CN208396009U - A kind of steel structure connection component being easily installed connection - Google Patents
A kind of steel structure connection component being easily installed connection Download PDFInfo
- Publication number
- CN208396009U CN208396009U CN201820908320.0U CN201820908320U CN208396009U CN 208396009 U CN208396009 U CN 208396009U CN 201820908320 U CN201820908320 U CN 201820908320U CN 208396009 U CN208396009 U CN 208396009U
- Authority
- CN
- China
- Prior art keywords
- steel
- fixed
- steel column
- installation
- easily installed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model belongs to steel structure technology field, specially a kind of steel structure connection component for being easily installed connection, including two mounting plates, the upper end of two mounting plates is fixed with the first steel column, steel truss is equipped between two first steel columns, the two sides up and down of the steel truss are equipped with fixed plate, one end of two fixed plates is fixedly connected to movable sleeving, the movable sleeving is set on the first steel column, the lateral wall of the movable sleeving is equipped with the lock-screw being fixed on the first steel column, the other end of two fixed plates is fixedly connected with link block, fixed link is equipped between two link blocks, the fixed link both ends extend through two link blocks, and thread bush is equipped with fixed ring in fixed link, the steel structure connection component for being easily installed connection solves the problems, such as that steel structure connection installation is inconvenient, and It is easy to operate, it is easy for installation, the amount of labour of steel structure connection installation is reduced, is improved work efficiency.
Description
Technical field
The utility model belongs to steel structure technology field, specially a kind of steel structure connection component for being easily installed connection.
Background technique
The structure that steel construction is made of steel material is one of main building construction types.Structure is mainly by fashioned iron
With the components composition such as girder steel, steel column, steel truss made of steel plate etc., and using silanization, pure manganese phosphatization, washing drying, zinc-plated
Equal derusting rust-proofings technique.Weld seam, bolt or rivet interlacement are generallyd use between each component or component.Because its self weight is lighter, and apply
Work is easy, is widely used in the fields such as large-sized workshop, venue, Super High.
Existing steel structure connection component installing and dismounting is inconvenient, and steel structure connection installation amount of labour when work is caused to increase,
Cause working efficiency low.
Utility model content
The purpose of this utility model is to provide a kind of steel structure connection components for being easily installed connection, to solve above-mentioned back
It proposes that existing steel structure connection component installing and dismounting is inconvenient in scape technology, steel structure connection installation amount of labour when work is caused to increase
Add, causes ineffective problem.
To achieve the above object, the utility model provides the following technical solutions:
A kind of steel structure connection component being easily installed connection, including two mounting plates, the upper end of two mounting plates
It is fixed with the first steel column, is equipped with steel truss between two first steel columns, the two sides up and down of the steel truss are equipped with
Fixed plate, one end of two fixed plates are fixedly connected to movable sleeving, and the movable sleeving is set on the first steel column, described
The lateral wall of movable sleeving is equipped with the lock-screw being fixed on the first steel column, and the other end of two fixed plates is fixed
It is connected with link block, is equipped with fixed link between two link blocks, the fixed link both ends extend through two link blocks, and
Thread bush is equipped with fixed ring in fixed link.
Preferably, the upper end sliding sleeve of first steel column is equipped with installation set, installation cavity, institute are equipped in the installation set
It states and is equipped with the second steel column in installation set, the bottom side of the wall of second steel column offsets with the upper end side wall of the first steel column, the peace
Gag lever post there are two setting on the lateral wall of encapsulation, is threadedly coupled between the gag lever post and installation set, and one end of gag lever post is solid
Surely it is connected with rubber block, lateral wall of two rubber blocks respectively with the second steel column, the first steel column offsets.
Preferably, the both ends of the mounting plate are equipped with hollow groove, it is equipped with fixing glue in two hollow grooves, institute
The upper end for stating fixing glue is fixedly connected with fixed block, and the lower end of the fixing glue is run through hollow groove, is arranged in the fixing glue
Spring, the spring is between fixed block and mounting plate.
Preferably, two opposite sides of the fixed plate are respectively and fixedly provided with rubber slab.
Preferably, one end of the fixed link is fixedly connected with anti-drop block.
Preferably, being vertically arranged between first steel column and steel truss.
Compared with prior art, the utility model has the beneficial effects that by exerting a force to fixed block, compressed spring makes solid
Fixed nail is plugged into ground, realizes the fixation between mounting plate and ground, the first steel column of mounting plate upper end is vertical with steel truss to be put
It sets and is installed, the rubber slab being moved in fixed plate on the first steel column by two movable sleevings offsets with steel truss, rotation
Movable sleeving is fixed on the first steel column between lock-screw, is rotated further by fixed ring, passes through the screw thread between fixed ring and fixed link
Effect, realizes the fixation between two link blocks, to realize the reinforcing fixed to steel truss of two fixed plates, improves and stablizes
Property, and it is easy to operate, when needing to increase steel construction, by the second steel column and the first steel column butt joint, installation set is moved to
At one steel column and the second steel column butt joint, by rotating two gag lever posts, threaded function between gag lever post and installation set realizes peace
Fixation of the encapsulation between the first steel column and the second steel column, it is easy for installation.This is easily installed the steel structure connection component solution of connection
The inconvenient problem of steel structure connection of having determined installation, and it is easy to operate, it is easy for installation, reduce the labour of steel structure connection installation
Amount, improves work efficiency.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of steel structure connection component for being easily installed connection structural schematic diagram;
Fig. 2 be the utility model proposes a kind of steel structure connection component for being easily installed connection movable sleeving side view structure
Schematic diagram.
In figure: 1 mounting plate, 2 fixing glues, 3 springs, 4 fixed blocks, 5 anti-drop blocks, 6 link blocks, 7 fixed plates, 8 lock-screws,
9 second steel columns, 10 gag lever posts, 11 rubber blocks, 12 installation sets, 13 movable sleevings, 14 fixed rings, 15 fixed links, 16 steel truss, 17
One steel column, 18 rubber slabs.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be understood that term " on ", "lower", "front", "rear", "left", "right",
The orientation or positional relationship of the instructions such as "top", "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only
For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific
Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
The utility model provides a kind of technical solution referring to FIG. 1-2: a kind of steel structure connection being easily installed connection
Component, including two mounting plates 1, the upper end of two mounting plates 1 are fixed with the first steel column 17, between two the first steel columns 17
Equipped with steel truss 16, the two sides up and down of steel truss 16 are equipped with fixed plate 7, and one end of two fixed plates 7 is fixedly connected to shifting
Dynamic set 13, movable sleeving 13 is set on the first steel column 17, and the lateral wall of movable sleeving 13, which is equipped with, is fixed in the first steel column 17
On lock-screw 8, the first steel column 17 of 1 upper end of mounting plate is disposed vertically with steel truss 16 to be installed, and two movements are passed through
The rubber slab 18 that set 13 is moved in fixed plate 7 on the first steel column 17 offsets with steel truss 16, moves between rotation lock screw 8
Dynamic set 13 is fixed on the first steel column 17, and the other end of two fixed plates 7 is fixedly connected with link block 6, between two link blocks 6
Equipped with fixed link 15,15 both ends of fixed link extend through two link blocks 6, and thread bush is equipped with fixed ring 14 in fixed link 15,
It rotates fixed ring 14 and the fixation between two link blocks 6 is realized by the threaded function between fixed ring 14 and fixed link 15,
To realize the reinforcing fixed to steel truss 16 of two fixed plates 7, stability is improved;Further, the upper end of the first steel column 17
Sliding sleeve is equipped with installation set 12, and installation cavity is equipped in installation set 12, is equipped with the second steel column 9, the lower end of the second steel column 9 in installation set
The upper end side wall of side wall and the first steel column 17 offsets, and is set on the lateral wall of installation set 12 there are two gag lever post 10, gag lever post 10 with
It is threadedly coupled between installation set 12, and one end of gag lever post 10 is fixedly connected with rubber block 11, two rubber blocks 11 are respectively with
Two steel columns 9, the first steel column 17 lateral wall offset, it is right by the second steel column 9 and the first steel column 17 when needing to increase steel construction
It connects, installation set 12 is moved to the first steel column 17 and docks place with the second steel column 9, by rotating two gag lever posts 10, gag lever post 10
With the threaded function between installation set 12, fixation of the installation set 12 between the first steel column 17 and the second steel column 9, installation side are realized
Just, the both ends of mounting plate 1 are equipped with hollow groove, and fixing glue 2 is equipped in two hollow grooves, and the upper end of fixing glue 2 is fixedly connected
There is fixed block 4, hollow groove is run through in the lower end of fixing glue 2, and spring 3 is arranged in fixing glue 2, and spring 3 is located at fixed block 4 and installation
Between plate 1, by exerting a force to fixed block 4, compressed spring 3 plugs fixing glue 2 into ground, realizes between mounting plate 1 and ground
Fixation, two opposite sides of fixed plate 7 are respectively and fixedly provided with rubber slab 18, and one end of fixed link 15 is fixedly connected with anti-drop block 5,
It is vertically arranged between first steel column 17 and steel truss 16.
Working principle: by exerting a force to fixed block 4, compressed spring 3 plugs fixing glue 2 into ground, realizes mounting plate 1
Fixation between ground, the first steel column 17 of 1 upper end of mounting plate is disposed vertically with steel truss 16 to be installed, and is moved by two
The rubber slab 18 that dynamic set 13 is moved in fixed plate 7 on the first steel column 17 offsets with steel truss 16, between rotation lock screw 8
Movable sleeving 13 is fixed on the first steel column 17, is rotated further by fixed ring 14, is made by the screw thread between fixed ring 14 and fixed link 15
With, realize the fixation between two link blocks 6, thus realize the reinforcing that two fixed plates 7 fix steel truss 16, raising stabilization
Property, and it is easy to operate, when needing to increase steel construction, docked by the second steel column 9 with the first steel column 17, installation set 12 is mobile
Place is docked with the second steel column 9 to the first steel column 17, the spiral shell by rotating two gag lever posts 10, between gag lever post 10 and installation set 12
Fixation of the installation set 12 between the first steel column 17 and the second steel column 9 is realized in line effect, easy for installation.This is easily installed connection
Steel structure connection component solve the problems, such as that steel structure connection installation is inconvenient and easy to operate, it is easy for installation, reduce steel knot
The amount of labour of structure connection installation, improves work efficiency.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of steel structure connection component for being easily installed connection, including two mounting plates (1), it is characterised in that: described in two
The upper end of mounting plate (1) is fixed with the first steel column (17), is equipped with steel truss (16) between two first steel columns (17),
The two sides up and down of the steel truss (16) are equipped with fixed plate (7), and one end of two fixed plates (7) is fixedly connected to shifting
Dynamic set (13), the movable sleeving (13) are set on the first steel column (17), and the lateral wall of the movable sleeving (13) is equipped with it
The other end of the lock-screw (8) being fixed on the first steel column (17), two fixed plates (7) is fixedly connected with link block
(6), fixed link (15) are equipped between two link blocks (6), fixed link (15) both ends extend through two link blocks
(6), and in fixed link (15) thread bush is equipped with fixed ring (14).
2. a kind of steel structure connection component for being easily installed connection according to claim 1, it is characterised in that: described first
The upper end sliding sleeve of steel column (17) is equipped with installation set (12), and installation cavity is equipped in the installation set (12), is set in the installation set
Have the second steel column (9), the bottom side of the wall of second steel column (9) and the upper end side wall of the first steel column (17) offset, the installation
It covers there are two being set on the lateral wall of (12) gag lever post (10), is threadedly coupled between the gag lever post (10) and installation set (12), and
One end of gag lever post (10) is fixedly connected with rubber block (11), two rubber blocks (11) respectively with the second steel column (9), first
The lateral wall of steel column (17) offsets.
3. a kind of steel structure connection component for being easily installed connection according to claim 1, it is characterised in that: the installation
The both ends of plate (1) are equipped with hollow groove, are equipped in two hollow grooves fixing glue (2), and the upper end of the fixing glue (2) is solid
Surely it being connected with fixed block (4), hollow groove is run through in the lower end of the fixing glue (2), spring (3) are arranged on the fixing glue (2),
The spring (3) is located between fixed block (4) and mounting plate (1).
4. a kind of steel structure connection component for being easily installed connection according to claim 1, it is characterised in that: described in two
The opposite side of fixed plate (7) is respectively and fixedly provided with rubber slab (18).
5. a kind of steel structure connection component for being easily installed connection according to claim 1, it is characterised in that: the fixation
One end of bar (15) is fixedly connected with anti-drop block (5).
6. a kind of steel structure connection component for being easily installed connection according to claim 1, it is characterised in that: described first
It is vertically arranged between steel column (17) and steel truss (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820908320.0U CN208396009U (en) | 2018-06-13 | 2018-06-13 | A kind of steel structure connection component being easily installed connection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820908320.0U CN208396009U (en) | 2018-06-13 | 2018-06-13 | A kind of steel structure connection component being easily installed connection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208396009U true CN208396009U (en) | 2019-01-18 |
Family
ID=65135848
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820908320.0U Active CN208396009U (en) | 2018-06-13 | 2018-06-13 | A kind of steel structure connection component being easily installed connection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208396009U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111424818A (en) * | 2020-04-10 | 2020-07-17 | 熊美俊 | Assembled light-load steel structure building beam column connecting structure |
CN114232796A (en) * | 2021-12-23 | 2022-03-25 | 潘磊 | Steel structure house assembling connecting component of prefabricated building |
-
2018
- 2018-06-13 CN CN201820908320.0U patent/CN208396009U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111424818A (en) * | 2020-04-10 | 2020-07-17 | 熊美俊 | Assembled light-load steel structure building beam column connecting structure |
CN114232796A (en) * | 2021-12-23 | 2022-03-25 | 潘磊 | Steel structure house assembling connecting component of prefabricated building |
CN114232796B (en) * | 2021-12-23 | 2023-09-05 | 苏州中晟盛金属材料制造有限公司 | Steel house of assembled building assembles adapting unit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208396009U (en) | A kind of steel structure connection component being easily installed connection | |
CN208023781U (en) | A kind of assembled architecture wall and prefabricated concrete structure | |
CN207672752U (en) | A kind of joint structure of assembling type steel structure | |
CN201310072Y (en) | Supporting bracket of bridge construction | |
CN110145030B (en) | Assembled beam column node adopting I-steel high-strength bolt connection | |
CN207672751U (en) | One kind being conveniently detached formula steel construction | |
CN210238788U (en) | Stable form assembled steel construction building | |
CN209723216U (en) | A kind of architectural engineering beam-column connection | |
CN209227769U (en) | A kind of connection structure of steel structure column and steel structure girder | |
CN210529993U (en) | A connected node that is used for bucking restraint of antidetonation reinforced (rfd) to support and concrete beam | |
CN209429381U (en) | A kind of assembled architecture steel construction bottom ring beam | |
CN204753837U (en) | High steadiness girder steel | |
CN208830464U (en) | A kind of girder steel and concrete small column rigid joint | |
CN103615088B (en) | Shaped stone material point hanging hang structure | |
CN107476564B (en) | Special fastener for support frame | |
CN207812662U (en) | Compound prefabricated components for building | |
CN202755491U (en) | Stone curtain wall connection node | |
CN209891396U (en) | Intercolumnar bearing structure for steel construction | |
CN204691301U (en) | A kind of reinforced concrete frame structure joint reinforcing device | |
CN206667476U (en) | A kind of novel joint of steel construction abnormity beam column | |
CN209011416U (en) | A kind of light pseudo-classic architecture roof wooden frame | |
CN209194708U (en) | A kind of connecting node for assembling type steel structure pillar | |
CN208309868U (en) | A kind of buckling restrained brace device | |
CN205296890U (en) | Building combination strengthening structure | |
CN208219443U (en) | A kind of bridge pier bracing means |