CN207514380U - Poling resistance absorber - Google Patents
Poling resistance absorber Download PDFInfo
- Publication number
- CN207514380U CN207514380U CN201721609152.7U CN201721609152U CN207514380U CN 207514380 U CN207514380 U CN 207514380U CN 201721609152 U CN201721609152 U CN 201721609152U CN 207514380 U CN207514380 U CN 207514380U
- Authority
- CN
- China
- Prior art keywords
- lower plate
- pipeline
- arc lower
- resistance absorber
- arc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The utility model discloses a kind of poling resistance absorber, including upper arc panel, arc lower plate, connection bolt, vertical rib plate;Upper arc panel and arc lower plate are respectively arranged with engaging lug on two sides, and vertical rib plate is connected on the outer wall of arc lower plate, and engaging lug is provided with connection through-hole, and connection bolt is mounted in connection through-hole.The utility model can make pipeline quickly pass through concrete sleeve, and reduce operating expenses.
Description
Technical field
The utility model is related to a kind of poling equipment, specifically, are related to a kind of poling resistance absorber.
Background technology
During traditional artificial driving formula jacking construction, first casing is installed, is carried out using cooperations such as hoist engine and digging machines
The poling construction of pipeline.During poling, because pipeline and casing-contact area are larger, with the increase of duct length, pipeline is certainly
The weight of body is increased by, and so as to cause the frictional resistance between pipeline and casing that will increase, Pipeline Crossing Program difficulty of construction is caused to increase
Add, the traverse velocity of pipeline slows down, and so as to cause claim for eot, the cost of construction increases.
But there is no corresponding technical measures at present to improve jacking construction process.
Utility model content
The technical issues of the utility model solves is to provide a kind of poling resistance absorber, pipeline can be made quickly to pass through mixed
Solidifying soil suite pipe, and reduce operating expenses.
Technical solution is as follows:
A kind of poling resistance absorber, including upper arc panel, arc lower plate, connection bolt, vertical rib plate;Upper arc panel and lower arc
Shape plate is respectively arranged with engaging lug on two sides, and vertical rib plate is connected on the outer wall of arc lower plate, and engaging lug is provided with connection
Through-hole, connection bolt are mounted in connection through-hole.
Further:Upper arc panel, arc lower plate are cylinder by the shape after connecting bolt combination.
Further:The shape of upper arc panel and arc lower plate is semicircular arc,
Further:Insulating rubber slab is provided on the inside of upper arc panel, arc lower plate.
Further:Vertical rib plate is parallel with the axis of upper arc panel and arc lower plate.
Compared with prior art, the utility model technique effect includes:
The utility model can reduce frictional resistance between pipeline and concrete sleeve, accelerate the speed of application of Pipeline Crossing Program,
Shorten the duration of jacking construction, reduce construction cost expense.
Construction time can be shortened, while can save construction cost using the construction method of the utility model.This practicality
Novel use is easy to operate, safe, quick, and in push pipe road work progress, the use of the utility model can make pipeline quick
Concrete sleeve is passed through, and reduces operating expenses.
Description of the drawings
Fig. 1 is the structure diagram of resistance absorber in the utility model;
Fig. 2 is the side view of resistance absorber in the utility model Fig. 1;
Fig. 3 is the vertical view of resistance absorber in the utility model Fig. 1.
Specific embodiment
It elaborates below with reference to example embodiment to technical solutions of the utility model.However, example embodiment
It can implement in a variety of forms, and be not understood as limited to embodiment set forth herein;On the contrary, provide these embodiments
So that the utility model is more comprehensively and completely, and the design of example embodiment is comprehensively communicated to those skilled in the art
Member.
As shown in Figure 1, it is the structure diagram of resistance absorber in the present invention;As shown in Fig. 2, it is resistance absorber in Fig. 1 of the present invention
Side view;As shown in figure 3, it is the vertical view of resistance absorber in Fig. 1 of the present invention.
The structure of resistance absorber includes:Including:Upper arc panel 1, arc lower plate 2, insulating rubber slab 3, connection bolt 4, stud
Plate 5.
Upper arc panel 1 is respectively arranged with engaging lug 6 on two sides, and the shape of upper arc panel 1 is semicircular arc.
Arc lower plate 2 is respectively arranged with engaging lug 6 on two sides, and the shape of arc lower plate 2 is semicircular arc;Three pieces
Vertical rib plate 5 is connected on the outer wall of arc lower plate 2, and vertical rib plate 5 is parallel with the axis of arc lower plate 2.The outer edge of arc lower plate 2
For arc, other shapes can also be used.Upper arc panel 1, arc lower plate 2 material use steel plate of the thickness for 12mm.Stud
The material of plate 5 is the steel plate that thickness is 16mm, is highly 100mm.
Engaging lug 6 is provided with connection through-hole, and connection bolt 4 is mounted in connection through-hole.Upper arc panel 1, arc lower plate 2 pass through
The shape after bolt 4 combines is connected as cylinder.Insulating rubber slab 3 sets upper arc panel 1 after combining, arc lower plate 2
Inside.The material of insulating rubber slab 3 is the electro-insulating rubber pad of thickness 5mm.
Using the construction method of resistance absorber, following steps are specifically included:
Step 1:Resistance absorber is mounted on to the position that close end is leaned on pipeline;
Arc lower plate 2 is placed in the lower part of pipeline, and vertical rib plate 5 is made to be supported on suit inner wall, insulating rubber slab 3 is padded
Between pipeline and arc lower plate 2, and wrap on the outside of pipeline.The width of insulating rubber slab 3 is required than 2 width of arc lower plate simultaneously
Big 100mm, in order to avoid pipeline anticorrosion coating is caused to be damaged by lower curved plate stress.
Highway section pipeline Crossing by Pipe Pushing Construction, jacking bore DN1200, outer diameter D N1400, concrete reinforced pipe is as defeated
Feed channel casing, engineering jacking crossing length be 100m, 152.6 meters of overall length.Rising to high speed gutter 3.5m for pipeline, it is supreme
Fast road surface 4.0m, until natural ground 11.5m.
Pipeline specifications:D508 × 8.0mm, using longitudinal submerged arc welded pipe, material is L415 grades, and wherein bend pipe is using warm
It simmers, bending radius 6D.Design pressure 6.3MPa, pumped (conveying) medium are two class natural gas.
The welding technique of pipeline is using semi-automatic down hill welding technology by hand.Pipeline Crossing Program concrete set of tubes length is 104m, is examined
Steel conduit is considered during concrete casing is worn, and as pipeline weld length is continuously increased, makes pipeline dead weight and and casing
Contact surface increases, and causes frictional resistance increase during Pipeline Crossing Program.In order to reduce the resistance during Pipeline Crossing Program, push pipe is applied
Resistance absorber is employed in work.
Step 2:Upper arc panel 1 is placed on insulating rubber slab 3, the connection through-hole of engaging lug 6 is to just, connecting bolt 4
It is sleeved on and is added gasket in connection through-hole and is fastened using nut;
Step 3:By the telescopic rod of push-bench withstand on pipeline end (install protection facility additional between telescopic rod and pipeline,
In order to avoid causing pipeline during jacking, the end face of pipeline is damaged, influences pipe joint welding quality), it is pushed away to pipeline application
Power, pipeline move under thrust into casing, and vertical rib plate 5 is slided on suit inner wall, and resistance absorber moves together with pipeline
It is dynamic;
Due to the supporting role of resistance absorber, the contact surface between vertical rib plate 5 and casing is small, so as to reduce pipeline and casing
The frictional force of inner wall reduces the frictional resistance between pipeline and casing, accelerates the speed of application of Pipeline Crossing Program.
Step 4:After the pipeline sleeve pipe of half length, stop applying thrust to pipeline, be installed at the middle part of pipeline
Resistance absorber continues to press on pipeline to set in-pipe, until pipeline is completely into casing after installation is complete.
During if necessary to connect next pipeline, pipeline is continued to press on after the completion of pipeline welding to in-pipe is covered, directly
Casing is passed through to pipeline completion.If pipeline is longer, multiple resistance absorbers can be installed on pipeline, resistance absorber is in the length of pipeline
Direction is evenly arranged.
