CN207313639U - Converter Residual Heat Boiler movable gas hood - Google Patents

Converter Residual Heat Boiler movable gas hood Download PDF

Info

Publication number
CN207313639U
CN207313639U CN201721296062.7U CN201721296062U CN207313639U CN 207313639 U CN207313639 U CN 207313639U CN 201721296062 U CN201721296062 U CN 201721296062U CN 207313639 U CN207313639 U CN 207313639U
Authority
CN
China
Prior art keywords
heat
absorbing pipe
annular
water outlet
annular heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721296062.7U
Other languages
Chinese (zh)
Inventor
陈艳
陈仪佳
何网秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Hailu Heavy Industry Co Ltd
Original Assignee
Suzhou Hailu Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Hailu Heavy Industry Co Ltd filed Critical Suzhou Hailu Heavy Industry Co Ltd
Priority to CN201721296062.7U priority Critical patent/CN207313639U/en
Application granted granted Critical
Publication of CN207313639U publication Critical patent/CN207313639U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The utility model discloses Converter Residual Heat Boiler movable gas hood, including:Header of intaking and water outlet header,Heat sink is provided between water inlet header and water outlet header,Heat sink is longitudinally formed by stacking by several horizontal positioned annular heat-absorbing pipes,And heat sink is in integrally truncated cone-shaped,The inside of every annular heat-absorbing pipe in heat sink is separated into two sections of relatively independent heat absorption pipeline sections by two block weldings in the partition plate on annular heat-absorbing pipe inner tubal wall respectively,Water inlet and water outlet are arranged with every section of heat absorption pipeline section of every annular heat-absorbing pipe,The water inlet of every section of heat absorption pipeline section of every annular heat-absorbing pipe is communicated by the first branch pipe with water inlet header respectively,The water outlet of every section of heat absorption pipeline section of every annular heat-absorbing pipe is communicated by the second branch pipe with water outlet header respectively in heat sink,The middle part of every piece of partition plate in every annular heat-absorbing pipe is respectively arranged with the exhausting-gas hole that an aperture is much smaller than annular heat-absorbing pipe caliber.The utility model has the advantages that service life is long.

Description

Converter Residual Heat Boiler movable gas hood
Technical field
It the utility model is related to Converter Residual Heat Boiler, and in particular to a kind of Converter Residual Heat Boiler movable gas hood.
Background technology
Coal gas, high temperature when Converter Residual Heat Boiler generally use gasification cooling flue structure is to iron and steel enterprise's Converter Oxigen Blowing steel-making Flue gas and flue dust carry out waste heat recovery, it is directly chain with the production process of converter, and the part as converter steelmaking process is straight Participation STEELMAKING PRODUCTION is connect, it can collect high-temperature flue gas during converter smelting steel, and high-temperature flue gas is cooled down, Meet the steel-making later stage dedusting and requirement of coal-gas recovering, while substantial amounts of steam can also be produced, for the needs for producing and living, The cost of production and life can be substantially reduced, occupies highly important status in steel mill.Converter Residual Heat Boiler mainly includes living Dynamic petticoat pipe, fire door fix petticoat pipe, hypomere cooling stack and epimere cooling stack.Due to Converter Residual Heat Boiler operating condition with turn The smelting process of stove and periodicity, sharp change, and when bessemerizing, substantial amounts of high-temperature flue gas flows through waste heat boiler, waste heat The thermic load of boiler sharply increases;When blowing stops, the thermic load of waste heat boiler strongly reduces, this severe service condition Necessarily the service life of waste heat boiler is had an impact.At present, the service life of Converter Residual Heat Boiler is very short, epimere cooling stack Average life span be 6 years or so, service life of hypomere cooling stack is 2~3 years, and movable gas hood due to service condition more Badly, the service life of movable gas hood only has 1 year or so.Due to movable gas hood be mainly used for coordinating the more preferable supplementary set of fixed petticoat pipe, The high-temperature flue gas produced in converter steelmaking process is dredged, while prevents extraneous air intrusion effect coal-gas recovering quality and prevents Flue gas escapes deterioration workshop condition.Therefore, the design of Converter Residual Heat Boiler particularly movable gas hood is most important, it is directly affected The normal production of converter.
The structure of movable gas hood is used at present:Including water inlet header and water outlet header, header of intaking and water outlet collection Heat sink is provided between case, the annular heat-absorbing pipe that heat sink is horizontal positioned by several and caliber is 51mm is longitudinally superimposed Form, and heat sink is in integrally truncated cone-shaped, the inside of every annular heat-absorbing pipe in heat sink respectively by two block weldings in Partition plate on annular heat-absorbing pipe inner tubal wall is separated into two sections of relatively independent heat absorption pipeline sections, the every annular heat-absorbing in heat sink It is respectively arranged with water inlet and water outlet on every section of pipe heat absorption pipeline section, every section of heat absorption of every annular heat-absorbing pipe in heat sink The water inlet of pipeline section is connected by the first branch pipe with water inlet header respectively, every section of suction of every annular heat-absorbing pipe in heat sink The water outlet of heat pipe section is connected by the second branch pipe with water outlet header respectively.During work, the water for header of intaking is through each first Guan Houcong respectively absorb heat pipeline section water inlet enter it is each heat absorption pipeline section, again from it is each heat absorption pipeline section water outlet enter through each second branch pipe Water outlet header.Above-mentioned movable gas hood has the following disadvantages:Water inlet and the water outlet in each heat absorption pipeline section are flowed primarily through due to water Region between mouthful, causes to go out in the region in heat absorption pipeline section between water inlet partition plate corresponding with homonymy and heat absorption pipeline section The exhaust of the sloughs such as the region between the partition plate corresponding with homonymy of the mouth of a river is not smooth, and remaining gas is easily in slough collection in water Knot, under the action of fluctuating hydraulic pressure in use, these gases for concentrating at heat absorption pipeline section slough can be compressed continuously, spring back, So as to which the heat absorption tube wall to slough and partition plate produce continuous continual impact, cause the weldering between annular heat-absorbing pipe and partition plate Drawing crack is sewed, so as to cause annular heat-absorbing tube leakage, causes movable gas hood service life short;And once find annular heat-absorbing pipe Leak, can force steel mill blowing out to be rebuild, and the service life of movable gas hood only has or so half a year at present, and average monthly necessary Want blowing out twice to movable gas hood carry out soldering, each soldering take 6 it is small when or so, leverage manufacturing schedule, while Increase the danger of service work.
Utility model content
The purpose of this utility model is to provide a kind of Converter Residual Heat Boiler movable gas hood of service life length.
To achieve the above object, the utility model employs following technical solution:The Converter Residual Heat Boiler activity Petticoat pipe, including:Intake header and water outlet header, be provided with heat sink between header of intaking and water outlet header, heat sink by Several horizontal positioned annular heat-absorbing pipes are longitudinally formed by stacking, and heat sink is in integrally truncated cone-shaped, every in heat sink The inside of root annular heat-absorbing pipe respectively by two block weldings in the partition plate on annular heat-absorbing pipe inner tubal wall be separated into two sections it is relatively independent Heat absorption pipeline section, be respectively arranged with water inlet and water outlet on every section of heat absorption pipeline section of every annular heat-absorbing pipe in heat sink Mouthful, the water inlet of every section of heat absorption pipeline section of every annular heat-absorbing pipe passes through the first branch pipe and header phase of intaking respectively in heat sink Connect, the water outlet of every section of heat absorption pipeline section of every annular heat-absorbing pipe passes through the second branch pipe and water outlet header respectively in heat sink It is connected, the middle part of every piece of partition plate in every annular heat-absorbing pipe is respectively arranged with an aperture and is much smaller than annular heat-absorbing pipe The exhausting-gas hole of caliber.
