CN207436536U - Tower crane construction system - Google Patents

Tower crane construction system Download PDF

Info

Publication number
CN207436536U
CN207436536U CN201721486564.6U CN201721486564U CN207436536U CN 207436536 U CN207436536 U CN 207436536U CN 201721486564 U CN201721486564 U CN 201721486564U CN 207436536 U CN207436536 U CN 207436536U
Authority
CN
China
Prior art keywords
platform
building structure
tower crane
shear wall
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721486564.6U
Other languages
Chinese (zh)
Inventor
王玉泽
赵蕾
张祎
王玲
张福江
王小娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Bureau Group North China Construction Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Bureau Group North China Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Bureau Group North China Construction Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201721486564.6U priority Critical patent/CN207436536U/en
Application granted granted Critical
Publication of CN207436536U publication Critical patent/CN207436536U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a tower crane construction system, which is used for reforming and constructing an existing building structure, wherein the existing building comprises a civil air defense project provided with a building structure shear wall, and the building structure shear wall of the civil air defense project is connected with a foundation; the system comprises: the system comprises a tower crane, a wall attaching piece and a tower crane foundation platform; the tower body of the tower crane is connected with the building structure column by using the wall attaching piece, and the bottom of the tower body is fixedly connected with the tower crane foundation platform; the tower crane foundation platform is an underframe ballast type foundation platform; the tower crane foundation platform is fixedly connected to a building structure shear wall of civil air defense engineering through a mechanical anchor bolt. The utility model discloses tower crane construction system is applicable to the building height higher, around the place narrow and small, the limited existing building tower crane foundation platform installation of ground bearing capacity, especially the building transformation engineering of geographical position close to city center.

Description

A kind of derrick crane construction system
Technical field
The utility model belongs to tower crane construction and installation technical field, more particularly to a kind of derrick crane construction system.
Background technology
More eminence structure installing engineering involved in reconstruction of existing building, some even larger installing engineerings of batch, Installing engineering amount is larger or when construction weight is heavier, and live vertical transport demand need to be met by means of derrick crane.Roofing Elevator shaft, staircase can be used as tower crane installation region.A kind of tower crane mounting means is as follows:Tower crane uses girder steel Basis, girder steel are connected with Core Walls Structure and are connected by the way of slugging.But by with designing unit and tower crane unit into Row verification, program derrick crane factor of safety against overturning are relatively low.
Therefore, for geographical location close to the existing building tower crane installing engineering of central city, it is necessary to overcome building high Higher, the surrounding narrow field of degree, the problems such as foundation bearing capacity is limited.
Utility model content
The purpose of this utility model is to provide a kind of derrick crane construction system, to solve tower crane installing engineering antidumping The problem of safety coefficient is low.
The technical solution that the utility model solves above-mentioned technical problem is as follows:A kind of derrick crane construction system, it is described For existing structures to be transformed with construction, the existed building includes setting the people's air defense work of building structure shear wall system Journey, the building structure shear wall connection ground of civil air defense constructions and installations;The system comprises:Derrick crane, attached wall part and tower crane Platform;The tower body of the derrick crane is connected using attached wall part with building structure column, and tower body bottom is consolidated with tower crane platform Fixed connection;The tower crane platform is chassis ballast formula basic platform;Tower crane platform is fixedly connected by mechanical anchor To the building structure shear wall of civil air defense constructions and installations.
The utility model derrick crane construction system as described above, further, the tower crane platform include flat Platform beam peace important actor, the landing beam are rectangular configuration, and platform column is vertically connected on four corner positions of landing beam;Tower body bottom Portion is fixedly connected with landing beam.
The utility model derrick crane construction system as described above further, further includes suspension column, suspension column and platform column Bottom be fixedly connected, suspension column is fixedly connected with the shear wall of building structure.
The utility model derrick crane construction system as described above, further, the building structure of the civil air defense constructions and installations Shear wall is the building structure shear wall of civil air defense constructions and installations entrance;The building structure shear wall on cutting protrusion ground, utilizes Buried plate is fixedly attached to the building structure shear wall by mechanical anchor, and platform column and the buried plate welding of tower crane platform connect It connects.
The utility model derrick crane construction system as described above, further, the tower body profit of the derrick crane It is connected at least three attached wall parts with building structure column.
The beneficial effects of the utility model are:
1st, this construction system properly settled higher building height, surrounding narrow field, basement space scope it is relatively wide and Existing building derrick crane position when bearing capacity is limited is selected and installation question, provides a solution and thinking.
2nd, it is located at compared with tower crane branch close to the elevator of roofing or staircase position, this construction system tower crane topples Coefficient and danger coefficient are substantially reduced, and this engineering method setting height(from bottom) is relatively low, therefore installation footprint is smaller, and ground is held It is relatively low to carry power requirement.This construction system need not be relatively low to prototype structure extent of the destruction through basement structure to sole plate.
3rd, this engineering method tower crane platform construction work surface is located at first layer ground position, has evaded the risk of high-rise working, Effectively prevent the probability of object strike and high falling.
Description of the drawings
By the detailed description made in conjunction with the following drawings, the above-mentioned and/or otherwise advantage of the utility model will It becoming more apparent upon and is easier to understand, these attached drawings are simply schematical, are not intended to limit the utility model, wherein:
Fig. 1 is a kind of tower crane platform stereoscopic schematic diagram of embodiment of the utility model;
Fig. 2 is a kind of landing beam peace important actor connection diagram of embodiment of the utility model;
Fig. 3 is a kind of landing beam peace important actor connecting node schematic diagram of embodiment of the utility model;
Fig. 4 is the Section A-A schematic diagram of Fig. 3;
Fig. 5 is a kind of platform column of embodiment of the utility model and heel join node schematic diagram;
Fig. 6 is installed for a kind of suspension column of embodiment of the utility model to shear wall schematic diagram;
Fig. 7 is the section B-B schematic diagram of Fig. 6.
In attached drawing, parts list represented by the reference numerals is as follows:
1st, landing beam, 11, outer shroud roof beam structure, 12, inner ring roof beam structure, 2, platform column, 3, suspension column, 31, heel slab, 32, attached wall plate, 4th, shear wall, 5, anchor bolt, 6, Screw arbor with nut at both-ends.
Specific embodiment
Hereinafter, the embodiment of the derrick crane construction system of the utility model is described with reference to the accompanying drawings.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model Design, is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model System.In addition to the embodiment recorded herein, those skilled in the art can also be based on the application claims and specification institute is public The content opened includes doing using the embodiment to recording herein using obvious other technical solutions, these technical solutions Go out the technical solution of any obvious substitutions and modifications.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the utility model, it is schematically indicated each several part Shape and its correlation.It note that clearly to show the structure of each component of the utility model embodiment, respectively It is not drawn between attached drawing according to identical ratio.Identical reference marker is used to represent identical part.
A kind of derrick crane construction system of embodiment of the utility model described further below, the system are used for having Building structure is transformed construction, and existed building includes setting the civil air defense constructions and installations of building structure shear wall, the building of civil air defense constructions and installations Structural shear wall connects ground;System includes:Derrick crane, attached wall part and tower crane platform;The tower body of derrick crane It is connected using attached wall part with building structure column, tower body bottom is fixedly connected with tower crane platform;Tower crane platform is chassis Ballast formula basic platform;Tower crane platform is fixedly attached to the building structure shear wall of civil air defense constructions and installations by mechanical anchor.
In a kind of derrick crane construction system of preferred embodiment, as shown in Figure 1, tower crane platform includes platform The peaceful important actor 2 of beam 1, landing beam is rectangular configuration, and platform column is vertically connected on four corner positions of landing beam;Tower body bottom with Landing beam is fixedly connected.In order to further improve the stability of tower crane platform, said structure can also further optimize, and such as scheme Shown in 2, landing beam includes connected outer shroud roof beam structure 11 and inner ring roof beam structure 12, above-mentioned roof beam structure are welded by beam column.
Specifically, as shown in Figure 3 and Figure 4, platform column is connected to the inner ring beam rack position of criss-cross construction, platform column with Beam column is welded to connect.Link position snaps in order to prevent, and plate is welded to connect at the top of platform column, further by bolt Reinforce connecting platform column and landing beam.
In a kind of derrick crane construction system of preferred embodiment, the building structure shear wall of civil air defense constructions and installations is people's air defense The building structure shear wall of engineering entrance;The building structure shear wall on cutting protrusion ground, will be buried using mechanical anchor Plate is fixedly attached to building structure shear wall, and platform column and the buried plate of tower crane platform are welded to connect.
In another embodiment, as shown in Fig. 1, Fig. 5, Fig. 6 and Fig. 7, the bottom welding suspension column 3 of platform column 2, the column Foot 3 includes heel slab 31 and attached wall plate 32, and heel slab 31 and the bottom of platform column are welded to connect, and are fixed to by anchor bolt 5 Shear wall 4.Attached wall plate is vertically welded in the both sides of heel slab, is formed to be inserted into the sky of shear wall between two attached wall plates Gap, Screw arbor with nut at both-ends 6 penetrate attached wall plate and shear wall.Suspension column is fastened on shear wall by heel slab and the dual of attached wall plate, Improve the fastness that tower crane platform is connected with existing structures.
Since underground civil defence structure layer concrete intensity is higher, people's air defense shear wall can pass through sole plate power transmission to ground Structure stress according to pre-installation tower crane specifications and models bearing capacity demand, is calculated by design in people's air defense shearing wall zone installation tower Basic platform is hung, tower crane platform is connected by mechanical anchor with shear wall, and tower crane is forced through tower crane platform Ground is transferred to shear wall.It is located at close to the elevator of roofing or staircase position compared with tower crane platform branch, originally applies The installation of work system tower crane need to use smaller truck crane tonnage, space requirement and foundation bearing capacity requirement relatively low, while tower crane topples and is Number and danger coefficient are substantially reduced.
In a kind of derrick crane construction system of preferred embodiment, the tower body of derrick crane is attached using at least three Wall part is connected with building structure column.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and other feature combination, and those skilled in the art are also Other combinations between each technical characteristic can be carried out according to the purpose of invention, are subject to the purpose for realizing the utility model.

Claims (5)

1. a kind of derrick crane construction system, for existing structures to be transformed with construction, feature exists the system In the existed building includes setting the civil air defense constructions and installations of building structure shear wall, the building structure shear wall connection of civil air defense constructions and installations Ground;The system comprises:Derrick crane, attached wall part and tower crane platform;The tower body of the derrick crane utilizes attached Wall part is connected with building structure column, and tower body bottom is fixedly connected with tower crane platform;The tower crane platform is chassis pressure Weight formula basic platform;Tower crane platform is fixedly attached to the building structure shear wall of civil air defense constructions and installations by mechanical anchor.
2. derrick crane construction system according to claim 1, which is characterized in that the tower crane platform includes flat Platform beam peace important actor, the landing beam are rectangular configuration, and platform column is vertically connected on four corner positions of landing beam;Tower body bottom Portion is fixedly connected with landing beam.
3. derrick crane construction system according to claim 1, which is characterized in that further include suspension column, suspension column and platform The bottom of column is fixedly connected, and suspension column is fixedly connected with the shear wall of building structure.
4. derrick crane construction system according to claim 1, which is characterized in that the building structure of the civil air defense constructions and installations Shear wall is the building structure shear wall of civil air defense constructions and installations entrance;The building structure shear wall on cutting protrusion ground, utilizes Buried plate is fixedly attached to the building structure shear wall by mechanical anchor, and platform column and the buried plate welding of tower crane platform connect It connects.
5. according to claim 1-4 any one of them derrick crane construction systems, which is characterized in that the derrick crane Tower body be connected using at least three attached wall parts with building structure column.
CN201721486564.6U 2017-11-09 2017-11-09 Tower crane construction system Expired - Fee Related CN207436536U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721486564.6U CN207436536U (en) 2017-11-09 2017-11-09 Tower crane construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721486564.6U CN207436536U (en) 2017-11-09 2017-11-09 Tower crane construction system

Publications (1)

Publication Number Publication Date
CN207436536U true CN207436536U (en) 2018-06-01

Family

ID=62288264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721486564.6U Expired - Fee Related CN207436536U (en) 2017-11-09 2017-11-09 Tower crane construction system

Country Status (1)

Country Link
CN (1) CN207436536U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098202A (en) * 2018-09-18 2018-12-28 中铁十局集团建筑工程有限公司 Non- console mode tower crane foundation construction method
CN110424445A (en) * 2019-08-22 2019-11-08 中交路桥北方工程有限公司 Independent derrick crane pedestal

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098202A (en) * 2018-09-18 2018-12-28 中铁十局集团建筑工程有限公司 Non- console mode tower crane foundation construction method
CN110424445A (en) * 2019-08-22 2019-11-08 中交路桥北方工程有限公司 Independent derrick crane pedestal

Similar Documents

Publication Publication Date Title
EP3379002A1 (en) Flexible hanging type module building structure
CN101886468B (en) Construction method of suspension type template support in high-position conjoined structure
CN105926674B (en) High intensity Urban Underground pipe gallery
CN102304928A (en) Big-span and big-load prestress trough-shaped laminated plate used as 6-level civil air defence basement roof plate
CN106812235B (en) A kind of assembled sheet-pile steel structure system
CN105908868B (en) A kind of practice of light steel frame cage bar type single-row reinforcement regeneration concrete shear force wall
CN207436536U (en) Tower crane construction system
CN210947142U (en) Assembled concrete structure post roof beam connecting steel node
CN202481960U (en) Wall-attached frame of tower crane
Jagadish et al. A study on bracing systems on high rise steel structures
CN102912991A (en) Track hosting device and track hoisting method of large curtain wall unit plate
CN102287022A (en) Large-span heavy-load prestress groove-shaped laminated plate for civil defense basement ceiling plate
CN216740047U (en) Overhead tool type steel platform with high altitude and large span
CN205777531U (en) Floor slab construction beam string shuttering supporting equipment
CN114108808B (en) PVC-FRP pipe concrete column and concrete superposed beam combined structure with adjustable connecting node and installation method thereof
CN106285028A (en) Reinforcement of factory building construction method in long-span heavy type crane girder based on BIM technology dismounting
CN108331172A (en) A kind of conversion beam of the unidirectional diagonal brace of setting
CN208137136U (en) A kind of conversion beam that unidirectional diagonal brace is set
CN211172365U (en) Assembled low-rise residential structure system
CN211257759U (en) Truss type heavy suspension scaffold
CN210032222U (en) Steel-concrete combined shear wall
CN202518904U (en) Express elevator stability control structure for construction of super high-rise building
CN206844680U (en) Steel gallery ground assembly load transfer device
Melkumyan et al. Application of base isolation to multifunctional multistory buildings in Yerevan, Armenia
CN108824920B (en) Novel buckling restrained energy-consumption steel plate shear wall, structural system and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180601