CN207514380U - Poling resistance absorber - Google Patents

Poling resistance absorber Download PDF

Info

Publication number
CN207514380U
CN207514380U CN201721609152.7U CN201721609152U CN207514380U CN 207514380 U CN207514380 U CN 207514380U CN 201721609152 U CN201721609152 U CN 201721609152U CN 207514380 U CN207514380 U CN 207514380U
Authority
CN
China
Prior art keywords
lower plate
pipeline
arc lower
resistance absorber
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721609152.7U
Other languages
Chinese (zh)
Inventor
陈鹏
陈志刚
郭子彬
范维立
李福平
韩振宇
厍艳茹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN201721609152.7U priority Critical patent/CN207514380U/en
Application granted granted Critical
Publication of CN207514380U publication Critical patent/CN207514380U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a kind of poling resistance absorber, including upper arc panel, arc lower plate, connection bolt, vertical rib plate;Upper arc panel and arc lower plate are respectively arranged with engaging lug on two sides, and vertical rib plate is connected on the outer wall of arc lower plate, and engaging lug is provided with connection through-hole, and connection bolt is mounted in connection through-hole.The utility model can make pipeline quickly pass through concrete sleeve, and reduce operating expenses.

Description

Poling resistance absorber
Technical field
The utility model is related to a kind of poling equipment, specifically, are related to a kind of poling resistance absorber.
Background technology
During traditional artificial driving formula jacking construction, first casing is installed, is carried out using cooperations such as hoist engine and digging machines The poling construction of pipeline.During poling, because pipeline and casing-contact area are larger, with the increase of duct length, pipeline is certainly The weight of body is increased by, and so as to cause the frictional resistance between pipeline and casing that will increase, Pipeline Crossing Program difficulty of construction is caused to increase Add, the traverse velocity of pipeline slows down, and so as to cause claim for eot, the cost of construction increases.
But there is no corresponding technical measures at present to improve jacking construction process.
Utility model content
The technical issues of the utility model solves is to provide a kind of poling resistance absorber, pipeline can be made quickly to pass through mixed Solidifying soil suite pipe, and reduce operating expenses.
Technical solution is as follows:
A kind of poling resistance absorber, including upper arc panel, arc lower plate, connection bolt, vertical rib plate;Upper arc panel and lower arc Shape plate is respectively arranged with engaging lug on two sides, and vertical rib plate is connected on the outer wall of arc lower plate, and engaging lug is provided with connection Through-hole, connection bolt are mounted in connection through-hole.
Further:Upper arc panel, arc lower plate are cylinder by the shape after connecting bolt combination.
Further:The shape of upper arc panel and arc lower plate is semicircular arc,
Further:Insulating rubber slab is provided on the inside of upper arc panel, arc lower plate.
Further:Vertical rib plate is parallel with the axis of upper arc panel and arc lower plate.
Compared with prior art, the utility model technique effect includes:
The utility model can reduce frictional resistance between pipeline and concrete sleeve, accelerate the speed of application of Pipeline Crossing Program, Shorten the duration of jacking construction, reduce construction cost expense.
Construction time can be shortened, while can save construction cost using the construction method of the utility model.This practicality Novel use is easy to operate, safe, quick, and in push pipe road work progress, the use of the utility model can make pipeline quick Concrete sleeve is passed through, and reduces operating expenses.
Description of the drawings
Fig. 1 is the structure diagram of resistance absorber in the utility model;
Fig. 2 is the side view of resistance absorber in the utility model Fig. 1;
Fig. 3 is the vertical view of resistance absorber in the utility model Fig. 1.
Specific embodiment
It elaborates below with reference to example embodiment to technical solutions of the utility model.However, example embodiment It can implement in a variety of forms, and be not understood as limited to embodiment set forth herein;On the contrary, provide these embodiments So that the utility model is more comprehensively and completely, and the design of example embodiment is comprehensively communicated to those skilled in the art Member.
As shown in Figure 1, it is the structure diagram of resistance absorber in the present invention;As shown in Fig. 2, it is resistance absorber in Fig. 1 of the present invention Side view;As shown in figure 3, it is the vertical view of resistance absorber in Fig. 1 of the present invention.
The structure of resistance absorber includes:Including:Upper arc panel 1, arc lower plate 2, insulating rubber slab 3, connection bolt 4, stud Plate 5.
Upper arc panel 1 is respectively arranged with engaging lug 6 on two sides, and the shape of upper arc panel 1 is semicircular arc.
Arc lower plate 2 is respectively arranged with engaging lug 6 on two sides, and the shape of arc lower plate 2 is semicircular arc;Three pieces Vertical rib plate 5 is connected on the outer wall of arc lower plate 2, and vertical rib plate 5 is parallel with the axis of arc lower plate 2.The outer edge of arc lower plate 2 For arc, other shapes can also be used.Upper arc panel 1, arc lower plate 2 material use steel plate of the thickness for 12mm.Stud The material of plate 5 is the steel plate that thickness is 16mm, is highly 100mm.
Engaging lug 6 is provided with connection through-hole, and connection bolt 4 is mounted in connection through-hole.Upper arc panel 1, arc lower plate 2 pass through The shape after bolt 4 combines is connected as cylinder.Insulating rubber slab 3 sets upper arc panel 1 after combining, arc lower plate 2 Inside.The material of insulating rubber slab 3 is the electro-insulating rubber pad of thickness 5mm.
Using the construction method of resistance absorber, following steps are specifically included:
Step 1:Resistance absorber is mounted on to the position that close end is leaned on pipeline;
Arc lower plate 2 is placed in the lower part of pipeline, and vertical rib plate 5 is made to be supported on suit inner wall, insulating rubber slab 3 is padded Between pipeline and arc lower plate 2, and wrap on the outside of pipeline.The width of insulating rubber slab 3 is required than 2 width of arc lower plate simultaneously Big 100mm, in order to avoid pipeline anticorrosion coating is caused to be damaged by lower curved plate stress.
Highway section pipeline Crossing by Pipe Pushing Construction, jacking bore DN1200, outer diameter D N1400, concrete reinforced pipe is as defeated Feed channel casing, engineering jacking crossing length be 100m, 152.6 meters of overall length.Rising to high speed gutter 3.5m for pipeline, it is supreme Fast road surface 4.0m, until natural ground 11.5m.
Pipeline specifications:D508 × 8.0mm, using longitudinal submerged arc welded pipe, material is L415 grades, and wherein bend pipe is using warm It simmers, bending radius 6D.Design pressure 6.3MPa, pumped (conveying) medium are two class natural gas.
The welding technique of pipeline is using semi-automatic down hill welding technology by hand.Pipeline Crossing Program concrete set of tubes length is 104m, is examined Steel conduit is considered during concrete casing is worn, and as pipeline weld length is continuously increased, makes pipeline dead weight and and casing Contact surface increases, and causes frictional resistance increase during Pipeline Crossing Program.In order to reduce the resistance during Pipeline Crossing Program, push pipe is applied Resistance absorber is employed in work.
Step 2:Upper arc panel 1 is placed on insulating rubber slab 3, the connection through-hole of engaging lug 6 is to just, connecting bolt 4 It is sleeved on and is added gasket in connection through-hole and is fastened using nut;
Step 3:By the telescopic rod of push-bench withstand on pipeline end (install protection facility additional between telescopic rod and pipeline, In order to avoid causing pipeline during jacking, the end face of pipeline is damaged, influences pipe joint welding quality), it is pushed away to pipeline application Power, pipeline move under thrust into casing, and vertical rib plate 5 is slided on suit inner wall, and resistance absorber moves together with pipeline It is dynamic;
Due to the supporting role of resistance absorber, the contact surface between vertical rib plate 5 and casing is small, so as to reduce pipeline and casing The frictional force of inner wall reduces the frictional resistance between pipeline and casing, accelerates the speed of application of Pipeline Crossing Program.
Step 4:After the pipeline sleeve pipe of half length, stop applying thrust to pipeline, be installed at the middle part of pipeline Resistance absorber continues to press on pipeline to set in-pipe, until pipeline is completely into casing after installation is complete.
During if necessary to connect next pipeline, pipeline is continued to press on after the completion of pipeline welding to in-pipe is covered, directly Casing is passed through to pipeline completion.If pipeline is longer, multiple resistance absorbers can be installed on pipeline, resistance absorber is in the length of pipeline Direction is evenly arranged.
By using resistance absorber, the duration of a project can shorten the construction period, so as to save construction cost.
Term used in the utility model is explanation and term exemplary, and not restrictive.Due to the utility model energy The enough spirit or essence being embodied in a variety of forms without departing from utility model, it should therefore be appreciated that above-described embodiment is unlimited In any aforementioned details, and should widely be explained in the spirit and scope that appended claims are limited, therefore fall into power Whole variations and remodeling in profit requirement or its equivalent scope all should be appended claims and covered.

Claims (5)

1. a kind of poling resistance absorber, it is characterised in that:Including upper arc panel, arc lower plate, connection bolt, vertical rib plate;Upper arc Shape plate and arc lower plate are respectively arranged with engaging lug on two sides, and vertical rib plate is connected on the outer wall of arc lower plate, connection Ear is provided with connection through-hole, and connection bolt is mounted in connection through-hole.
2. poling resistance absorber as described in claim 1, it is characterised in that:Upper arc panel, arc lower plate are by connecting bolt group Shape after conjunction is cylinder.
3. poling resistance absorber as described in claim 1, it is characterised in that:The shape of upper arc panel and arc lower plate is semi arch Shape.
4. poling resistance absorber as described in claim 1, it is characterised in that:It is provided on the inside of upper arc panel, arc lower plate absolutely Edge rubber slab.
5. poling resistance absorber as described in claim 1, it is characterised in that:Vertical rib plate and upper arc panel and the axis of arc lower plate It is parallel.
CN201721609152.7U 2017-11-27 2017-11-27 Poling resistance absorber Active CN207514380U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721609152.7U CN207514380U (en) 2017-11-27 2017-11-27 Poling resistance absorber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721609152.7U CN207514380U (en) 2017-11-27 2017-11-27 Poling resistance absorber

Publications (1)

Publication Number Publication Date
CN207514380U true CN207514380U (en) 2018-06-19

Family

ID=62541606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721609152.7U Active CN207514380U (en) 2017-11-27 2017-11-27 Poling resistance absorber

Country Status (1)

Country Link
CN (1) CN207514380U (en)

Similar Documents

Publication Publication Date Title
CN201828463U (en) Hydraulic testing device of pipeline
CN103506799A (en) Jack-type large diameter pipe orifice aligning device and using method
CN103292036B (en) A kind of assembling type curve steel pipe jacking section header
CN102392653A (en) Bent pipe one-sided freezing method for shield docking of stratum and freezing pipe driving device
CN207514380U (en) Poling resistance absorber
CN201688028U (en) Buried pipeline rolling heat-insulation bracket
CN205877474U (en) On --spot welding steel pipe exempts from
WO2015158074A1 (en) Construction method for connection and replacement of underground water-supply fiber-reinforced plastic mortar pipe and steel pipe
CN206583582U (en) A kind of complete fast pressure testing device of piping lane pipeline
CN107830241A (en) Poling resistance absorber and its construction method using resistance absorber
CN204416673U (en) Earth source heat pump grout lines carries pipe machine
CN210566724U (en) Pipeline casing fixing device placed in middle
CN207048796U (en) A kind of special concrete wet shot chassis containing Simple mechanical arm
CN211965496U (en) Pipeline bending platform for concentrated solution system installation
CN210128176U (en) CIPP (cleaning in place) overturning method pipeline repair material turning auxiliary device
CN204075612U (en) A kind of welding device of large diameter steel pipe
CN209479705U (en) Transport vehicle is used in a kind of reinforcing of jacking construction tube head
CN107152026B (en) A kind of the mud jacking pipe support and its distribution method of steel-pipe pile
CN202509774U (en) External joint grouting device for socket of prestressed concrete cylinder pipe (PCCP)
CN204153316U (en) A kind of plumbing installation
CN205100565U (en) But steel pipe concrete jacking of superelevation layer is with retractable pump pipe
CN205956562U (en) Wall pipe with sleeve pipe
CN105135054B (en) The pipe jacking construction method of super-long pipeline
CN204042271U (en) Underground coal mine pipe connecting structure
CN220792263U (en) Connecting device for pipeline installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant