first I-steel Two bors d's oeuveres 2 and the second I-steel Two bors d's oeuveres 3 are by being in that crosswise splices and leads to The mode for crossing welding is fixed, and first leg backing plate 4 and the second support leg liner plate 5, first leg are provided on the first I-steel Two bors d's oeuveres 2 Backing plate 4 and the second support leg liner plate 5 symmetrically fix the both sides for being connected to the first I-steel Two bors d's oeuveres 2, are arranged on the second I-steel Two bors d's oeuveres 3 There are third support leg liner plate 6 and the 4th support leg liner plate 7, symmetrically fixation is connected to second for third support leg liner plate 6 and the 4th support leg liner plate 7 The both sides of I-steel Two bors d's oeuveres 3, first leg backing plate 4 and the second support leg liner plate 5 and the first I-steel Two bors d's oeuveres 2 and third leg pads It is installed with triangle gusset 14 on the downside of plate 6 and the connecting pin of the 4th support leg liner plate 7 and the second I-steel Two bors d's oeuveres 3;First work The two side ends of word steel Two bors d's oeuveres 2 and the two side ends of the second I-steel Two bors d's oeuveres 3 are both provided with embedded part 12, and each embedded part 12 passes through anchor ear Form be fixedly connected with the first I-steel Two bors d's oeuveres 2 or the second I-steel Two bors d's oeuveres 3;By directly in 2 He of the first I-steel Two bors d's oeuveres Embedded part 12 is installed in the side of second I-steel Two bors d's oeuveres 3, embedded part 12 according to the flexible form of live structural beams select pre-buried direction and Trend, takes and is being drilled again with the first I-steel Two bors d's oeuveres 2 or the second I-steel Two bors d's oeuveres 3 in a manner of anchor ear after completion structure Connection, easy to demolition, tower crane convenient for selecting best positioning as far as possible in roofing surface layer crawl space, the based process structure Linking beam A8, linking beam B9, linking beam C10 and linking beam D11 are eliminated, and reduces the quantity of embedded part 12, is suitable for lift heavy The lower tower crane of performance has the advantages that easy to demolition and is conveniently adjusted selection best orientation point.
In summary:This roofing tower crane based process structure by switch rack 1 and linking beam A8, linking beam B9, link The corresponding position of reselection is to pre-embedded steel slab 121, bed course channel steel 122 and bed course steel plate 123 after beam C10 is connected with linking beam D11 Holes drilled through 13 is carried out, embedded part 12 and linking beam A8, linking beam B9, linking beam C10 and linking beam D11 is made to connect by the way of anchor ear It connects, this form greatly reduces the stress of structure individual node, improves stability, and embedded part 12 can be taken after completion structure The connection type of anchor ear is done carrying out drilling, largely avoided because roofing ground form is not accordant to the old routine and leads to pacify that tear open can not It carries out, facilitating outside tower crane can be most according to the lift heavy performance of roofing tower crane and roofing form in roofing surface layer crawl space It may select best positioning, embedded part 12 that can select pre-buried direction and trend according to the flexible form of live structural beams, be detached from and pass System roofing tower crane stress supporting leg is pressed in the limitation in structural beams, avoids a large amount of cumbersome reinforcement measures, high financial profit;Pass through The mounting means of the lift heavy performance selection embedded part 12 of tower crane so that the form of roofing tower crane based process structure is convenient for according to using Situation is adjusted adjustment;Overall structure stability is high, easy to demolition, high financial profit.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (3)

1. a kind of roofing tower crane based process structure, including switch rack(1), it is characterised in that:The switch rack(1)Including first I-steel Two bors d's oeuveres(2)With the second I-steel Two bors d's oeuveres(3), the first I-steel Two bors d's oeuveres(2)With the second I-steel Two bors d's oeuveres(3)By being in ten Shape is spliced and is fixed by welding, the first I-steel Two bors d's oeuveres(2)On be provided with first leg backing plate(4)With second Leg backing plate(5), first leg backing plate(4)With the second support leg liner plate(5)Symmetrical fixation is connected to the first I-steel Two bors d's oeuveres(2)Two Side, the second I-steel Two bors d's oeuveres(3)On be provided with third support leg liner plate(6)With the 4th support leg liner plate(7), third support leg liner plate(6) With the 4th support leg liner plate(7)Symmetrical fixation is connected to the second I-steel Two bors d's oeuveres(3)Both sides;The switch rack(1)Outside set It is equipped with linking beam A(8), linking beam B(9), linking beam C(10)With linking beam D(11), linking beam A(8)Middle-end on the downside of with first I-steel Two bors d's oeuveres(2)Left-hand end fix welding, linking beam B(9)Middle-end on the downside of with the first I-steel Two bors d's oeuveres(2)Right-hand end Fixed welding, linking beam C(10)Middle-end on the downside of with the second I-steel Two bors d's oeuveres(3)Left-hand end fix welding, linking beam D(11) Middle-end on the downside of with the second I-steel Two bors d's oeuveres(3)Right-hand end fix welding;The linking beam A(8), linking beam B(9), link Beam C(10)With linking beam D(11)Two side ends be both provided with embedded part(12), embedded part(12)Including pre-embedded steel slab(121), bed course slot Steel(122), bed course steel plate(123)And screw rod(124), bed course channel steel(122)With bed course steel plate(123)Quantity be two, Pre-embedded steel slab(121), bed course channel steel(122)With bed course steel plate(123)On offer through-hole(13), pre-embedded steel slab(121)It is upper logical Hole(13)Quantity be four, four through-holes(13)Symmetrically it is opened in pre-embedded steel slab(121)Four side corners, bed course channel steel (122)Upper through-hole(13)Quantity be two, two through-holes(13)Symmetrically it is opened in bed course channel steel(122)Center;Bed course steel Plate(123)Upper through-hole(13)Quantity be two, two through-holes(13)Symmetrically it is opened in bed course steel plate(123)Center;It is described Screw rod(124)Quantity be four, four screw rods(124)Sequentially pass through pre-embedded steel slab(121), bed course channel steel(122)And bed course Steel plate(123)And it is fixed by nut.
2. a kind of roofing tower crane based process structure according to claim 1, it is characterised in that:The first leg backing plate (4), the second support leg liner plate(5)With the first I-steel Two bors d's oeuveres(2)And third support leg liner plate(6), the 4th support leg liner plate(7)With Second I-steel Two bors d's oeuveres(3)Connecting pin on the downside of be installed with triangle gusset(14).
3. a kind of roofing tower crane based process structure according to claim 1, it is characterised in that:The linking beam A(8)、 Linking beam B(9), linking beam C(10)With linking beam D(11)It is all made of the form and embedded part of anchor ear(12)It is fixedly connected.
CN201721784215.2U 2017-12-20 2017-12-20 A kind of roofing tower crane based process structure Active CN207659982U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721784215.2U CN207659982U (en) 2017-12-20 2017-12-20 A kind of roofing tower crane based process structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721784215.2U CN207659982U (en) 2017-12-20 2017-12-20 A kind of roofing tower crane based process structure

Publications (1)

Publication Number Publication Date
CN207659982U true CN207659982U (en) 2018-07-27

Family

ID=62941937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721784215.2U Active CN207659982U (en) 2017-12-20 2017-12-20 A kind of roofing tower crane based process structure

Country Status (1)

Country Link
CN (1) CN207659982U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700500A (en) * 2019-10-12 2020-01-17 中国十七冶集团有限公司 Roof crane steel structure foundation and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700500A (en) * 2019-10-12 2020-01-17 中国十七冶集团有限公司 Roof crane steel structure foundation and construction method thereof

Similar Documents

Publication Publication Date Title
CN107419824A (en) The full precast shear wall structural system of regenerative steel skeleton and construction method
CN103882801B (en) The section assembling formula highway and railway bi-purpose cable-stayed bridge girder public, railway deck width is inconsistent
CN206844314U (en) A kind of new prefabricated assembled bean column node
CN206769354U (en) A kind of steel structure hoisting platform
CN110965474A (en) Construction method of cable tower cross beam
CN105604183B (en) The construction method of node is welded after a kind of truss
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN109537929A (en) Demolishing columns bracing means and reinforcement means
CN115467421A (en) Hoisting construction method for complex large-span steel roof
CN207659982U (en) A kind of roofing tower crane based process structure
CN107724540A (en) Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates
CN109235280A (en) The operation platform and construction method of bridge coping
CN207597918U (en) A kind of damaged Concrete Filled Square Steel Tubular Frame mid-side node ruggedized construction
CN209194347U (en) The operation platform of bridge coping
CN210134326U (en) Steel wall box type steel anchor beam combined cable tower anchoring structure
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
CN111395548A (en) Reinforced steel column and ECC concrete combined joint and construction method thereof
CN216892017U (en) Tie beam integral casting template in template connecting piece and lower stand
CN205955008U (en) Basement roof arch without beam pile cap node that is all -trans
CN105088962B (en) A kind of integral hoisting method of Wavelike steel webplate part
CN208167780U (en) A kind of foundation bolt mounting device
CN209495852U (en) A kind of anti-buckling steel plate shear force wall slidably fixed device of cross-brace
CN205975958U (en) Notch cuttype bracket device
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 510000 Room 1130, 11th Floor, Traffic Building, 95 Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province

Patentee after: Guangdong Pang Yuan construction machinery and equipment Co., Ltd

Address before: 510635 Unit 212, Second Floor, Comprehensive Building of Science and Technology Innovation Base, No. 80 Lanyue Road, Science City, Tianhe District, Guangzhou City, Guangdong Province

Patentee before: Guangdong Pang Yuan construction machinery and equipment Co., Ltd

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: Room 109-12, Building 3, 43 Yingbin Avenue West, Huadu District, Guangzhou City, Guangdong 510000

Patentee after: Guangdong Pang Yuan construction machinery and equipment Co., Ltd

Address before: 510000 Room 1130, 11th Floor, Traffic Building, 95 Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province

Patentee before: Guangdong Pang Yuan construction machinery and equipment Co., Ltd

CP02 Change in the address of a patent holder