Further, foregoing Converter Residual Heat Boiler movable gas hood, wherein:The aperture of exhausting-gas hole is 2~3mm.
Further, foregoing Converter Residual Heat Boiler movable gas hood, wherein:Every piece of partition plate in every annular heat-absorbing pipe Both side surface be in indent arc-shaped setting.
The implementation of Pass through above-mentioned technical proposal, the beneficial effects of the utility model are:By in every annular heat-absorbing pipe The middle part of every piece of partition plate be respectively arranged with the exhausting-gas hole that an aperture is 2~3mm, and by the both sides table of every piece of partition plate Face is arranged to the arc-shaped of indent, can make the region in heat absorption pipeline section between water inlet partition plate corresponding with homonymy and heat absorption The slough smooth in exhaust such as the region in pipeline section between water outlet partition plate corresponding with homonymy, and then greatly reduce remaining in water Impact of the gas to annular heat-absorbing pipe inner tubal wall and partition plate, greatly reduces the weld seam between annular heat-absorbing pipe and partition plate by drawing crack The occurrence of, and then the generation of annular heat-absorbing tube leakage phenomenon is effectively reduced, considerably increase movable gas hood uses the longevity Life, the service life of movable gas hood are up to 2 to three years, and need not monthly blowing out carries out soldering to movable gas hood again, reduce Labor strength.
Brief description of the drawings
Fig. 1 is the structure diagram of Converter Residual Heat Boiler movable gas hood described in the utility model.
Fig. 2 is the structure diagram of the overlook direction of Fig. 1.
Fig. 3 is the enlarged diagram at the H positions shown in Fig. 2.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
As shown in Figure 1, Figure 2, Figure 3 shows, the Converter Residual Heat Boiler movable gas hood, including:Header 1 of intaking and water outlet collection Case 2, is provided with heat sink, heat sink is by several horizontal positioned annular heat-absorbings between header 1 of intaking and water outlet header 2 The longitudinal direction of pipe 3 is formed by stacking, and heat sink be in integrally truncated cone-shaped, and the inside of every annular heat-absorbing pipe 3 in heat sink is distinguished Two sections of relatively independent heat absorption pipeline sections are separated into the partition plate 4 on 3 inner tubal wall of annular heat-absorbing pipe by two block weldings, in heat sink In every annular heat-absorbing pipe 3 every section of heat absorption pipeline section on be respectively arranged with water inlet and water outlet, every annular in heat sink The water inlet of every section of heat absorption pipeline section of endothermic tube 3 is connected by the first branch pipe 5 with water inlet header 1 respectively, every in heat sink The water outlet of every section of heat absorption pipeline section of root annular heat-absorbing pipe 3 is connected by the second branch pipe 6 with water outlet header 2 respectively, at every The middle part of every piece of partition plate 4 in annular heat-absorbing pipe 3 is respectively arranged with the row that an aperture is much smaller than 3 caliber of annular heat-absorbing pipe Stomata 7, can make the region in heat absorption pipeline section between water inlet partition plate corresponding with homonymy and heat absorption pipeline section by exhausting-gas hole 7 The slough smooth in exhaust such as the region between middle water outlet partition plate corresponding with homonymy, can reduce gas remaining in water to ring The impact of shape endothermic tube inner tubal wall and partition plate, reduces the occurrence of weld seam between annular heat-absorbing pipe and partition plate is by drawing crack, into And the generation of annular heat-absorbing tube leakage phenomenon is effectively reduced, considerably increase the service life of movable gas hood;In the present embodiment In, the aperture of exhausting-gas hole 7 is 2~3mm;In the present embodiment, the both side surface of every piece of partition plate 4 in every annular heat-absorbing pipe 3 It is in the arc-shaped setting of indent, gas that so can be remaining in further disperse water is to annular heat-absorbing pipe inner tubal wall and partition plate Impact, further reduces the occurrence of weld seam between annular heat-absorbing pipe and partition plate is by drawing crack, and then further reduce The generation of annular heat-absorbing tube leakage phenomenon, further increases the service life of movable gas hood.
The utility model has the advantages that:Set respectively by the middle part of every piece of partition plate in every annular heat-absorbing pipe There is the exhausting-gas hole that an aperture is 2~3mm, and the both side surface of every piece of partition plate is arranged to the arc-shaped of indent, suction can be made Water outlet partition plate corresponding with homonymy in region and heat absorption pipeline section in heat pipe section between water inlet partition plate corresponding with homonymy Between the slough smooth in exhaust such as region, and then greatly reduce gas remaining in water to annular heat-absorbing pipe inner tubal wall and partition plate Impact, greatly reduce the occurrence of weld seam between annular heat-absorbing pipe and partition plate is by drawing crack, and then effectively reduce ring The generation of shape endothermic tube drainage, considerably increases the service life of movable gas hood, and the service life of movable gas hood is up to two To 3 years, and need not again monthly blowing out to movable gas hood carry out soldering, reduce labor strength.

