CN109098202A - Non- console mode tower crane foundation construction method - Google Patents

Non- console mode tower crane foundation construction method Download PDF

Info

Publication number
CN109098202A
CN109098202A CN201811087469.8A CN201811087469A CN109098202A CN 109098202 A CN109098202 A CN 109098202A CN 201811087469 A CN201811087469 A CN 201811087469A CN 109098202 A CN109098202 A CN 109098202A
Authority
CN
China
Prior art keywords
reinforced concrete
tower crane
concrete frame
steel box
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811087469.8A
Other languages
Chinese (zh)
Inventor
宗玉军
刘廷滨
陈浩
耿贤军
骆明足
贾霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
CR10BG CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CR10BG CONSTRUCTION ENGINEERING Co Ltd filed Critical CR10BG CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201811087469.8A priority Critical patent/CN109098202A/en
Publication of CN109098202A publication Critical patent/CN109098202A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of non-console mode tower crane foundation construction methods, the non-console mode tower crane includes existing building reinforced concrete frame column, newly-built reinforced concrete frame column, main steel box-girder and secondary steel box-girder, newly-built reinforced concrete frame column is arranged on existing building reinforced concrete frame column, main steel box-girder basis of formation frame is equipped at intervals between two newly-built reinforced concrete frame columns, it is equipped with time steel box-girder described in time steel box-girder between two relatively main steel box-girders and constitutes " well " word structure, forms four intersection points at middle part and constitutes tower crane.The present invention solves when adding layer, transformation of existing building roof system or more, non- console mode tower crane safety, the guarantee of total bearing capacity, it is relative to the advantages of existing tower crane foundation construction method: realizes that the non-console mode tower crane of existing building roof system or more is set up, and the overall stability of tower crane, anti-overturning and shear resistant are all satisfied requirement.

Description

Non- console mode tower crane foundation construction method
Technical field
The present invention relates to a kind of non-console mode tower crane foundation construction methods, belong to technical field of building construction.
Background technique
Tower crane is widely used in modern society's construction, mainly solves the problems, such as the vertical transport in construction.For Guarantee the safety in tower crane operational process, tower crane must be secured to it is reliable on the basis of, tower crane must have enough intensity, Resistance to capsizing and anti-shear ability.Existing tower crane form is seated on the ground around building, predominantly integrally Two kinds of formula reinforced concrete foundation and pile foundation support table formula reinforced concrete foundation, this two kinds of foundation construction methods are more conventional steel Muscle, template, concrete construction process are constructed more convenient.But after having the following deficiencies: 1) concreting, coagulation is undergone Native curing time, construction period are long;2) reinforcing bar, concrete material dosage are big, and cannot reuse, and result in waste of resources;3) It can not achieve the non-console mode tower crane of existing building roof system or more to set up.To layer, transformation is added on existing building roof system, according to biography The tower crane foundation construction method of system, it is difficult to realize that tower crane is set up.
Summary of the invention
The technical problem to be solved by the present invention is to provide one for limitation present in existing tower crane foundation construction method The non-console mode tower crane foundation construction method of kind.
In order to solve this technical problem, described non-to fall the present invention provides a kind of non-console mode tower crane foundation construction method Ground formula tower crane includes existing building reinforced concrete frame column, newly-built reinforced concrete frame column, main steel box-girder and secondary steel Box beam, the newly-built reinforced concrete frame column are arranged on existing building reinforced concrete frame column, two newly-built reinforced concretes It is equipped at intervals with main steel box-girder basis of formation frame between native frame column, is equipped between two relatively main steel box-girders secondary described in time steel box-girder Steel box-girder constitutes " well " word structure, forms four intersection points at middle part and constitutes tower crane;
Steps are as follows for Specific construction:
1) in existing building reinforced concrete frame column bar planting process: being included in existing reinforced concrete frame column 1 and plant Enter reinforcing bar to form multiple bar planting regions corresponding with the connection of newly-built reinforced concrete frame column;
2) the pre-buried gusset plate process of reinforced concrete frame column is created: including pre-buried section in newly-built reinforced concrete frame column Contact plate forms multiple pre-buried regions corresponding with main steel box-girder beam-ends connection;
3) preburied component absolute altitude control process: all pre-buried gusset plate bottom absolute altitudes in the multiple pre-buried region are located At same default absolute altitude;
4) newly-built reinforced concrete frame column and main steel box-girder are attached using high-strength bolt by pre-buried gusset plate;
5) time steel box-girder is installed in main steel box-girder frame and forms tower crane.
Bar planting process is that more reinforcing bar rules are arranged and are implanted in existing building reinforced concrete respectively in the step 1) In native frame column, bar planting region corresponding with the connection of newly-built reinforced concrete frame column is formed.
The reinforcing bar that 16 diameters are 25mm is implanted into the step 1) in existing building reinforced concrete frame column, is implanted into ruler Very little is 1m, is stretched out having a size of 1m, and existing building reinforced concrete frame column column cap dabbing.
Pre-buried gusset plate is formed and main steel according to the pre-buried gusset plate of gusset plate bottom absolute altitude set in the step 2) Box beam beam-ends connects corresponding pre-buried region.
It is described it is rapid 2) in create reinforced concrete frame column pre-buried gusset plate and main steel box-girder beam-ends use high-strength bolt It is attached.
In the step 3) absolute altitude control be in each pre-buried region gusset plate bottom absolute altitude carry out levelness detection and Adjustment in real time makes tower crane platform until the gusset plate bottom absolute altitude in multiple pre-buried regions is at same default absolute altitude In the same plane.
The size of the newly-built reinforced concrete frame column is 1600mm × 1600mm.
The utility model has the advantages that present invention greatly enhances the working efficiency of tower crane installation process, engineering cost is saved, and into one Step reduces environmental pollution caused by construction, reaches green construction requirement.Solve existing building roof system or more simultaneously plus layer, When transformation, non-console mode tower crane safety, the guarantee of total bearing capacity, relative to the excellent of existing tower crane foundation construction method Point is: realizing that the non-console mode tower crane of existing building roof system or more is set up;Material is saved, construction speed is promoted, it is at low cost It is honest and clean, it is economic and environment-friendly, and the overall stability of tower crane, anti-overturning and shear resistant are all satisfied requirement.
Detailed description of the invention
Fig. 1 is the flow diagram of construction method of the present invention;
Fig. 2 is the floor map of the non-console mode tower crane of the present invention;
Fig. 3 is existing building reinforced concrete frame column reinforcing steel implant diagrammatic cross-section of the present invention;
Fig. 4 is existing building reinforced concrete frame column reinforcing steel implant schematic top plan view of the present invention;
Fig. 5 is the pre-buried schematic top plan view of new building reinforced concrete frame column reinforcing bar of the present invention.
In figure: 1 existing building reinforced concrete frame column, 2 newly-built reinforced concrete frame columns, 3 main steel box-girders, 4 steel Box beam, 5 reinforcing bars, 6 gusset plates.
Specific embodiment
The present invention will now be described in detail with reference to the accompanying drawings and examples.
Fig. 1 show the flow diagram of construction method of the present invention.
The present invention provides a kind of non-console mode tower crane foundation construction methods, including existing building reinforced concrete frame column Bar planting process, the newly-built pre-buried gusset plate process of reinforced concrete frame column and preburied component absolute altitude control process.
Fig. 2 show the floor map of the non-console mode tower crane of the present invention.
The non-console mode tower crane includes existing building reinforced concrete frame column 1, newly-built reinforced concrete frame Column 2, main steel box-girder 3 and secondary steel box-girder 4, the newly-built reinforced concrete frame column 2 are arranged in existing building steel reinforced concrete frame On trestle 1, main 3 basis of formation frame of steel box-girder, two relatively main steel casees are equipped at intervals between two newly-built reinforced concrete frame columns 2 Time steel box-girder 4 is equipped between beam 3, the secondary steel box-girder 4 constitutes " well " word structure, forms four intersection points at middle part and constitutes tower crane base Plinth.
The size of the newly-built reinforced concrete frame column 2 is 1600mm × 1600mm.
Steps are as follows for Specific construction of the present invention:
1) in existing building reinforced concrete frame column bar planting process: being included in existing reinforced concrete frame column 1 and plant Enter reinforcing bar 5 to be formed and connect corresponding multiple bar planting regions with newly-built reinforced concrete frame column 2;
2) the pre-buried gusset plate process of reinforced concrete frame column is created: including pre-buried in newly-built reinforced concrete frame column 2 Gusset plate 6 forms multiple pre-buried regions corresponding with main 3 beam-ends of steel box-girder connection;
3) preburied component absolute altitude control process: all pre-buried 6 bottom absolute altitudes of gusset plate in the multiple pre-buried region are equal At same default absolute altitude;
4) newly-built reinforced concrete frame column 2 and main steel box-girder 3 are connected using high-strength bolt by pre-buried gusset plate 6 It connects;
5) time steel box-girder 4 is installed in main 3 frame of steel box-girder and forms tower crane.
Bar planting process is that more 5 rules of reinforcing bar are arranged and are implanted in existing building reinforced concrete respectively in the step 1) In native frame column 1, is formed and connect corresponding bar planting region with newly-built reinforced concrete frame column 2.
The reinforcing bar 5 that 16 diameters are 25mm, implantation are implanted into the step 1) in existing building reinforced concrete frame column 1 It having a size of 1m, stretches out having a size of 1m, and 1 column cap dabbing of existing building reinforced concrete frame column is (in conjunction with Fig. 2, Fig. 3 and Fig. 4 institute Show).
Pre-buried gusset plate is formed and main according to the pre-buried gusset plate 6 of gusset plate bottom absolute altitude set in the step 2) 3 beam-ends of steel box-girder connects corresponding pre-buried region.
It is described it is rapid 2) in create reinforced concrete frame column 2 pre-buried gusset plate 6 and main 3 beam-ends of steel box-girder use high-strength spiral shell Bolt is attached (as shown in connection with fig. 5).
In the step 3) absolute altitude control be in each pre-buried region gusset plate bottom absolute altitude carry out levelness detection and Adjustment in real time makes tower crane platform until the gusset plate bottom absolute altitude in multiple pre-buried regions is at same default absolute altitude In the same plane.
Non- console mode tower crane foundation construction method provided by the invention, the advantages of relative to existing tower crane foundation construction method It is: realizes that the non-console mode tower crane of existing building roof system or more is set up;Material is saved, construction speed is promoted, it is low in cost, It is economic and environment-friendly, and the overall stability of tower crane, anti-overturning and shear resistant are all satisfied requirement.
The embodiment above of the present invention, is merely illustrative, be not it is only, it is all within the scope of the present invention or it is equivalent this Change in the range of invention is surrounded by the present invention.

Claims (7)

1. a kind of non-console mode tower crane foundation construction method, it is characterised in that: the non-console mode tower crane includes existing builds Reinforced concrete frame column (1), newly-built reinforced concrete frame column (2), main steel box-girder (3) and time steel box-girder (4) are built, it is described new It builds reinforced concrete frame column (2) to be arranged on existing building reinforced concrete frame column (1), two newly-built reinforced concrete frames It is equipped at intervals with main steel box-girder (3) basis of formation frame between column (2), is equipped with time steel box-girder between two relatively main steel box-girders (3) (4), the secondary steel box-girder (4) constitutes " well " word structure, forms four intersection points at middle part and constitutes tower crane;
Steps are as follows for Specific construction:
1) in existing building reinforced concrete frame column bar planting process: being included in implantation in existing reinforced concrete frame column (1) Reinforcing bar (5) is to form multiple bar planting regions corresponding with newly-built reinforced concrete frame column (2) connection;
2) the pre-buried gusset plate process of reinforced concrete frame column is created: including pre-buried section in newly-built reinforced concrete frame column (2) Contact plate (6) forms multiple pre-buried regions corresponding with (3) the beam-ends connection of main steel box-girder;
3) preburied component absolute altitude control process: all pre-buried gusset plate (6) bottom absolute altitudes in the multiple pre-buried region are located At same default absolute altitude;
4) newly-built reinforced concrete frame column (2) and main steel box-girder (3) are carried out using high-strength bolt by pre-buried gusset plate (6) Connection;
5) time steel box-girder (4) is installed in main steel box-girder (3) frame and forms tower crane.
2. non-console mode tower crane foundation construction method according to claim 1, it is characterised in that: bar planting in the step 1) Process is by more reinforcing bar (5) rule arrangements and to be implanted in existing building reinforced concrete frame column (1) respectively, is formed and new It builds reinforced concrete frame column (2) and connects corresponding bar planting region.
3. non-console mode tower crane foundation construction method according to claim 2, it is characterised in that: the existing building reinforcing bar The reinforcing bar (5) that 16 diameters of implantation are 25mm in concrete frame trestle (1), implantation are stretched out having a size of 1m having a size of 1m, and existing Building iron concrete frame trestle (1) column cap dabbing.
4. non-console mode tower crane foundation construction method according to claim 1, it is characterised in that: pre-buried in the step 2) Gusset plate is formed corresponding with (3) the beam-ends connection of main steel box-girder according to the pre-buried gusset plate of gusset plate bottom absolute altitude (6) set Pre-buried region.
5. non-console mode tower crane foundation construction method according to claim 4, it is characterised in that: the newly-built reinforced concrete The pre-buried gusset plate (6) of native frame column (2) is attached with main steel box-girder (3) beam-ends using high-strength bolt.
6. non-console mode tower crane foundation construction method according to claim 1, it is characterised in that: absolute altitude in the step 3) Control is that levelness detection and adjustment in real time are carried out to the gusset plate bottom absolute altitude in each pre-buried region, until multiple pre-buried regions Interior gusset plate bottom absolute altitude is at same default absolute altitude, makes tower crane platform in the same plane.
7. non-console mode tower crane foundation construction method according to claim 1-6, it is characterised in that: described newly-built The size of reinforced concrete frame column (2) is 1600mm × 1600mm.
CN201811087469.8A 2018-09-18 2018-09-18 Non- console mode tower crane foundation construction method Pending CN109098202A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811087469.8A CN109098202A (en) 2018-09-18 2018-09-18 Non- console mode tower crane foundation construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811087469.8A CN109098202A (en) 2018-09-18 2018-09-18 Non- console mode tower crane foundation construction method

Publications (1)

Publication Number Publication Date
CN109098202A true CN109098202A (en) 2018-12-28

Family

ID=64866601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811087469.8A Pending CN109098202A (en) 2018-09-18 2018-09-18 Non- console mode tower crane foundation construction method

Country Status (1)

Country Link
CN (1) CN109098202A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512639A (en) * 2019-07-10 2019-11-29 中铁二局第一工程有限公司 A kind of no floor steel structure tower crane foundation construction method and constructing structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20016009U1 (en) * 2000-09-15 2001-04-26 Vetter Foerdertechnik Gmbh Fastening the column of a jib crane on a concrete foundation
US20160237681A1 (en) * 2013-09-11 2016-08-18 Hitachimentalstechno, Ltd. Column base structure
CN207436536U (en) * 2017-11-09 2018-06-01 中国建筑一局(集团)有限公司 A kind of derrick crane construction system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20016009U1 (en) * 2000-09-15 2001-04-26 Vetter Foerdertechnik Gmbh Fastening the column of a jib crane on a concrete foundation
US20160237681A1 (en) * 2013-09-11 2016-08-18 Hitachimentalstechno, Ltd. Column base structure
CN207436536U (en) * 2017-11-09 2018-06-01 中国建筑一局(集团)有限公司 A kind of derrick crane construction system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512639A (en) * 2019-07-10 2019-11-29 中铁二局第一工程有限公司 A kind of no floor steel structure tower crane foundation construction method and constructing structure

Similar Documents

Publication Publication Date Title
CN205205635U (en) Stride footpath bailey frame steel suspension bridge structure greatly
CN106869321A (en) The prefabricated regeneration concrete bean column node and its construction method of a kind of reinforcement
CN103161126A (en) Road bridge variable section hollow high pier slip-form construction method
CN106284106A (en) A kind of double curvature arch bridge arch compound sleeve arch reinforcement means
CN110552502A (en) Construction method of C-shaped stock yard intermediate retaining wall overhanging platform
CN108442239A (en) A kind of full assembled light abutment and its construction method
CN105839784B (en) Assembled jacking type construction techniques
CN107795124A (en) A kind of laminated floor slab truss support device for steel building
CN108277882A (en) Super-huge steel structure canopy construction technology under mal-condition
CN106836262A (en) A kind of construction method of packaged type bridges substructure
CN103952979A (en) Bracket-free construction device and construction method for steel-concrete superposed beam top plate
CN109098202A (en) Non- console mode tower crane foundation construction method
CN206655065U (en) Combined type support post and overhead rail system for overhead rail system
CN208533570U (en) A kind of prefabricated assembled fetal membrane
CN202450548U (en) Adjustable support for fundament of construction elevator on basement top plate
CN107299596B (en) Concrete support trestle plate lower supporting beam template system and construction method thereof
CN205296206U (en) Tower cane foundation
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN208965580U (en) A kind of non-console mode tower crane
CN210947710U (en) Synchronous sliding mode system for multiple special-shaped cabin bodies of underground shaft
CN208685617U (en) A kind of foundation underpinning system of old brick foundation building
CN207027858U (en) A kind of post stretching precast beam pedestal for being applicable different length and cross sectional shape
CN206655113U (en) Lattice support post and overhead rail system for overhead rail system
CN206681491U (en) The detachable assembled enclosure wall in building site
CN206655064U (en) Type steel support column and overhead rail system for overhead rail system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210428

Address after: 250101 6-9 / F, building 8, No. 59, Gongye South Road, Jinan area, China (Shandong) pilot Free Trade Zone, Jinan City, Shandong Province

Applicant after: The Sixth Engineering Co., Ltd. of China Railway 10th Bureau Group

Address before: 59 Building No. 8, industrial South Road, Ji'nan hi tech Zone, Shandong, 250101

Applicant before: CHINA RAILWAY TENTH GROUP CONSTRUCTION ENGINEERING Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20181228

RJ01 Rejection of invention patent application after publication