CN207259555U - A kind of sinter mixture pre-heating system - Google Patents

A kind of sinter mixture pre-heating system Download PDF

Info

Publication number
CN207259555U
CN207259555U CN201721075078.5U CN201721075078U CN207259555U CN 207259555 U CN207259555 U CN 207259555U CN 201721075078 U CN201721075078 U CN 201721075078U CN 207259555 U CN207259555 U CN 207259555U
Authority
CN
China
Prior art keywords
steam
pipe
preheating
mixture
granulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721075078.5U
Other languages
Chinese (zh)
Inventor
张飞宇
曾涛
张立国
王志君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN201721075078.5U priority Critical patent/CN207259555U/en
Application granted granted Critical
Publication of CN207259555U publication Critical patent/CN207259555U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to sintering technology field, more particularly to a kind of sinter mixture pre-heating system.Including the quicklime slaking system and device, mixer and material machine preheating device processed, granulation ore deposit groove preheating device, mixture ore trough preheating device set gradually along sintered production line;The quicklime slaking system and device by tripper, close glassware and device of fetching water forms, it is installed in sintered material room;The mixer and material machine preheating device processed by heating water pre-heater apparatus with plus steam preheating apparatus form, its be installed on mixer with granulation machine drum body;The granulation ore deposit groove preheating device is made of the steam bustle pipe on granulation ore deposit groove;The mixture ore trough preheating device is made of the steam preheating pipe on mixture ore trough with steam preheating bustle pipe.The utility model can improve sinter mixture temperature, reduce sinter solid burnup, improve sinter bed vapor-permeable type, reduce sinter production cost, make sintering production energy-saving.

Description

A kind of sinter mixture pre-heating system
Technical field
It the utility model is related to sintering technology field, more particularly to a kind of sinter mixture pre-heating system.
Background technology
In sintering production, the temperature of sinter mixture is directly related to the yield and quality and fuel consumption of sinter.Improve Sinter mixture temperature can reduce sinter solid burnup, improve permeability of sintering material bed, can reduce sinter and be produced into This.Have research and practice have shown that, the temperature of mixture often improves 10 DEG C, and sintering solid fuel consumption reduces 2kg/t, usage factor Improve 5% or so.Especially in the north iron and steel enterprise, in the winter time when temperature it is relatively low, the requirement to sinter mixture temperature Higher, the bed of material cross the influences of wet bands also bigger, with greater need for improving the temperature of mixture more than dew-point temperature.
At present, there is no sinter mixture pre-heating system, the method for improving sinter mixture temperature mainly utilizes sintering heat Return mine and mixture is preheated, since most enterprises have eliminated Thermal griddle technique, so can use without hot returning ore, It is a kind of the pre- of relatively backwardness and hot returning ore pre-heating technique can produce substantial amounts of dust and steam, have a great influence to production environment Thermal process.
The content of the invention
For overcome the deficiencies in the prior art, the utility model provides a kind of sinter mixture pre-heating system, improves and burns Mixture temperature is tied, reduces sinter solid burnup, improves sinter bed vapor-permeable type, reduces sinter production cost.
In order to achieve the above object, the utility model is realized using following technical scheme:
A kind of sinter mixture pre-heating system, including set gradually along sintered production line quicklime slaking system and device, Mixer and material machine preheating device processed, granulation ore deposit groove preheating device, mixture ore trough preheating device;The quicklime slaking system Device by tripper, close glassware and device of fetching water forms, it is installed in sintered material room;The mixer is preheated with material machine processed For device by heating water pre-heater apparatus with adding steam preheating apparatus to form, it is installed on mixer with pelletizing in machine drum body;The system Grain ore deposit groove preheating device is made of the steam bustle pipe on granulation ore deposit groove;The mixture ore trough preheating device by installed in Steam preheating pipe on mixture ore trough is formed with steam preheating bustle pipe.
The tripper is located in front of quick lime blanking point, and tripper is made of I-steel and wear-resisting iron block, wear-resisting iron block I-steel one end is fixed in, the I-steel other end is fixed on the belt conveyor steelframe that proportioning room is used to convey sinter mixture On, wear-resisting iron block is located at top in the middle part of belt width direction.
The conjunction glassware is made of fixed frame with closing flitch;Close flitch and be fixed on fixed frame one end, the fixed frame other end is consolidated The belt conveyor steelframe that proportioning room is used to convey sinter mixture is scheduled on, closes flitch with belt direction of travel into 30~60 ° Angle, it is consistent with belt radian to close flitch;One combination glassware is formed by two with conjunction glassware dislocation, and the distance of two conjunction glasswares is 600~1500mm.
The device of fetching water is made of multiple watering pipes, between watering pipe is located at tripper and closes glassware, the water outlet of watering pipe Point and tripper are on the same line.
The heating water pre-heater apparatus is with adding steam preheating apparatus to be made of steam pipe and hot-water line;Steam pipe and hot-water line It is hung in by steel wire rope in the middle part of mixer or system material machine drum body;The steam inlet of steam pipe and the hot water inlet of hot-water line are positioned at system Grain machine or mixing machine drum body input end.
The steam bustle pipe is installed on above the small set of granulation ore deposit groove, and the main steam pipe of steam bustle pipe is located at outside granulation ore deposit groove, It surround granulation ore deposit groove one week;The main steam pipe of steam bustle pipe sets a steam branch pipe to probe into granulation ore deposit every 800~1200mm Inside groove, it is connected with the inside liner plate for ore deposit groove of pelletizing.
The steam preheating pipe is vertically mounted on inside mixture ore trough, along mixture ore trough be evenly distributed with spacing for 800~ Two rows of steam preheating pipes of 1200mm;Steam preheating bustle pipe is made of main steam economizer bank and steam preheating branch pipe, and main steam is pre- Heat pipe sets a steam preheating branch pipe every 800~1200mm, and steam preheating branch pipe is probeed into inside mixture ore trough, with mixing Liner plate is connected inside material ore deposit groove.
Compared with prior art, the beneficial effects of the utility model are:
The utility model can improve sinter mixture temperature, reduce sinter solid burnup, improve sinter bed vapor-permeable type, Sinter production cost is reduced, makes sintering production energy-saving.
Brief description of the drawings
Fig. 1 is the utility model quicklime slaking system and device dimensional structure diagram;
Fig. 2 is the utility model mixer and material machine preheating device dimensional structure diagram processed;
Fig. 3 is the utility model granulation ore deposit groove preheating device dimensional structure diagram;
Fig. 4 is the utility model mixture ore trough preheating device dimensional structure diagram.
In figure:1- quicklime slakings system and device 2- mixers and material machine preheating device 3- processed granulation ore deposit groove preheating devices 4- mixture ore trough preheating device 5- trippers 6- close glassware 7- fetch water device 8- heating water pre-heater apparatus 9- add steam preheating Device 10- mixers and granulation machine drum body 11- granulation ore deposit groove 12- steam bustle pipe 13- mixture ore trough 14- steam preheatings The wear-resisting iron block 18- belt conveyors steelframe 19- fixed frames 20- of pipe 15- steam preheating bustle pipe 16- I-steel 17- close material Plate 21- steam pipe 22- hot-water lines
Embodiment
Specific embodiment of the present utility model is described further below in conjunction with the accompanying drawings
Embodiment:Exemplified by 1# machines being sintered by Report of Ironmaking Production in Anshan I & S Co head factory West
As shown in Figs 1-4, a kind of sinter mixture pre-heating system, including the quick lime set gradually along sintered production line disappear Change system and device 1, mixer and material machine preheating device 2 processed, granulation ore deposit groove preheating device 3, mixture ore trough preheating device 4.
As shown in Figure 1, Report of Ironmaking Production in Anshan I & S Co head factory West sintering 1# machines are 360m2Sintering machine, mix in proportioning room and pacify on 1 belt Quicklime slaking system and device 1 is filled, it is 1200mm to mix 1 belt width.Quicklime slaking system and device 1 is by tripper 5, conjunction glassware 6 and device 7 of fetching water form.Proportioning room has two quick lime blanking points of 7# and 8# ore deposits groove, and tripper 5 is arranged on 7# quick lime ore deposit grooves Sub-material is carried out before blanking point.Glassware 6 is closed to be arranged on after 8# quick lime ore deposit groove blanking points.7# and 8# quick lime ore deposit groove blanking points It is each provided afterwards and puts a device 7 of fetching water.The distance between two conjunction glasswares are 500mm.
Tripper 5 is made of the wear-resisting iron block 17 of the I-steel 16 and 100 × 200mm long equilateral triangle types of 50 × 800mm, Wear-resisting iron block 17 is welded on the end of I-steel 16, and the other end of I-steel 16 is fixed on belt conveyor steelframe 18, I-shaped Steel 16 can vertically adjust the distance of tripper 5 and belt on steelframe, to reach the needs of the different upper doses of belt.Wear-resisting iron Block 17 is apart from belt 50MM, and in the centre position in belt width direction, its effect is that the mixture on belt feeder is separated for position One of ditch, drops into so as to quick lime and wherein carries out digestion reaction.Before tripper 5 is located at all quick lime blanking points of proportioning room Face.
Close glassware 6 to be made of with closing flitch 20 fixed frame 19, close the end that flitch 20 is welded on fixed frame 19, fixed frame 19 The other end be fixed on belt conveyor steelframe 18, fixed frame 19 can vertically adjust on steelframe and close glassware 6 and belt Distance, to reach the needs of the different upper doses of belt.Close flitch 20 and belt direction of travel angle at 45 °.Close flitch 20 and skin Band arc angles are consistent.Flitch 20 is closed apart from belt 50mm.One combination glassware is made of two dislocation of conjunction glassware 6, two conjunctions The distance of glassware 6 is 1000mm, and the purpose so designed is to prevent the debris on belt from assembling on glassware is closed, and influences to close material effect Fruit.The effect for closing glassware 6 is to be covered the quick lime for carrying out digestion reaction with mixture, ensures that digestion reaction produces Heat do not scatter and disappear, improve the temperature of digestion reaction, make its reaction abundant.Close glassware 6 and be located at all proportioning room quick lime blankings Behind point.
Fetching water, device 7 is made of filler pipe with fetching water, the EXIT POINT of watering pipe with tripper 5 point-blank, with Ensure that digestion level really falls on quick lime.Device 7 of fetching water is made of 3 watering pipes, to prevent in water quantity set, is occurred outside digestion water Excessive phenomenon, moreover it is possible to make quick lime fully be combined with digestion water (because quick lime granularity is small to be combined with certain difficulty with water). Device 7 of fetching water is located at after each quick lime blanking point of proportioning room and tripper 5, before glassware 6 is closed.
After sintered material room uses this burnt lime slaking device, quicklime slaking reaction can be fully carried out, ensure that The temperature of sinter mixture is improved with granularity.This device design is simple, and highly practical, maintenance cost is low, is burnt in Anshan iron and steel plant Tie region widely uses.
As shown in Fig. 2, the heating water pre-heater apparatus 8 of mixer and material machine preheating device 2 processed with plus steam preheating apparatus 9 by Steam pipe 21 is formed with hot-water line 22.Steam pipe 21 is hung in mixer or system material machine drum body 10 with hot-water line 22 by steel wire rope Portion.Steam pipe 21 and hot-water line 22 are installed in mixed once machine drum body, steam pipe 21 is probeed into from mixer entrance, steam pipe 21 length are 2000mm;Hot-water line 22 adds hot water, and hot water is provided by additive pump works.Installed in five machine drum bodies of pelletizing Steam pipe 21 and hot-water line 22, steam pipe 21 are probeed into from granulator entrance, and 21 length of steam pipe is 2000mm;Hot-water line 22 adds Water is heated, hot water is provided by additive pump works.
As shown in figure 3, the steam bustle pipe 12 of granulation ore deposit groove preheating device 3 is installed on above 11 small set of granulation ore deposit groove, steam The main steam pipe of bustle pipe 12 surround granulation ore deposit groove 11 1 weeks outside granulation ore deposit groove 11.The main steam pipe of steam bustle pipe 12 every 800~1200mm sets a steam branch pipe to probe into inside granulation ore deposit groove, is connected with the inside liner plate for ore deposit groove of pelletizing, contact granulation Mixture in ore deposit groove 11, a diameter of 20~50mm of steam branch pipe, a diameter of 50~100mm of main steam pipe.
As shown in figure 4, the increase steam preheating pipe 14 in mixture ore trough 13, it is pre- to increase steam outside mixture ore trough 13 Hot bustle pipe 15.Two rows of steam preheating pipes 14 are installed below the frame above mixture ore trough 13, steam preheating pipe 14 it is adjacent away from From for 800mm, 16 steam preheating pipes 14 are amounted to.The steel pipe of a diameter of 50mm of steam preheating pipe 14, length to mud roller top 2000mm positions.Steam preheating bustle pipe 15 is made of main steam pipe and steam branch pipe, and steam preheating bustle pipe 15 is in main steam pipe On every 800mm set a steam branch pipe probe into inside mixture ore trough 13, be connected with 13 inside liner plate of mixture ore trough, Contact the mixture in mixture ore trough.The a diameter of 25mm of steam branch pipe, amounts to 26 steam branch pipes.Steam passes through steam-water separation After device, entered by steam preheating pipe and steam bustle pipe in granulation ore deposit groove.
After Report of Ironmaking Production in Anshan I & S Co head factory West sintering 1# machines use the utility model, 7 DEG C are improved between sinter mixture ratio.This reality Sinter mixture temperature is improved with New Energy, and then reduces sinter solid burnup, sinter bed vapor-permeable type is improved, reduces sintering Ore deposit production cost, makes sintering production energy-saving.
The above, is only the preferable embodiment of the utility model, but the scope of protection of the utility model is not This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality New technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (7)

1. a kind of sinter mixture pre-heating system, it is characterised in that including the quicklime slaking set gradually along sintered production line System and device, mixer and material machine preheating device processed, granulation ore deposit groove preheating device, mixture ore trough preheating device;The raw stone Grey digestive system device by tripper, close glassware and device of fetching water forms, it is installed in sintered material room;The mixer with For material machine preheating device processed by heating water pre-heater apparatus with adding steam preheating apparatus to form, it is installed on mixer and granulation machine drum body It is interior;The granulation ore deposit groove preheating device is made of the steam bustle pipe on granulation ore deposit groove;The pre- hot charging of mixture ore trough Put and be made of the steam preheating pipe on mixture ore trough with steam preheating bustle pipe.
2. a kind of sinter mixture pre-heating system according to claim 1, it is characterised in that the tripper is located at raw stone In front of grey blanking point, tripper is made of I-steel and wear-resisting iron block, and wear-resisting iron block is fixed in I-steel one end, and I-steel is another End is fixed on the belt conveyor steelframe that proportioning room is used to convey sinter mixture, and wear-resisting iron block is located in belt width direction Above portion.
3. a kind of sinter mixture pre-heating system according to claim 1, it is characterised in that the conjunction glassware is by fixed frame Formed with closing flitch;Close flitch and be fixed on fixed frame one end, the fixed frame other end is fixed on proportioning room and is used to convey sintered compound On the belt conveyor steelframe of material, flitch is closed with belt direction of travel into 30~60 ° of angles, it is consistent with belt radian to close flitch; One combination glassware is formed by two with conjunction glassware dislocation, and the distance of two conjunction glasswares is 600~1500mm.
4. a kind of sinter mixture pre-heating system according to claim 1, it is characterised in that the device of fetching water is beaten by multiple Water pipe forms, and between watering pipe is located at tripper and closes glassware, the EXIT POINT and tripper of watering pipe are on the same line.
A kind of 5. sinter mixture pre-heating system according to claim 1, it is characterised in that the heating water pre-heater apparatus With adding steam preheating apparatus to be made of steam pipe and hot-water line;Steam pipe is hung in mixer by steel wire rope with hot-water line or system is expected In the middle part of machine drum body;The steam inlet of steam pipe is located at granulator with the hot water inlet of hot-water line or mixes machine drum body input end.
6. a kind of sinter mixture pre-heating system according to claim 1, it is characterised in that the steam bustle pipe is installed on Pelletize above the small set of ore deposit groove, the main steam pipe of steam bustle pipe surround granulation ore deposit groove one week outside granulation ore deposit groove;Steam bustle pipe Main steam pipe sets a steam branch pipe to probe into inside granulation ore deposit groove every 800~1200mm, the inside liner plate with ore deposit groove of pelletizing It is connected.
7. a kind of sinter mixture pre-heating system according to claim 1, it is characterised in that the steam preheating pipe is vertical Inside mixture ore trough, two rows of steam preheating pipes that spacing is 800~1200mm are evenly distributed with along mixture ore trough;Steam is pre- Hot bustle pipe is made of main steam economizer bank and steam preheating branch pipe, and main steam economizer bank sets a steaming every 800~1200mm The pre- hot leg pipe of vapour, steam preheating branch pipe are probeed into inside mixture ore trough, are connected with liner plate inside mixture ore trough.
CN201721075078.5U 2017-08-25 2017-08-25 A kind of sinter mixture pre-heating system Active CN207259555U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721075078.5U CN207259555U (en) 2017-08-25 2017-08-25 A kind of sinter mixture pre-heating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721075078.5U CN207259555U (en) 2017-08-25 2017-08-25 A kind of sinter mixture pre-heating system

