CN207405873U - Bridge at the top of a kind of assembled architecture steel construction - Google Patents

Bridge at the top of a kind of assembled architecture steel construction Download PDF

Info

Publication number
CN207405873U
CN207405873U CN201721369812.9U CN201721369812U CN207405873U CN 207405873 U CN207405873 U CN 207405873U CN 201721369812 U CN201721369812 U CN 201721369812U CN 207405873 U CN207405873 U CN 207405873U
Authority
CN
China
Prior art keywords
fixedly connected
bridge
plate
steel construction
assembled architecture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721369812.9U
Other languages
Chinese (zh)
Inventor
刘杰
邵子轩
宋锦琳
张鹏宁
韩初浩
郭彦龙
刘佳屏
王莎莎
郭淑玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Yihe Steel Construction Co Ltd
Original Assignee
Qingdao Yihe Steel Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Yihe Steel Construction Co Ltd filed Critical Qingdao Yihe Steel Construction Co Ltd
Priority to CN201721369812.9U priority Critical patent/CN207405873U/en
Application granted granted Critical
Publication of CN207405873U publication Critical patent/CN207405873U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides bridge at the top of a kind of assembled architecture steel construction, is related to steel construction bridge field.Bridge at the top of the assembled architecture steel construction, including beam body, the left end of the beam body is fixedly connected with left deck, the screw hole being connected with right side is offered on the left of the left deck, the internal whorl of the screw hole is connected with screw rod, accessory plate is fixedly connected on the right side of the left deck, the movable span being connected with right side is offered on the left of the accessory plate, the internal activity of the movable span is connected with motion bar.Bridge at the top of the assembled architecture steel construction, it is cooperated by left deck and right clamp seat, achieve the effect that complete pre-installation when bridge is installed at the top of steel construction, by turning screw rod to the right, achieve the effect that screw rod is made to move right and drive push plate that entire beam body is fixed, by the first spring and the mutual cooperation of contact plate, achieve the effect that the first spring is made to promote contact plate that beam body is fixed.

Description

Bridge at the top of a kind of assembled architecture steel construction
Technical field
The utility model is related to steel construction bridge technical field, be specially at the top of a kind of assembled architecture steel construction across Beam.
Background technology
Manufacture assembled architecture be then building material component is transported in factory's well in advance construction site assemble and Into.This will be China's building, a great revolution facing at the turn of the century of building materials industry, can be used to steel in assembled architecture Material, steel are since hardness is high, and corrosion-resistant, service life is long, the similary extensive use in other building trades, the steel of steel composition Structure is for assembled architecture using most, and bridge is used for primarily serving the effect of branch support in building in reality In be even more important.
At present, steel construction top bridge is a kind of relatively simple and basic structure type of beam, is exactly that both ends respectively have one The beam of a displacement constraint point.Single beam mainly has following three kinds of forms, i.e. simply supported beam, cantilever beam, cantilever beam and beam with both ends built-in. Bridge is primarily subjected to moment of flexure, belongs to curved effect structure, and bridge is in an installation due to peace at the top of existing assembled architecture steel construction Dress process is complicated, causes installment work inconvenient.
Utility model content
(One)The technical issues of solution
In view of the deficiencies of the prior art, the utility model provides bridge at the top of a kind of assembled architecture steel construction, solution Existing assembled architecture steel construction top bridge determined in an installation since installation process is complicated, has caused installment work inconvenient The problem of prompt.
(Two)Technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs:A kind of assembled architecture steel Structural top bridge, including beam body, the left end of the beam body is fixedly connected with left deck, offered on the left of the left deck with The screw hole that right side is connected, the internal whorl of the screw hole are connected with screw rod, auxiliary are fixedly connected on the right side of the left deck Plate offers the movable span being connected with right side on the left of the accessory plate, and the internal activity of the movable span is connected with activity Bar is fixedly connected with the first spring on the left of the accessory plate, and the described one end of first spring away from accessory plate is fixedly connected with Contact plate, the bottom of the contact plate are fixedly connected with the upper surface of motion bar, and the one end of the motion bar away from contact plate is passed through It wears movable span and extends to the right side of accessory plate, the right end of the beam body is fixedly connected with right clamp seat, the left side of the right clamp seat Fixed strip is fixedly connected with, the one end of the fixed strip away from right clamp seat is fixedly connected with shaft, the surface socket of the shaft There is runner, the lower surface of the runner is fixedly connected with movable plate, second spring, institute are fixedly connected on the right side of the movable plate It states the one end of second spring away from movable plate and is fixedly connected with fixed plate.
Preferably, the one end of the screw rod away from screw hole through screw hole and extends to the left side of left deck, the screw rod position One end on the left of left deck is fixedly connected with pole cap.
Preferably, the inner left wall of the left deck is overlapped with push plate, and the left side of the push plate and the right end of screw rod are fixed Connection.
Preferably, baffle ring is overlapped on the right side of the accessory plate, the inner wall of the baffle ring and the surface of motion bar are socketed.
Preferably, handle is overlapped on the right side of the baffle ring, the left side of the handle is fixedly connected with the right end of motion bar.
Preferably, the mounting hole being connected with right side is offered on the left of the fixed plate, the inside of the mounting hole is inserted It is connected to bolt.
(Three)Advantageous effect
The utility model provides bridge at the top of a kind of assembled architecture steel construction.Possesses following advantageous effect:
1st, bridge at the top of the assembled architecture steel construction is cooperated by left deck and right clamp seat, reached in steel knot The effect of pre-installation is completed at the top of structure during bridge installation, by turning screw rod to the right, reaching, which makes screw rod move right and drive, pushes away The effect that entire beam body is fixed plate, by the first spring and the mutual cooperation of contact plate, reaching makes the first spring The effect for promoting contact plate that beam body is fixed.
2nd, bridge at the top of the assembled architecture steel construction, by the bolt inside mounting hole, reaches and carries out right clamp seat Fixed effect, by the contraction of second spring, reach that buffering beam body occurs after mounting rocks, and solves existing assembling Bridge is in an installation since installation process is complicated at the top of formula construction steel structure, the problem of causing installment work inconvenient.
Description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model structure front view.
Wherein, 1 beam body, 2 left decks, 3 push plates, 4 screw rods, 5 pole caps, 6 screw holes, 7 contact plates, 8 first springs, 9 motion bars, 10 movable spans, 11 baffle rings, 12 handles, 13 accessory plates, 14 right clamp seats, 15 fixed strips, 16 shafts, 17 runners, 18 movable plates, 19 Two springs, 20 mounting holes, 21 fixed plates, 22 bolts.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
The utility model embodiment provides bridge at the top of a kind of assembled architecture steel construction, as shown in Figs. 1-2, including beam Body 1, the left end of beam body 1 are fixedly connected with left deck 2, and the left side of left deck 2 offers the screw hole 6 being connected with right side, screw hole 6 Internal whorl be connected with screw rod 4, the one end of screw rod 4 away from screw hole 6 is through screw hole 6 and extends to the left side of left deck 2, screw rod 4 one end for being located at 2 left side of left deck are fixedly connected with pole cap 5, and when beam body 1 is fixed, pole cap 5 is caught turn can In order to be moved screw rod 4, beam body 1 is fixed using screw rod 4, the inner left wall of left deck 2 is overlapped with push plate 3, The left side of push plate 3 is fixedly connected with the right end of screw rod 4, and when screw rod 4 moves right, screw rod 4 can drive push plate 3 to move right, The fastness of beam body 1 can be increased by being contacted using the surface of push plate 3 with wall, and the right side of left deck 2 is fixedly connected with accessory plate 13, The left side of accessory plate 13 offers the movable span 10 being connected with right side, and the internal activity of movable span 10 is connected with motion bar 9, auxiliary The right side of plate 13 is helped to be overlapped with baffle ring 11, the inner wall of baffle ring 11 is socketed with the surface of motion bar 9, and baffle ring 11 can prevent the first bullet Spring 8 discharges elastic force and takes motion bar 9 out of from the inside of movable span 10 and provided for installment work convenient, avoids in fixed beam Occurs unnecessary trouble during body 1, the right side of baffle ring 11 is overlapped with handle 12, and the left side of handle 12 and the right end of motion bar 9 are consolidated Fixed connection, when clamping wall using contact plate 7, catches handle 12 to pull to the right, the first spring 8 can so shunk, together When contact plate 7 is pulled to the right, convenient for clamping wall below, the left side of accessory plate 13 is fixedly connected with the first spring 8, the first bullet The one end of spring 8 away from accessory plate 13 is fixedly connected with contact plate 7, and the bottom of contact plate 7 is fixed with the upper surface of motion bar 9 to be connected It connects, the one end of motion bar 9 away from contact plate 7 is through movable span 10 and extends to the right side of accessory plate 13, and the right end of beam body 1 is fixed Right clamp seat 14 is connected with, the left side of right clamp seat 14 is fixedly connected with fixed strip 15, and the one end of fixed strip 15 away from right clamp seat 14 is consolidated Surely shaft 16 is connected with, the surface of shaft 16 is socketed with runner 17, and the lower surface of runner 17 is fixedly connected with movable plate 18, activity The right side of plate 18 is fixedly connected with second spring 19, and the one end of second spring 19 away from movable plate 18 is fixedly connected with fixed plate 21, the left side of fixed plate 21 offers the mounting hole 20 being connected with right side, and the inside of mounting hole 20 is plugged with bolt 22, is inciting somebody to action After the installation of right clamp seat 14 and left deck 2, second spring 19 can discharge elastic force and promote fixed plate 21 to be contacted with wall, then will Bolt 22 is inserted into wall, can so increase the fastness of beam body 1.
In use, handle 12 is pulled to the right, fixed plate 21 pulls to the left, and left deck 2 and right clamp seat 14 are placed on dress Top with formula building, decontrols handle 12 and fixed plate 21 at this time, and the first spring 8 release elastic force promotes contact plate 7 to the left, and second Spring 19 discharges elastic force and promotes fixed plate 21 to the right, after fixed plate 21 is contacted with building body, bolt 22 is inserted into building body, so Screw rod 4 is turned afterwards, screw rod 4 can drive push plate 3 to move right at this time.
In conclusion bridge at the top of the assembled architecture steel construction, is cooperated by left deck 2 with right clamp seat 14, Achieve the effect that complete pre-installation when bridge is installed at the top of steel construction, by turning screw rod 4 to the right, reaching makes screw rod 4 to the right The effect for moving and driving push plate 3 that entire beam body is fixed, by the first spring 8 and the mutual cooperation of contact plate 7, Achieve the effect that the first spring 8 is made to promote contact plate 7 that beam body 1 is fixed.
By the bolt 22 inside mounting hole 20, achieve the effect that right clamp seat 14 being fixed, pass through second spring 19 Contraction, reach rocking of occurring after mounting of buffering beam body 1, solve bridge at the top of existing assembled architecture steel construction In an installation since installation process is complicated, the problem of causing installment work inconvenient..
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that in the case where not departing from the principle of the utility model and spirit can these embodiments be carried out with a variety of variations, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of bridge at the top of assembled architecture steel construction, including beam body(1), it is characterised in that:The beam body(1)Left end It is fixedly connected with left deck(2), the left deck(2)Left side offer the screw hole being connected with right side(6), the screw hole (6)Internal whorl be connected with screw rod(4), the left deck(2)Right side be fixedly connected with accessory plate(13), the accessory plate (13)Left side offer the movable span being connected with right side(10), the movable span(10)Internal activity be connected with motion bar (9), the accessory plate(13)Left side be fixedly connected with the first spring(8), first spring(8)Away from accessory plate(13)'s One end is fixedly connected with contact plate(7), the contact plate(7)Bottom and motion bar(9)Upper surface be fixedly connected, the work Lever(9)Away from contact plate(7)One end run through movable span(10)And extend to accessory plate(13)Right side, the beam body(1) Right end be fixedly connected with right clamp seat(14), the right clamp seat(14)Left side be fixedly connected with fixed strip(15), the fixation Item(15)Away from right clamp seat(14)One end be fixedly connected with shaft(16), the shaft(16)Surface be socketed with runner (17), the runner(17)Lower surface be fixedly connected with movable plate(18), the movable plate(18)Right side be fixedly connected with Second spring(19), the second spring(19)Away from movable plate(18)One end be fixedly connected with fixed plate(21).
2. bridge at the top of a kind of assembled architecture steel construction according to claim 1, it is characterised in that:The screw rod (4)Away from screw hole(6)One end run through screw hole(6)And extend to left deck(2)Left side, the screw rod(4)Positioned at left deck (2)The one end in left side is fixedly connected with pole cap(5).
3. bridge at the top of a kind of assembled architecture steel construction according to claim 1, it is characterised in that:The left deck (2)Inner left wall be overlapped with push plate(3), the push plate(3)Left side and screw rod(4)Right end be fixedly connected.
4. bridge at the top of a kind of assembled architecture steel construction according to claim 1, it is characterised in that:The accessory plate (13)Right side be overlapped with baffle ring(11), the baffle ring(11)Inner wall and motion bar(9)Surface socket.
5. bridge at the top of a kind of assembled architecture steel construction according to claim 1 or 4, it is characterised in that:The gear Ring(11)Right side be overlapped with handle(12), the handle(12)Left side and motion bar(9)Right end be fixedly connected.
6. bridge at the top of a kind of assembled architecture steel construction according to claim 1 or 4, it is characterised in that:It is described solid Fixed board(21)Left side offer the mounting hole being connected with right side(20), the mounting hole(20)Inside be plugged with bolt (22).
CN201721369812.9U 2017-10-23 2017-10-23 Bridge at the top of a kind of assembled architecture steel construction Expired - Fee Related CN207405873U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721369812.9U CN207405873U (en) 2017-10-23 2017-10-23 Bridge at the top of a kind of assembled architecture steel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721369812.9U CN207405873U (en) 2017-10-23 2017-10-23 Bridge at the top of a kind of assembled architecture steel construction

Publications (1)

Publication Number Publication Date
CN207405873U true CN207405873U (en) 2018-05-25

Family

ID=62321035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721369812.9U Expired - Fee Related CN207405873U (en) 2017-10-23 2017-10-23 Bridge at the top of a kind of assembled architecture steel construction

Country Status (1)

Country Link
CN (1) CN207405873U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577550A (en) * 2018-12-31 2019-04-05 江苏扬桩金源管业有限公司 A kind of assembled architecture top bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577550A (en) * 2018-12-31 2019-04-05 江苏扬桩金源管业有限公司 A kind of assembled architecture top bridge

Similar Documents

Publication Publication Date Title
CN207405873U (en) Bridge at the top of a kind of assembled architecture steel construction
CN105127092A (en) Standard rail seat type elastic rod sieve plate
CN205857723U (en) A kind of form for construction engineering
CN208966012U (en) Suitable for the building template quickly assembled
CN208396009U (en) A kind of steel structure connection component being easily installed connection
CN208961884U (en) Lower nut tightens rotation-preventing mechanism on a kind of full-automatic film column pull rod
CN204367858U (en) A kind of drawing and pulling type battery fastening structure of electronlmobil
CN106894650B (en) Reinforcement structure for mortise and tenon joints of wood structure beam column and construction method thereof
CN205857479U (en) A kind of architectural engineering curtain wall
CN205667439U (en) A kind of guard rail burnisher
CN208219443U (en) A kind of bridge pier bracing means
CN104343119A (en) Recyclable steel strand irregular support pile based on pre-stress technique
CN208748825U (en) A kind of assembling type steel structure supporting beam for building
CN209907571U (en) Connection node of assembled frame construction beam column
CN208565209U (en) A kind of dismountable hollow bolt
CN104085829B (en) The goods fork locking gear of combination buckets
CN201011068Y (en) Vertical elevator
CN205822295U (en) A kind of the connection structure of scraper pan and bucket arm
CN209308386U (en) A kind of construction safety platform
CN214785359U (en) Conversion layer steel bar spacing frame
CN207554475U (en) A kind of turning shape steel construction fixing device
CN210307545U (en) Locking sleeve with self-locking function
CN201972330U (en) Handrail
CN208763407U (en) A kind of fastener of building materials aluminum alloy pattern plate
KR101571078B1 (en) the one touch apparatus for separating the detachable deck plate structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180525