By using resistance absorber, the duration of a project can shorten the construction period, so as to save construction cost.
Term used in the utility model is explanation and term exemplary, and not restrictive.Due to the utility model energy
The enough spirit or essence being embodied in a variety of forms without departing from utility model, it should therefore be appreciated that above-described embodiment is unlimited
In any aforementioned details, and should widely be explained in the spirit and scope that appended claims are limited, therefore fall into power
Whole variations and remodeling in profit requirement or its equivalent scope all should be appended claims and covered.
Claims (5)
1. a kind of poling resistance absorber, it is characterised in that:Including upper arc panel, arc lower plate, connection bolt, vertical rib plate;Upper arc
Shape plate and arc lower plate are respectively arranged with engaging lug on two sides, and vertical rib plate is connected on the outer wall of arc lower plate, connection
Ear is provided with connection through-hole, and connection bolt is mounted in connection through-hole.
2. poling resistance absorber as described in claim 1, it is characterised in that:Upper arc panel, arc lower plate are by connecting bolt group
Shape after conjunction is cylinder.
3. poling resistance absorber as described in claim 1, it is characterised in that:The shape of upper arc panel and arc lower plate is semi arch
Shape.
4. poling resistance absorber as described in claim 1, it is characterised in that:It is provided on the inside of upper arc panel, arc lower plate absolutely
Edge rubber slab.
5. poling resistance absorber as described in claim 1, it is characterised in that:Vertical rib plate and upper arc panel and the axis of arc lower plate
It is parallel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721609152.7U CN207514380U (en) | 2017-11-27 | 2017-11-27 | Poling resistance absorber |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721609152.7U CN207514380U (en) | 2017-11-27 | 2017-11-27 | Poling resistance absorber |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207514380U true CN207514380U (en) | 2018-06-19 |
Family
ID=62541606
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721609152.7U Active CN207514380U (en) | 2017-11-27 | 2017-11-27 | Poling resistance absorber |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207514380U (en) |
-
2017
- 2017-11-27 CN CN201721609152.7U patent/CN207514380U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201828463U (en) | Hydraulic testing device of pipeline | |
CN103506799A (en) | Jack-type large diameter pipe orifice aligning device and using method | |
CN103292036B (en) | A kind of assembling type curve steel pipe jacking section header | |
CN102392653A (en) | Bent pipe one-sided freezing method for shield docking of stratum and freezing pipe driving device | |
CN207514380U (en) | Poling resistance absorber | |
CN201688028U (en) | Buried pipeline rolling heat-insulation bracket | |
CN205877474U (en) | On --spot welding steel pipe exempts from | |
WO2015158074A1 (en) | Construction method for connection and replacement of underground water-supply fiber-reinforced plastic mortar pipe and steel pipe | |
CN206583582U (en) | A kind of complete fast pressure testing device of piping lane pipeline | |
CN107830241A (en) | Poling resistance absorber and its construction method using resistance absorber | |
CN204416673U (en) | Earth source heat pump grout lines carries pipe machine | |
CN210566724U (en) | Pipeline casing fixing device placed in middle | |
CN207048796U (en) | A kind of special concrete wet shot chassis containing Simple mechanical arm | |
CN211965496U (en) | Pipeline bending platform for concentrated solution system installation | |
CN210128176U (en) | CIPP (cleaning in place) overturning method pipeline repair material turning auxiliary device | |
CN204075612U (en) | A kind of welding device of large diameter steel pipe | |
CN209479705U (en) | Transport vehicle is used in a kind of reinforcing of jacking construction tube head | |
CN107152026B (en) | A kind of the mud jacking pipe support and its distribution method of steel-pipe pile | |
CN202509774U (en) | External joint grouting device for socket of prestressed concrete cylinder pipe (PCCP) | |
CN204153316U (en) | A kind of plumbing installation | |
CN205100565U (en) | But steel pipe concrete jacking of superelevation layer is with retractable pump pipe | |
CN205956562U (en) | Wall pipe with sleeve pipe | |
CN105135054B (en) | The pipe jacking construction method of super-long pipeline | |
CN204042271U (en) | Underground coal mine pipe connecting structure | |
CN220792263U (en) | Connecting device for pipeline installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |