CN207267141U - A kind of Zhu Chao bead loadings mechanism - Google Patents

A kind of Zhu Chao bead loadings mechanism Download PDF

Info

Publication number
CN207267141U
CN207267141U CN201720860065.2U CN201720860065U CN207267141U CN 207267141 U CN207267141 U CN 207267141U CN 201720860065 U CN201720860065 U CN 201720860065U CN 207267141 U CN207267141 U CN 207267141U
Authority
CN
China
Prior art keywords
bead
ball
sub
pearl
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720860065.2U
Other languages
Chinese (zh)
Inventor
蔡耿锡
李建平
黄志锋
陈楷敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Saca Precision Manufacturing Co Ltd
Original Assignee
Guangdong Saca Precision Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Saca Precision Manufacturing Co Ltd filed Critical Guangdong Saca Precision Manufacturing Co Ltd
Priority to CN201720860065.2U priority Critical patent/CN207267141U/en
Application granted granted Critical
Publication of CN207267141U publication Critical patent/CN207267141U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Casting Or Compression Moulding Of Plastics Or The Like (AREA)

Abstract

The utility model discloses a kind of Zhu Chao bead loadings mechanism, including rack, pearl nest loading assemblies and bracket in rack, ball box arranged on bracket top, ball sub-material component below ball box, the ball mounting assembly of pearl nest loading assemblies discharging port in rack, divide pearl pipe equipped with least one set in the ball box, the ball box divides pearl pipe to connect with point ball assembly by one of which, described point of ball assembly is connected with ball mounting assembly by defeated pearl pipe, the ball mounting assembly includes backing plate, bead loading mould arranged on backing plate both sides, the bead loading mould is equipped with the hole of bead with being connected into the hole of bead and with into the hole of bead of going out that pearl pipe connects;Compared with prior art, the utility model is simple in structure, automatic degree is high, can effectively improve production efficiency, save the time, reduces production cost, and can occur to avoid the situation of ball neglected loading.