Claims (3)

1. Converter Residual Heat Boiler movable gas hood, including:Header of intaking and water outlet header, set between header of intaking and water outlet header Heat sink is equipped with, heat sink is longitudinally formed by stacking by several horizontal positioned annular heat-absorbing pipes, and heat sink is overall In truncated cone-shaped, the inside of every annular heat-absorbing pipe in heat sink is respectively by two block weldings on annular heat-absorbing pipe inner tubal wall Partition plate is separated into two sections of relatively independent heat absorption pipeline sections, divides in heat sink on every section of heat absorption pipeline section of every annular heat-absorbing pipe It is not provided with water inlet and water outlet, the water inlet of every section of heat absorption pipeline section of every annular heat-absorbing pipe passes through respectively in heat sink First branch pipe is connected with water inlet header, and the water outlet of every section of heat absorption pipeline section of every annular heat-absorbing pipe leads to respectively in heat sink The second branch pipe is crossed with water outlet header to be connected, it is characterised in that:The middle part of every piece of partition plate in every annular heat-absorbing pipe It is respectively arranged with the exhausting-gas hole that an aperture is much smaller than annular heat-absorbing pipe caliber.
2. Converter Residual Heat Boiler movable gas hood according to claim 1, it is characterised in that:The aperture of exhausting-gas hole for 2~ 3mm。
3. Converter Residual Heat Boiler movable gas hood according to claim 1, it is characterised in that:In every annular heat-absorbing pipe The both side surface of every piece of partition plate is in the arc-shaped setting of indent.
CN201721296062.7U 2017-10-10 2017-10-10 Converter Residual Heat Boiler movable gas hood Active CN207313639U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721296062.7U CN207313639U (en) 2017-10-10 2017-10-10 Converter Residual Heat Boiler movable gas hood

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721296062.7U CN207313639U (en) 2017-10-10 2017-10-10 Converter Residual Heat Boiler movable gas hood

Publications (1)

Publication Number Publication Date
CN207313639U true CN207313639U (en) 2018-05-04

Family

ID=62429104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721296062.7U Active CN207313639U (en) 2017-10-10 2017-10-10 Converter Residual Heat Boiler movable gas hood

Country Status (1)

Country Link
CN (1) CN207313639U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604122A (en) * 2017-10-10 2018-01-19 苏州海陆重工股份有限公司 Converter Residual Heat Boiler movable gas hood

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604122A (en) * 2017-10-10 2018-01-19 苏州海陆重工股份有限公司 Converter Residual Heat Boiler movable gas hood

Similar Documents

Publication Publication Date Title
CN101968317A (en) Sintering waste heat generating system
CN106497609A (en) Band CO2Gasification furnace coal powder conveying system and method in the IGCC system of trapping
CN207313639U (en) Converter Residual Heat Boiler movable gas hood
CN109576436B (en) Forced circulation cooling flue
CN203848696U (en) Heat accumulating type settling chamber waste heat storage device
CN107604122A (en) Converter Residual Heat Boiler movable gas hood
CN103102993B (en) Non-chilling anti-slagging radiant waste heat boiler and its application
CN111457749A (en) Synthetic furnace chassis heat transfer system
CN203757690U (en) Finned tube membrane coal economizer
CN202947489U (en) Waste-heat cascaded utilization system at low-temperature sections of sintering circular cooling machine
CN212253706U (en) Synthetic furnace chassis heat transfer system
CN201534852U (en) Connecting structure of blast furnace tuyere sleeve and furnace case
CN209415770U (en) A kind of integrated room combustion hot-water boiler of horizontal condensation
CN202993867U (en) Recovery system of flue gas waste heat of ferro-nickel smelting furnace
CN207487135U (en) Pipeline energy-saving hot blast furnace
CN201136848Y (en) Powdered coke cooling jacket
CN202485206U (en) Energy-saving air heating furnace
CN206626555U (en) A kind of waste heat boiler of all-oxygen combustion glass furnace
CN200993473Y (en) Coal-fired hot blast stove
CN109210792A (en) A kind of integrated room combustion hot-water boiler of horizontal condensation
CN202530099U (en) Heat exchanger for remained hot water of blast furnace
CN109186093A (en) Fire hot-water boiler in a kind of vertical condensation one room
CN212692557U (en) Boiler for utilizing waste heat of calcined petroleum coke flue gas
CN204962818U (en) Twin furnace body industrial furnace with exhaust treatment device
CN201191009Y (en) Water-cooled wall calorific energy recovering stalk gas stove

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant