CN207597635U - One body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing - Google Patents

One body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing Download PDF

Info

Publication number
CN207597635U
CN207597635U CN201721641612.4U CN201721641612U CN207597635U CN 207597635 U CN207597635 U CN 207597635U CN 201721641612 U CN201721641612 U CN 201721641612U CN 207597635 U CN207597635 U CN 207597635U
Authority
CN
China
Prior art keywords
bearing
heat insulation
fast installation
composite board
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201721641612.4U
Other languages
Chinese (zh)
Inventor
张延年
樊旭峰
董天泽
刘金升
汪青杰
刘庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201721641612.4U priority Critical patent/CN207597635U/en
Application granted granted Critical
Publication of CN207597635U publication Critical patent/CN207597635U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/90Passive houses; Double facade technology

Landscapes

  • Building Environments (AREA)

Abstract

The utility model provides a kind of one body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing, including one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing, longitudinal girder (2), longitudinal roof girder (3), bolt (4), one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing, lateral bottom beam (6), lateral top beam (7), the wall of formation, the Fast Installation technical system construction is simple of beam are quick, integrated weight keeps the temperature, is decoration integrated, and stress performance is good, saves the duration, reduces cost;The overall coordination performance of wall is good, and energy-efficient performance is high, using entirety without heat bridge technology, can effectively cut off heat bridge, have good heat-insulating property;Significantly improve anti-seismic performance;Using dry construction, simplify construction technology, and connector quantity is greatly reduced, be obviously improved it and industrialize efficiency.Wallboard density is greatly reduced, reduces wall piece quantity, reduces connection, easy to process, transport and lifting.It connects process significantly to simplify, execute-in-place very simple is convenient, significantly shortens the construction period, reduces cost.

Description

One body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing
Technical field
The utility model is related to a kind of building energy conservation wall, the Fast Installation used more particularly to a kind of energy saving building is held The heat insulation decoration integrated composite plate L-shaped wall of weight.
Background technology
Assembly concrete building refers to pass through site-assembled side by main of the concrete prefabricated element of factorial praluction The concrete structure class building construction of formula design-build.The assembly method of component pours overlapping layer concrete, steel after generally having scene Sleeve grouting connection, welding, mechanical connection and reserving hole overlap joint can be used in pouring concrete connection etc. after muscle anchoring, bar connecting The ways such as connection.In the 1980s, in the prefabricated big plate house of China's prevalence, due to structural integrity is poor, leakage, The reasons such as cracks on floor slab, there are many influence structure safety and the hidden danger and defect of normal use, gradually by cast-in-place concrete knot Structure is replaced.But it with the application of current emerging prefabricated concrete structure, particularly introduces in recent years many external first Into technology, localized prefabricated concrete structure is built new technology and is just gradually formed.
With the quickening of China " building industrialization, housing industrialization " process and constantly subtracting for China's " demographic dividend " The trend of the waste appearance housing industry industrialization of few building trade recruitment is increasingly apparent.The application weight of prefabricated concrete structure Newly the new technology of residential housing prefabricated concrete structure, new model are continued to bring out out as current research hot spot all parts of the country. Precast reinforced concrete structure is one of important directions of China's building structure development, it is conducive to China's building industrialization Development, raising production efficiency is energy saving, develops Green environmental-protection building, and be conducive to improve and ensure construction engineering quality. Compared with cast-in-situ construction method, assembled reinforced concrete structure is conducive to green construction, because fabricated construction can more meet green construction Save land, be energy saving, section material, the requirements such as water-saving and environmental protection, the negative effect to environment is reduced, including reducing noise, preventing Airborne dust reduces environmental pollution, cleans transport, reduce place interference, save resources and the energy such as water, electricity, material, it then follows sustainable The principle of development.Moreover, fabricated construction can continuously complete multiple or whole processes of engineering in order, so as to reduce into The engineering machinery type and quantity of field eliminate resting the time for procedure connection, realize interchange operation, reduce construction personnel, So as to improve work efficiency, reduction supplies consumption, reduce environmental pollution, provide safeguard for green construction.In addition, fabricated construction compared with Building waste (account for about municipal refuse total amount 30% -40%) is reduced in big degree, such as steel scrap muscle, waste iron wire, useless bamboo wood material, is given up Abandon concrete etc..
Assembly concrete building can be divided into two major class of full assembling and part assembling according to assembling degree height.Full assembling Building is generally limited to low layer or the relatively low tier building of requirements for fortification against earthquake;Part assembling concrete construction main member is general It using prefabricated components, is at the scene connected by cast-in-place concrete, forms the building of cast in place and precast construction.
North America region mainly using America & Canada as main since prefabricated/prestressed concrete association (PCI) studies for a long period of time With promoting pre-cast building, the Specification of precast concrete also improves very much so its assembly concrete Application in Building is non- It is often universal.The pre-cast building of North America mainly includes building prefabrication exterior wall and the big series of structure prefabricated components two, and prefabricated components are total to It is that enlargement and prestressing force are combined and can optimize structural reinforcement and connecting structure with feature.Reduce making and installation workload, contracting The short Yi works duration fully demonstrates industrialization, standardization and Technical Economy feature.In 20th century, the pre-cast building of North America is main For the non-antidetonation fortified defence area of low layer.Due to the earthquake effect in California area, antidetonation and on the middle and senior level prefabricated is paid much attention in recent years The engineer application technical research of structure.PCI is published recently《Precast concrete Aseismic Design》One book, from theory and practice The Aseismic Design problem of pre-cast building is analyzed to angle system, the newest section for summarizing many precast construction Aseismic Designs is ground into Fruit, to precast construction design and engineer application is instructed to promote with very strong directive significance.
Europe is the cradle of pre-cast building, and the road of building industrialization has been begun to early in the 17th century.Second of the world is big After the war, due to human resources shortage, Europe further research and probe building industrialization pattern.Either economically developed north Europe, West Europe or Eastern Europe underdeveloped, always all in the design and construction side for actively carrying out prefabrication and assembly construction concrete construction Formula.The design and construction experience of many pre-cast buildings is had accumulated, form various special precast building systems and is standardized general Pre-manufactured product series, and a series of precast concrete engineering specifications and application manual have been worked out, to pushing precast concrete complete The application in the world plays the role of very important.
Japan and South Korea have used for reference American-European successful experience, on the basis of the standardized designs construction of pre-cast building is explored. With reference to oneself requirement.Breakthrough is achieved in terms of precast construction system globality antidetonation and shock design.With representative Property achievement the Tokyo Tower of two 58 floor for being Japan 2008 and being built up using prefabrication and assembly construction frame structure.It is meanwhile Japanese pre- Concrete construction System Design processed, making and the standard criterion of construction are also very perfect, and the prefabricated specification used at present has《It is prefabricated mixed Solidifying geotechnique's journey } (JASSl0) and《Concrete curtain wall) (JASSl4).
China from five sixties of 20th century begin one's study assembly concrete building design and construction technology, form one Serial assembly concrete building system, more typical building system have assembled single storey industry workshop building system, assembling Formula multistory frame building system, assembled large panel building system etc..To the application of assembly concrete building the 1980s Reach the period of full bloom, many places in the whole nation all form the integrated assembly concrete industry of design, making and construction and installation Change architectural mode assembly concretes building and two kinds of most important building bodies are become using the masonry building of prefabricated hollow floor System, application popularization rate is up to more than 70%.Due to the function and physical property of assembled architecture, there are many limitations and deficiency, China Assembly concrete architectural design and construction technology R & D Level do not catch up with also social demand and Building technology development variation, To mid-term the 1990s, assembly concrete building is gradually replaced by full cast-in-place concrete building system, at present except dress With formula single storey industry workshop building system using wide outer.The engineer application of other prefabrication systems is few.In advance The globality of earthquake-resistant structure processed and the specialized research of management in design and operation are inadequate, cause its Technical Economy poor.It is to cause The basic reason that precast construction stagnates for a long time.
At present, prefabricated concrete structure is wet construction, and complicated construction technique is of high cost, and due to wall density Greatly, therefore wallboard can not be prefabricated larger, otherwise can encounter series of problems in processing, transport and hoisting engineering, additionally, due to The presence of insulating layer sets inside holding, sandwich heat preservation or external thermal insulation, can significantly reduce the globality of wall piece, separately Outside, connection mode is more complicated, and execute-in-place encounters more difficulty, and increases the duration, and cost is obviously improved.
Utility model content
The purpose of this utility model is to provide a kind of one body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing, mainly The overall coordination performance of assembly concrete energy-saving wall is solved, energy-efficient performance is improved, using with higher-strength and cohesiveness The thermal insulation material of energy.Using dry construction, simplify construction technology, and connector quantity is greatly reduced, be obviously improved its industrialization Efficiency.Wallboard density is greatly reduced, reduces wall piece quantity, reduces connection, reduces in processing, transport and hoisting engineering due to wall Series of problems caused by plate weight is excessive.Process is connected by simplifying, execute-in-place difficulty is reduced, significantly shortens the construction period, is dropped Low cost.China's housing industrialization development process is pushed, reduces resource and energy consumption.
The utility model is realized using following technical scheme:
One body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing, including one bluk recombination of Fast Installation heat insulation decorative load-bearing Plate A plates (1), longitudinal girder (2), longitudinal roof girder (3), bolt (4), one body composite board B plates of Fast Installation heat insulation decorative load-bearing (5), lateral bottom beam (6), lateral top beam (7), up and down the two of the one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing End is connect by bolt (4) with longitudinal roof girder (3), longitudinal girder (2) respectively;The Fast Installation heat insulation decorative load-bearing is integrally multiple The upper and lower ends of plywood B plates (5) are connect by bolt (4) with lateral top beam (7), lateral bottom beam (6) respectively;The Fast Installation One end of one body composite board B plates (5) of heat insulation decorative load-bearing passes through bolt (4) and one body composite board of Fast Installation heat insulation decorative load-bearing One end connection of A plates (1), one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing and Fast Installation heat insulation decorative load-bearing one Body composite board A plates (1) connection is L-shaped;
In bottom, lateral bottom beam (6) and longitudinal girder (2) intersect vertically a bit, and the two connection is L-shaped;
One body composite board A plates of Fast Installation heat insulation decorative load-bearing are installed respectively in longitudinal girder (2) and lateral bottom beam (6) (1) and one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing, the two connection are L-shaped;
One body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing, Fast Installation load bearing heat preserving are filled using bolt (4) It adorns a body composite board B plates (5) to connect with longitudinal girder (2), lateral bottom beam (6) respectively, link position is protected for Fast Installation load-bearing Warm decorating integrative composite plate A plates (1), each installation of Fast Installation heat insulation decorative load-bearing one body composite board B plates (5) bottom are reserved Mouth (1-11), the vertical connection end plate (1-4) for each installing vertical light steel pipe (1-3) end in reserved opening (1-11) install 4 Root bolt (4), by one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing, one bluk recombination of Fast Installation heat insulation decorative load-bearing The vertical connection end plate (1-4) of plate B plates (5) connect with the flange plate of longitudinal girder (2), lateral bottom beam (6);
Using bolt (4) by one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing and the Fast Installation of wherein side One body composite board A plates (1) of heat insulation decorative load-bearing are longitudinally connected;Link position is one body composite board of Fast Installation heat insulation decorative load-bearing A plates (1) and each installation reserved opening (1-11) of the adjacent side of one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing, often 4 bolts (4) of installation in a installation reserved opening (1-11);By adjacent one body composite board A plates of Fast Installation heat insulation decorative load-bearing (1) and the horizontal connection end plate of light steel pipe (1-5) end of level of one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing (1-6) is connected;
One body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing and one body composite board B of Fast Installation heat insulation decorative load-bearing The end vertical connection of plate (5), link position are L-shaped node connection plate (1-12);Using bolt (4) by Fast Installation load-bearing Heat insulation decoration integrated composite plate A plates (1) connection;Connection mode is one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing The horizontal connection end plate (1-6) and one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing of horizontal light steel pipe (1-5) end L-shaped node connect L-shaped node connection plate (1-12) connection of light steel pipe (1-13) end;
One body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing, Fast Installation load bearing heat preserving are filled using bolt (4) It adorns a body composite board B plates (5) to connect with longitudinal roof girder (3), lateral top beam (7) respectively, link position is protected for Fast Installation load-bearing Warm decorating integrative composite plate A plates (1), each installation of Fast Installation heat insulation decorative load-bearing one body composite board B plates (5) bottom are reserved Mouth (1-11) each installs 4 bolts (4) of installation in reserved opening (1-11), by one bluk recombination of Fast Installation heat insulation decorative load-bearing Plate A plates (1), the vertical connection end plate (1-4) of one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing and longitudinal roof girder (3), the flange plate connection of lateral top beam (7).
Further, the one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing include Indoor decorative plate layer (1- 1), exterior decoration plate layer (1-2), vertical light steel pipe (1-3), vertically connection end plate (1-4), horizontal light steel pipe (1-5), it is horizontal even Meet end plate (1-6), bubble concrete layer (1-7), macroporous cellulose net (1-8), heat preservation tension member (1-9), adjustable screw hole (1- 10) and installation reserved opening (1-11), one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing are rectangular slab, and wherein side is Indoor decorative plate layer (1-1), opposite side are exterior decoration plate layer (1-2), indoors decorative plies (1-1) and exterior decoration plate layer The inside of (1-2) sets vertical and equally distributed enhancing tooth respectively;
Decorative plies (1-1) and exterior decoration plate layer (1-2) are intermediate indoors, set equally distributed vertical light steel pipe (1-3), the distance of vertical light steel pipe (1-3) to plate left and right ends are 2 to two/5ths points of vertical light steel pipe (1-3) spacing One of, vertical light steel pipe (1-3) elongated setting up and down, and internal filling high-strength concrete, strength of high strength concrete C40- C60;Be respectively vertical connection end plate (1-4) in vertical light steel pipe (1-3) upper and lower ends, vertically connect end plate (1-4) with it is vertical Light steel pipe (1-3) welding, it is rectangular slab vertically to connect end plate (1-4);
In the horizontal direction, set it is several be mutually parallel and equally distributed horizontal light steel pipe (1-5), horizontal light steel pipe (1- 5) it is horizontal light steel pipe (1-5) spacing 2/5ths to half, horizontal light steel pipe (1-5) to the distance of plate upper and lower ends It is identical with size with vertical light steel pipe (1-3) selection type, between vertical light steel pipe (1-3), level gently steel pipe (1-5) with Vertical light steel pipe (1-3) welding, light steel pipe (1-5) inner opposite end of level on the outside are welded with vertical light steel pipe (1-3), outside One end setting horizontal connection end plate (1-6), horizontal connection end plate (1-6) respectively extend to Fast Installation heat insulation decorative load-bearing one The left and right outer edge of composite plate;4 adjustable screw hole (1- are respectively opened up on the horizontal connection end plate (1-6) at wall both ends 10), adjustable screw hole (1-10) is strip hole, is rectangle among strip hole, and both ends are semicircle;Adjustable screw hole (1-10) point Not Wei Yu horizontal connection end plate (1-6) four angles, adjacent adjustable screw hole (1-10) is mutually vertical, and one of them can Mode screw hole (1-10) is directed toward the midpoint of another adjustable screw hole (1-10), and adjustable screw hole (1-10) is horizontal or vertical;When When the adjustable screw hole of one end same position (1-10) is horizontal, then the adjustable screw hole (1-10) of other end corresponding position vertically, when When the adjustable screw hole of one end same position (1-10) is vertical, then the adjustable screw hole (1-10) of other end corresponding position is horizontal;It is perpendicular It is and outdoor to the central plane where light steel pipe (1-3) and horizontal light steel pipe (1-5) and the distance of Indoor decorative plate layer (1-1) The 1/2 ~ 1 of the distance of decorative plies (1-2);
Vertical macroporous cellulose net is set respectively inside and outside vertical light steel pipe (1-3) and horizontal light steel pipe (1-5) (1-8);Macroporous cellulose net (1-8) extends to the outside of one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing up and down Edge;
Indoors between decorative plies (1-1), exterior decoration plate layer (1-2) respectively it is pre-buried heat preservation tension member (1-9), two The heat preservation tension member (1-9) of side is corresponded and is connected with each other, and heat preservation tension member (1-9) transverse and longitudinal is in a row;
Full bubble concrete layer (1-7) is poured between decorative plies (1-1), exterior decoration plate layer (1-2) indoors;
Vertical connection end plate (1-4) and horizontal connection end plate (1-6) and coupled vertical light steel pipe (1-3) and Installation reserved opening (1-11) is reserved in decorative plies (1-1) side indoors for the end of horizontal light steel pipe (1-5), installs reserved opening (1-11) is rectangle, vertically connects end plate (1-4) and horizontal connection end plate (1-6) and reveals in reserved installation reserved opening (1-11) Go out.
Further, the Indoor decorative plate layer (1-1) is preferentially using cement fibrolite plate, thickness 5-15mm;Quick It is straight to install the Indoor decorative plate layer (1-1) of the surface side of one body composite board A plates (1) of heat insulation decorative load-bearing, with indoor dress Equally distributed vertical rib is carried on the bubble concrete layer (1-7) of plaque layer (1-1) contact side.
Further, the exterior decoration plate layer (1-2) is using cement fibrolite plate, thickness 10-40mm;In Fast Installation The exterior decoration plate layer (1-2) of the surface side of one body composite board A plates (1) of heat insulation decorative load-bearing is straight or with uniform perpendicular Vertical compression trace contacts with exterior decoration plate layer (1-2) and equally distributed vertical rib is carried on the bubble concrete layer (1-7) of side.
Further, the thermal conductivity factor of the bubble concrete layer (1-7) is 0.06-0.08W/ (m.K), and dry volume is close It spends for 300-400kg/m3
Further, the macroporous cellulose net (1-8) be polypropylene fiber net, steel wire, wire netting or basalt fibre, Mesh diameter is 3-10mm.
Further, the heat preservation tension member (1-9) preferentially selects PVC tension members, glass fibre tension member, synthetic resin Tension member or basalt fibre tension member.
Further, the one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing include Indoor decorative plate layer (1- 1), exterior decoration plate layer (1-2), vertical light steel pipe (1-3), vertically connection end plate (1-4), horizontal light steel pipe (1-5), it is horizontal even Meet end plate (1-6), bubble concrete layer (1-7), macroporous cellulose net (1-8), heat preservation tension member (1-9), adjustable screw hole (1- 10), installation reserved opening (1-11), L-shaped node connection plate (1-12) connect light steel pipe (1-13) with L-shaped node;
The one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing be rectangular slab, Fast Installation heat insulation decorative load-bearing The side of one body composite board B plates (5) is Indoor decorative plate layer (1-1), and opposite side is exterior decoration plate layer (1-2);It fills indoors Full bubble concrete layer (1-7) is poured between plaque layer (1-1) and exterior decoration plate layer (1-2);Decorative plies (1-1) indoors The pre-buried heat preservation tension member (1-9) between exterior decoration plate layer (1-2);
In one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing and one bluk recombination of Fast Installation heat insulation decorative load-bearing One end of plate A plates (1) installation, horizontal light steel pipe (1-5) are truncated, the vertical light steel pipe (1-3) of welding in end, the vertical light steel Manage vertical light steel pipe (1- on (1-3) to the one body composite board A plates (1) of distance and Fast Installation heat insulation decorative load-bearing of wall end 3) distance to exterior decoration plate layer (1-2) surface is L;Horizontal light steel pipe (1-5) is far from Fast Installation heat insulation decorative load-bearing One end of one body composite board A plates (1) is connect with horizontal connection end plate (1-6);It is perpendicular in vertical light steel pipe (1-3) upper and lower ends To connection end plate (1-4), vertical macroporous cellulose net (1-8) is set respectively in the both sides of vertical light steel pipe (1-3);Vertical light The side of steel pipe (1-3) and one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing installation and with horizontal light steel pipe (1-5) Corresponding position, welding L-shaped node connect light steel pipe (1-13);L-shaped node connects light steel pipe (1-13) and the vertical light steel pipe (1-3) is vertically, and vertical with metope;And L-shaped node connection plate is welded in the end that light steel pipe (1-13) is connected in L-shaped node (1-12), opens up adjustable screw hole (1-10) on L-shaped node connection plate (1-12), and these adjustable screw holes (1-10) with Corresponding adjustable screw hole (1-10) is perpendicular on its one body composite board A plate (1) of Fast Installation heat insulation decorative load-bearing connected;It is perpendicular To connection end plate (1-4) and horizontal connection end plate (1-6) and coupled vertical light steel pipe (1-3) and horizontal light steel pipe Installation reserved opening (1-11) is reserved on decorative plies (1-1) and exterior decoration plate layer (1-2) indoors in the end of (1-5).
Compared with prior art, with having the beneficial effect that the advantages of the utility model:
The effect and advantage of the utility model are that the wall to be formed, the Fast Installation technical system construction is simple of beam are quick, collection Cheng Chong, heat preservation, decoration integrated, stress performance is good, saves the duration, reduces cost;The overall coordination performance of wall is good, energy saving Can be high, using entirety without heat bridge technology, heat bridge can be effectively cut off, there is good heat-insulating property;Significantly improve shock resistance Energy;Using dry construction, simplify construction technology, and connector quantity is greatly reduced, be obviously improved it and industrialize efficiency.Substantially drop Parapet plate density reduces wall piece quantity, reduces connection, easy to process, transport and lifting.It connects process significantly to simplify, scene behaviour It is convenient to make very simple, significantly shortens the construction period, reduces cost.China's housing industrialization development process is pushed, reduces resource and energy Source consumes.
Description of the drawings
Fig. 1 is one body composite board L-shaped wall schematic diagram of Fast Installation heat insulation decorative load-bearing.
Fig. 2 is elevational schematic view on the inside of one body composite board A plates of Fast Installation heat insulation decorative load-bearing.
Fig. 3 is one body composite board A plates indoor perspective diagram of Fast Installation heat insulation decorative load-bearing.
Fig. 4 is the A-A diagrammatic cross-sections of Fig. 2.
Fig. 5 is the side view perspective diagram of one body composite board A plates of Fast Installation heat insulation decorative load-bearing.
Fig. 6 is one body composite board B plate elevational schematic views of Fast Installation heat insulation decorative load-bearing.
Fig. 7 is one body composite board B plate facade perspective diagrams of Fast Installation heat insulation decorative load-bearing.
Fig. 8 is one body composite board B plate side view perspective diagrams of Fast Installation heat insulation decorative load-bearing.
In figure, 1 is one body composite board A plates of Fast Installation heat insulation decorative load-bearing;2 be longitudinal girder;3 be longitudinal roof girder;4 are Bolt;5 be one body composite board B plates of Fast Installation heat insulation decorative load-bearing;6 be lateral bottom beam;7 be lateral top beam;
1-1 is Indoor decorative plate layer;1-2 is exterior decoration plate layer;1-3 is vertical light steel pipe;1-4 is vertical connecting pin Plate;1-5 is horizontal light steel pipe;1-6 is horizontal connection end plate;1-7 is bubble concrete layer;1-8 is macroporous cellulose net;1-9 is Keep the temperature tension member;1-10 is adjustable screw hole;1-11 is installation reserved opening;1-12 is L-shaped node connection plate;1-13 is L-shaped Node connects light steel pipe.
Specific embodiment
In order to further illustrate the utility model, the utility model is retouched in detail with reference to the accompanying drawings and embodiments It states, but they cannot be interpreted as to the restriction to scope of protection of the utility model.
Embodiment
The utility model proposes one body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing as shown in Fig. 1 ~ Fig. 8.
As shown in Figure 1, one body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing, mainly by Fast Installation load bearing heat preserving Decorating integrative composite plate A plates 1, longitudinal girder 2, longitudinal roof girder 3, bolt 4, one body composite board B of Fast Installation heat insulation decorative load-bearing The compositions such as plate 5, lateral bottom beam 6, lateral top beam 7.
In bottom, lateral bottom beam 6 and longitudinal girder 2 intersect vertically a bit, and the two connection is L-shaped;
One body composite board A plates 1 of Fast Installation heat insulation decorative load-bearing and fast are installed respectively in longitudinal girder 2 and lateral bottom beam 6 Speed installation one body composite board B plates 5 of heat insulation decorative load-bearing, the two connection are L-shaped;
Using bolt 4 by one body composite board A plates 1 of Fast Installation heat insulation decorative load-bearing, Fast Installation heat insulation decorative load-bearing one Body composite board B plates 5 are connect respectively with longitudinal girder 2, lateral bottom beam 6, and link position is Fast Installation heat insulation decorative load-bearing one Composite plate A plates 1, each installation the reserved opening 1-11, Mei Gean of one body composite board B plates of Fast Installation heat insulation decorative load-bearing, 5 bottom The vertical connection end plate 1-4 for filling the vertical light steel pipe 1-3 ends in reserved opening 1-11 installs 4 bolts 4, by Fast Installation load-bearing Heat insulation decoration integrated composite plate A plates 1, one body composite board B plates 5 of Fast Installation heat insulation decorative load-bearing vertical connection end plate 1-4 with The flange plate connection of longitudinal girder 2, lateral bottom beam 6;
Using bolt 4 by one body composite board B plates 5 of Fast Installation heat insulation decorative load-bearing and the Fast Installation load-bearing of wherein side Heat insulation decoration integrated composite plate A plates 1 are connected thereto;Link position for one body composite board A plates 1 of Fast Installation heat insulation decorative load-bearing with Each installation reserved opening 1-11 of one body composite board B plates of Fast Installation heat insulation decorative load-bearing, 5 adjacent side, each installs reserved opening 4 bolts 4 of installation in 1-11;Adjacent one body composite board A plates 1 of Fast Installation heat insulation decorative load-bearing and Fast Installation load-bearing are protected The horizontal connection end plate 1-6 of the light steel pipe 1-5 ends of level of warm decorating integrative composite plate B plates 5 is connected;
One body composite board A plates 1 of Fast Installation heat insulation decorative load-bearing and one body composite board B plates of Fast Installation heat insulation decorative load-bearing 5 end vertical connection, link position are L-shaped node connection plate 1-12;Using bolt 4 by Fast Installation heat insulation decorative load-bearing One body composite board A plates 1 connect;Level light steel pipe 1- of the connection mode for one body composite board A plates 1 of Fast Installation heat insulation decorative load-bearing The horizontal connection end plate 1-6 of 5 ends connect light steel pipe with the L-shaped node of one body composite board B plates 5 of Fast Installation heat insulation decorative load-bearing The L-shaped node connection plate 1-12 connections of 1-13 ends;
Using bolt 4 by one body composite board A plates 1 of Fast Installation heat insulation decorative load-bearing, Fast Installation heat insulation decorative load-bearing one Body composite board B plates 5 are connect respectively with longitudinal roof girder 3, lateral top beam 7, and link position is Fast Installation heat insulation decorative load-bearing one Composite plate A plates 1, each installation the reserved opening 1-11, Mei Gean of one body composite board B plates of Fast Installation heat insulation decorative load-bearing, 5 bottom 4 bolts 4 of installation in reserved opening 1-11 are filled, by one body composite board A plates 1 of Fast Installation heat insulation decorative load-bearing, Fast Installation load-bearing The vertical connection end plate 1-4 of heat insulation decoration integrated composite plate B plates 5 is connect with the flange plate of longitudinal roof girder 3, lateral top beam 7.
As shown in Figure 2-5, one body composite board A plates 1 of Fast Installation heat insulation decorative load-bearing mainly by Indoor decorative plate layer 1-1, Exterior decoration plate layer 1-2, vertical light steel pipe 1-3, vertical connection end plate 1-4, horizontal light steel pipe 1-5, horizontal connection end plate 1-6, Bubble concrete layer 1-7, macroporous cellulose net 1-8, heat preservation tension member 1-9, adjustable screw hole 1-10 and installation reserved opening 1-11 etc. Composition, one body composite board A plates 1 of Fast Installation heat insulation decorative load-bearing are rectangular slab, and side is Indoor decorative plate layer 1-1 wherein, In opposite side be exterior decoration plate layer 1-2, Indoor decorative plate layer 1-1 and exterior decoration plate layer 1-2 is reinforcing fiber concrete Plate, indoors the inside of decorative plies 1-1 and exterior decoration plate layer 1-2 vertical and equally distributed enhancing tooth is set respectively;
Indoors among decorative plies 1-1 and exterior decoration plate layer 1-2, equally distributed vertical light steel pipe 1-3 is set, is erected It is vertical light steel pipe 1-3 spacing 2/5ths to half, vertical light steel to light steel pipe 1-3 to the distance of plate left and right ends The elongated settings of above and below pipe 1-3, and internal filling high-strength concrete, strength of high strength concrete C40-C60;In vertical light steel pipe 1- 3 upper and lower ends are respectively vertical connection end plate 1-4, and the vertical end plate 1-4 and vertical light steel pipe 1-3 that connects is welded, vertical connecting pin Plate 1-4 is rectangular slab;
In the horizontal direction, set it is several be mutually parallel and equally distributed horizontal light steel pipe 1-5, horizontal light steel pipe 1-5 is extremely The distance of plate upper and lower ends is horizontal light steel pipe 1-5 spacing 2/5ths to half, horizontal light steel pipe 1-5 with it is vertical light Steel pipe 1-3 selection types are identical with size, between vertical light steel pipe 1-3, horizontal light steel pipe 1-5 with vertical gently steel pipe 1-3 Welding, the light steel pipe 1-5 inner opposite ends of level on the outside are welded with vertical light steel pipe 1-3, lateral ends setting horizontal connection end Plate 1-6, horizontal connection end plate 1-6 respectively extend to the left and right outer edge of one body composite board of Fast Installation heat insulation decorative load-bearing;Wall 4 adjustable screw hole 1-10 are respectively opened up on the horizontal connection end plate 1-6 at body both ends, adjustable screw hole 1-10 is strip hole, It is rectangle among strip hole, both ends are semicircle;Adjustable screw hole 1-10 is located at four angles of horizontal connection end plate 1-6 respectively, Adjacent adjustable screw hole 1-10 is mutually vertical, and one of them adjustable screw hole 1-10 is directed toward another adjustable screw hole 1- 10 midpoint, adjustable screw hole 1-10 are horizontal or vertical;When the adjustable screw hole 1-10 levels of one end same position, then the other end The adjustable screw hole 1-10 of corresponding position is vertical, when same position adjustable screw hole 1-10 in one end is vertical, then the other end pair The adjustable screw hole 1-10 for answering position is horizontal;Central plane and indoor dress where vertical light steel pipe 1-3 and horizontal light steel pipe 1-5 The distance of plaque layer 1-1 is 1/2 ~ 1 with the distance of exterior decoration plate layer 1-2;
Vertical macroporous cellulose net 1-8 is set respectively inside and outside vertical light steel pipe 1-3 and horizontal light steel pipe 1-5; The mesh diameter of macroporous cellulose net 1-8 is 3-10mm, and macroporous cellulose net 1-8 extends to Fast Installation load bearing heat preserving dress up and down Adorn the outer edge of a body composite board;
Respectively pre-buried heat preservation tension member 1-9, the heat preservation of both sides are drawn by decorative plies 1-1, exterior decoration plate layer 1-2 indoors It ties part 1-9 to correspond and be connected with each other, the heat preservation equal transverse and longitudinals of tension member 1-9 are in a row;
Full bubble concrete layer 1-7 is poured between indoor decorative plies 1-1, exterior decoration plate layer 1-2;
Vertical connection end plate 1-4 and horizontal connection end plate 1-6 and coupled vertical light steel pipe 1-3 and level are light Decorative plies 1-1 reserves side installation reserved opening 1-11 indoors for the end of steel pipe 1-5, and installation reserved opening 1-11 is rectangle, is erected Expose in reserved installation reserved opening 1-11 to connection end plate 1-4 and horizontal connection end plate 1-6.
The Indoor decorative plate layer 1-1 is preferentially using cement fibrolite plate, thickness 5-15mm;In Fast Installation load bearing heat preserving The Indoor decorative plate layer 1-1 of the surface side of decorating integrative composite plate is straight, is being divided with bubble concrete layer 1-7 with uniform The vertical rib of cloth.
The exterior decoration plate layer 1-2 uses cement fibrolite plate, thickness 10-40mm;It is filled in Fast Installation load bearing heat preserving The exterior decoration plate layer 1-2 for adoring the surface side of a body composite board is straight or with uniform vertical impression, in foam coagulation Soil layer 1-7 sides carry equally distributed vertical rib.
The thermal conductivity factor of the bubble concrete layer 1-7 is 0.06-0.08W/ (m.K), and dry volume density is 300- 400kg/m3.The macroporous cellulose net 1-8 is polypropylene fiber net, steel wire, wire netting or basalt fibre, and mesh diameter is 3-10mm.The heat preservation tension member 1-9 preferentially selects PVC tension members, glass fibre tension member, synthetic resin tension member or the Black Warrior Rock fiber tension member.
As shown in figs 6-8, one body composite board B plates 5 of Fast Installation heat insulation decorative load-bearing and Fast Installation heat insulation decorative load-bearing The main distinction of one body composite board A plates 1 is:It is held in one body composite board B plates 5 of Fast Installation heat insulation decorative load-bearing with Fast Installation One end that the heat insulation decoration integrated composite plate A plates 1 of weight are installed, horizontal light steel pipe 1-5 are truncated, the vertical light steel pipe 1- of welding in end It is vertical light on 3, the vertical light steel pipe 1-3 to the one body composite board A plates 1 of distance and Fast Installation heat insulation decorative load-bearing of wall end The distance on steel pipe 1-3 to exterior decoration plate layer 1-2 surfaces is L;And protecting with Fast Installation load-bearing in the vertical light steel pipe 1-3 The side and position corresponding with horizontal gently steel pipe 1-5, welding L-shaped node that warm decorating integrative composite plate A plates 1 are installed connect light steel Pipe 1-13;L-shaped node connects light steel pipe 1-13 and the vertical light steel pipe 1-3 is vertical and vertical with metope;And connect in L-shaped node It connects and opens up adjustable screw hole on end welding the L-shaped node connection plate 1-12, L-shaped node connection plate 1-12 of light steel pipe 1-13 1-10, and pair on these adjustable screw hole 1-10 one body composite board A plates 1 of Fast Installation heat insulation decorative load-bearing connected to it The adjustable screw hole 1-10 answered is perpendicular.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, under the premise of the utility model principle is not departed from, several improvements and modifications can also be made, these improve and Retouching also should be regarded as the scope of protection of the utility model.

Claims (8)

1. one body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing, including one body composite board A of Fast Installation heat insulation decorative load-bearing Plate (1), longitudinal girder (2), longitudinal roof girder (3), bolt (4), one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing, horizontal stroke To bottom girder (6), lateral top beam (7), it is characterised in that:The one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing it is upper Lower both ends are connect by bolt (4) with longitudinal roof girder (3), longitudinal girder (2) respectively;The Fast Installation heat insulation decorative load-bearing one The upper and lower ends of body composite board B plates (5) are connect by bolt (4) with lateral top beam (7), lateral bottom beam (6) respectively;It is described quick The one end for installing one body composite board B plates (5) of heat insulation decorative load-bearing is integrally multiple by bolt (4) and Fast Installation heat insulation decorative load-bearing One end connection of plywood A plates (1), one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing and Fast Installation load bearing heat preserving dress It is L-shaped to adorn a body composite board A plates (1) connection;
In bottom, lateral bottom beam (6) and longitudinal girder (2) intersect vertically a bit, and the two connection is L-shaped;
Installed respectively in longitudinal girder (2) and lateral bottom beam (6) one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing and One body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing, the two connection are L-shaped;
Using bolt (4) by one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing, Fast Installation heat insulation decorative load-bearing one Body composite board B plates (5) are connect respectively with longitudinal girder (2), lateral bottom beam (6), and link position is filled for Fast Installation load bearing heat preserving Adorn a body composite board A plates (1), each of Fast Installation heat insulation decorative load-bearing one body composite board B plates (5) bottom installs reserved opening (1-11), the vertical connection end plate (1-4) for each installing vertical light steel pipe (1-3) end in reserved opening (1-11) install 4 Bolt (4), by one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing, one body composite board of Fast Installation heat insulation decorative load-bearing The vertical connection end plate (1-4) of B plates (5) connect with the flange plate of longitudinal girder (2), lateral bottom beam (6);
Using bolt (4) by one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing and the Fast Installation load-bearing of wherein side Heat insulation decoration integrated composite plate A plates (1) are longitudinally connected;Link position is one body composite board A plates of Fast Installation heat insulation decorative load-bearing (1) reserved opening (1-11) is installed with each of the adjacent side of one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing, each 4 bolts (4) of installation in reserved opening (1-11) are installed;By adjacent one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing With the horizontal connection end plate (1- of light steel pipe (1-5) end of level of one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing 6) it is connected;
One body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing and one body composite board B plates of Fast Installation heat insulation decorative load-bearing (5) end vertical connection, link position are L-shaped node connection plate (1-12);Fast Installation load-bearing is protected using bolt (4) Warm decorating integrative composite plate A plates (1) connection;Connection mode is the water of one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing Put down the horizontal connection end plate (1-6) of light steel pipe (1-5) end and the L of one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing Shape node connects L-shaped node connection plate (1-12) connection of light steel pipe (1-13) end;
Using bolt (4) by one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing, Fast Installation heat insulation decorative load-bearing one Body composite board B plates (5) are connect respectively with longitudinal roof girder (3), lateral top beam (7), and link position is filled for Fast Installation load bearing heat preserving Adorn a body composite board A plates (1), each of Fast Installation heat insulation decorative load-bearing one body composite board B plates (5) bottom installs reserved opening (1-11) each installs 4 bolts (4) of installation in reserved opening (1-11), by one body composite board A of Fast Installation heat insulation decorative load-bearing Vertical connection end plate (1-4) and longitudinal roof girder (3), the horizontal stroke of plate (1), one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing It is connected to the flange plate of top beam (7).
2. one body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing according to claim 1, it is characterised in that:It is described One body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing including Indoor decorative plate layer (1-1), exterior decoration plate layer (1-2), Vertical light steel pipe (1-3), vertically connection end plate (1-4), horizontal light steel pipe (1-5), horizontal connection end plate (1-6), foam coagulation Soil layer (1-7), macroporous cellulose net (1-8), heat preservation tension member (1-9), adjustable screw hole (1-10) and installation reserved opening (1-11), One body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing are rectangular slab, and side is Indoor decorative plate layer (1-1) wherein, Opposite side is exterior decoration plate layer (1-2), and the inside of decorative plies (1-1) and exterior decoration plate layer (1-2) is set respectively indoors Put vertical and equally distributed enhancing tooth;
Decorative plies (1-1) and exterior decoration plate layer (1-2) are intermediate indoors, set equally distributed vertical light steel pipe (1-3), The distance of vertical light steel pipe (1-3) to plate left and right ends is that vertically gently 2/5ths of steel pipe (1-3) spacing to half, erect To light steel pipe (1-3) elongated setting up and down, and high-strength concrete, strength of high strength concrete C40-C60 are filled in inside;Vertical Light steel pipe (1-3) upper and lower ends are respectively vertical connection end plate (1-4), vertically connect end plate (1-4) and vertical light steel pipe (1-3) Welding, it is rectangular slab vertically to connect end plate (1-4);
In the horizontal direction, set it is several be mutually parallel and equally distributed horizontal light steel pipe (1-5), horizontal light steel pipe (1-5) is extremely The distance of plate upper and lower ends is horizontal light steel pipe (1-5) spacing 2/5ths to half, horizontal light steel pipe (1-5) with it is perpendicular It is identical with size to light steel pipe (1-3) selection type, between vertical light steel pipe (1-3), horizontal light steel pipe (1-5) with vertically Light steel pipe (1-3) welding, light steel pipe (1-5) inner opposite end of level on the outside are welded with vertical light steel pipe (1-3), lateral ends Horizontal connection end plate (1-6) is set, and horizontal connection end plate (1-6) respectively extends to one bluk recombination of Fast Installation heat insulation decorative load-bearing The left and right outer edge of plate;4 adjustable screw holes (1-10) are respectively opened up on the horizontal connection end plate (1-6) at wall both ends, it can Mode screw hole (1-10) is strip hole, is rectangle among strip hole, and both ends are semicircle;Adjustable screw hole (1-10) is located at respectively Four angles of horizontal connection end plate (1-6), adjacent adjustable screw hole (1-10) is mutually vertical, and one of them adjustable spiral shell The midpoint of another adjustable screw hole (1-10) is directed toward in hole (1-10), and adjustable screw hole (1-10) is horizontal or vertical;When one end is same When one position adjustable screw hole (1-10) is horizontal, then the adjustable screw hole (1-10) of other end corresponding position vertically, when one end is same When one position adjustable screw hole (1-10) is vertical, then the adjustable screw hole (1-10) of other end corresponding position is horizontal;Vertical light steel Pipe (1-3) and the horizontal gently distance of the central plane where steel pipe (1-5) and Indoor decorative plate layer (1-1) are and exterior decoration plate The 1/2 ~ 1 of the distance of layer (1-2);
Vertical macroporous cellulose net (1- is set respectively inside and outside vertical light steel pipe (1-3) and horizontal light steel pipe (1-5) 8);Macroporous cellulose net (1-8) extends to the outer edge of one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing up and down;
It is respectively pre-buried between decorative plies (1-1), exterior decoration plate layer (1-2) indoors to keep the temperature tension member (1-9), both sides It keeps the temperature tension member (1-9) to correspond and be connected with each other, heat preservation tension member (1-9) transverse and longitudinal is in a row;
Full bubble concrete layer (1-7) is poured between decorative plies (1-1), exterior decoration plate layer (1-2) indoors;
Vertical connection end plate (1-4) and horizontal connection end plate (1-6) and coupled vertical light steel pipe (1-3) and level Installation reserved opening (1-11), installation reserved opening (1-11) are reserved in decorative plies (1-1) side indoors for the end of light steel pipe (1-5) For rectangle, vertically connect end plate (1-4) and horizontal connection end plate (1-6) and expose in reserved installation reserved opening (1-11).
3. one body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing according to claim 2, it is characterised in that:It is described Indoor decorative plate layer (1-1) is preferentially using cement fibrolite plate, thickness 5-15mm;It is integrally multiple in Fast Installation heat insulation decorative load-bearing The Indoor decorative plate layer (1-1) of the surface side of plywood A plates (1) is straight, and the bubble of side is contacted with Indoor decorative plate layer (1-1) Equally distributed vertical rib is carried on foam concrete layer (1-7).
4. one body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing according to claim 2, which is characterized in that described Exterior decoration plate layer (1-2) is using cement fibrolite plate, thickness 10-40mm;In one bluk recombination of Fast Installation heat insulation decorative load-bearing The exterior decoration plate layer (1-2) of the surface side of plate A plates (1) is straight or with uniform vertical impression, with exterior decoration plate The bubble concrete layer (1-7) of layer (1-2) contact side is with equally distributed vertical rib.
5. one body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing according to claim 2, it is characterised in that:It is described The thermal conductivity factor of bubble concrete layer (1-7) is 0.06-0.08W/ (m.K), and dry volume density is 300-400kg/m3
6. one body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing according to claim 2, it is characterised in that:It is described Macroporous cellulose net (1-8) be polypropylene fiber net, steel wire, wire netting or basalt fibre, mesh diameter 3-10mm.
7. one body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing according to claim 2, it is characterised in that:It is described Keeping the temperature tension member (1-9), preferentially selection PVC tension members, glass fibre tension member, synthetic resin tension member or basalt fibre are drawn Tie part.
8. one body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing according to claim 1, which is characterized in that described One body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing including Indoor decorative plate layer (1-1), exterior decoration plate layer (1-2), Vertical light steel pipe (1-3), vertically connection end plate (1-4), horizontal light steel pipe (1-5), horizontal connection end plate (1-6), foam coagulation Soil layer (1-7), macroporous cellulose net (1-8), heat preservation tension member (1-9), adjustable screw hole (1-10), installation reserved opening (1-11), L Shape node connection plate (1-12) connects light steel pipe (1-13) with L-shaped node;The Fast Installation heat insulation decorative load-bearing is integrally multiple Plywood B plates (5) are rectangular slab, and the side of one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing is Indoor decorative plate layer (1-1), opposite side are exterior decoration plate layer (1-2);It is poured between decorative plies (1-1) and exterior decoration plate layer (1-2) indoors Build full bubble concrete layer (1-7);Pre-buried heat preservation drawknot between decorative plies (1-1) and exterior decoration plate layer (1-2) indoors Part (1-9);
In one body composite board B plates (5) of Fast Installation heat insulation decorative load-bearing and one body composite board A plates of Fast Installation heat insulation decorative load-bearing (1) one end of installation, horizontal light steel pipe (1-5) are truncated, the vertical light steel pipe (1-3) of welding in end, the vertical light steel pipe (1- 3) to light steel pipe (1-3) vertical on one body composite board A plates (1) of the distance of wall end and Fast Installation heat insulation decorative load-bearing to room The distance on balustrade exterior panelling layer (1-2) surface is L;Horizontal light steel pipe (1-5) is integrally multiple far from Fast Installation heat insulation decorative load-bearing One end of plywood A plates (1) is connect with horizontal connection end plate (1-6);It is vertical connection in vertical light steel pipe (1-3) upper and lower ends End plate (1-4) sets vertical macroporous cellulose net (1-8) respectively in the both sides of vertical light steel pipe (1-3);In vertical light steel pipe (1-3) is with side that one body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing are installed and corresponding with horizontal light steel pipe (1-5) Position, welding L-shaped node connects light steel pipe (1-13);L-shaped node connects light steel pipe (1-13) and the vertical light steel pipe (1-3) Vertically, it is and vertical with metope;And the end welding L-shaped node connection plate (1-12) of light steel pipe (1-13) is connected in L-shaped node, Adjustable screw hole (1-10) is opened up on L-shaped node connection plate (1-12), and these adjustable screw holes (1-10) are connected thereto One body composite board A plates (1) of Fast Installation heat insulation decorative load-bearing on corresponding adjustable screw hole (1-10) it is perpendicular;Vertical connection End plate (1-4) and horizontal connection end plate (1-6) and coupled vertical light steel pipe (1-3) and horizontal light steel pipe (1-5) End reserve installation reserved opening (1-11) on decorative plies (1-1) and exterior decoration plate layer (1-2) indoors.
CN201721641612.4U 2017-11-30 2017-11-30 One body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing Withdrawn - After Issue CN207597635U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721641612.4U CN207597635U (en) 2017-11-30 2017-11-30 One body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721641612.4U CN207597635U (en) 2017-11-30 2017-11-30 One body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing

Publications (1)

Publication Number Publication Date
CN207597635U true CN207597635U (en) 2018-07-10

Family

ID=62761541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721641612.4U Withdrawn - After Issue CN207597635U (en) 2017-11-30 2017-11-30 One body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing

Country Status (1)

Country Link
CN (1) CN207597635U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761992A (en) * 2017-11-30 2018-03-06 沈阳建筑大学 The body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing one

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761992A (en) * 2017-11-30 2018-03-06 沈阳建筑大学 The body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing one

Similar Documents

Publication Publication Date Title
CN106121107B (en) Assemble type concrete slab and its plate dry type connection method
CN106320601B (en) Assembly concrete is whole without heat bridge board wall and its vertical connection method
CN107747378A (en) The body composite board processing method of Fast Installation heat insulation decorative load-bearing one
CN207597635U (en) One body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing
CN207892081U (en) One body composite board T shape walls of Fast Installation heat insulation decorative load-bearing
CN207597695U (en) One body composite board of Fast Installation heat insulation decorative load-bearing
CN206016048U (en) Assemble type concrete slab
CN207812740U (en) One body composite board linear type wall of Fast Installation heat insulation decorative load-bearing
CN106284681B (en) Assembly concrete is whole without heat bridge board wall and the connection method of running-on floor
CN206016002U (en) Assembly concrete beam
CN106638956A (en) Concrete wallboard and ribbed slab dry type connection node
CN107762055A (en) The body composite board of Fast Installation heat insulation decorative load-bearing one
CN208777440U (en) Dry construction bilayer core plate sleeper shear connector concrete panel
CN209369023U (en) The connecting node of dry construction bilayer core plate thermal insulation concrete wallboard and floor
CN206616695U (en) A kind of concrete panel and girt strip floor dry type connecting node
CN206408743U (en) A kind of assembly concrete node
CN106284739B (en) Assembly concrete is whole without heat bridge gusset
CN106223532B (en) Assembly concrete is whole without heat bridge wallboard
CN108678259A (en) Dry construction bilayer core plate thermal insulation concrete roof boarding
CN108678152A (en) The connecting node of dry construction bilayer core plate thermal insulation concrete wallboard and floor
CN109296074A (en) A kind of assembly concrete column beam connecting node
CN108678151A (en) The connecting node of dry construction bilayer core plate thermal insulation concrete roof boarding and indoor wall
CN208578229U (en) Dry construction bilayer core plate thermal insulation concrete roof boarding
CN107747365A (en) The body composite board T-shaped wall of Fast Installation heat insulation decorative load-bearing one
CN108678149A (en) The wallboard wall connecting node of dry construction bilayer core plate thermal insulation concrete wallboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20180710

Effective date of abandoning: 20181206

AV01 Patent right actively abandoned