Description

A kind of Zhu Chao bead loadings mechanism
Technical field
It the utility model is related to slide mounting technology field, more particularly to a kind of Zhu Chao bead loadings mechanism.
Background technology
Pearl nest is the core component in cabinet drawer slide, in slide, plays the role of reducing frictional resistance, Make the relative motion between interior external slide rail flexible, since pearl Nest architecture is compact, pearl nest ball is smaller, and quantity is more, but existing Assembly method uses artificial feeding, and pearl nest ball is pressed into pearl nest with simple fixture by manual operation, assembling Inefficiency, causes the production cycle to grow, of high cost;And assembler is easily tired, it may appear that the situation of neglected loading pearl nest ball, Influence product quality.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, there is provided it is a kind of it is simple in structure, automatic degree is high Zhu Chao bead loadings mechanism, can effectively improve production efficiency, save the time, reduce production cost and ensure product quality, and can keep away The situation for exempting from ball neglected loading occurs.
To achieve the above object, technical solution is a kind of Zhu Chao bead loadings mechanism used by the utility model, including rack, Pearl nest loading assemblies and bracket in rack, the ball box arranged on bracket top, the ball sub-material below ball box Component, in rack pearl nest loading assemblies discharging port ball mounting assembly, at least one set of point is equipped with the ball box Pearl pipe, the ball box divide pearl pipe to connect with point ball assembly by one of which, described to divide ball assembly and ball installation group Part is connected by defeated pearl pipe, and the ball mounting assembly includes backing plate, the bead loading mould arranged on backing plate both sides, is set on the bead loading mould Have and the hole of bead with being connected into the hole of bead and with into the hole of bead of going out that pearl pipe connects.
One kind as the utility model is improved, it is described go out the hole of bead above be connected with can centered on pin axis along bead loading mould The envelope pearl block of swing.
One kind as the utility model is improved, and going out hole of bead side on the bead loading mould is equipped with limited step, and opposite side is set There is the dynamic clamping head and quiet clamping head being connected with envelope pearl block.
One kind as the utility model is improved, and the bead loading mould is equipped with from going out what the hole of bead extended to pearl nest moving direction Sliding slot.
One kind as the utility model is improved, and polarization components, institute are equipped between ball box and ball the sub-material component State polarization components include be arranged on be arranged on bracket on motor and eccentric wheel mounting base, the eccentric wheel in eccentric wheel mounting base, The adapting table being connected with eccentric wheel mounting base, the eccentric wheel are connected with the machine shaft, described to divide pearl pipe to be held through described Connect platform.
One kind as the utility model is improved, and fixed station, the ball box are equipped with below polarization components on the bracket The guide rod of the eccentric wheel mounting base is provided through between fixed station.
As the utility model one kind improve, the ball sub-material component include be arranged on bracket on sub-material slide, set It is described in the material splitting cylinder on sub-material slide, the sub-material sliding block that is connected and can be moved in sub-material slide with material splitting cylinder cylinder column Sub-material slide upper bottom surface is equipped with divides pearl pipe to connect charging hole with one of which, and the sub-material slide bottom surface is equipped with discharge hole, institute State sub-material sliding block and be equipped with the blanking channel that can be connected respectively with the charging hole on sub-material slide and discharge hole.
One kind as the utility model is improved, and the sub-material slide is equipped with limiting plate.
One kind as the utility model is improved, and the sub-material sliding slot is equipped with cover board.
Compared with prior art, the Zhu Chao bead loadings mechanism of the utility model has the following advantages:The utility model includes rolling Pearl box, ball sub-material component, ball mounting assembly, the ball mounting assembly is by backing plate, the bead loading module arranged on backing plate both sides It is equipped with into, bead loading mould and the hole of bead with being connected into the hole of bead and with into the hole of bead of going out that pearl pipe connects, when pearl nest passes through two bead loading moulds When, ball is from going out the hole of bead and roll out to be loaded into pearl nest, and simple in structure, automatic degree is high, when can effectively improve production efficiency, save Between, reduce production cost, and can occur to avoid the situation of ball neglected loading.
Brief description of the drawings
Fig. 1 is a kind of structure diagram of Zhu Chao bead loadings mechanism of the utility model;
Fig. 2 is the partial structural diagram of Fig. 1;
Fig. 3 is the structure diagram of ball mounting assembly in Fig. 1;
Fig. 4 is the structure diagram of bead loading mould in Fig. 3;
Fig. 5 is the structure diagram of ball sub-material component in Fig. 1;
Fig. 6 is that ball sub-material component removes the structure diagram after cover board in Fig. 5;
In figure:1. ball box, 11. points of pearl pipes, 2. ball sub-material components, 21. sub-material slides, 22. material splitting cylinders, 23. points Expect sliding block, 231. charging holes, 232. discharge holes, 24. limiting plates, 25. cover boards, 3. ball mounting assemblies, 31. backing plates, 32. bead loadings Mould, 321. go out the hole of bead, 323. limited steps, 324. dynamic clamping head and quiet clamping heads, 325. sliding slots, 33. envelope pearl blocks, 4. inclined into the hole of bead, 322. Shake component, 41. motors, 42. eccentric wheel mounting bases, 43. adapting tables, 44. fixed stations, 45. guide rods, 5. pearl nest loading assemblies, 6. Rack, 61. brackets
The embodiments will be further described with reference to the accompanying drawings for the realization of the utility model function and advantage.
Embodiment
The utility model is described in further detail with preferred embodiment below in conjunction with the accompanying drawings.
As shown in Figures 1 to 6, a kind of Zhu Chao bead loadings mechanism, including rack 6, the pearl nest loading assemblies 5 in rack 6 Ball box 1 with bracket 61, arranged on 61 top of bracket, the ball sub-material component 2 arranged on the lower section of ball box 1, the pearl in rack 6 The ball mounting assembly 3 of the discharging of nest loading assemblies 5 port, the ball box 1 is interior to divide pearl pipe 11, the ball equipped with least one set Box 1 divides pearl pipe 11 to connect with point ball assembly by one of which, described to divide ball assembly to pass through defeated pearl with ball mounting assembly 3 Pipe connects, and the ball mounting assembly 3 includes backing plate 31, the bead loading mould 32 arranged on 31 both sides of backing plate, is set on the bead loading mould 32 Have and the hole of bead 322 with being connected into the hole of bead 321 and with into the hole of bead 321 of going out that pearl pipe connects;The ball sub-material component 2 includes setting In the sub-material slide 21 on bracket 61, the material splitting cylinder 22 on sub-material slide 21, it is connected with 22 cylinder column of material splitting cylinder and can The sub-material sliding block 23 moved in sub-material slide 21,21 upper bottom surface of sub-material slide is equipped with divides pearl pipe 11 to connect with one of which Charging hole 231,21 bottom surface of sub-material slide are equipped with discharge hole 232, the sub-material sliding block 23 be equipped with can respectively with sub-material The blanking channel that charging hole 231 on slide 21 is connected with discharge hole 232.
Preferably, go out the top of the hole of bead 322 be connected with can axis is swung along bead loading mould 32 centered on pin envelope pearl block 33, When pearl nest is without passage by two bead loading moulds 32 composition, envelope pearl block 33 can cover out the hole of bead 322, avoid ball from going out the hole of bead 322 roll out and cause to waste, and when the passage that pearl nest is formed by bead loading mould 32, under the promotion of pearl nest, envelope pearl block 33 is with pin Centered on axis rotate, use the hole of bead 322 and opened wide to pearl nest, ball from go out the hole of bead 322 enter pearl nest.
Preferably, 322 side of the hole of bead is gone out on bead loading mould 32 and is equipped with limited step 323, opposite side is equipped with to be connected with envelope pearl block 33 The dynamic clamping head and quiet clamping head 324 connect, limited step 323 and dynamic clamping head and quiet clamping head 324 can no pearl nest by when to envelope pearl block 33 rise To position-limiting action, tissue envelope pearl block 33 arbitrarily swings, uses the hole of bead 322 and keep shielding status.
Preferably, bead loading mould 32 is equipped with from the sliding slot 325 for going out the hole of bead 322 and extending to pearl nest moving direction, when ball from Go out after the hole of bead 322 is put into pearl nest, during being moved with pearl nest, ball can be moved along sliding slot 325.Both rolling can be debugged Pearl and the degree of cooperation of pearl nest, and can be that pearl nest is more smooth by the process of bead loading mould 32.
Preferably, polarization components 4 are equipped between ball box 1 and ball sub-material component 2, the polarization components 4 include being arranged on Motor 41 and eccentric wheel mounting base 42 on bracket 61, the eccentric wheel in eccentric wheel mounting base 42 and eccentric wheel are pacified The adapting table 43 that seat 42 connects is filled, the eccentric wheel is connected with 41 shaft of motor, described to divide pearl pipe 11 to pass through the undertaking Platform 43;After motor 41 starts, due to the effect of eccentric wheel, eccentric wheel mounting base 42 will drive adapting table 43 to swing, and can make rolling Pearl is smoothly from the charging hole 231 for dividing pearl pipe 11 to enter 21 upper bottom surface of sub-material slide.
Preferably, the lower section of polarization components 4 is equipped with fixed station 44 on bracket 61, is set between the ball box 1 and fixed station 44 There is the guide rod 45 through the eccentric wheel mounting base 42, when motor 41 works, due to the effect of eccentric wheel, eccentric wheel mounting base 42 Swing will be produced, guide rod 45 can limit the amplitude of fluctuation and swaying direction of eccentric wheel mounting base 42, make eccentric wheel mounting base 42 It can only be swung up and down along guide rod 45.
Preferably, sub-material slide 21 is equipped with limiting plate 24, and limiting plate 24 can play the displacement distance of sub-material sliding block 23 To limitation, the blanking channel on sub-material sliding block 23 is set to connect exactly with the charging hole 231 on sub-material slide 21 or discharge hole 232 It is logical.
One kind as the utility model is improved, and the sub-material sliding slot 325 is equipped with cover board 25, and cover board 25 can be to sub-material Slide 21 plays a protective role, and avoids influencing sub-material 23 movement in sub-material slide 21 of sliding block.
The operation principle of the utility model is:During work, according to the model of ball, a component pearl pipe 11 is selected to be slided with sub-material The charging hole 231 of 21 upper bottom portions of seat connects, and the motor 41 of polarization components 4 starts, under the action of eccentric wheel, eccentric wheel mounting base 42 drive adapting tables 43 are swung up and down along guide rod 45, ball from the charging hole 231 for dividing pearl pipe 11 to enter 21 upper bottom portion of sub-material slide, Material splitting cylinder 22 starts, and cylinder column, which stretches out, drives sub-material sliding block 23 to move, and blanking channel and the charging hole 231 of sub-material sliding block 23 connect Logical, ball falls into blanking channel through charging hole 231, and material splitting cylinder 22 starts, and the recycling of cylinder column drives sub-material sliding block 23 to retreat, sub-material The discharge port on 21 times ground of blanking channel and sub-material slide on sliding block 23 connects, and ball falls through discharge hole at blanking channel 232 Enter defeated pearl pipe, and enter being passed through into the hole of bead 321 for bead loading mould 32 through defeated pearl pipe, and by rolling to out the hole of bead 322 into the hole of bead 321, Seal under the masking of pearl block 33, ball cannot temporarily be rolled out from the hole of bead 322 is gone out, when pearl nest is from the discharging port of pearl nest loading assemblies 5 Into two bead loading moulds 32 composition passage when, under the action of pearl nest, envelope pearl block 33 is promoted by pearl nest and along pearl nest moving direction Swing, go out the hole of bead 322 and opened wide to pearl nest, ball is loaded into pearl nest through going out the hole of bead 322, and is formed in pearl nest by two bead loading moulds 32 Passage when moved along the sliding slot 325 on bead loading mould 32, when pearl nest is curved pass fully through two bead loading moulds 32 composition passage when, in bullet Property return unit 324 under the action of, envelope pearl block 33 resets, and will go out the hole of bead 322 and covers up.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Any modification, equivalent substitution or improvement made within the spirit and principle of utility model etc. should be included in the utility model Within the scope of guarantor.

Claims (9)

  1. A kind of 1. Zhu Chao bead loadings mechanism, it is characterised in that:Pearl nest loading assemblies and bracket including rack, in rack, set Ball box in bracket top, ball sub-material component, the pearl nest loading assemblies discharge end in rack below ball box The ball mounting assembly of mouth, the ball box is interior to divide pearl pipe equipped with least one set, and the ball box passes through it with a point ball assembly In a component pearl pipe connect, described to divide ball assembly to be connected with ball mounting assembly by defeated pearl pipe, the ball mounting assembly Bead loading mould including backing plate, arranged on backing plate both sides, the bead loading mould be equipped with go out that pearl pipe connects into the hole of bead and with into the hole of bead Connection goes out the hole of bead.
  2. 2. according to Zhu Chao bead loadings mechanism described in claim 1, it is characterised in that:It is described go out the hole of bead above be connected with can using pin as The envelope pearl block that central shaft is swung along bead loading mould.
  3. 3. according to Zhu Chao bead loadings mechanism described in claim 2, it is characterised in that:Go out hole of bead side on the bead loading mould equipped with spacing Step, opposite side are equipped with the dynamic clamping head and quiet clamping head being connected with envelope pearl block.
  4. 4. according to Zhu Chao bead loadings mechanism described in claim 3, it is characterised in that:The bead loading mould is equipped with from the hole of bead is gone out to pearl nest The sliding slot of moving direction extension.
  5. 5. according to Zhu Chao bead loadings mechanism described in claim 1, it is characterised in that:Set between ball box and ball the sub-material component There are polarization components, the polarization components include the motor being arranged on bracket and eccentric wheel mounting base, installed arranged on eccentric wheel Eccentric wheel, the adapting table that is connected with eccentric wheel mounting base in seat, the eccentric wheel is connected with the machine shaft, described to divide pearl Pipe is through the adapting table.
  6. 6. according to Zhu Chao bead loadings mechanism described in claim 5, it is characterised in that:It is equipped with and fixes below polarization components on the bracket Platform, is provided through the guide rod of the eccentric wheel mounting base between the ball box and fixed station.
  7. 7. according to Zhu Chao bead loadings mechanism described in claim 1, it is characterised in that:The ball sub-material component includes being arranged on bracket Sub-material slide, the material splitting cylinder on sub-material slide, be connected and can be moved in sub-material slide with material splitting cylinder cylinder column Sub-material sliding block, the sub-material slide upper bottom surface is equipped with divides pearl pipe to connect charging hole, the sub-material slide bottom surface with one of which Equipped with discharge hole, the sub-material sliding block is equipped with the blanking that can be connected respectively with the charging hole on sub-material slide and discharge hole and leads to Road.
  8. 8. according to Zhu Chao bead loadings mechanism described in claim 7, it is characterised in that:The sub-material slide is equipped with limiting plate.
  9. 9. according to Zhu Chao bead loadings mechanism described in claim 7, it is characterised in that:The sub-material sliding slot is equipped with cover board.
CN201720860065.2U 2017-07-14 2017-07-14 A kind of Zhu Chao bead loadings mechanism Active CN207267141U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720860065.2U CN207267141U (en) 2017-07-14 2017-07-14 A kind of Zhu Chao bead loadings mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720860065.2U CN207267141U (en) 2017-07-14 2017-07-14 A kind of Zhu Chao bead loadings mechanism

Publications (1)

Publication Number Publication Date
CN207267141U true CN207267141U (en) 2018-04-24

Family

ID=61960060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720860065.2U Active CN207267141U (en) 2017-07-14 2017-07-14 A kind of Zhu Chao bead loadings mechanism

Country Status (1)

Country Link
CN (1) CN207267141U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112296626A (en) * 2020-10-21 2021-02-02 佛山市本吉智能科技有限公司 Production assembly line of two sections of hidden rails

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112296626A (en) * 2020-10-21 2021-02-02 佛山市本吉智能科技有限公司 Production assembly line of two sections of hidden rails
CN112296626B (en) * 2020-10-21 2024-06-07 佛山市昊誉自动化设备有限公司 Production assembly line of two-section hidden rail

Similar Documents

Publication Publication Date Title
CN2710794Y (en) Cold-box core blower having multiple station
CN109590434A (en) A kind of wax-pattern splicing tooling for titanium investment precision casting
CN207267141U (en) A kind of Zhu Chao bead loadings mechanism
CN216635249U (en) Vertical injection molding machine locking mechanism
CN207548091U (en) A kind of middle rail bead loading nest oiling mechanism
CN208437614U (en) A kind of loudspeaker T iron cold-heading feeding device modified form material retractable device
CN207255091U (en) A kind of damping press machine being moved easily
CN207655491U (en) Montmorillonite screening machine
CN209124724U (en) A kind of bracket stretching die
CN209381297U (en) A kind of dust catcher door molding die
CN205363633U (en) Ball piece die positioning device and mill abrasive material ball piece mould unloading machine
CN210477620U (en) Injection molding machine feed mechanism
CN209681143U (en) A kind of overturning casting machine
CN103991187B (en) Injection (mo(u)lding) machine
CN208084988U (en) A kind of transmission mechanism for 3D printer
CN203093133U (en) Box retreating mechanism
CN205020781U (en) Quick pressing equipment of model
CN207982708U (en) A kind of internal rail attachment assembly machine turns over interior rail mechanism
CN207564837U (en) Package integral jig in ear band insert feeding
CN209616238U (en) A kind of bumper mold core pulling component
CN220240000U (en) Three-die-opening overturning core shooting machine
CN105728662B (en) Core shooter shooting cylinder Pneumatic power elevator apparatus
CN105437098B (en) A kind of pellet die arrangement device and mill abrasive material pellet mould unloading machine
CN104494047A (en) Automatic cap closing mechanism of injection molding mold
CN214517456U (en) Efficient damping double-station core shooter with bottom die

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Guangdong Yaoda Financial Leasing Co., Ltd

Assignor: GUANGDONG SACA PRECISION MANUFACTURING Co.,Ltd.

Contract record no.: X2020980005447

Denomination of utility model: A kind of bead loading mechanism for bead nest

Granted publication date: 20180424

License type: Exclusive License

Record date: 20200827

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A kind of bead loading mechanism for bead nest

Effective date of registration: 20200904

Granted publication date: 20180424

Pledgee: Guangdong Yaoda Financial Leasing Co., Ltd

Pledgor: GUANGDONG SACA PRECISION MANUFACTURING Co.,Ltd.

Registration number: Y2020980005710