CN204917989U - System for carbide stove and shaft furnace ally oneself with to be used - Google Patents

System for carbide stove and shaft furnace ally oneself with to be used Download PDF

Info

Publication number
CN204917989U
CN204917989U CN201520543291.9U CN201520543291U CN204917989U CN 204917989 U CN204917989 U CN 204917989U CN 201520543291 U CN201520543291 U CN 201520543291U CN 204917989 U CN204917989 U CN 204917989U
Authority
CN
China
Prior art keywords
furnace
calcium carbide
spray gun
reducing gas
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520543291.9U
Other languages
Chinese (zh)
Inventor
邓君
薛逊
曹志成
张岚
范志辉
孟嘉乐
唐敬坤
吴道洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenwu Technology Group Corp Co Ltd
Original Assignee
Beijing Shenwu Environmental and Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shenwu Environmental and Energy Technology Co Ltd filed Critical Beijing Shenwu Environmental and Energy Technology Co Ltd
Priority to CN201520543291.9U priority Critical patent/CN204917989U/en
Application granted granted Critical
Publication of CN204917989U publication Critical patent/CN204917989U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Carbon And Carbon Compounds (AREA)

Abstract

The utility model discloses a carbide stove and shaft furnace ally oneself with the system that uses. This system includes: carbide stove, carbide stove include the furnace body, inject carbide production space in the furnace body, a plurality of electrodes, a plurality of electrodes are embedded into in the carbide production space from the furnace body, a plurality of spray guns, a plurality of spray guns are embedded into in the carbide production space from the roof and/or the lateral wall of furnace body, a purifier, purifier links to each other with the carbide stove for being directed at the flue gas carries out purification treatment to obtain uncontaminated reducing gas, a heating furnace, the heating furnace with for being directed at uncontaminated reducing gas heats purifier links to each other, and utilizing the high temperature reducing gas to carry out the shaft furnace of electronation reaction, the shaft furnace links to each other with the heating furnace. With the carbide stove the flue gas that reducing gas content is high that the in -process of preparation carbide produced through purify with the heating after can be for the shaft furnace provides heat and reductant, salvaging, the system that sparingly prepares the reducing gas invests, has reduced the manufacturing cost of shaft furnace product.

Description

The system of furnace of calcium carbide and shaft furnace coupling
Technical field
The utility model relates to field of metallurgy, particularly, relates to the system of furnace of calcium carbide and shaft furnace coupling.
Background technology
Calcium carbide is the main raw material producing ethene, in the industry in occupation of very consequence, it is that furnace charge is sent into electric furnace by pay-off and tremie pipe by a certain proportion of unslaked lime and blue charcoal (coke) mixing that calcium carbide is produced, electric furnace primary structure comprises body of heater and electrode, electric arc is produced after relying on energising during furnace of calcium carbide work, rely on the heat furnace charge that electric arc is formed, furnace charge is made to reach chemical reaction institute heat requirement, wherein, electric arc send region that high temperature can be applied directly in electric arc working district or molten bath, the position in this region below electrode tip until furnace bottom, traditional furnace of calcium carbide, its structure formation is circular three-phase electrode structure, three electrodes are that equilateral triangle is arranged in furnace interior, outside body of heater is circular, this form furnace of calcium carbide structural disadvantages: stove inside circumference has a lot of electric arc not act on or the place of the non-constant of action effect, i.e. non-molten bath zone, the temperature in these places is made not reach reaction requirement, this region furnace charge just can not or be difficult to react, because heat distribution difference is too large, cause furnace of calcium carbide productivity low, power consumption is high, blue charcoal (coke) consumption is relatively large, cost is high.
Shaft furnace is widely used in oxidizing roasting or the direct-reduced iron field of iron ore pellets, for the oxidizing roasting of iron ore pellets or directly pelletizing is reduced to iron in iron and steel metallurgical industry, it is indispensable processing unit in ferrous metallurgy, shaft furnace directly needs a large amount of heats and consumes a large amount of reducing gass in smelting process, increases production cost.
Therefore, the technique reducing shaft furnace production cost requires study.
Utility model content
The utility model is intended at least to solve one of technical problem existed in prior art.For this reason, an object of the present utility model is the system proposing a kind of furnace of calcium carbide and shaft furnace coupling, and this system utilizes furnace of calcium carbide to provide heat and reducing gas for shaft furnace, realizes the Appropriate application of the energy.
According to an aspect of the present utility model, the utility model provides the system of a kind of furnace of calcium carbide and shaft furnace coupling.According to embodiment of the present utility model, this system comprises: furnace of calcium carbide, for the preparation of calcium carbide, and obtains flue gas, and wherein, described furnace of calcium carbide comprises: body of heater, limits calcium carbide production space in described body of heater; Multiple electrode, described multiple electrode is embedded into described calcium carbide production space from described body of heater; Multiple spray gun, described multiple spray gun is embedded into described calcium carbide production space from the roof of described body of heater and/or sidewall, for providing coal dust and oxygen in described calcium carbide production space, refining plant, described refining plant is connected with described furnace of calcium carbide, for carrying out purifying treatment to described flue gas, to obtain clean reducing gas; Process furnace, described process furnace is connected with described refining plant, for heating the reducing gas of described cleaning, to obtain high-temperature reducing gas; Shaft furnace, described shaft furnace is connected with described process furnace, utilizes described high-temperature reducing gas to carry out reduction reaction.
According to embodiment of the present utility model, by rationally arranging spray gun between the roof and the electrode of sidewall of furnace of calcium carbide body of heater, injecting oxygen and coal dust in stove, oxygen and coal dust generation chemical reaction release of heat, heat can be delivered to stove inside circumference has a lot of electric arc not act on or the place of the non-constant of action effect, uniform heat distribution in furnace of calcium carbide; It is low that calcium carbide produces power consumption, in addition, the coal dust sprayed into can also with calcium carbide generation reduction reaction, thus, calcium carbide production cost is low, and produce and obtain the high flue gas of reducing gas content, in the system of the utility model furnace of calcium carbide and shaft furnace coupling, the flue gas that the reducing gas content produced in the process preparing calcium carbide by furnace of calcium carbide of the present utility model is high can provide heat and reductive agent for shaft furnace after purification and heating, realize utilization of waste material, save the system investments of preparation reducing gas, reduce the production cost of shaft furnace product.
With reference to figure 3, according to embodiment of the present utility model, this furnace of calcium carbide 1000 comprises further: spray gun setting device 500, and this spray gun setting device 500 is connected with spray gun 200, is inserted into position in calcium carbide production space 400 for regulating spray gun 200.Thus, the on position of spray gun can be adjusted as required, thus heat can be delivered to stove inside circumference there is a lot of electric arc not act on or the place of the non-constant of action effect, and uniform heat distribution in furnace of calcium carbide, heats more fully to material.
According to embodiment of the present utility model, each in described multiple spray gun includes: housing, limits spatial accommodation in described housing; Coal dust jet pipe, described coal dust jet pipe is arranged in described spatial accommodation; Multiple oxygen spray pipe, described multiple oxygen spray pipe is arranged in described spatial accommodation, and described multiple oxygen spray pipe distributes along the circumference of described coal dust jet pipe; And cooling water pipeline, described cooling water pipeline is arranged on the outer wall of described housing.Thus, utilize this spray gun, oxygen and coal dust can be provided efficiently in furnace of calcium carbide, and the cooling water pipeline of spray gun outer wall can reduce the temperature of spray gun, prevent in the too high spray gun shortening in work-ing life caused of body of heater internal cause temperature.
According to embodiment of the present utility model, described spray gun extend into described calcium carbide production space from the roof of described body of heater, and the angle between described spray gun and described furnace of calcium carbide roof is 15 ~ 90 degree.Thus, be convenient to spray gun be inserted in the material on top, furnace of calcium carbide molten bath.
According to embodiment of the present utility model, described spray gun extend into described calcium carbide production space from the sidewall of described body of heater, and the angle between described spray gun and described furnace of calcium carbide sidewall is 15 ~ 90 degree.Thus, be convenient to spray gun be inserted in the material on top, furnace of calcium carbide molten bath.
According to embodiment of the present utility model, the spout of described spray gun and the distance of described calcium carbide central axis are the 2/3-5/6 of the radical length of the furnace of calcium carbide at the spout place place of described spray gun.Thus, the oxygen of spray gun ejection and the heat of coal dust firing release have a lot of electric arc not act on stove inside circumference or the place of the non-constant of action effect respectively, ensure that furnace heat is evenly distributed.
The technique of furnace of calcium carbide of the present utility model and shaft furnace coupling and system, at least can have one of following advantages:
(1) furnace of calcium carbide furnace heat is evenly distributed.Existing furnace of calcium carbide structure and production technique, the power consumption of ton calcium carbide is about 3100kwh/t. calcium carbide, the high temperature arc light produced by electrode, the region that arc light can not arrive is there is in stove, this region origin of heat mainly relies between furnace charge and conducts heat, and heat transmission is comparatively slow, and thermosteresis is high.The utility model is by arranging spray gun at the top cover of body of heater and/or sidewall, injecting oxygen and coal dust in stove, winding-up process oxygen coal combustion generation heat can be radiated arc light to be difficult to reach position, relatively traditional furnace of calcium carbide, furnace heat distribution is more even, calcium carbide smelting energy consumption is low, and the cycle is short, and the production cost of calcium carbide per ton can reduce by 120 yuan-223 yuan.
(2) utilize furnace of calcium carbide of the present utility model to produce calcium carbide, the coal dust that spray gun sprays into can the blue charcoal (or coke) of Substitute For Partial calcium carbide reductive agent, and the consumption of blue charcoal (or coke) reduces, and calcium carbide production cost declines.
(3) process utilizing furnace of calcium carbide of the present utility model to produce calcium carbide can combine with shaft kiln directly reduced process, realize duplex to produce, the flue gas that furnace of calcium carbide produces is through dedusting, washing, dehumidifying, compression, cleaning and desulfurization decarburization converts, process furnace is heated to 850-1000 DEG C and send shaft furnace, for shaft furnace production provides heat and reductive agent, the flue gas that the furnace of calcium carbide producing 900000 tons of calcium carbides per year produces after treatment, the demand of the reducing gas of the shaft furnace production of 28-36 ten thousand tons of DRI can be met, save the investment of coal reducing gas system, the cost of investment of shaft furnace product DRI significantly reduces.
Additional aspect of the present utility model and advantage will part provide in the following description, and part will become obvious from the following description, or be recognized by practice of the present utility model.
Accompanying drawing explanation
Above-mentioned and/or additional aspect of the present utility model and advantage will become obvious and easy understand from accompanying drawing below combining to the description of embodiment, wherein:
Fig. 1 shows the structural representation in the furnace of calcium carbide longitudinal section according to the utility model embodiment;
Fig. 2 shows the structural representation of the spray gun according to the utility model embodiment;
Fig. 3 shows the plan structure schematic diagram of the spray gun according to the utility model embodiment.
Embodiment
Be described below in detail embodiment of the present utility model, the example of described embodiment is shown in the drawings, and wherein same or similar label represents same or similar element or has element that is identical or similar functions from start to finish.Being exemplary below by the embodiment be described with reference to the drawings, only for explaining the utility model, and can not being interpreted as restriction of the present utility model.
In description of the present utility model, term " longitudinal direction ", " transverse direction ", " on ", D score, "front", "rear", "left", "right", " vertically ", " level ", " top ", the orientation of the instruction such as " end " or position relationship be based on orientation shown in the drawings or position relationship, it is only the utility model instead of require that the utility model with specific azimuth configuration and operation, therefore can not must be interpreted as restriction of the present utility model for convenience of description.
According to an aspect of the present utility model, the utility model provides the system of a kind of furnace of calcium carbide and shaft furnace coupling.With reference to figure 2, according to embodiment of the present utility model, this system comprises: furnace of calcium carbide 1000, refining plant 2000, process furnace 3000 and shaft furnace 4000.With reference to figure 3, according to embodiment of the present utility model, furnace of calcium carbide 1000 for the preparation of calcium carbide, and obtains flue gas, and this furnace of calcium carbide comprises: electrode 100, spray gun 200, body of heater 300, wherein, limits calcium carbide production space 400 in body of heater 300; Multiple electrode 100 is connected with body of heater 300 and stretches in calcium carbide production space 400, for providing heat in calcium carbide production space 400; Multiple spray gun 200 is connected with body of heater 300 and stretches in calcium carbide production space 400, for providing coal dust and oxygen in calcium carbide production space 400.According to embodiment of the present utility model, refining plant 2000 is connected with furnace of calcium carbide 1000, for carrying out purifying treatment to flue gas, obtains clean reducing gas.According to embodiment of the present utility model, process furnace 3000 is connected with refining plant 2000, for heating the reducing gas of cleaning, obtains high-temperature reducing gas.According to embodiment of the present utility model, shaft furnace 4000 is connected with process furnace 3000, and shaft furnace 4000 utilizes high-temperature reducing gas to carry out reduction reaction.
According to embodiment of the present utility model, by rationally arranging spray gun at the roof of furnace of calcium carbide body of heater and sidewall, injecting oxygen and coal dust in stove, oxygen and coal dust generation chemical reaction release of heat, heat can be delivered to stove inside circumference has a lot of electric arc not act on or the place of the non-constant of action effect, uniform heat distribution in furnace of calcium carbide; It is low that calcium carbide produces power consumption, in addition, the coal dust sprayed into can also with calcium carbide generation reduction reaction, thus, calcium carbide production cost is low, and produce and obtain the high flue gas of reducing gas content, in the system of the utility model furnace of calcium carbide and shaft furnace coupling, the flue gas that the reducing gas content produced in the process preparing calcium carbide by furnace of calcium carbide of the present utility model is high can provide heat and reductive agent for shaft furnace after purification and heating, realize utilization of waste material, save the system investments of preparation reducing gas, reduce the production cost of shaft furnace product.
According to embodiments more of the present utility model, this furnace of calcium carbide comprises further: spray gun setting device, (spray gun setting device and spray gun can be man-to-man for this spray gun setting device and multiple spray gun, also can a spray gun setting device be connected with multiple spray gun) be connected, be inserted into position in described calcium carbide production space for regulating described spray gun.Thus, can according to the position of material and molten bath, the on position of adjustment spray gun, makes spray gun insert above molten bath and between solid materials.
According to specific embodiment of the utility model, each spray gun includes: housing, and coal dust jet pipe, oxygen spray pipe and cooling water pipeline wherein, limit spatial accommodation in housing; Coal dust jet pipe is arranged in this spatial accommodation; Multiple oxygen spray pipe is arranged in this spatial accommodation, and oxygen spray pipe distributes along the circumference of coal dust jet pipe; Cooling water pipeline is arranged on the outer wall of housing, wherein, cooling water pipeline can be wrapped on the outer wall of housing in snakelike, comprise inlet segment and backwater section, water coolant flow to the other end from the inlet segment along pipeline from one end of housing, arrive the top of inlet segment, then return along the backwater section of this pipeline, final outflow conduit.
According to embodiments more of the present utility model, spray gun is positioned on the sidewall of body of heater, and the spout of spray gun is positioned at solid charge district, does not stretch in the district of molten bath.Thus, the heat that the coal dust firing of spray gun ejection produces fully heats material, and increases the contact of coal dust and material, promotes that coal dust and material reaction generate calcium carbide, thus reduce the consumption of coke and blue charcoal in calcium carbide production, production cost is low.
According to embodiment of the present utility model, coal dust jet pipe in spray gun is connected by pipeline with high pressure coal filler bin, oxygen spray pipe is connected by high pressure oxygen pipeline with oxygen pressing station, the leading portion of spray gun arranges valve, when jetting in stove, pulverized coal channel, oxygen channel and valve open, coal dust/oxygen enters spray gun, and in the spout and stove of spray gun, following chemical reaction occurs:
C+O 2=CO+Q(1)
A small amount of C+O 2=CO 2+ Q (2)
C+CaO=CaC 2+CO(3)
Wherein, formula (1) and formula (2) are thermopositive reaction, release heat for heating furnace charge to reduce power consumption.Part charcoal in coal dust and calcium oxide generation reduction reaction, blue charcoal (coke) usage quantity can be reduced, and, burning produces heat smoke after dedusting, washing, dehumidifying, compressor compresses, desulfurization and decarburization conversion, process furnace are heated to 800-1000 DEG C, shaft furnace can be sent into, there is provided heat and reducing gas for shaft kiln directly reduced, thus make full use of the energy, increase economic efficiency.In addition, because calcium carbide in-furnace temperature is very high, the cooling water pipeline of spray gun outer wall can reduce the temperature of spray gun, prevents the too high spray gun shortening in work-ing life caused of temperature in body of heater.
According to embodiments more of the present utility model, spray gun extend into calcium carbide production space 400 from the roof of body of heater 300, and the angle between spray gun 200 and furnace of calcium carbide 300 roof is 15 ~ 90 degree.Thus, be convenient to the angle of the distributing position adjustment spray gun according to material in stove and electrode, ensure that spray gun inserts in the middle part of the material on top, furnace of calcium carbide molten bath, and not with molten bath contact.
According to embodiments more of the present utility model, spray gun 200 extend into calcium carbide production space 400 from the sidewall of body of heater 300, and the angle between spray gun 200 and furnace of calcium carbide 300 sidewall is 15 ~ 90 degree, be convenient to the angle of the distributing position adjustment spray gun according to material in stove and electrode, ensure spray gun insert top, furnace of calcium carbide molten bath material in the middle part of, and not with molten bath contact.
According to embodiments more of the present utility model, the distance of the spout of spray gun 200 and the central axis of furnace of calcium carbide 1000 is the 2/3-5/6 of the radical length of the furnace of calcium carbide at the spout place place of spray gun 200.Wherein, radical length refers to and extends radially outward length to the radial line segments crossing with sidewall from medullary ray, and the radical length at spout place place refers to the length of the radial line segments at spout place.Thus, the oxygen of spray gun ejection and the heat of coal dust firing release have a lot of electric arc not act on stove inside circumference or the place of the non-constant of action effect respectively, ensure that furnace heat is evenly distributed.
According to embodiment of the present utility model, refining plant 2000 can comprise: gas water scrubber 2100, moisture trap 2200, compressor 2300 and desulfurization and decarburization umformer 2400.Thus utilize aforesaid device to wash reducing gas, except water vapour, pressurization and desulfurization decarbonisation, remove the impurity in flue gas and the non-reducing gas such as carbonic acid gas, sulfurous gas, the ratio of reducing gas in the component of flue gas is significantly increased, obtain clean reducing gas, prevent the dust occluding device pipeline in reducing gas, affect the normal operation of equipment pipe.
For the ease of understanding, the utility model provides the technique that a kind of aforesaid system carries out furnace of calcium carbide and shaft furnace coupling.With reference to figure 1, according to embodiment of the present utility model, be described in detail to the technique of furnace of calcium carbide and shaft furnace coupling, this technology utilization furnace of calcium carbide provides heat and reducing gas for shaft furnace, according to embodiment of the present utility model, the method for furnace of calcium carbide and shaft furnace coupling comprises:
S100: according to embodiment of the present utility model, joins furnace charge in described calcium carbide production space.Thus, furnace charge is utilized to start to prepare calcium carbide.
S200: utilize multiple electrode 100 to heat the furnace charge in described calcium carbide production space.Thus, the heat provided by electrode, makes furnace charge react, and generates calcium carbide.
S300: utilize multiple spray gun 200 to supply coal dust and oxygen in calcium carbide production space, a part and the oxygen generation combustion reactions of this coal dust provide heat to calcium carbide production space, the remainder of this coal dust as reductive agent, to obtain calcium carbide and flue gas.Thus, by spray gun to injecting oxygen in stove and coal dust, oxygen and coal dust generation chemical reaction release of heat, heat can be delivered to stove inside circumference has a lot of electric arc not act on or the place of the non-constant of action effect, uniform heat distribution in furnace of calcium carbide; It is low that calcium carbide produces power consumption, in addition, the coal dust sprayed into can also with calcium carbide generation reduction reaction, thus calcium carbide production cost is low, and produces and obtain the high a large amount of flue gases of reducing gas content.
According to embodiments more of the present utility model, the ratio of coal dust and oxygen is: 1 ton of coal dust: (350-800) cubic meter oxygen, and wherein, oxygen is the oxygen under standard state.Thus, coal dust and oxygen carry out oxygen debt formula burning, generate a large amount of carbon monoxide, make to be in reducing atmosphere in furnace of calcium carbide, promote that the reduction reaction of calcium carbide is carried out, simultaneously, burning produces heat smoke after dedusting, washing, dehumidifying, compressor compresses, desulfurization and decarburization conversion, process furnace are heated to 800-1000 DEG C, can send into shaft furnace, provide heat and reducing gas for shaft kiln directly reduced, thus make full use of the energy, economic benefit is provided.
According to specific embodiment of the utility model, the particle diameter of coal dust is not more than 1mm.Thus, the contact area of coal dust and oxygen is large, is easy to burning.
S400: flue gas is carried out purifying treatment, obtains clean reducing gas.Thus, remove water vapour, impurity and the non-reducing gas such as carbonic acid gas, sulfurous gas in flue gas, obtain clean reducing gas, be convenient to later use.
S500: the reducing gas of cleaning is carried out heat treated, obtains high-temperature reducing gas.Thus, high-temperature reducing gas can provide sufficient heat for shaft furnace, is convenient to the carrying out of perpendicular reaction in furnace.
S600: high-temperature reducing gas is delivered to shaft furnace, shaft furnace utilizes high-temperature reducing gas to carry out reduction reaction.Thus, the reducing gas produced in the process preparing calcium carbide by furnace of calcium carbide of the present utility model can provide heat and reductive agent for shaft furnace after purification and heating, realize utilization of waste material, this reducing gas can provide heat and reductive agent for shaft furnace after purification and heating, save the system investments of preparation reducing gas, reduce the production cost of shaft furnace product.
According to embodiment of the present utility model, by rationally arranging spray gun at the roof of furnace of calcium carbide body of heater and sidewall, injecting oxygen and coal dust in stove, oxygen and coal dust generation chemical reaction release of heat, heat can be delivered to stove inside circumference has a lot of electric arc not act on or the place of the non-constant of action effect, uniform heat distribution in furnace of calcium carbide; It is low that calcium carbide produces power consumption, in addition, the coal dust sprayed into can also with calcium carbide generation reduction reaction, thus calcium carbide production cost is low, and produces and obtain the high flue gas of reducing gas content.In the technique of the utility model furnace of calcium carbide and shaft furnace coupling, the flue gas that the reducing gas content produced in the process preparing calcium carbide by furnace of calcium carbide of the present utility model is high can provide heat and reductive agent for shaft furnace after purification and heating, realize utilization of waste material, this flue gas can provide heat and reductive agent for shaft furnace after purification and heating, save the system investments of preparation reducing gas, reduce the production cost of shaft furnace product.
Below with reference to specific embodiment, be described the utility model, it should be noted that, these embodiments are only illustrative, and can not be interpreted as restriction of the present utility model.
Embodiment 1:
With a furnace of calcium carbide for spray gun, comprise bell, gun body, spray gun lifting gear, insulated enclosure cover.Described furnace of calcium carbide is the furnace of calcium carbide that bell is provided with spray gun, and spray gun is copper spray gun.In the present embodiment, spray gun structure as shown in Figure 2, spray gun inside is provided with jetting oxygen tube, coal powder jetting tube and water-cooled tube, jetting oxygen tube/coal powder jetting tube is connected with external oxygen pipeline/high pressure coal dust transfer lime, pipe connecting is equipped with control valve, when carrying out oxygen coal to furnace of calcium carbide and mixing spray, open by-pass valve control control pressure and flow.Spray gun water-cooled tube is connected with high pressure clean circulating water pipe, makes water coolant Rapid Circulation in spray gun, guarantees inflow temperature <35 DEG C, leaving water temperature(LWT) <50 DEG C.Spray gun is connected with lifting gear, spray gun can be regulated to enter stove position according to melt pool height and work loading height.Be heated more evenly to make furnace of calcium carbide furnace charge and calorific loss reduces, calcium carbide furnace cover spray gun is evenly arranged in outside electrode concentric(al) circles, perforate direction and horizontal plane, and spray gun arranges insulating sealing materials with calcium carbide bell or furnace wall, prevents from conducting electricity and altering outside flue gas.When calcium carbide smelted by this device furnace of calcium carbide, large calorimetric is released in the biochemical reaction of the mixed eruption of oxygen coal, can Substitute For Partial electric energy, reduction power consumption; Heat can be delivered to the non-molten bath zone that arclight is difficult to arrive simultaneously, and calcium carbide furnace heat is more even, reduces calcium carbide tap to tap time and energy consumption.
When calcium carbide furnace charge loads in furnace of calcium carbide, adjustment electrode and spray gun, make the spout of spray gun insert the furnace charge pars intermedia on top, molten bath, the power transmission starting the arc, opens spray gun early gate simultaneously, carries out oxygen coal mixed injection, and winding-up pulverized anthracite 130kg/t. calcium carbide, oxygen consumption are 95NM 3/ t. calcium carbide, is heated to 2000-2200 DEG C and smelts by bath temperature.Tradition calcium carbide produces the about 3100kwh/t. calcium carbide of power consumption, and after calcium carbide prepared by use furnace of calcium carbide of the present utility model, power consumption is reduced to 2600kwh/t. calcium carbide, production cost reduces by 165 yuan/t. calcium carbide, meanwhile, coal dust and oxygen reaction generate a large amount of CO, make exhaust gas volumn increase about 210Nm 3/ t. calcium carbide, total exhaust gas volumn is about 650NM 3/ t.Flue gas is passed into refining plant and carry out dedusting, washing, dehumidifying, compression, cleaning and desulfurization decarburization conversion process, obtain clean flue gas, the flue gas of cleaning is passed in process furnace and is heated to 850-1000 DEG C, obtain high-temperature flue gas.High-temperature flue gas is passed into shaft furnace, and shaft furnace utilizes high-temperature flue gas to reduce to ferric oxide, obtains iron.Usually, the flue gas that the furnace of calcium carbide producing 900000 tons of calcium carbides per year produces can meet the demand of the reducing gas of the DRI shaft furnace production of annual output 300000 tons substantially.
Embodiment 2:
With a furnace of calcium carbide for spray gun, comprise bell, gun body, spray gun lifting gear, insulated enclosure cover.Described furnace of calcium carbide is the furnace of calcium carbide that bell is provided with spray gun, and spray gun is copper spray gun.In the present embodiment, spray gun structure as shown in Figure 2, spray gun inside is provided with jetting oxygen tube, coal powder jetting tube and water-cooled tube, jetting oxygen tube/coal powder jetting tube is connected with external oxygen pipeline/high pressure coal dust transfer lime, pipe connecting is equipped with control valve, when carrying out oxygen coal to furnace of calcium carbide and mixing spray, open by-pass valve control control pressure and flow.Spray gun water-cooled tube is connected with high pressure clean circulating water pipe, makes water coolant Rapid Circulation in spray gun, guarantees inflow temperature <35 DEG C, leaving water temperature(LWT) <50 DEG C.Spray gun is connected with lifting gear, spray gun can be regulated to enter stove position according to melt pool height and work loading height.Be heated more evenly and calorific loss minimizing to make furnace of calcium carbide furnace charge, furnace of calcium carbide installs copper spray gun in the perforate of furnace of calcium carbide furnace wall, furnace wall tapping is positioned at top, furnace of calcium carbide molten bath, perforate direction becomes 35 ° with horizontal plane, spray gun and calcium carbide bell or furnace wall arrange insulating sealing materials, prevent from altering outside conduction and flue gas.When calcium carbide smelted by this device furnace of calcium carbide, large calorimetric is released in the biochemical reaction of the mixed eruption of oxygen coal, can Substitute For Partial electric energy, reduction power consumption; Heat can be delivered to the non-molten bath zone that arclight is difficult to arrive simultaneously, and calcium carbide furnace heat is more even, reduces calcium carbide tap to tap time and energy consumption.
When calcium carbide furnace charge loads in furnace of calcium carbide, adjustment electrode and spray gun, make the spout of spray gun insert the furnace charge pars intermedia on top, molten bath, the power transmission starting the arc, opens spray gun early gate simultaneously, carries out oxygen coal mixed injection, and winding-up pulverized anthracite 200kg/t. calcium carbide, oxygen consumption are 145NM 3/ t. calcium carbide, is heated to 2000-2200 DEG C and smelts by bath temperature.Tradition calcium carbide produces the about 3100kwh/t. calcium carbide (344.4kgce) of power consumption, after calcium carbide prepared by use furnace of calcium carbide of the present utility model, power consumption is reduced to 2500kwh/t. calcium carbide, production cost reduces by 233 yuan/t. calcium carbide, simultaneously, coal dust and oxygen reaction generate a large amount of CO, make CO exhaust gas volumn increase about 350Nm 3/ t. calcium carbide, total exhaust gas volumn is about 800NM 3/ t.Flue gas is passed into refining plant and carry out dedusting, washing, dehumidifying, compression, cleaning and desulfurization decarburization conversion process, obtain clean flue gas, the flue gas of cleaning is passed in process furnace and is heated to 850-1000 DEG C, obtain high-temperature flue gas.High-temperature flue gas is passed into shaft furnace, and shaft furnace utilizes high-temperature flue gas to reduce to ferric oxide, obtains iron.Usually, the flue gas that the furnace of calcium carbide producing 900000 tons of calcium carbides per year produces can meet the demand of the reducing gas of direct-reduced iron (DRI) shaft furnace production of annual output 380000 tons substantially.
In the description of this specification sheets, specific features, structure, material or feature that the description of reference term " embodiment ", " some embodiments ", " example ", " concrete example " or " some examples " etc. means to describe in conjunction with this embodiment or example are contained at least one embodiment of the present utility model or example.In this manual, identical embodiment or example are not necessarily referred to the schematic representation of above-mentioned term.And the specific features of description, structure, material or feature can combine in an appropriate manner in any one or more embodiment or example.
Although illustrate and described embodiment of the present utility model, those having ordinary skill in the art will appreciate that: can carry out multiple change, amendment, replacement and modification to these embodiments when not departing from principle of the present utility model and aim, scope of the present utility model is by claim and equivalents thereof.

Claims (7)

1. a system for furnace of calcium carbide and shaft furnace coupling, is characterized in that, comprising:
Furnace of calcium carbide, described furnace of calcium carbide comprises body of heater, limits calcium carbide production space in described body of heater; Multiple electrode, described multiple electrode is embedded into described calcium carbide production space from described body of heater; Multiple spray gun, described multiple spray gun is embedded into described calcium carbide production space from the roof of described body of heater and/or sidewall;
For carrying out the refining plant of purifying treatment to flue gas, described refining plant is connected with described furnace of calcium carbide, to obtain clean reducing gas;
For the process furnace heated the reducing gas of cleaning, described process furnace is connected with described refining plant; And
Utilize high-temperature reducing gas to carry out the shaft furnace of reduction reaction, described shaft furnace is connected with described process furnace.
2. system according to claim 1, is characterized in that, described furnace of calcium carbide comprises further:
Spray gun setting device, described spray gun setting device is connected with described spray gun.
3. system according to claim 1, is characterized in that, each in described multiple spray gun includes:
Housing, limits spatial accommodation in described housing;
Coal dust jet pipe, described coal dust jet pipe is arranged in described spatial accommodation;
Multiple oxygen spray pipe, described multiple oxygen spray pipe is arranged in described spatial accommodation, and described multiple oxygen spray pipe distributes along the circumference of described coal dust jet pipe; And
Cooling water pipeline, described cooling water pipeline is arranged on the outer wall of described housing.
4. system according to claim 1, is characterized in that, described spray gun extend into described calcium carbide production space from the roof of described body of heater, and the angle between described spray gun and described furnace of calcium carbide roof is 15 ~ 90 degree.
5. system according to claim 1, is characterized in that, described spray gun extend into described calcium carbide production space from the sidewall of described body of heater, and the angle between described spray gun and described furnace of calcium carbide sidewall is 15 ~ 90 degree.
6. system according to claim 1, is characterized in that, the spout of described spray gun and the distance of described calcium carbide central axis are the 2/3-5/6 of the radical length of the furnace of calcium carbide at the spout place place of described spray gun.
7. system according to claim 1, is characterized in that, described refining plant comprises gas water scrubber, moisture trap, compressor and desulfurization and decarburization umformer.
CN201520543291.9U 2015-07-24 2015-07-24 System for carbide stove and shaft furnace ally oneself with to be used Expired - Fee Related CN204917989U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520543291.9U CN204917989U (en) 2015-07-24 2015-07-24 System for carbide stove and shaft furnace ally oneself with to be used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520543291.9U CN204917989U (en) 2015-07-24 2015-07-24 System for carbide stove and shaft furnace ally oneself with to be used

Publications (1)

Publication Number Publication Date
CN204917989U true CN204917989U (en) 2015-12-30

Family

ID=54967136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520543291.9U Expired - Fee Related CN204917989U (en) 2015-07-24 2015-07-24 System for carbide stove and shaft furnace ally oneself with to be used

Country Status (1)

Country Link
CN (1) CN204917989U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105036133A (en) * 2015-07-24 2015-11-11 北京神雾环境能源科技集团股份有限公司 Technology and system for combined use of calcium carbide furnace and vertical furnace
CN107117619A (en) * 2017-06-29 2017-09-01 神雾环保技术股份有限公司 Furnace of calcium carbide uses the control system and method for blowing oxygen

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105036133A (en) * 2015-07-24 2015-11-11 北京神雾环境能源科技集团股份有限公司 Technology and system for combined use of calcium carbide furnace and vertical furnace
CN105036133B (en) * 2015-07-24 2018-01-19 神雾科技集团股份有限公司 Technique and system associated with furnace of calcium carbide and shaft furnace
CN107117619A (en) * 2017-06-29 2017-09-01 神雾环保技术股份有限公司 Furnace of calcium carbide uses the control system and method for blowing oxygen

Similar Documents

Publication Publication Date Title
CN104404189B (en) Utilize the method that chromite powder two-step method melting and reducing produces ferrochrome
CN105036134B (en) Furnace of calcium carbide and the method for preparing calcium carbide
CN101724726B (en) Method and device for ironmaking by smelting
CN102010924B (en) Method for producing directly reduced iron from coal
CN101386897A (en) Iron-smelting technology of SDRF furnace
CN101445869A (en) Method for manufacturing metallic pellets by direct reduction of oxygen-enriched combustion in rotary furnace
CN101956037A (en) Method and device for indirect heating type reduction iron making
CN103058536A (en) Heat-accumulation dividing-wall heating rotary kiln device
CN105036132A (en) Calcium carbide preparing method
CN107130079B (en) It is a kind of to prepare CO using coal gas of converter2And the method and system of cycle injection
CN104498656B (en) The method directly utilizing fine ore fused reduction iron-smelting
CN204917989U (en) System for carbide stove and shaft furnace ally oneself with to be used
CN106119449B (en) A kind of blast furnace whole world group smelting process
CN215102889U (en) Double-hearth lime kiln for realizing parallel-flow countercurrent synchronous calcination and denitration in furnace
CN205151782U (en) Calcium carbide furnace
CN102146490B (en) Reduction iron making method and device
CN101749931A (en) Smelting furnace
CN106244758A (en) A kind of system and method efficiently utilizing body of heater fume afterheat to process iron-containing resource
CN103194557A (en) Novel gas fusing and melting furnace
CN206256095U (en) The system that a kind of new gas-based shaft kiln prepares sponge iron
CN205170895U (en) Rotary kiln CO2 and argon gas are used for controlling means of converter smelting
CN102409128B (en) Device and process for making gas and reducing iron through coal derived fusion melting bed
CN102127610B (en) Ironmaking equipment and process for direct smelting reduction of iron ore
CN201292373Y (en) Fusion ironmaking apparatus
CN105036133A (en) Technology and system for combined use of calcium carbide furnace and vertical furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 102200 Beijing city Changping District Machi Town cow Road No. 18

Patentee after: Shenwu Technology Group Co.,Ltd.

Address before: 102200 Beijing city Changping District Machi Town cow Road No. 18

Patentee before: BEIJING SHENWU ENVIRONMENT AND ENERGY TECHNOLOGY Co.,Ltd.

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20190121

Granted publication date: 20151230

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20220921

Granted publication date: 20151230

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151230