CN207228577U - A kind of finishing grey processing equipment early period of wall batch - Google Patents

A kind of finishing grey processing equipment early period of wall batch Download PDF

Info

Publication number
CN207228577U
CN207228577U CN201720967717.2U CN201720967717U CN207228577U CN 207228577 U CN207228577 U CN 207228577U CN 201720967717 U CN201720967717 U CN 201720967717U CN 207228577 U CN207228577 U CN 207228577U
Authority
CN
China
Prior art keywords
gear
belt pulley
plate
motor
processing equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720967717.2U
Other languages
Chinese (zh)
Inventor
刘培龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Huaxia Tiancheng Construction Co Ltd
Original Assignee
Nanjing Huaxia Tiancheng Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Huaxia Tiancheng Construction Co Ltd filed Critical Nanjing Huaxia Tiancheng Construction Co Ltd
Priority to CN201720967717.2U priority Critical patent/CN207228577U/en
Application granted granted Critical
Publication of CN207228577U publication Critical patent/CN207228577U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Nozzles (AREA)

Abstract

It the utility model is related to a kind of finishing processing equipment early period, more particularly to a kind of finishing grey processing equipment early period of wall batch.The technical problem to be solved by the present invention is to provide a kind of spray area uniformly, water effect is good, simple to operate finishing grey processing equipment early period of wall batch.In order to solve the above-mentioned technical problem, the utility model provides grey processing equipment early period of such a finishing wall batch, include bottom plate, wheel, water tank, into bucket, rotating device, pendulous device, nozzle etc.;Wheel is symmetrically arranged with left and right sides of bottom base plate, bottom plate top left side is provided with water tank, is provided with the left of tank top into bucket, and bottom plate top right side is provided with rotating device, is provided with pendulous device at the top of rotating device, nozzle is provided with pendulous device.The utility model reached pour wetted surface uniformly, water that effect is good, effect simple to operate.The utility model is simple in structure, highly practical, easy to operate.

Description

A kind of finishing grey processing equipment early period of wall batch
Technical field
A kind of finishing processing equipment early period is the utility model is related to, more particularly to a kind of finishing is criticized at grey early period with wall Manage equipment.
Background technology
Finishing is also known as decorate or decoration.Refer to what is carried out in certain area and scope, including Hydroelectric Project Construction, wall, What plate, ceiling, landscape etc. were realized, a whole set of arrangement and method for construction and design formed according to certain design concept and beautiful rule Scheme.New body of building a wall must first water criticizes ash again, and common brick must irrigate, and light-weight brick then moderately waters, and batch ash pays attention to ensureing that metope is put down It is whole.
Need first to water metope before wall batch ash at present, more using the method manually watered, there is sprinkling The shortcomings that area is uneven, to water effect poor, cumbersome, thus there is an urgent need for research and develop a kind of spray area uniformly, water effect it is good, Finishing simple to operate grey processing equipment early period of wall batch.
Utility model content
(1)Technical problems to be solved
The utility model is in order to overcome the shortcomings that spray area is uneven, to water effect poor, cumbersome, the utility model Technical problems to be solved be to provide a kind of spray area uniformly, water effect is good, simple to operate finishing wall batch Grey processing equipment early period.
(2)Technical solution
In order to solve the above-mentioned technical problem, the utility model provides grey processing early period of such a finishing wall batch and sets It is standby, include bottom plate, wheel, water tank, into bucket, rotating device, pendulous device, nozzle, water pump, hose and pushing hands, bottom plate bottom Wheel is symmetrically arranged with left and right sides of portion, bottom plate top left side is provided with water tank, is provided with the left of tank top into bucket, bottom plate Top right side is provided with rotating device, and pendulous device is provided with the top of rotating device, is provided with nozzle on pendulous device, in water tank Bottom right is provided with water pump, and hose is connected with water pump, and the hose other end is connected with nozzle, and bottom plate top left, which is provided with, to be pushed away Hand.
Preferably, rotating device includes mechanical box, the first motor, first gear, first bearing seat, first rotating shaft and Two gears, bottom plate top right side are provided with mechanical box, and mechanical box top left side is provided with aperture, and bottom right is provided with mechanical box First motor, first gear is provided with the output shaft of the first motor, is connected with second gear on the left of first gear, in mechanical box Bottom left is provided with first bearing seat, and first rotating shaft is provided with first bearing seat, second gear is provided with first rotating shaft, Second gear is engaged with first gear, and aperture is provided with pendulous device at the top of first rotating shaft.
Preferably, pendulous device include installing plate, stent, top plate, arc-shaped guide rail, guide sleeve, mounting base, the second motor, Small belt pulley, second bearing seat, the second shaft, big belt pulley, turntable, connecting rod and flat belt, first rotating shaft top are provided with Installing plate, installing plate top right side are provided with stent, and cantilever tip is provided with top plate, top plate bottom right and installing plate top right Side is connected with arc-shaped guide rail, and slidingtype is provided with guide sleeve on arc-shaped guide rail, and guide sleeve coordinates with arc-shaped guide rail, installing plate top left side Mounting base is provided with, the second motor is provided with mounting base, small belt pulley, installing plate top are provided with the output shaft of the second motor Second bearing seat is provided with the right side of portion, the second shaft is provided with second bearing seat, turntable and great Pi are provided with the second shaft Belt wheel, big belt pulley are wound with flat belt on rear side of turntable between big belt pulley and small belt pulley, turntable eccentric position is provided with company Extension bar, connecting rod are connected with guide sleeve, and nozzle is arranged on guide sleeve.
Preferably, further include rubber sleeve, fixed plate and placing frame, pushing hands top sets rubber sleeve, on the left of pushing hands under Portion is provided with fixed plate, and placing frame is provided with the top of fixed plate.
Operation principle:When needing to use this equipment, water is poured into water tank from into bucket first, after filling it up with, work people Before member promotes pushing hands to shift this equipment onto and need the metope that is handled, then staff starts pump working, and water pump is by water Pumped out by hose, be sprayed at by nozzle on metope, then restart rotating device and pendulous device work, pendulous device band Dynamic nozzle is swung up and down, and rotating device drives pendulous device and nozzle right to rotate back and forth, and realizes and metope is sprayed on a large scale Spill.This equipment spray area is uniform, and it is good to water effect.
Because rotating device includes mechanical box, the first motor, first gear, first bearing seat, first rotating shaft and second Gear, bottom plate top right side are provided with mechanical box, and mechanical box top left side is provided with aperture, and bottom right is provided with mechanical box One motor, first gear is provided with the output shaft of the first motor, is connected with second gear on the left of first gear, bottom in mechanical box First bearing seat is provided with the left of portion, first rotating shaft is provided with first bearing seat, second gear is provided with first rotating shaft, the Two gears are engaged with first gear, and aperture is provided with pendulous device at the top of first rotating shaft.Staff starts the first motor Work, the first motor drive two gears to rotate, and the first motor drives first gear to rotate clockwise, and then first gear drives Second gear rotates counterclockwise, and second gear drives first rotating shaft to rotate counterclockwise, and first rotating shaft drives pendulous device counterclockwise Rotation, pendulous device are rotated to after 45 °, and the first motor drives first gear to rotate counterclockwise, and then first gear drives second Gear rotates clockwise, and second gear drives first rotating shaft to rotate clockwise, and first rotating shaft drives pendulous device to rotate clockwise, Pendulous device is rotated to after 45 °, then the first motor of secondary control opposite direction rotates, constantly repeat on act, can allow water or so Mobile sprinkling, the present apparatus is simple in structure, and flexibility is good, and spraying range is wide.
Because pendulous device includes installing plate, stent, top plate, arc-shaped guide rail, guide sleeve, mounting base, the second motor, cuticle Belt wheel, second bearing seat, the second shaft, big belt pulley, turntable, connecting rod and flat belt, first rotating shaft top are provided with installation Plate, installing plate top right side are provided with stent, and cantilever tip is provided with top plate, and top plate bottom right and installing plate top right side connect Arc-shaped guide rail is connected to, slidingtype is provided with guide sleeve on arc-shaped guide rail, and guide sleeve coordinates with arc-shaped guide rail, and installing plate top left side is set There is mounting base, the second motor is provided with mounting base, small belt pulley, installing plate top right are provided with the output shaft of the second motor Side is provided with second bearing seat, and the second shaft is provided with second bearing seat, turntable and big belt pulley are provided with the second shaft, Big belt pulley is wound with flat belt on rear side of turntable between big belt pulley and small belt pulley, turntable eccentric position is provided with connecting rod, Connecting rod is connected with guide sleeve, and nozzle is arranged on guide sleeve.When staff controls the work of the second motor, the second motor drives cuticle Belt wheel rotates clockwise, and small belt pulley drives big belt pulley to rotate clockwise by flat belt, and big belt pulley drives turntable up time Pin rotates, and by connecting rod drive guide sleeve, arcuately guide rail moves down turntable, when guide sleeve touches installing plate, control second Motor drives small belt pulley to rotate counterclockwise, and small belt pulley drives big belt pulley to rotate counterclockwise by flat belt, big belt pulley Turntable is driven to rotate counterclockwise, arcuately guide rail moves up turntable by connecting rod drive guide sleeve, when guide sleeve touches top plate When, the second motor reversal is controlled, is constantly acted on repetition, thus controls nozzle to move up and down and sprays metope back and forth, is realized big Scope is sprayed.The present apparatus is simple in structure, easy to operate, and spray effect is good.
Because further including rubber sleeve, fixed plate and placing frame, pushing hands top sets rubber sleeve, and pushing hands left lower is set Fixed plate is equipped with, placing frame is provided with the top of fixed plate.Staff can hold the rubber on pushing hands top when using this equipment Gum cover moves equipment, plays the role of anti-skidding, can place material tool in placing frame, the design is flexible, is easy to use.
(3)Beneficial effect
The utility model reached pour wetted surface uniformly, water that effect is good, effect simple to operate.The utility model Pass through the collective effect of rotating device and pendulous device so that nozzle can move back and forth up and down carries out at sprinkling wall Reason, preferably carries out metope sprinkling and pours wet process, the utility model is simple in structure, highly practical, easy to operate.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the utility model.
Fig. 2 is the main structure diagram of the utility model rotating device.
Fig. 3 is the main structure diagram of the utility model pendulous device.
Fig. 4 is second of main structure diagram of the utility model.
Mark in attached drawing for:1- bottom plates, 2- wheels, 3- water tanks, 4- is into bucket, 5- rotating devices, 51- mechanical boxes, 52- Aperture, the first motors of 53-, 54- first gears, 55- first bearing seats, 56- first rotating shafts, 57- second gears, 6- swing dress Put, 61- installing plates, 62- stents, 63- top plates, 64- arc-shaped guide rails, 65- guide sleeves, 66- mounting bases, the second motors of 67-, 68- is small Belt pulley, 69- second bearing seats, the second shafts of 610-, 611- big belt pulleys, 612- turntables, 613- connecting rods, the flat skins of 614- Band, 7- nozzles, 8- water pumps, 9- hoses, 10- pushing hands, 11- rubber sleeves, 12- fixed plates, 13- placing frames.
Embodiment
The utility model is further described with reference to the accompanying drawings and examples.
Embodiment 1
A kind of finishing grey processing equipment early period of wall batch, as shown in Figs 1-4, include bottom plate 1, wheel 2, water tank 3, into Bucket 4, rotating device 5, pendulous device 6, nozzle 7, water pump 8, hose 9 and pushing hands 10,1 bottom of the bottom plate left and right sides are symmetrical arranged There is wheel 2,1 top left side of bottom plate is provided with water tank 3, and 3 top left side of water tank is provided with into bucket 4,1 top right side of bottom plate and sets There is a rotating device 5, the top of rotating device 5 is provided with pendulous device 6, is provided with nozzle 7 on pendulous device 6, bottom, right in water tank 3 Side is provided with water pump 8, and hose 9 is connected with water pump 8, and 9 other end of hose is connected with nozzle 7, and 1 top left of bottom plate, which is provided with, to be pushed away Hand 10.
Embodiment 2
A kind of finishing grey processing equipment early period of wall batch, as shown in Figs 1-4, include bottom plate 1, wheel 2, water tank 3, into Bucket 4, rotating device 5, pendulous device 6, nozzle 7, water pump 8, hose 9 and pushing hands 10,1 bottom of the bottom plate left and right sides are symmetrical arranged There is wheel 2,1 top left side of bottom plate is provided with water tank 3, and 3 top left side of water tank is provided with into bucket 4,1 top right side of bottom plate and sets There is a rotating device 5, the top of rotating device 5 is provided with pendulous device 6, is provided with nozzle 7 on pendulous device 6, bottom, right in water tank 3 Side is provided with water pump 8, and hose 9 is connected with water pump 8, and 9 other end of hose is connected with nozzle 7, and 1 top left of bottom plate, which is provided with, to be pushed away Hand 10.
Rotating device 5 includes mechanical box 51, the first motor 53, first gear 54, first bearing seat 55, first rotating shaft 56 With second gear 57,1 top right side of bottom plate is provided with mechanical box 51, and 51 top left side of mechanical box is provided with aperture 52, mechanical box 51 Interior bottom right is provided with the first motor 53, and first gear 54 is provided with the output shaft of the first motor 53, and first gear 54 is left Side is connected with second gear 57, and bottom left is provided with first bearing seat 55 in mechanical box 51, is provided with first bearing seat 55 First rotating shaft 56, is provided with second gear 57 in first rotating shaft 56, second gear 57 is engaged with first gear 54, first rotating shaft 56 Top is provided with pendulous device 6 through aperture 52.
Embodiment 3
A kind of finishing grey processing equipment early period of wall batch, as shown in Figs 1-4, include bottom plate 1, wheel 2, water tank 3, into Bucket 4, rotating device 5, pendulous device 6, nozzle 7, water pump 8, hose 9 and pushing hands 10,1 bottom of the bottom plate left and right sides are symmetrical arranged There is wheel 2,1 top left side of bottom plate is provided with water tank 3, and 3 top left side of water tank is provided with into bucket 4,1 top right side of bottom plate and sets There is a rotating device 5, the top of rotating device 5 is provided with pendulous device 6, is provided with nozzle 7 on pendulous device 6, bottom, right in water tank 3 Side is provided with water pump 8, and hose 9 is connected with water pump 8, and 9 other end of hose is connected with nozzle 7, and 1 top left of bottom plate, which is provided with, to be pushed away Hand 10.
Rotating device 5 includes mechanical box 51, the first motor 53, first gear 54, first bearing seat 55, first rotating shaft 56 With second gear 57,1 top right side of bottom plate is provided with mechanical box 51, and 51 top left side of mechanical box is provided with aperture 52, mechanical box 51 Interior bottom right is provided with the first motor 53, and first gear 54 is provided with the output shaft of the first motor 53, and first gear 54 is left Side is connected with second gear 57, and bottom left is provided with first bearing seat 55 in mechanical box 51, is provided with first bearing seat 55 First rotating shaft 56, is provided with second gear 57 in first rotating shaft 56, second gear 57 is engaged with first gear 54, first rotating shaft 56 Top is provided with pendulous device 6 through aperture 52.
Pendulous device 6 includes installing plate 61, stent 62, top plate 63, arc-shaped guide rail 64, guide sleeve 65, mounting base 66, second Motor 67, small belt pulley 68, second bearing seat 69, the second shaft 610, big belt pulley 611, turntable 612, the peace of connecting rod 613 Belt 614, the top of first rotating shaft 56 are provided with installing plate 61, and 61 top right side of installing plate is provided with stent 62,62 top of stent Top plate 63 is provided with, 63 bottom right of top plate and 61 top right side of installing plate are connected with arc-shaped guide rail 64, are slided on arc-shaped guide rail 64 Dynamic formula is provided with guide sleeve 65, and guide sleeve 65 coordinates with arc-shaped guide rail 64, and 61 top left side of installing plate is provided with mounting base 66, mounting base The second motor 67 is provided with 66, small belt pulley 68 is provided with the output shaft of the second motor 67,61 top right side of installing plate is set Second bearing seat 69 is equipped with, the second shaft 610 is provided with second bearing seat 69,612 He of turntable is provided with the second shaft 610 Big belt pulley 611, big belt pulley 611 are wound with flat belt on rear side of turntable 612 between big belt pulley 611 and small belt pulley 68 614,612 eccentric position of turntable is provided with connecting rod 613, and connecting rod 613 is connected with guide sleeve 65, and nozzle 7 is arranged on guide sleeve 65.
Embodiment 4
A kind of finishing grey processing equipment early period of wall batch, as shown in Figs 1-4, include bottom plate 1, wheel 2, water tank 3, into Bucket 4, rotating device 5, pendulous device 6, nozzle 7, water pump 8, hose 9 and pushing hands 10,1 bottom of the bottom plate left and right sides are symmetrical arranged There is wheel 2,1 top left side of bottom plate is provided with water tank 3, and 3 top left side of water tank is provided with into bucket 4,1 top right side of bottom plate and sets There is a rotating device 5, the top of rotating device 5 is provided with pendulous device 6, is provided with nozzle 7 on pendulous device 6, bottom, right in water tank 3 Side is provided with water pump 8, and hose 9 is connected with water pump 8, and 9 other end of hose is connected with nozzle 7, and 1 top left of bottom plate, which is provided with, to be pushed away Hand 10.
Rotating device 5 includes mechanical box 51, the first motor 53, first gear 54, first bearing seat 55, first rotating shaft 56 With second gear 57,1 top right side of bottom plate is provided with mechanical box 51, and 51 top left side of mechanical box is provided with aperture 52, mechanical box 51 Interior bottom right is provided with the first motor 53, and first gear 54 is provided with the output shaft of the first motor 53, and first gear 54 is left Side is connected with second gear 57, and bottom left is provided with first bearing seat 55 in mechanical box 51, is provided with first bearing seat 55 First rotating shaft 56, is provided with second gear 57 in first rotating shaft 56, second gear 57 is engaged with first gear 54, first rotating shaft 56 Top is provided with pendulous device 6 through aperture 52.
Pendulous device 6 includes installing plate 61, stent 62, top plate 63, arc-shaped guide rail 64, guide sleeve 65, mounting base 66, second Motor 67, small belt pulley 68, second bearing seat 69, the second shaft 610, big belt pulley 611, turntable 612, the peace of connecting rod 613 Belt 614, the top of first rotating shaft 56 are provided with installing plate 61, and 61 top right side of installing plate is provided with stent 62,62 top of stent Top plate 63 is provided with, 63 bottom right of top plate and 61 top right side of installing plate are connected with arc-shaped guide rail 64, are slided on arc-shaped guide rail 64 Dynamic formula is provided with guide sleeve 65, and guide sleeve 65 coordinates with arc-shaped guide rail 64, and 61 top left side of installing plate is provided with mounting base 66, mounting base The second motor 67 is provided with 66, small belt pulley 68 is provided with the output shaft of the second motor 67,61 top right side of installing plate is set Second bearing seat 69 is equipped with, the second shaft 610 is provided with second bearing seat 69,612 He of turntable is provided with the second shaft 610 Big belt pulley 611, big belt pulley 611 are wound with flat belt on rear side of turntable 612 between big belt pulley 611 and small belt pulley 68 614,612 eccentric position of turntable is provided with connecting rod 613, and connecting rod 613 is connected with guide sleeve 65, and nozzle 7 is arranged on guide sleeve 65.
Rubber sleeve 11, fixed plate 12 and placing frame 13 are further included, 10 top of pushing hands sets rubber sleeve 11, and pushing hands 10 is left Side lower part is provided with fixed plate 12, and the top of fixed plate 12 is provided with placing frame 13.
Operation principle:When needing to use this equipment, water is poured into water tank 3 from into bucket 4 first, after filling it up with, work Before personnel promote pushing hands 10 to shift this equipment onto need to be handled metope, then staff starts water pump 8 and works, water pump 8 pump out water by hose 9, are sprayed at by nozzle 7 on metope, then restart rotating device 5 and pendulous device 6 works, Pendulous device 6 drives nozzle 7 to swing up and down, and rotating device 5 drives pendulous device 6 and nozzle 7 or so to rotate back and forth, and realizes pair Metope sprays on a large scale.This equipment spray area is uniform, and it is good to water effect.
Because rotating device 5 includes mechanical box 51, the first motor 53, first gear 54,55, first turns of first bearing seat Axis 56 and second gear 57,1 top right side of bottom plate are provided with mechanical box 51, and 51 top left side of mechanical box is provided with aperture 52, machinery Bottom right is provided with the first motor 53 in case 51, and first gear 54, first gear are provided with the output shaft of the first motor 53 54 left sides are connected with second gear 57, and bottom left is provided with first bearing seat 55 in mechanical box 51, is set in first bearing seat 55 First rotating shaft 56 is equipped with, second gear 57 is provided with first rotating shaft 56, second gear 57 is engaged with first gear 54, first turn The top of axis 56 is provided with pendulous device 6 through aperture 52.Staff starts the first motor 53 and works, and the first motor 53 drives two A gear rotates, and the first motor 53 drives first gear 54 to rotate clockwise, and then first gear 54 drives second gear 57 inverse Hour hands rotate, and second gear 57 drives first rotating shaft 56 to rotate counterclockwise, and first rotating shaft 56 drives pendulous device 6 to revolve counterclockwise Turn, pendulous device 6 is rotated to after 45 °, and the first motor 53 drives first gear 54 to rotate counterclockwise, and then first gear 54 drives Second gear 57 rotates clockwise, and second gear 57 drives first rotating shaft 56 to rotate clockwise, and first rotating shaft 56, which drives, swings dress Put 6 to rotate clockwise, pendulous device 6 is rotated to after 45 °, then 53 opposite direction of the first motor of secondary control rotates, constantly on repetition Action, can allow water to move left and right sprinkling, the present apparatus is simple in structure, and flexibility is good, and spraying range is wide.
Because pendulous device 6 include installing plate 61, stent 62, top plate 63, arc-shaped guide rail 64, guide sleeve 65, mounting base 66, Second motor 67, small belt pulley 68, second bearing seat 69, the second shaft 610, big belt pulley 611, turntable 612, connecting rod 613 With flat belt 614, the top of first rotating shaft 56 is provided with installing plate 61, and 61 top right side of installing plate is provided with stent 62, stent 62 Top is provided with top plate 63, and 63 bottom right of top plate and 61 top right side of installing plate are connected with arc-shaped guide rail 64, arc-shaped guide rail 64 Upper slidingtype is provided with guide sleeve 65, and guide sleeve 65 coordinates with arc-shaped guide rail 64, and 61 top left side of installing plate is provided with mounting base 66, peace The second motor 67 is provided with dress seat 66, small belt pulley 68,61 top right of installing plate are provided with the output shaft of the second motor 67 Side is provided with second bearing seat 69, and the second shaft 610 is provided with second bearing seat 69, turntable is provided with the second shaft 610 612 and big belt pulley 611, big belt pulley 611 is wound with flat skin in the rear side of turntable 612 between big belt pulley 611 and small belt pulley 68 Band 614,612 eccentric position of turntable are provided with connecting rod 613, and connecting rod 613 is connected with guide sleeve 65, and nozzle 7 is arranged on guide sleeve 65 On.When staff controls the second motor 67 to work, the second motor 67 drives small belt pulley 68 to rotate clockwise, small belt pulley 68 Big belt pulley 611 is driven to rotate clockwise by flat belt 614, big belt pulley 611 drives turntable 612 to rotate clockwise, turntable 612 by connecting rod 613 drive guide sleeve 65 arcuately guide rail 64 move down, when guide sleeve 65 touches installing plate 61, control Second motor 67 drives small belt pulley 68 to rotate counterclockwise, and small belt pulley 68 drives 611 inverse time of big belt pulley by flat belt 614 Pin rotates, and big belt pulley 611 drives turntable 612 to rotate counterclockwise, and turntable 612 drives guide sleeve 65 arcuately by connecting rod 613 Guide rail 64 moves up, and when guide sleeve 65 touches top plate 63, the second motor 67 of control inverts, and is constantly acted on repetition, by This control nozzle 7 moves up and down sprays metope back and forth, realizes a wide range of sprinkling.The present apparatus is simple in structure, easy to operate, sprinkling effect Fruit is good.
Because further including rubber sleeve 11, fixed plate 12 and placing frame 13,10 top of pushing hands sets rubber sleeve 11, pushing hands 10 left lowers are provided with fixed plate 12, and the top of fixed plate 12 is provided with placing frame 13.Staff, can when using this equipment Equipment is moved to hold the rubber sleeve 11 on 10 top of pushing hands, plays the role of anti-skidding, material tool can be placed in placing frame 13, this Flexible design is convenient, is easy to use.
Embodiment described above only expresses the preferred embodiment of the utility model, its description is more specific and detailed, But it should not be interpreted as limiting the scope of the present invention.It should be pointed out that for the common of this area For technical staff, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these are all Belong to the scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (4)

1. a kind of finishing grey processing equipment early period of wall batch, it is characterised in that include bottom plate(1), wheel(2), water tank (3), into bucket(4), rotating device(5), pendulous device(6), nozzle(7), water pump(8), hose(9)And pushing hands(10), bottom plate (1)Wheel is symmetrically arranged with left and right sides of bottom(2), bottom plate(1)Top left side is provided with water tank(3), water tank(3)Top left side It is provided with into bucket(4), bottom plate(1)Top right side is provided with rotating device(5), rotating device(5)Top is provided with swing dress Put(6), pendulous device(6)On be provided with nozzle(7), water tank(3)Interior bottom right is provided with water pump(8), water pump(8)Upper connection There is hose(9), hose(9)The other end and nozzle(7)Connection, bottom plate(1)Top left is provided with pushing hands(10).
A kind of 2. finishing according to claim 1 grey processing equipment early period of wall batch, it is characterised in that rotating device (5)Include mechanical box(51), the first motor(53), first gear(54), first bearing seat(55), first rotating shaft(56)With Two gears(57), bottom plate(1)Top right side is provided with mechanical box(51), mechanical box(51)Top left side is provided with aperture(52), machine Tool case(51)Interior bottom right is provided with the first motor(53), the first motor(53)Output shaft on be provided with first gear (54), first gear(54)Left side is connected with second gear(57), mechanical box(51)Interior bottom left is provided with first bearing seat (55), first bearing seat(55)On be provided with first rotating shaft(56), first rotating shaft(56)On be provided with second gear(57), second Gear(57)With first gear(54)Engagement, first rotating shaft(56)Top passes through aperture(52)It is provided with pendulous device(6).
A kind of 3. finishing according to claim 2 grey processing equipment early period of wall batch, it is characterised in that pendulous device (6)Include installing plate(61), stent(62), top plate(63), arc-shaped guide rail(64), guide sleeve(65), mounting base(66), second electricity Machine(67), small belt pulley(68), second bearing seat(69), the second shaft(610), big belt pulley(611), turntable(612), connection Bar(613)And flat belt(614), first rotating shaft(56)Top is provided with installing plate(61), installing plate(61)Top right side is set There is stent(62), stent(62)Top is provided with top plate(63), top plate(63)Bottom right and installing plate(61)Top right side connects It is connected to arc-shaped guide rail(64), arc-shaped guide rail(64)Upper slidingtype is provided with guide sleeve(65), guide sleeve(65)With arc-shaped guide rail(64)Match somebody with somebody Close, installing plate(61)Top left side is provided with mounting base(66), mounting base(66)On be provided with the second motor(67), the second motor (67)Output shaft on be provided with small belt pulley(68), installing plate(61)Top right side is provided with second bearing seat(69), second Bearing block(69)On be provided with the second shaft(610), the second shaft(610)On be provided with turntable(612)And big belt pulley (611), big belt pulley(611)In turntable(612)Rear side, big belt pulley(611)With small belt pulley(68)Between be wound with flat belt (614), turntable(612)Eccentric position is provided with connecting rod(613), connecting rod(613)With guide sleeve(65)Connection, nozzle(7)If Put in guide sleeve(65)On.
4. a kind of finishing according to claim 3 grey processing equipment early period of wall batch, it is characterised in that further included rubber Gum cover(11), fixed plate(12)And placing frame(13), pushing hands(10)Top sets rubber sleeve(11), pushing hands(10)Left lower It is provided with fixed plate(12), fixed plate(12)Top is provided with placing frame(13).
CN201720967717.2U 2017-08-04 2017-08-04 A kind of finishing grey processing equipment early period of wall batch Expired - Fee Related CN207228577U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720967717.2U CN207228577U (en) 2017-08-04 2017-08-04 A kind of finishing grey processing equipment early period of wall batch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720967717.2U CN207228577U (en) 2017-08-04 2017-08-04 A kind of finishing grey processing equipment early period of wall batch

Publications (1)

Publication Number Publication Date
CN207228577U true CN207228577U (en) 2018-04-13

Family

ID=61856385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720967717.2U Expired - Fee Related CN207228577U (en) 2017-08-04 2017-08-04 A kind of finishing grey processing equipment early period of wall batch

Country Status (1)

Country Link
CN (1) CN207228577U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108782524A (en) * 2018-06-22 2018-11-13 明光市丰润家庭农场 A kind of honey peach plantation multi-angle spraying machine
CN110073950A (en) * 2019-05-29 2019-08-02 合肥亿境景观建筑设计有限公司 A kind of landscape garden rainer and its working method
CN111686538A (en) * 2020-06-29 2020-09-22 马鹏飞 Heatstroke prevention dust removal watering device for construction
CN112814705A (en) * 2021-01-04 2021-05-18 李伟忠 Wall watering curing means for tunnel construction

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108782524A (en) * 2018-06-22 2018-11-13 明光市丰润家庭农场 A kind of honey peach plantation multi-angle spraying machine
CN110073950A (en) * 2019-05-29 2019-08-02 合肥亿境景观建筑设计有限公司 A kind of landscape garden rainer and its working method
CN111686538A (en) * 2020-06-29 2020-09-22 马鹏飞 Heatstroke prevention dust removal watering device for construction
CN112814705A (en) * 2021-01-04 2021-05-18 李伟忠 Wall watering curing means for tunnel construction
CN112814705B (en) * 2021-01-04 2023-09-08 成都铁路工程总承包有限责任公司 Wall watering maintenance device for tunnel construction

Similar Documents

Publication Publication Date Title
CN207228577U (en) A kind of finishing grey processing equipment early period of wall batch
CN107630547B (en) A kind of wall plastering device with liquid self-feeding function
CN208760167U (en) A kind of novel automatic water transfer operation platform
CN205794068U (en) Efficient fertilizer apparatus is used in a kind of Poria plantation
CN107059747A (en) A kind of quick dust falling device of construction
CN105917829B (en) A kind of booth vegetable cultivation fertilizer apparatus
CN204531315U (en) A kind of controlled automatic material spray cylinder
CN205755507U (en) A kind of booth vegetable cultivation fertilizer apparatus
CN206784849U (en) A kind of wall plaster constructing device
CN107338467A (en) Auto parts machinery electrophoretic painting processing unit
CN108787279A (en) One kind being based on the chaindriven building decoration plank paint spraying apparatus of tooth
CN208649862U (en) A kind of road upkeep care device
CN202185374U (en) Automatic monocrystal crucible coating machine
CN106284928B (en) A kind of finishing quick mopping device of eminence wall
CN206308976U (en) Integrated full-automatic wall plaster unit
CN112627468A (en) Swing type building decoration wall plastering device
CN205477360U (en) Quick digging device in ground for building
CN207109689U (en) A kind of civic building ground high-performance cleaning equipment
CN208380108U (en) A kind of urban construction concrete ground leveling device
CN203680476U (en) Ceramic art withdrawal device
CN215520063U (en) Concrete curing equipment
CN211247023U (en) Spraying device with adjustable indoor air treatment is with angle
CN205655427U (en) Building site uses workman's heat sink
CN105274520A (en) Online enameling station for water heater linear
CN209757145U (en) Electronic transport trolley of cement mortar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180413

Termination date: 20190804