CN207079665U - Low-carbon log cabin - Google Patents
Low-carbon log cabin Download PDFInfo
- Publication number
- CN207079665U CN207079665U CN201720672054.1U CN201720672054U CN207079665U CN 207079665 U CN207079665 U CN 207079665U CN 201720672054 U CN201720672054 U CN 201720672054U CN 207079665 U CN207079665 U CN 207079665U
- Authority
- CN
- China
- Prior art keywords
- water
- water storage
- log cabin
- outlet pipe
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/108—Rainwater harvesting
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a kind of low-carbon log cabin, its drip irrigation device is the gutter for including log cabin body and being arranged on log cabin bodies top edge, sluice pipe is connected with the gutter, the sluice pipe is communicated with water storage box away from the end of gutter, the sluice pipe is provided with filter close to water storage box one end, current outlet pipe one is provided with the water storage box, the current outlet pipe one connects water equipment.Rainwater-collecting can be realized to the reasonable utilization of resource for water equipment, the use for reducing water purification resource possesses the feature of environmental protection.
Description
Technical field
A kind of wood house is the utility model is related to, more particularly to a kind of low-carbon log cabin.
Background technology
Log cabin is global leisure, furniture main product, and its design-build has evolved to a high level;Typically
Attractive in appearance using lines, the soft pine of color and luster is built, and its feature is cool in summer and warm in winter, insulation., can according to the characteristic property of timber
To reach long-lived effect.
Notification number is that CN205558062U Chinese patent discloses a kind of log cabin roof water discharging structure, including gutter, institute
State gutter and include groove, sluice pipe, preventing clogging up device, control device and alarm set, the groove is fixed on house
On fascia, sluice pipe one end is connected with the notch of the groove, and the other end is parallel with wall, and is fixed on the wall
On, the preventing clogging up device is arranged at notch, prevents the notch from blocking, and the control device is arranged on outside the groove
Be connected with the preventing clogging up device, control preventing clogging up device operation, the alarm set be arranged on outside the groove with it is described
Control device is connected, and the control device controls the alarm set operation.
The log cabin structure is mainly used in design by the water discharge on roof, and the sluice pipe of setting is directly by roof
Water be directed to ground and be transported away by sewer pipe, the water directly drained through sewer pipe is not used, causes resource
Waste.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of low-carbon log cabin, the low-carbon wood
The setting in room can rationally use rainwater resource, possess the feature of environmental protection.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of low-carbon log cabin, including log cabin body and it is arranged on log cabin bodies top and the day at the lower edge of top
Ditch, sluice pipe is connected with the gutter, and the sluice pipe is communicated with water storage box, the tapping pipe away from the end of gutter
Road is provided with filter close to water storage box one end, and current outlet pipe one is provided with the water storage box, and the current outlet pipe one connects
General wetting system.
Pass through above-mentioned technical proposal, filter device will be first passed around after the rainwater-collecting at the top of log cabin and is filtered to remove it
In impurity, then by the rainwater after removal of impurities be applied to water equipment on, realize the reasonable utilization of water resource, reduce fresh water
The use of resource, possesses the feature of environmental protection.
The utility model is further arranged to:The filter includes removal of impurities portion, and the removal of impurities portion is arranged to install
Removal of impurities pond on sluice pipe, it is described removal of impurities pond on be provided with the first current inlet pipe and the first current outlet pipe, first water
Screen pack is provided with effuser, rain water drainage portion is provided between the removal of impurities portion and water storage box.
Pass through above-mentioned technical proposal, the water on sluice pipe are entered in removal of impurities pond by the first current inlet pipe, cleaned
Chi Zhonghou is expelled to rain water drainage portion through the first current outlet pipe, can tentatively be filtered out in the screen pack that the first water outlet pipe part is set
The bigger impurity contained in rainwater, reduce the sluice pipe clogging being likely to occur in rainwater course of conveying.
The utility model is further arranged to:The removal of impurities bottom of pond portion is provided with collection filter frame, the upper end in the removal of impurities pond
It is provided with the opening passed through for collecting filter frame.
Pass through above-mentioned technical proposal, the impurity after strainer filtering can be received into collection filter frame by collecting filter frame,
When collecting more impurity in collection filter frame, taken out filter frame is collected by opening, continued after pouring out the impurity collected in filter frame
It is put into removal of impurities pond and continues to collect impurity.
The utility model is further arranged to:The rain water drainage portion includes the sewage well on sluice pipe,
The second current inlet pipe, the second current outlet pipe and waste liquid outlet pipe are provided with the sewage well, dividing plate is provided with the sewage well,
The second current inlet pipe, the second current outlet pipe are located above dividing plate, and the waste liquid outlet pipe be located at dividing plate lower section and caliber is than the
Two current inlet pipes are small, and abandoned stream hole is offered on the dividing plate, and the first ball float is provided with above dividing plate, closing is provided with below dividing plate
Abandoned stream hole and the second ball float being connected with the first ball float, the volume of second ball float are less than the first ball float.
Pass through above-mentioned technical proposal, the rainwater when discharge of rain water drainage portion begins to rain is reached by the rainwater in removal of impurities portion,
Contain more dust granules when beginning to rain in rainwater, so discharge impure more rainwater by rain water drainage portion,
Rainwater is concentrated after the first current inlet pipe on dividing plate, and during dividing plate upper level rises, the first ball float can be floated gradually
Rise, current can be entered to by abandoned stream hole below dividing plate during floating, and the rainwater below dividing plate can pass through waste liquid outlet pipe and arrange
Go out, because the caliber of waste liquid outlet pipe is less than the caliber of the second current inlet pipe, so the liquid level below dividing plate can be gradually increasing, treat liquid
It is able to can be gradually increasing up to the liquid level above the second ball float closing abandoned stream hole, abandoned stream hole enclosed baffle when on face, the liquid of rising
Rainwater is expelled in water storage box by the second current outlet pipe when position is gradually higher than the second current outlet pipe.
The utility model is further arranged to:The water storage box includes is provided with Garden Greenland above case lid and case lid.
Pass through above-mentioned technical proposal, the Garden Greenland one side greening environment that water storage box top is set, is on the other hand realized
The reasonable utilization of land resource, save space.
The utility model is further arranged to:It is provided with the water storage box and water storage box is divided into the first precipitation chamber and storage
The first partition of water cavity, the second partition that water storage cavity is divided into the second precipitation chamber and water-purifying cavity is provided with the water storage cavity,
First partition is connected with case lid and leaves gap with water storage box bottom, and second partition is fixed on water storage box bottom and stayed between case lid
There is gap, rainwater flows through the first precipitation chamber, the second precipitation chamber and water-purifying cavity successively, and the water-purifying cavity side wall is close to second partition 2/
Current outlet pipe one is communicated with 3 ~ 3/4 height.
Pass through above-mentioned technical proposal, rainwater enter water storage to it is middle when enter in the first precipitation chamber, due to first partition
Gap is left between bottom and the bottom of water storage box, then entering to the rainwater of the first precipitation chamber can flow in the second precipitation chamber, rainwater
Meeting preliminary sedimentation in the first precipitation chamber and the second precipitation chamber, when liquid level gradually rises directly in the first precipitation chamber and the second precipitation chamber
To exceed second partition upper end when, second precipitate chamber close to top clarification rainwater will overflow into water-purifying cavity, in water-purifying cavity
In further precipitate, because effuser is arranged on height of the water-purifying cavity side wall close to second partition 2/3 ~ 3/4, then by outflow
The impurities in water of pipe outflow is less.
The utility model is further arranged to:The aqueduct through case lid, the aqueduct are connected with the water-purifying cavity
Detection cell is connected with away from the end of water storage box, the first force (forcing) pump and the first check valve, the inspection are provided with the aqueduct
Survey on pond and be provided with cover plate, PH detector is installed on the cover plate.
Pass through above-mentioned technical proposal, detection cell are provided for detecting the PH of rainwater, if rainwater acid when in use
Property is excessive may to erode to water equipment.
The utility model is further arranged to:It is provided with the detection cell and detection cell is divided into test chamber and mixing chamber
Demarcation strip and aqueduct connected with test chamber, PH detector is arranged on the top of test chamber, be provided with the mixing chamber with
The medicine-introducing pipe of water-purifying cavity connection, is connected with the second force (forcing) pump and the second check valve on the medicine-introducing pipe, is set on the demarcation strip
There is the connecting tube of communication with detection chamber and mixing chamber, be connected with the connecting tube and reach the 3rd of mixing chamber by test chamber for rainwater
Check valve.
Detection cell is divided into test chamber and water-purifying cavity, rainwater is carried out in test chamber by Pass through above-mentioned technical proposal, demarcation strip
PH detection, conditioning agent can be added into mixing chamber when rainwater is in peracid, and it is dilute using the rainwater progress in test chamber
Release, realize resource rational utilization, if rainwater acid-base value is normal, rainwater is delivered to water purification again after entering to mixing chamber by test chamber
In chamber.
The utility model is further arranged to:It is provided with Rose Box and the Rose Box and sets in the current outlet pipe one
There are some equally distributed active carbon filter nets, water inlet pipe and outlet pipe are provided with the Rose Box, the water inlet pipe enters
Water is discharged after active carbon filter net through outlet pipe successively.
Pass through above-mentioned technical proposal, the rainwater in water storage box are filtered in Rose Box, and active carbon filter net can be inhaled
Pigment and solid impurity in attached water, the water quality that water equipment is delivered to after Rose Box filters are excellent.
The utility model is further arranged to:Solar panel, the sun are equipped with the top of the log cabin body
Energy cell panel is electrically connected by wire with electrical equipment.
Pass through above-mentioned technical proposal, solar panel can be converted solar energy into electrical energy and be connected with electrical equipment,
The reasonable utilization of the energy is then realized, possesses the feature of environmental protection.
In summary, the utility model having the beneficial effect that in contrast to prior art:
The 1st, rainwater-collecting can be realized to the reasonable utilization of resource for water equipment, reduce the use tool of water purification resource
The standby feature of environmental protection;
2nd, enable to water quality purer by removal of impurities, early-stage rainwater stream abandoning, precipitation and filtering during rainwater-collecting;
3rd, the solar panel that log cabin bodies top is set can convert the solar into electric energy and be used, and reduce
The utilization of electric energy, save the energy.
Brief description of the drawings
Fig. 1 is the first viewing angle constructions figure of embodiment;
Fig. 2 is the second viewing angle constructions figure;
Fig. 3 is the broken section structure chart of embodiment, it is intended to represents the annexation of water storage box and Rose Box;
Fig. 4 is the structure chart in the rain water drainage portion of embodiment;
Fig. 5 is the structure chart that embodiment is removal of impurities portion;
Fig. 6 is the base fabric sectional structure chart of embodiment, it is intended to represents the attachment structure of water storage box and detection cell;
Fig. 7 is Fig. 6 A portions enlarged drawing, it is intended to represents the structure of detection cell.
Reference:1st, log cabin body;11st, gutter;111st, sluice pipe;2nd, water storage box;21st, current outlet pipe one;22nd,
One dividing plate;221st, the first precipitation chamber;222nd, water storage cavity;23rd, second partition;231st, the second precipitation chamber;232nd, water-purifying cavity;24th, case
Lid;3rd, filter;31st, removal of impurities portion;311st, clean pond;3111st, the first current inlet pipe;3112nd, the first current outlet pipe;3113、
Screen pack;3114th, filter frame is collected;3115th, it is open;32nd, rain water drainage portion;321st, sewage well;3211st, the second current inlet pipe;
3212nd, the second current outlet pipe;3213rd, waste liquid outlet pipe;3214th, dividing plate;3215th, abandoned stream hole;3216th, the first ball float;3217th, second
Ball float;4th, water equipment;5th, Garden Greenland;6th, detection cell;61st, aqueduct;611st, the first force (forcing) pump;612nd, the first check valve;
62nd, PH detector;63rd, cover plate;64th, demarcation strip;641st, test chamber;642nd, mixing chamber;65th, medicine-introducing pipe;651st, the second force (forcing) pump;
652nd, the second check valve;66th, connecting tube;661st, the 3rd check valve;7th, Rose Box;71st, active carbon filter net;72nd, water inlet pipe;
73rd, outlet pipe;8th, solar panel.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
A kind of low-carbon log cabin, as illustrated in fig. 1 and 2, including log cabin body 1 and the top of log cabin body 1 is arranged on close to edge
Gutter 11, gutter 11 is arranged on the front and rear sides edge at the top of log cabin body 1, and sluice pipe is connected with gutter 11
111, sluice pipe 111 is communicated with water storage box 2 away from the end of gutter 11, sluice pipe 111 close to one end of water storage box 2 according to
It is secondary to be provided with removal of impurities portion 31 and rain water drainage portion 32, current outlet pipe 1 is provided with water storage box 2, current outlet pipe 1 connects
There is water equipment 4, water equipment 4 can be closestool, pond, can be used for green area irrigation.
When the rainy day, rainwater falls can slide into gutter 11 in the top of log cabin body 1, rainwater along log cabin body 1, so
Big impurity is removed when flowing through removal of impurities portion 31 along sluice pipe 111 afterwards, then in the case where starting by the removing of rain water drainage portion 32
Impurity content higher rainwater during rain, more pure water can enter to water storage box 2 after one end time is drained, in water storage box 2
Water be delivered to water equipment 4 and be applied.
As shown in Figures 3 and 5, removal of impurities portion 31 includes the removal of impurities pond 311 on sluice pipe 111, cleans on pond 311
The first current inlet pipe 3111 and the first current outlet pipe 3112 are provided with, the end of the first current outlet pipe 3112 is set in the pond 311 that cleans
Screen pack 3113 is equipped with, is provided with the bottom in removal of impurities pond 311 and collects filter frame 3114, the top in removal of impurities pond 311 is provided with collection
The opening 3115 that filter frame 3114 passes through, the cover plate 63 of closing opening 3115 can be set at opening 3115, collecting filter frame 3114
Top edge sets handle(Not shown in figure).
When rainwater entered through the first current inlet pipe 3111 through sluice pipe 111 in removal of impurities pond 311 by filter screen 3113 from
First current outlet pipe 3112 is discharged, and the impurity in the pond 311 that cleans has part and rested in collection filter frame 3114, works as impurity
Filter frame 3114 will be collected by aid to propose at opening 3115, the impurity collected in filter frame 3114 will be fallen when collecting more
Go out, then continue to collect impurity in it will collect filter frame 3114 and put removal of impurities pond 311 into along opening 3115.
As shown in Figures 3 and 4, rain water drainage portion 32 includes the sewage well 321 on sluice pipe 111, sewage well
The second current inlet pipe 3211, the second current outlet pipe 3212 and waste liquid outlet pipe 3213 are provided with 321, in the first current inlet pipe
3111st, the lower section of the second current outlet pipe 3212 is provided with dividing plate 3214, and waste liquid outlet pipe 3213 is arranged on the lower section of dividing plate 3214, dividing plate
Abandoned stream hole 3215 is offered on 3214, the top of dividing plate 3214 is provided with the first ball float 3216, and the lower section of dividing plate 3214 is provided with second
Ball float 3217, the first ball float 3216 are connected with the second ball float 3217 by expansion link, wherein the volume of the second ball float 3217 is less than
First ball float 3216, the caliber of waste liquid outlet pipe 3213 are smaller than the caliber of the second current inlet pipe 3211.
Conveyed when by the rainwater in removal of impurities portion 31 after the discharge of the first current outlet pipe 3112 through sluice pipe 111 through the second water
Flow into pipe 3211 and enter to sewage well 321, can gradually collect on dividing plate 3214, the first ball float 3216 will be floated up and abandoned
Discharge orifice 3215 is opened, and the water of the top of dividing plate 3214 can enter to the lower section of dividing plate 3214 and be discharged by waste liquid outlet pipe 3213, by
Be less than the second current inlet pipe 3211 in the caliber of waste liquid outlet pipe 3213, then water can building up below in dividing plate 3214, the mistake of accumulation
The lower section liquid level of journey median septum 3214 rises, and is gradually increasing until the second ball float 3217 closes abandoned stream hole 3215, then on dividing plate 3214
The rainwater of side will not flow to the lower section of dividing plate 3214, while the first ball float 3216 can also be gradually increasing the second ball float 3217 of traction and close
Abandoned stream hole 3215.Then the rainwater of the top of dividing plate 3214 runs past the second current outlet pipe 3212 and is expelled in water storage box 2.
As shown in figure 3, being provided with case lid 24 above water storage box 2, the top of case lid 24 is provided with Garden Greenland 5, and in case
Lid 24 is provided with the side inside water storage box 2 is divided into water storage box 2 the of first precipitation chamber 221 and water storage cavity 222
One dividing plate 22, the bottom of water storage cavity 222, which is provided with, is divided into water storage cavity 222 the second of second precipitation chamber 231 and water-purifying cavity 232
Dividing plate 23, first partition 22 are connected with case lid 24 and leave gap with the bottom of water storage box 2, and second partition 23 is fixed on water storage box 2
Bottom and gap is left between case lid 24, the side wall of water-purifying cavity 232, which is located in the height of second partition 232/3 ~ 3/4, connects water outflow
Pipe 1, Rose Box 7 is installed in current outlet pipe 1.
It is delivered to by the rainwater in rain water drainage portion 32 by sluice pipe 111 in water storage box 2, chamber 221 is precipitated first
It is the less clarified solution of impurity with rainwater of the preliminary sedimentation close to upper strata in the second precipitation chamber 231, when the first precipitation chamber 221 and the
When the liquid level of two precipitation chambers 231 is higher than the height of second partition 23, the second precipitation top clarified solution of chamber 231 can enter to water-purifying cavity
In 232, the height that then the current outlet pipe 1 on water-purifying cavity 232 is set is at the 2/3 ~ 3/4 of the height of second partition 23, then only
More limpid liquid of the water cavity 232 close to top can reach Rose Box 7.
As shown in figure 3, being provided with water inlet pipe 72 and outlet pipe 73 on Rose Box 7, it is provided with Rose Box 7 some uniform
The active carbon filter net 71 of distribution, rainwater have water inlet pipe 72 to enter, and are passed through after the adsorpting pigment of multi-filtering net 3113 and impurity
Cross outlet pipe 73 and be delivered to water equipment 4.
As shown in Figures 6 and 7, influenceed by factors such as environmental pollutions, rainwater may be in acidity, when acid rainwater uses
It can corrode using equipment, so being connected with the aqueduct 61 through case lid 24 in water-purifying cavity 232, aqueduct 61 deviates from water storage box
2 end is connected with detection cell 6, and cover plate 63 is provided with detection cell 6, PH detector 62 is provided with cover plate 63, in detection cell 6
The demarcation strip 64 that detection cell 6 is divided into test chamber 641 and mixing chamber 642 is inside provided with, the detection probe of PH detector 62 is held
It is placed in test chamber 641, is provided with the medicine-introducing pipe 65 connected with water-purifying cavity 232 in mixing chamber 642, the company of being provided with demarcation strip 64
Lead to the connecting tube 66 of test chamber 641 and mixing chamber 642, be provided with the 3rd check valve 661 in connecting tube 66, set on aqueduct 61
There are the first check valve 612 and the first force (forcing) pump 611, the second force (forcing) pump 651 and the second check valve 652 are provided with medicine-introducing pipe 65.
Water in water-purifying cavity 232 in the presence of the first force (forcing) pump 611, which can be entered in test chamber 641, detects PH, works as inspection
When survey result is qualified, the water in test chamber 641 can be delivered to after connecting tube 66 is delivered in mixing chamber 642 through medicine-introducing pipe 65
Rose Box 7 is expelled in water-purifying cavity 232, and when testing result is unqualified, it is defeated that the water in test chamber 641 can pass through connecting tube 66
Mixing chamber 642 to be delivered to, PH conditioning agents are added in mixing chamber 642 and are dissolved, PH conditioning agents are gradually added dropwise in water-purifying cavity 232,
Water quality in water-purifying cavity 232 is adjusted, the rainwater after regulation, which is delivered in Rose Box 7, to be continued to be used for water equipment after filtering
4, reduce corrosion of the acidic rain water to water equipment 4.
As illustrated in fig. 1 and 2, solar panel 8 is equipped with the top of log cabin body 1, solar panel 8 is by leading
Line electrically connects with electrical equipment, electrical equipment can with when fan, electric light.Solar panel 8 converts the solar into electric energy reality
Show the reasonable utilization of resource, reduce the consumption to electric energy.
Described above is only exemplary embodiment of the present utility model, not for limitation protection model of the present utility model
Enclose, the scope of protection of the utility model is determined by appended claim.
Claims (10)
1. a kind of low-carbon log cabin, including log cabin body (1) and it is arranged at the top of log cabin body (1) and at the lower edge of top
Gutter (11), sluice pipe (111) is connected with the gutter (11), it is characterized in that:The sluice pipe (111) deviates from gutter
(11) end is communicated with water storage box (2), and the sluice pipe (111) is provided with filter close to water storage box (2) one end
(3) current outlet pipe one (21), current outlet pipe one (21) the connection water equipment (4), are provided with the water storage box (2).
2. low-carbon log cabin according to claim 1, it is characterized in that:The filter (3) includes removal of impurities portion (31), institute
The removal of impurities pond (311) that removal of impurities portion (31) is arranged to be arranged on sluice pipe (111) is stated, is provided with removal of impurities pond (311)
First current inlet pipe (3111) and the first current outlet pipe (3112), the first current outlet pipe (3112) place are provided with screen pack
(3113), it is provided with rain water drainage portion (32) between the removal of impurities portion (31) and water storage box (2).
3. low-carbon log cabin according to claim 2, it is characterized in that:Described removal of impurities pond (311) bottom is provided with collection filter frame
(3114), the upper end of removal of impurities pond (311) is provided with the opening (3115) passed through for collecting filter frame (3114).
4. low-carbon log cabin according to claim 2, it is characterized in that:The rain water drainage portion (32) includes installed in sluicing
Sewage well (321) on pipeline (111), the second current inlet pipe (3211), the outflow of the second water are provided with the sewage well (321)
(3212) and waste liquid outlet pipe (3213) are managed, dividing plate (3214), the second current inlet pipe are provided with the sewage well (321)
(3211), the second current outlet pipe (3212) is located above dividing plate (3214), and the waste liquid outlet pipe (3213) is located at dividing plate (3214)
Lower section and caliber is smaller than the second current inlet pipe (3211), abandoned stream hole (3215), dividing plate are offered on the dividing plate (3214)
(3214) top is provided with the first ball float (3216), and closing abandoned stream hole (3215) is provided with below dividing plate (3214) and is floated with first
The second ball float (3217) of ball (3216) connection, the volume of second ball float (3217) are less than the first ball float (3216).
5. low-carbon log cabin according to claim 1, it is characterized in that:The water storage box (2) includes case lid (24) and case lid
(24) top is provided with Garden Greenland (5).
6. low-carbon log cabin according to claim 1, it is characterized in that:It is provided with water storage box (2) point in the water storage box (2)
The first partition (22) of the first precipitation chamber (221) and water storage cavity (222) is divided into, is provided with the water storage cavity (222) by water storage
Chamber (222) is divided into the second partition (23) of the second precipitation chamber (231) and water-purifying cavity (232), first partition (22) and case lid
(24) connection and leave gap with water storage box (2) bottom, second partition (23) be fixed on water storage box (2) bottom and with case lid (24)
Between leave gap, rainwater flows through the first precipitation chamber (221), the second precipitation chamber (231) and water-purifying cavity (232), the water purification successively
Chamber (232) side wall is communicated with current outlet pipe one (21) in the height of second partition (23) 2/3 ~ 3/4.
7. low-carbon log cabin according to claim 6, it is characterized in that:It is connected with the water-purifying cavity (232) through case lid
(24) aqueduct (61), the aqueduct (61) are connected with detection cell (6), the aqueduct away from the end of water storage box (2)
(61) the first force (forcing) pump (611) and the first check valve (612) are provided with, cover plate (63), institute are provided with the detection cell (6)
State and PH detector (62) is installed on cover plate (63).
8. low-carbon log cabin according to claim 7, it is characterized in that:It is provided with detection cell (6) point in the detection cell (6)
The demarcation strip (64) and aqueduct (61) for being divided into test chamber (641) and mixing chamber (642) connect with test chamber (641), PH detections
Device (62) is arranged on the top of test chamber (641), is provided with the mixing chamber (642) and leads medicine with what water-purifying cavity (232) connected
Manage (65), the second force (forcing) pump (651) and the second check valve (652), the demarcation strip (64) are connected with the medicine-introducing pipe (65)
On be provided with the connecting tube (66) of communication with detection chamber (641) and mixing chamber (642), be connected with the connecting tube (66) for rainwater
The 3rd check valve (661) of mixing chamber (642) is reached by test chamber (641).
9. low-carbon log cabin according to claim 1, it is characterized in that:Rose Box is installed on the current outlet pipe one (21)
(7) some equally distributed active carbon filter nets (71) and in the Rose Box (7) are provided with, are set on the Rose Box (7)
There are water inlet pipe (72) and outlet pipe (73), the water inlet of the water inlet pipe (72) is successively through active carbon filter net (71) by outlet pipe
(73) discharge.
10. low-carbon log cabin according to claim 1, it is characterized in that:Solar energy is equipped with the top of the log cabin body (1)
Cell panel (8), the solar panel (8) are electrically connected by wire with electrical equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720672054.1U CN207079665U (en) | 2017-06-09 | 2017-06-09 | Low-carbon log cabin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720672054.1U CN207079665U (en) | 2017-06-09 | 2017-06-09 | Low-carbon log cabin |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207079665U true CN207079665U (en) | 2018-03-09 |
Family
ID=61425461
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720672054.1U Expired - Fee Related CN207079665U (en) | 2017-06-09 | 2017-06-09 | Low-carbon log cabin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207079665U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113047537A (en) * | 2021-02-26 | 2021-06-29 | 深圳市明润建筑设计有限公司 | Environment-friendly energy-saving green building |
-
2017
- 2017-06-09 CN CN201720672054.1U patent/CN207079665U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113047537A (en) * | 2021-02-26 | 2021-06-29 | 深圳市明润建筑设计有限公司 | Environment-friendly energy-saving green building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209723179U (en) | A kind of rainwater utilization system for sponge city | |
KR101056650B1 (en) | A treatment device for the rain water | |
CN206784757U (en) | A kind of device for recycling rainwater | |
CN207959471U (en) | A kind of afforestation rainwater Catchwork irrigation device | |
CN202017224U (en) | Distributional automatic rainwater flow abandoning device for roof | |
CN206512824U (en) | Rainwater automatic shunt flow abandoning apparatus | |
CN202030616U (en) | Shunting type rainwater collection utilization unit | |
CN204530842U (en) | Rain water collecting system | |
CN104631547A (en) | Rainwater collecting system | |
CN208934081U (en) | A kind of sponge cell rainwater utilization intelligent management system | |
CN205259259U (en) | Energy saving building rainwater collecting system | |
CN207079665U (en) | Low-carbon log cabin | |
CN207582618U (en) | A kind of pump discharges into water system | |
CN112982557A (en) | Equipment of recycling is collected to gardens rainwater | |
CN211143298U (en) | Steel construction canopy | |
CN205636411U (en) | Ecological grass planting ditch in sponge city | |
CN208293713U (en) | A kind of roadside greening leukorrhagia seeps purification and the utilization system of rainwater | |
CN109653333A (en) | Sponge city dweller's rainwater ecological system | |
CN207176864U (en) | Rain water collecting system for sponge city | |
CN103215985B (en) | Community rainwater utilization system based on secondary split-flow of rainwater and sewage | |
CN113359515A (en) | Intelligent courtyard system | |
CN210151815U (en) | Rainwater collecting and utilizing device for house building | |
CN210597454U (en) | Urban rainwater collection device | |
CN113846740A (en) | Initial rainwater collecting device | |
CN111732212A (en) | Be used for green ecosystem in sponge city roof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180309 Termination date: 20190609 |