CN207452602U - Both wired temperature pier structure of existing railway roadbed is worn under a kind of - Google Patents
Both wired temperature pier structure of existing railway roadbed is worn under a kind of Download PDFInfo
- Publication number
- CN207452602U CN207452602U CN201721470881.9U CN201721470881U CN207452602U CN 207452602 U CN207452602 U CN 207452602U CN 201721470881 U CN201721470881 U CN 201721470881U CN 207452602 U CN207452602 U CN 207452602U
- Authority
- CN
- China
- Prior art keywords
- wired
- buttress
- railway roadbed
- existing railway
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Abstract
The utility model is related to wear both wired temperature pier structure of existing railway roadbed under a kind of, both wired above newly-built under-traverse tunnel is arranged in parallel twice for both wired just beams for carrying out holding up reinforcing, just beam end to be supported by buttress, and buttress is located at tunnel both sides;Buttress pier top is provided with sleeper pile.The constructing tunnel structure of the utility model is using subsurface excavation method by if Shed-pipe Advanced Support is aided with grouting with small pipe and carries out pre support.The short drilling depth of in-cavity construction, strong supporting, fast lining cutting, construction safety utmostly reduce the influence to both wired operations, and ensure that both wired construction period does not cut off traffic.
Description
Technical field
The utility model is related to Tunnel Engineering technical fields, and in particular to the both wired of existing railway roadbed is worn under a kind of and is faced
When ruggedized construction.
Background technology
With the Large scale construction of urban rail transit in China, new route wears the situation of existing line increasingly under needing
It is more.The mode of passing through have on wear, under wear and wear three kinds with side, wherein under wear existing railway circuit engineering technology difficulty maximum, risk is most
It is high.During Tunnel Passing existing line, the existing country rock soil body can be generated and disturb and cause stratum deformation, when deformation reaches
The operation security of existing line or even generation damaging influence will be influenced when to a certain degree, correlation will be also influenced when serious
The security of the lives and property of personnel.
The content of the invention
The purpose of this utility model be to provide it is a kind of under wear both wired temperature pier structure of existing railway roadbed, it is ensured that both
Wired operation and construction safety.
Technical solution is used by the utility model:
Both wired temperature pier structure of existing railway roadbed is worn under a kind of, it is characterised in that:
Both wired above under-traverse tunnel is arranged in parallel twice for both wired just beams for carrying out holding up reinforcing, just beam
End is supported by buttress, and buttress is located at tunnel both sides;
Buttress pier top is provided with sleeper pile.
Just the circuit both sides of beam, which are extended, I-steel, and I-steel end is docked with just beam end, I-steel end
It is supported by buttress.
I-steel bottom surface has been evenly arranged sleeper pile.
The utility model has the following advantages:
The utility model is created under-traverse tunnel constructing structure and used to both wired temperature pier measures risen using just corbel
Subsurface excavation method is by if Shed-pipe Advanced Support is aided with grouting with small pipe and carries out pre support.The short drilling depth of in-cavity construction, strong supporting, fast lining cutting are applied
Work safety utmostly reduces the influence to both wired operations, and ensures that both wired construction period does not cut off traffic.
Description of the drawings
Fig. 1 is the utility model plan view.
Fig. 2 is I-I sectional views.
Fig. 3 is II-II sectional views.
In figure, 1- just beams, 2- I-steel, 3- sleeper piles, 4- buttresses.
Specific embodiment
The utility model is described in detail With reference to embodiment.
The utility model is related to it is a kind of under wear both wired temperature pier structure of existing railway roadbed, on newly built tunnels
Side it is both wired be arranged in parallel twice for both it is wired carry out hold up reinforcing just beam 1, just 1 end of beam supported by buttress 4, prop up
Pier 4 is located at tunnel both sides;4 pier top of buttress is provided with sleeper pile 3.
Just the circuit both sides of beam 1, which are extended, I-steel 2, and 2 end of I-steel is docked with just 1 end of beam, I-steel 2
End is supported by buttress 4;2 bottom surface of I-steel has been evenly arranged sleeper pile 3.
Embodiment:
Existing railway Roadbed Soil is worn under tunnel exit, vault is away from the high about 5.5m of existing railway rail level, using following measures:
1st, both wired using the widened D types of 2 hole 24m, just beam 1 holds up reinforcing, and carries out button rail to both wired, just 1 base of beam
Plinth uses the caisson of φ 120cm, i.e. buttress 4, digging hole pile foundation should go deep into complete basement rock 2m.
2nd, banket existing line base using grouting and reinforcing.φ 42mm ductules, 4 ~ 6m of length, 1.0 × 1.0m of spacing, plum
Flower pattern is arranged, notes single liquid cement mortar.
3rd, construction is worn under creating using subsurface excavation method by if Shed-pipe Advanced Support is aided with grouting with small pipe and carries out pre support.In hole
Construction has to do things steadily and surely, short drilling depth, strong supporting, fast lining cutting.
4th, strengthen deformation monitoring measure, including being restrained in surface subsidence and hole, especially to strengthen both wired rail level absolute altitude,
The measurement of gauge etc. will take the measures such as parking, reinforcing, it is ensured that both wired operation and construction safety immediately if any abnormal.
The content of the utility model is not limited to cited by embodiment, and those of ordinary skill in the art are new by reading this practicality
Type specification and to any equivalent conversion that technical solutions of the utility model are taken, be the claim institute of the utility model
Cover.
Claims (3)
1. both wired temperature pier structure of existing railway roadbed is worn under a kind of, it is characterised in that:
Both wired twice that are arranged in parallel above under-traverse tunnel are for both wired just beams for carrying out holding up reinforcing(1), just beam
(1)End is by buttress(4)Support, buttress(4)Positioned at tunnel both sides;
Buttress(4)Pier top is provided with sleeper pile(3).
2. it is according to claim 1 it is a kind of under wear both wired temperature pier structure of existing railway roadbed, it is characterised in that:
Just beam(1)Circuit both sides be extended have I-steel(2), I-steel(2)End and just beam(1)End is docked, work
Word steel(2)End is by buttress(4)Support.
3. it is according to claim 2 it is a kind of under wear both wired temperature pier structure of existing railway roadbed, it is characterised in that:
I-steel(2)Bottom surface has been evenly arranged sleeper pile(3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721470881.9U CN207452602U (en) | 2017-11-07 | 2017-11-07 | Both wired temperature pier structure of existing railway roadbed is worn under a kind of |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721470881.9U CN207452602U (en) | 2017-11-07 | 2017-11-07 | Both wired temperature pier structure of existing railway roadbed is worn under a kind of |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207452602U true CN207452602U (en) | 2018-06-05 |
Family
ID=62254023
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721470881.9U Active CN207452602U (en) | 2017-11-07 | 2017-11-07 | Both wired temperature pier structure of existing railway roadbed is worn under a kind of |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207452602U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110107303A (en) * | 2019-04-19 | 2019-08-09 | 同济大学 | The deformation control method of shallow earthing shield boring across underneath high-speed railway |
CN110438855A (en) * | 2019-07-19 | 2019-11-12 | 中国十七冶集团有限公司 | A kind of construction method of undercrossing tunnel bridges and culverts railway roadbed backfill |
-
2017
- 2017-11-07 CN CN201721470881.9U patent/CN207452602U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110107303A (en) * | 2019-04-19 | 2019-08-09 | 同济大学 | The deformation control method of shallow earthing shield boring across underneath high-speed railway |
CN110438855A (en) * | 2019-07-19 | 2019-11-12 | 中国十七冶集团有限公司 | A kind of construction method of undercrossing tunnel bridges and culverts railway roadbed backfill |
CN110438855B (en) * | 2019-07-19 | 2020-12-04 | 中国十七冶集团有限公司 | Construction method for backfilling underneath-crossing railway bridge and culvert road bed |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101818505B (en) | Soil pressure testing method for a cutting edge of caisson | |
Chen et al. | Recent advances in high slope reinforcement in China: Case studies | |
CN103147442A (en) | Ultra-deep foundation pit press-grouting pile and prestressed anchor combined supporting construction method | |
CN103437341A (en) | Effective grooving construction method for underground continuous wall in slightly-weathered limestone with overlying sandy soil | |
CN102518453A (en) | Quick tunnel-entrance construction method for bias-pressure shallow-buried or single-pressure tilting arenaceous loess tunnels | |
CN204199335U (en) | A kind of pressure release well reducing PHC tube pile construction soil compaction effect | |
CN102561330A (en) | Integrated construction method for artificial dug pile and steel pipe concrete column | |
CN105239586A (en) | Support structure for supporting foundation pit and method for supporting foundation pit | |
CN103321260A (en) | Rectifying method by drilling at intervals and pile cutting off | |
CN108979659A (en) | The ruggedized construction and method of structures are worn under weak soil rich water large cross-section tunnel group | |
CN103741605B (en) | Suppressing beam body produces crack and suppresses the method that beam cracks expands | |
CN112627832A (en) | Method for integrating detection, treatment and monitoring operation and maintenance of water inrush and mud inrush of karst tunnel | |
CN207878473U (en) | Layer depth foundation pit hangs foot stake supporting construction to Tu Yan in combination | |
CN207452602U (en) | Both wired temperature pier structure of existing railway roadbed is worn under a kind of | |
CN112576265A (en) | Sedimentation control method for old villages penetrated by shield | |
CN115539048A (en) | Construction method for shallow-buried bias tunnel portal | |
Ni et al. | Field investigation of the influence of basement excavation and dewatering on ground and structure responses | |
CN107100157A (en) | Study test platform and method that unfavorable geologic body interacts with bridge structure | |
CN210195766U (en) | Underground structure is built in same direction as digging to hunch lid | |
CN205576990U (en) | Cross section and wear bridge pier tunnel slip casting supporting construction | |
CN208605199U (en) | The ruggedized construction of structures is worn under a kind of weak soil rich water large cross-section tunnel group | |
KR100626820B1 (en) | Shallow overbuden tunnel construction method | |
CN110258606A (en) | Projecting wall encloses well construction | |
CN207862907U (en) | Study the test platform of unfavorable geologic body and bridge structure interaction | |
KR101437882B1 (en) | Tunnel excavating method having various cross sectional shapes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |