CN207553321U - Prefabricated panel connection structure and building construction - Google Patents

Prefabricated panel connection structure and building construction Download PDF

Info

Publication number
CN207553321U
CN207553321U CN201721416708.0U CN201721416708U CN207553321U CN 207553321 U CN207553321 U CN 207553321U CN 201721416708 U CN201721416708 U CN 201721416708U CN 207553321 U CN207553321 U CN 207553321U
Authority
CN
China
Prior art keywords
prefabricated
prefabricated panel
sleeper
connection structure
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721416708.0U
Other languages
Chinese (zh)
Inventor
李青山
马云飞
杨逸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sany Construction Technology Co Ltd
Original Assignee
Sany Construction Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sany Construction Industry Co Ltd filed Critical Sany Construction Industry Co Ltd
Priority to CN201721416708.0U priority Critical patent/CN207553321U/en
Application granted granted Critical
Publication of CN207553321U publication Critical patent/CN207553321U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of prefabricated panel connection structure and building constructions, are related to prefabricated panel technical field.Prefabricated panel connection structure described in the utility model, including:Prefabricated panel is reserved with bolt hole and installation hand hole on the prefabricated panel;When prefabricated panel is installed, bolt is inserted into bolt hole, and pass through installation hand hole fastening bolt, to realize the connection of two panels prefabricated panel.The utility model can solve wet method connection of the prior art and be commonly installed the technical issues of process is more complicated, installation effectiveness is relatively low.

Description

Prefabricated panel connection structure and building construction
Technical field
The utility model is related to prefabricated panel technical field, more particularly to a kind of prefabricated panel connection structure and house are built It builds.
Background technology
At present, Building Trade in China is just occurring from extensive style to intensive major transformation, and country and local government are successive Promulgate relevant policy document, and organizes expert has worked out the specification and atlas of assembled architecture.But assembled architecture is not yet Situ wet operation is completely free of, the advantage that assembled architecture speed of application is fast, easy for assembly does not show completely, therefore wall is done Method type of attachment need further to study.
Specifically, wet method connection is mutually to bind these reinforcing bars in plank (or wallboard) edge reserved steel bar, construction Or welding, then placing concrete and connect a kind of integral way.
However, present inventor has found, the process of installation operation is usually more complicated when being connected using wet method, installation effectiveness It is relatively low.
Therefore, how a kind of prefabricated panel connection structure and building construction are provided, and belongs to dry method connection, is installed with simplifying The technical issues of process improves installation effectiveness, becomes those skilled in the art's urgent need to resolve.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated panel connection structures, are connected with solving wet method of the prior art Connect the technical issues of normal installation process is more complicated, installation effectiveness is relatively low.
The utility model provides a kind of prefabricated panel connection structure, including:Prefabricated panel is reserved on the prefabricated panel Bolt hole and installation hand hole;When the prefabricated panel is installed, bolt is inserted into the bolt hole, and passes through the installation hand hole The bolt is fastened, to realize the connection of prefabricated panel described in two panels.
Specifically, after prefabricated panel connection described in two panels it is in integrally "-" type.
Specifically, after prefabricated panel connection described in two panels it is in integrally L fonts.
Relative to the prior art, prefabricated panel connection structure described in the utility model has the advantage that:
In prefabricated panel connection structure provided by the utility model, including:Prefabricated panel is reserved with spiral shell on the prefabricated panel Keyhole and installation hand hole;When prefabricated panel is installed, bolt is inserted into bolt hole, and pass through installation hand hole fastening bolt, with reality The connection of existing two panels prefabricated panel.From this analysis, prefabricated panel connection structure provided by the utility model, belongs to dry method company It connects, scene is almost without wet construction, and installation procedure is simple and fast, and difficulty of construction is low, and assembly rate is high.In addition, reinforcing bar does not have to stretch out Side mold, production, storage, the transport of prefabricated components are all very convenient, are suitble to production line production, meet architectural industrialization requirement.
The utility model also provides a kind of prefabricated panel connection structure, including:First prefabricated panel and the second prefabricated panel, Threaded built-in fitting is embedded in first prefabricated panel, bolt hole and installation hand are reserved on second prefabricated panel Hole;When first prefabricated panel and second prefabricated panel are installed, bolt is first fully inserted into second prefabricated panel The installation hand hole in, then by the described pre-buried of the bolt hole of second prefabricated panel and first prefabricated panel Part is aligned, and the bolt is released and is screwed into the built-in fitting, to realize first prefabricated panel and described second in advance The connection of wallboard processed.
Specifically, it is in integrally L fonts after first prefabricated panel is connected with second prefabricated panel.
Relative to the prior art, prefabricated panel connection structure described in the utility model has the advantage that:
In prefabricated panel connection structure provided by the utility model, including:First prefabricated panel and the second prefabricated panel;Its In, threaded built-in fitting is embedded in the first prefabricated panel, bolt hole and installation hand hole are reserved on the second prefabricated panel;Peace When filling the first prefabricated panel and the second prefabricated panel, first bolt is fully inserted into the installation hand hole of the second prefabricated panel, then will The bolt hole of second prefabricated panel is aligned with the built-in fitting of the first prefabricated panel, and bolt is released and is screwed into built-in fitting, with Realize the connection of the first prefabricated panel and the second prefabricated panel.From this analysis, prefabricated panel provided by the utility model connects Binding structure belongs to dry method connection, and scene is almost without wet construction, and installation procedure is simple and fast, and difficulty of construction is low, and assembly rate is high. In addition, reinforcing bar does not have to stretch out side mold, production, storage, the transport of prefabricated components are all very convenient, are suitble to production line production, meet Architectural industrialization requirement.
The utility model provides a kind of prefabricated panel connection structure again, including:Prefabricated sleeper and prefabricated panel, it is described prefabricated Threaded built-in fitting is embedded in sleeper, bolt hole and installation hand hole are reserved on the prefabricated panel;It installs described prefabricated When sleeper and the prefabricated panel, first bolt is fully inserted into the installation hand hole of the prefabricated panel, then will be described pre- The bolt hole of wallboard processed is aligned with the built-in fitting of the prefabricated sleeper, and the bolt is released and is screwed into described pre- In embedded part, to realize the connection of the prefabricated sleeper and the prefabricated panel.
Specifically, the prefabricated sleeper is located at intermediate, two prefabricated panels and is located at the two of the prefabricated sleeper respectively End, and be in integrally L fonts after the prefabricated sleeper and two prefabricated panel connections.
Specifically, the prefabricated sleeper is located at intermediate, three prefabricated panels and is located at the three of the prefabricated sleeper respectively A difference end, and be in integrally T fonts after the prefabricated sleeper and three prefabricated panel connections.
Specifically, the prefabricated sleeper is located at intermediate, four prefabricated panels and is located at the four of the prefabricated sleeper respectively A difference end, and integrally in cross after the prefabricated sleeper and four prefabricated panel connections.
Relative to the prior art, prefabricated panel connection structure described in the utility model has the advantage that:
In prefabricated panel connection structure provided by the utility model, including:Prefabricated sleeper and prefabricated panel;Wherein, it is prefabricated Threaded built-in fitting is embedded in sleeper, bolt hole and installation hand hole are reserved on prefabricated panel;Prefabricated sleeper and pre- is installed During wallboard processed, first bolt is fully inserted into the installation hand hole of prefabricated panel, then by the bolt hole of prefabricated panel and prefabricated sleeper Built-in fitting alignment, and by bolt release and be screwed into built-in fitting, to realize the connection of prefabricated sleeper and prefabricated panel.Thus divide Analysis belongs to dry method connection, scene is almost without wet construction, installation it is found that prefabricated panel connection structure provided by the utility model Process is simple and fast, and difficulty of construction is low, and assembly rate is high.In addition, reinforcing bar does not have to stretch out side mold, the production of prefabricated components, storage, Transport is all very convenient, is suitble to production line production, meets architectural industrialization requirement;It is connected using prefabricated sleeper, is split convenient for component And standardized designs, component type is reduced, reduces cost;Prefabricated sleeper connection can effectively improve building assembly rate, reduce construction Difficulty improves construction efficiency.
The another object of the utility model is to provide a kind of building construction, logical to solve wet method connection of the prior art The technical issues of often installation process is more complicated, installation effectiveness is relatively low.
The utility model also provides a kind of building construction, including:It is connected and tied according to prefabricated panel described in any one of the above embodiments Structure.
The building construction is identical relative to advantage possessed by the prior art with above-mentioned prefabricated panel connection structure, herein It repeats no more.
Description of the drawings
The attached drawing for forming the part of the utility model is used to provide a further understanding of the present invention, this practicality is new The illustrative embodiments and their description of type do not form the improper restriction to the utility model for explaining the utility model. In attached drawing:
Fig. 1 is the section structure diagram of prefabricated panel connection structure that the utility model embodiment one provides;
Fig. 2 is the section structure diagram of prefabricated panel connection structure that the utility model embodiment two provides;
Fig. 3 is the section structure diagram of prefabricated panel connection structure that the utility model embodiment three provides;
Fig. 4 is the section structure diagram of prefabricated panel connection structure that the utility model embodiment four provides;
Fig. 5 is the section structure diagram of prefabricated panel connection structure that the utility model embodiment five provides;
Fig. 6 is the section structure diagram of prefabricated panel connection structure that the utility model embodiment six provides.
In figure:1- prefabricated panels;The first prefabricated panels of 11-;The second prefabricated panels of 12-;2- bolts hole;3- is installed Hand hole;4- bolts;5- built-in fittings;The prefabricated sleeper of 6-.
Specific embodiment
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the utility model can To be combined with each other.The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
Fig. 1 is the section structure diagram of prefabricated panel connection structure that the utility model embodiment one provides;Fig. 2 is this The section structure diagram for the prefabricated panel connection structure that utility model embodiment two provides.
As depicted in figs. 1 and 2, the utility model embodiment provides a kind of prefabricated panel connection structure, including:Prefabricated panel 1, bolt hole 2 and installation hand hole 3 are reserved on prefabricated panel 1;When prefabricated panel 1 is installed, bolt 4 is inserted into bolt hole 2, and By 3 fastening bolt 4 of installation hand hole, to realize the connection of two panels prefabricated panel 1.
Relative to the prior art, the prefabricated panel connection structure described in the utility model embodiment has the advantage that:
In the prefabricated panel connection structure that the utility model embodiment provides, as shown in Figure 1, including:Prefabricated panel 1, should Bolt hole 2 and installation hand hole 3 are reserved on prefabricated panel 1;When prefabricated panel 1 is installed, bolt 4 is inserted into bolt hole 2, and lead to 3 fastening bolt 4 of installation hand hole is crossed, to realize the connection of two panels prefabricated panel 1.From this analysis, the utility model embodiment The prefabricated panel connection structure of offer belongs to dry method connection, and scene is almost without wet construction, and installation procedure is simple and fast, construction Difficulty is low, and assembly rate is high.In addition, reinforcing bar does not have to stretch out side mold, production, storage, the transport of prefabricated components are all very convenient, are suitble to Production line produces, and meets architectural industrialization requirement.
During actual installation, it is specifically as follows:First bolt 4 is fully inserted into the installation hand hole 3 of a piece of prefabricated panel 1, so The bolt hole 2 of two panels prefabricated panel 1 is aligned afterwards, bolt 4 is released, is located at the centre of two panels prefabricated panel 1, then uses machine Tool utensil tightens 4 both ends of bolt, forms reliable mechanical connection.
Further, as shown in Figure 1, whole after the connection of above-mentioned two panels prefabricated panel 1 can be in "-" type, so as to fulfill flat It is connected in face.
Further, as shown in Fig. 2, whole after the connection of above-mentioned two panels prefabricated panel 1 can be in L fonts, so as to fulfill turning Angle connects.
Fig. 3 is the section structure diagram of prefabricated panel connection structure that the utility model embodiment three provides.
As shown in figure 3, the utility model embodiment also provides a kind of prefabricated panel connection structure, including:First dry wall 11 and second prefabricated panel 12 of plate, is embedded with threaded built-in fitting 5 in the first prefabricated panel 11, pre- on the second prefabricated panel 12 There are bolts hole 2 and installation hand hole 3;When first prefabricated panel 11 and the second prefabricated panel 12 are installed, first bolt 4 is fully inserted into In the installation hand hole 3 of second prefabricated panel 12, then by the pre-buried of the bolt hole 2 of the second prefabricated panel 12 and the first prefabricated panel 11 Part 5 is aligned, and bolt 4 is released and is screwed into built-in fitting 5, to realize the company of the first prefabricated panel 11 and the second prefabricated panel 12 It connects.
Relative to the prior art, the prefabricated panel connection structure described in the utility model embodiment has the advantage that:
In the prefabricated panel connection structure that the utility model embodiment provides, as shown in figure 3, including:First prefabricated panel 11 and second prefabricated panel 12;Wherein, threaded built-in fitting 5, the second prefabricated panel 12 are embedded in the first prefabricated panel 11 On be reserved with bolt hole 2 and installation hand hole 3;It is first that bolt 4 is complete when first prefabricated panel 11 and the second prefabricated panel 12 are installed It is inserted into the installation hand hole 3 of the second prefabricated panel 12, then by 2 and first prefabricated panel 11 of bolt hole of the second prefabricated panel 12 Built-in fitting 5 is aligned, and bolt 4 is released and is screwed into built-in fitting 5, to realize the first prefabricated panel 11 and the second prefabricated panel 12 Connection.From this analysis, the prefabricated panel connection structure that the utility model embodiment provides, belongs to dry method connection, scene Almost without wet construction, installation procedure is simple and fast, and difficulty of construction is low, and assembly rate is high.In addition, reinforcing bar does not have to stretch out side mold, Production, storage, the transport of prefabricated components are all very convenient, are suitble to production line production, meet architectural industrialization requirement.
During actual installation, it is specifically as follows:A piece of prefabricated panel (i.e. the first prefabricated panel 11) is pre-buried threaded pre-buried Part 5, a piece of prefabricated panel (i.e. the second prefabricated panel 12) prepared screw-bolt hole 2 and installation hand hole 3, it is first that bolt 4 is complete during installation It is inserted into the installation hand hole 3 of the second prefabricated panel 12, then by 2 and first dry wall of prepared screw-bolt hole of the second prefabricated panel 12 Pre-buried threaded hole (namely built-in fitting 5) alignment of plate 11, bolt 4 is released, bolt 4 is screwed into built-in fitting 5 using mechanical implement It is interior, then bolt 4 is tightened, form reliable mechanical connection.
Further, as shown in figure 3, whole after the connection of 11 and second prefabricated panel 12 of above-mentioned first prefabricated panel can be in L fonts connect so as to fulfill corner.
Fig. 4 is the section structure diagram of prefabricated panel connection structure that the utility model embodiment four provides;Fig. 5 is this The section structure diagram for the prefabricated panel connection structure that utility model embodiment five provides;Fig. 6 is the utility model embodiment The section structure diagram of the six prefabricated panel connection structures provided.
As Figure 4-Figure 6, the utility model embodiment provides a kind of prefabricated panel connection structure again, including:It is prefabricated dark Column 6 and prefabricated panel 1 are embedded with threaded built-in fitting 5 in prefabricated sleeper 6, and bolt hole 2 and peace are reserved on prefabricated panel 1 Fill hand hole 3;When prefabricated sleeper 6 and prefabricated panel 1 are installed, first bolt 4 is fully inserted into the installation hand hole 3 of prefabricated panel 1, then The bolt hole 2 of prefabricated panel 1 is aligned, and bolt 4 is released and is screwed into built-in fitting 5 with the built-in fitting 5 of prefabricated sleeper 6, with Realize the connection of prefabricated sleeper 6 and prefabricated panel 1.
Relative to the prior art, the prefabricated panel connection structure described in the utility model embodiment has the advantage that:
In the prefabricated panel connection structure that the utility model embodiment provides, as Figure 4-Figure 6, including:Prefabricated sleeper 6 and prefabricated panel 1;Wherein, threaded built-in fitting 5 is embedded in prefabricated sleeper 6,2 He of bolt hole is reserved on prefabricated panel 1 Installation hand hole 3;When prefabricated sleeper 6 and prefabricated panel 1 are installed, first bolt 4 is fully inserted into the installation hand hole 3 of prefabricated panel 1, The bolt hole 2 of prefabricated panel 1 with the built-in fitting 5 of prefabricated sleeper 6 is aligned again, and bolt 4 is released and is screwed into built-in fitting 5, To realize the connection of prefabricated sleeper 6 and prefabricated panel 1.From this analysis, the prefabricated panel that the utility model embodiment provides Connection structure belongs to dry method connection, and scene is almost without wet construction, and installation procedure is simple and fast, and difficulty of construction is low, assembly rate It is high.In addition, reinforcing bar does not have to stretch out side mold, production, storage, the transport of prefabricated components are all very convenient, are suitble to production line production, full Sufficient architectural industrialization requirement;It is connected using prefabricated sleeper 6, is split convenient for component and standardized designs, reduction component type reduce Cost;The prefabricated connection of sleeper 6 can effectively improve building assembly rate, reduce difficulty of construction, improve construction efficiency.
During actual installation, it is specifically as follows:The prefabricated pre-buried threaded built-in fitting 5 of sleeper 6, it is first that bolt 4 is complete during installation It is fully inserted into the installation hand hole 3 of prefabricated panel 1, then by the prepared screw-bolt hole 2 of prefabricated panel 1 and the pre-buried spiral shell of prefabricated sleeper 6 Pit (namely built-in fitting 5) is aligned, and bolt 4 is released, bolt 4 is screwed into the built-in fitting 5 of prefabricated sleeper 6 using mechanical implement It is interior, then bolt 4 is tightened, form reliable mechanical connection.
Further, as shown in figure 4, above-mentioned prefabricated sleeper 6 prefabricated can become L-type;Also, prefabricated sleeper 6 can position It is located at the both ends of prefabricated sleeper 6 respectively in intermediate, two prefabricated panels 1, and after prefabricated sleeper 6 and two connections of prefabricated panels 1 Entirety can be in L fonts, be connected so as to fulfill corner.
Further, as shown in figure 5, above-mentioned prefabricated sleeper 6 prefabricated can become T fonts;Also, prefabricated sleeper 6 can be with It is located at three different ends of prefabricated sleeper 6, and prefabricated sleeper 6 and three prefabricated panels respectively positioned at intermediate, three prefabricated panels 1 Whole after 1 connection can be in T fonts, be connected so as to fulfill corner.
Further, as shown in fig. 6, above-mentioned prefabricated sleeper 6 prefabricated can become cross;Also, prefabricated sleeper 6 can be with It is located at four different ends of prefabricated sleeper 6, and prefabricated sleeper 6 and four prefabricated panels respectively positioned at intermediate, four prefabricated panels 1 Entirety can be in cross after 1 connection, be connected so as to fulfill corner.
The utility model embodiment provides a kind of building construction again, including:According to prefabricated panel described in any one of the above embodiments Connection structure.Since in terms of existing technologies, the prefabricated panel connection structure that the utility model embodiment provides belongs to dry Method connects, and scene is almost without wet construction, and installation procedure is simple and fast, and difficulty of construction is low, and assembly rate is high;In addition, reinforcing bar does not have to Side mold is stretched out, production, storage, the transport of prefabricated components are all very convenient, are suitble to production line production, and meeting architectural industrialization will It asks;It is connected using prefabricated sleeper 6, is split convenient for component and standardized designs, reduction component type reduce cost;Prefabricated sleeper 6 Connection can effectively improve building assembly rate, reduce difficulty of construction, improve construction efficiency.Therefore the utility model embodiment provides Building construction also has the advantage that:First, belong to dry method connection, almost without wet construction, installation procedure is simple and fast, applies at scene Work difficulty is low, and assembly rate is high;2nd, reinforcing bar does not have to stretch out side mold, and production, storage, the transport of prefabricated components are all very convenient, are suitble to Production line produces, and meets architectural industrialization requirement;3rd, connected using prefabricated sleeper 6, convenient for component split and standardized designs, Component type is reduced, reduces cost;4th, the prefabricated connection of sleeper 6 can effectively improve building assembly rate, reduce difficulty of construction, improve Construction efficiency.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection domain within.

Claims (10)

1. a kind of prefabricated panel connection structure, which is characterized in that including:Prefabricated panel (1) is reserved on the prefabricated panel (1) There are bolt hole (2) and installation hand hole (3);
Bolt (4) is threaded through in the bolt hole (2) of prefabricated panel (1) described in adjacent two panels, by prefabricated panel described in two panels (1) it connects.
2. prefabricated panel connection structure according to claim 1, which is characterized in that prefabricated panel described in two panels (1) connects Whole afterwards is in "-" type.
3. prefabricated panel connection structure according to claim 1, which is characterized in that prefabricated panel described in two panels (1) connects Whole afterwards is in L fonts.
4. a kind of prefabricated panel connection structure, which is characterized in that including:First prefabricated panel (11) and the second prefabricated panel (12), threaded built-in fitting (5) is embedded in first prefabricated panel (11), is reserved on second prefabricated panel (12) There are bolt hole (2) and installation hand hole (3);
Bolt (4) is threaded through in the bolt hole (2), and with the built-in fitting (5) thread fitting, by first dry wall Plate (11) and second prefabricated panel (12) connection.
5. prefabricated panel connection structure according to claim 4, which is characterized in that first prefabricated panel (11) and institute State after the second prefabricated panel (12) connects is in integrally L fonts.
6. a kind of prefabricated panel connection structure, which is characterized in that including:Prefabricated sleeper (6) and prefabricated panel (1), it is described prefabricated Threaded built-in fitting (5) is embedded in sleeper (6), bolt hole (2) and installation hand hole are reserved on the prefabricated panel (1) (3);
Bolt (4) is threaded through in the bolt hole (2), and with the built-in fitting (5) thread fitting, by the prefabricated panel (1) it is connected with the prefabricated sleeper (6).
7. prefabricated panel connection structure according to claim 6, which is characterized in that the prefabricated sleeper (6) positioned at it is intermediate, Two prefabricated panels (1) are located at the both ends of the prefabricated sleeper (6) respectively, and described in the prefabricated sleeper (6) and two It is in integrally L fonts after prefabricated panel (1) connection.
8. prefabricated panel connection structure according to claim 6, which is characterized in that the prefabricated sleeper (6) positioned at it is intermediate, Three prefabricated panels (1) are located at three different ends of the prefabricated sleeper (6), and the prefabricated sleeper (6) and three respectively It is in integrally T fonts after a prefabricated panel (1) connection.
9. prefabricated panel connection structure according to claim 6, which is characterized in that the prefabricated sleeper (6) positioned at it is intermediate, Four prefabricated panels (1) are located at four different ends of the prefabricated sleeper (6), and the prefabricated sleeper (6) and four respectively Integrally in cross after a prefabricated panel (1) connection.
10. a kind of building construction, which is characterized in that including:According to the dry wall described in any one of the claims 1-9 Board connecting structure.
CN201721416708.0U 2017-10-30 2017-10-30 Prefabricated panel connection structure and building construction Active CN207553321U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721416708.0U CN207553321U (en) 2017-10-30 2017-10-30 Prefabricated panel connection structure and building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721416708.0U CN207553321U (en) 2017-10-30 2017-10-30 Prefabricated panel connection structure and building construction

Publications (1)

Publication Number Publication Date
CN207553321U true CN207553321U (en) 2018-06-29

Family

ID=62674930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721416708.0U Active CN207553321U (en) 2017-10-30 2017-10-30 Prefabricated panel connection structure and building construction

Country Status (1)

Country Link
CN (1) CN207553321U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811933A (en) * 2019-02-18 2019-05-28 河南工业大学 A kind of ecological composite body and its construction technology
CN109811932A (en) * 2019-02-18 2019-05-28 河南工业大学 A kind of ecological composite body structure and its construction method
CN110107104A (en) * 2019-05-10 2019-08-09 中铁六局集团有限公司 Assembled architecture wallboard sleeve connection Winter Construction Methods
CN114575466A (en) * 2022-03-28 2022-06-03 昌建建设集团有限公司 Energy-conserving ready-package modularization house

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811933A (en) * 2019-02-18 2019-05-28 河南工业大学 A kind of ecological composite body and its construction technology
CN109811932A (en) * 2019-02-18 2019-05-28 河南工业大学 A kind of ecological composite body structure and its construction method
CN110107104A (en) * 2019-05-10 2019-08-09 中铁六局集团有限公司 Assembled architecture wallboard sleeve connection Winter Construction Methods
CN110107104B (en) * 2019-05-10 2021-04-16 中铁六局集团有限公司 Winter construction method for assembled building wallboard sleeve connection
CN114575466A (en) * 2022-03-28 2022-06-03 昌建建设集团有限公司 Energy-conserving ready-package modularization house

Similar Documents

Publication Publication Date Title
CN207553321U (en) Prefabricated panel connection structure and building construction
TW201243133A (en) Wall module for construction of a structure and associated structure
CN105113665B (en) The prefabrication and lifting wall of fabricated structure
CN206495362U (en) A kind of assembly concrete shear wall structure sleeve grouting cabin sealing device
CN102995756B (en) Concrete-filled rectangular steel tube column-box girder full-bolt connection node and construction method
CN104878948A (en) Reinforced concrete frame beam hogging moment region reinforcing method and reinforcing device
CN204040209U (en) A kind of syndeton of replaceable steel coupling beam
CN103967169A (en) Concrete shear wall with lead core energy-consuming device and built-in steel plate and manufacturing method
CN204152202U (en) Column template clamp frame
CN203685208U (en) End-shaping steel template for double-lining trolley for tunnel
CN210086553U (en) Dry-type connected precast concrete wall and foundation connection node
CN209211748U (en) A kind of structure node of assembled ceiling radiating system
CN106760059B (en) Assembled building structure system
KR20180090230A (en) Device for reinforcing the Earthquake of a concrete columns and Methods
CN209603349U (en) A kind of steel frame glass curtain wall structure that is spirally connected of unordered installation
CN210217085U (en) Building large hole safety sealing construction platform
CN204940608U (en) The prefabrication and lifting body of wall of fabricated structure
CN105113701B (en) The precast wall body of fabricated structure
CN109518851A (en) A kind of steel frame glass curtain wall structure that is spirally connected of unordered installation
CN106149922A (en) A kind of dismantled and assembled stealthy partition wall system and assembly and disassembly methods thereof
CN209975752U (en) Integrated prefabricated wallboard house structure
CN207361636U (en) A kind of assembly concrete high residential building tower crane passive energy dissipation attached wall lever apparatus
CN206928641U (en) Build aluminum alloy mould plate wall and column combination structure
CN219365094U (en) High-strength floor slab
CN206928643U (en) Build aluminum alloy mould plate floor and beam combination structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 102200 1st floor, building 6, No.8 Beiqing Road, Huilongguan town, Changping District, Beijing

Patentee after: Sany Construction Technology Co.,Ltd.

Address before: 102206, Beijing Changping District Huilongguan North Road 31 Industrial Park

Patentee before: SANY CONSTRUCTION TECHNOLOGY Co.,Ltd.