Publications (1)

Publication Number Publication Date
CN207259555U true CN207259555U (en) 2018-04-20

Family

ID=61923055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721075078.5U Active CN207259555U (en) 2017-08-25 2017-08-25 A kind of sinter mixture pre-heating system

Country Status (1)

Country Link
CN (1) CN207259555U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110484717A (en) * 2019-09-18 2019-11-22 四川省达州钢铁集团有限责任公司 A kind of sintering method and sintering equipment
CN110616314A (en) * 2019-10-15 2019-12-27 云南德胜钢铁有限公司 High-temperature sintering method for schreyerite mixture
CN112080632A (en) * 2020-09-25 2020-12-15 湖南华菱湘潭钢铁有限公司 Sintering method of super-thick material layer sintering ore

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110484717A (en) * 2019-09-18 2019-11-22 四川省达州钢铁集团有限责任公司 A kind of sintering method and sintering equipment
CN110616314A (en) * 2019-10-15 2019-12-27 云南德胜钢铁有限公司 High-temperature sintering method for schreyerite mixture
CN112080632A (en) * 2020-09-25 2020-12-15 湖南华菱湘潭钢铁有限公司 Sintering method of super-thick material layer sintering ore

Similar Documents

Publication Publication Date Title
CN207259555U (en) A kind of sinter mixture pre-heating system
CN104975169B (en) Method of improving breathability of sintering mixture
CN105274269B (en) A kind of distributing method of sinter mixture
CN102719264A (en) High-reactivity coke and manufacture method thereof
CN109776002B (en) Suspension calcination activation system and method suitable for clay mine tailings
CN112048616B (en) Liquid-gas two-phase medium coupling moving blowing sintering method and blowing device
CN104726696A (en) Medium-alkali thick blanking layer sintering and producing method
CN106350667A (en) Super-thick bed layer sintering method for reducing content of small particles by pre-sintering
CN106350666A (en) Super-thick bed layer sintering production method
CN207524501U (en) Two grey mixing plant feeding devices
CN112048617B (en) Liquid-gas two-phase medium coupling partition blowing sintering method and blowing device
CN105712640B (en) A kind of sintering burnt lime slaking device and method
CN205151782U (en) Calcium carbide furnace
CN109182735A (en) Highly crystalline water limonite sintering method
CN106498152B (en) A kind of limonite super thick bed of material sintering method using pre-sintering
CN104745803A (en) Shaft furnace and application of shaft furnace in coal-based magnetization roasting process for refractory low-grade iron ore
CN209834762U (en) Auxiliary tool for adding sintering lime
CN204917989U (en) System for carbide stove and shaft furnace ally oneself with to be used
CN105444563B (en) Ferro-alloy pellets shaft furnace
CN207632857U (en) A kind of device for promoting sinter mixture temperature
CN106350661A (en) Iron ore sintering method and device without quicklime digester
CN112760479A (en) Sintering method for improving quality of vanadium-titanium sintered mineral product
CN112226613A (en) Multi-pollutant collaborative emission reduction method in sintering process
CN214244545U (en) Device for improving air permeability of sintering mixture
CN109136543A (en) High mixture ratio magnetic iron ore sintering method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant