CN207063371U - A kind of assembled stair - Google Patents

A kind of assembled stair Download PDF

Info

Publication number
CN207063371U
CN207063371U CN201720268573.1U CN201720268573U CN207063371U CN 207063371 U CN207063371 U CN 207063371U CN 201720268573 U CN201720268573 U CN 201720268573U CN 207063371 U CN207063371 U CN 207063371U
Authority
CN
China
Prior art keywords
gangboard
armored concrete
concrete stage
stage
step face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720268573.1U
Other languages
Chinese (zh)
Inventor
孔令鹏
马建栋
***龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201720268573.1U priority Critical patent/CN207063371U/en
Application granted granted Critical
Publication of CN207063371U publication Critical patent/CN207063371U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

A kind of stair have been the utility model is related to, have specifically disclosed a kind of prefabricated assembled stair, including gangboard, plate support and armored concrete stage composition.Described armored concrete stage has horizontal step face vertical each other and vertical supporting surface, and the horizontal step face of armored concrete stage is fluted, and vertical supporting surface bottom is identical with the size of horizontal step face groove, and horizontal step face is provided with noctilucence tread plate.The utility model gangboard and separately prefabricated installation of marking time, alleviate the weight of component, can reach mass production, solve existing prefabricated assembled stair and the problems such as big weight, transport difficult, inconvenient installation be present.

Description

A kind of assembled stair
Technical field
It the utility model is related to stair field, and in particular to a kind of assembled stair.
Background technology
All the time, the construction of China's traditional architecture industry is all built upon the basis of price of labour power relative moderate On, using serious consumption of natural resource as cost, by simple construction technology engineering method, cause a large amount of environmental pollutions and energy wave Take, be finally completed engineering duty.Now land resource, water resource and energy scarcity are faced, problem of environmental pollution is serious and works Power is expensive to wait unfavorable conditions, and the development model of traditional architecture industry welcomes huge challenge.And with Chinese Urbanization Development scale is increasing, and worker's mobility causes greatly management difficulty to increase, government is for environmental requirement more and more higher, real estate Requirement of the developer for duration Quality Cost is increasingly strict, safety and comfort performance requirement of the owner for building products gradually carries High factor, which is increasingly becoming, restricts the bottleneck that building trade further develops.One side building trade faces the construction of sharp increase Demand, another aspect developer are faced with the problem of the low profit of high cost again, and this results in whole industry and must comply with social hair Exhibition trend and national sustainable development policy, by science and technology, improve instruments of labour and labor style, rely on mechanization and oneself The dynamicization mode of production improves its construction level.In this case, the housing industrialization pattern based on building industrialization Arise at the historic moment.
Main trend of the prefabrication as housing industrialization, can not only solve above-mentioned natural resources well In short supply, price of labour power costliness etc. restricts the problem of building trade develops, additionally it is possible to and construction quality is improved, saves engineering cost, Shorten the completion time of project.Stair are the important components in fabricated construction as floor gap vertical transportation instrument.It is and existing It is big construction weight to be more or less present in assembled stair, and lifting is difficult, bad installation in job site etc..
Utility model content
The purpose of this utility model is to provide a kind of assembled stair, light with member dead weight, easy for construction, Neng Goushi Existing batch production, standardization, commercialization requirement.
In order to achieve the above object, the technical solution of the utility model is:A kind of assembled stair, including gangboard, plate support With armored concrete stage, there are several armored concrete stages on described gangboard, it is each under each armored concrete stage There is a plate support;The horizontal step face of armored concrete stage is fluted, and vertical supporting surface bottom size is relative with groove size Should, two neighboring armored concrete stage, the vertical supporting surface bottom of a upper armored concrete stage is put in next reinforcing bar There is cement to sit slurry in the horizontal step face groove of concrete stage, and in groove.
In order to improve construction speed, gangboard, plate support and armored concrete stage are prefabrication, the pre-buried spiral shell of gangboard, plate support Line sleeve pipe, plate support are rectangular triangle column.
Gangboard upper ends of the present utility model are on the first rest ledge, and lower end is placed on the second rest ledge, gangboard Both ends are provided with card article, and the first rest ledge and the second rest ledge are provided with the neck for coordinating card article, and gangboard both ends contact with rest ledge Bottom has cement to sit slurry.
Gangboard of the present utility model and the pre-buried screwed pipe of plate support are bolted, and structure is provided between gangboard and plate support Glue, increase its globality.
The horizontal step face of the armored concrete stage of the top is no longer provided with groove, gangboard on gangboard of the present utility model Cement is provided between the vertical supporting surface and gangboard of the armored concrete stage of upper bottom and sits slurry.
Cement is provided between armored concrete stage of the present utility model and plate support below sits and starch, armored concrete rank The horizontal step face of platform is provided with noctilucence tread plate.
Compared with prior art, the beneficial effects of the utility model are:Gangboard separates with marking time, and significantly reduces component Weight, beneficial to installation;Gangboard, plate support and armored concrete stage are prefabrication, realize component standardization;The company of each component Connect simply, it is easy for construction;The horizontal step face of armored concrete stage is provided with noctilucence tread plate, need not be illuminated just at night It is clear that step.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the utility model embodiment.
Fig. 2 is armored concrete stage structural representation of the present utility model.
Fig. 3 is armored concrete stage side schematic view of the present utility model.
Fig. 4 is plate support structural representation of the present utility model.
Fig. 5 is plate support schematic bottom view of the present utility model.
Fig. 6 is gangboard top schematic diagram of the present utility model.
Fig. 7 is the close-up schematic view of gangboard lower end of the present utility model and rest ledge junction.
Wherein, 1- armored concrete stage;2- plate supports;3- gangboards;The rest ledges of 4- first;The rest ledges of 5- second;6- walls; 7- bolts;8- threaded sleeves;9- cement sits slurry;10- necks;11- card articles;12- noctilucence tread plates;13- structure glues;14- lifting hole(eyelet)s; 15- grooves.
Embodiment
Implementation process of the present utility model is further illustrated in conjunction with accompanying drawing.
The utility model is a kind of assembled stair, including gangboard 3, plate support 2 and armored concrete stage 1 form, described Gangboard 3, plate support 2 and armored concrete stage 1 be prefabricated in the factory, plate support 2 and gangboard 3 are embedded with threaded sleeve 8, transport to construction In-site installation, stair are installed from the bottom up during installation, install gangboard 3 by lifting hole(eyelet) 15 first, and the upper ends of gangboard 3 are stopped first Cease on platform 4, lower end is placed on the second rest ledge 5, and the both ends of gangboard 3 are provided with card article 11, the first rest ledge 4 and the second rest ledge 5 are provided with the neck 10 for coordinating card article 11, and the both ends of gangboard 3 contact bottom with the first rest ledge 4 and the second rest ledge 5 and are provided with cement Slurry 9 is sat, the first rest ledge 4 and the second rest ledge 5 are cast-in-place;Then plate support 2 is installed since the lower end of gangboard 3, gangboard 3 and plate The contact surface of support 2 is provided with the position correspondence of threaded sleeve 8 of structure glue 13, gangboard 3 and plate support 2, is connected with bolt 7. Armored concrete stage 1 is finally installed, since the lower end of gangboard 3, an armored concrete rank is placed above in each plate support 3 Platform 1, cement seat slurry 9 is provided between plate support 2 and armored concrete stage 1, the level of the armored concrete stage 1 of the top is stepped on Cement is provided between instep end and gangboard and sits slurry 9, the vertical supporting surface bottom of the armored concrete stage 1 of bottom and gangboard Between be provided with cement sit slurry 9.
The horizontal step face fluted 15 of described armored concrete stage 1, vertical supporting surface bottom size and groove 15 Size is corresponding, two neighboring armored concrete stage 1, and the vertical supporting surface bottom of a upper armored concrete stage 1 is put in There is cement to sit slurry 9, armored concrete stage 1 in next horizontal step face groove 15 of armored concrete stage 1, and in groove 15 Horizontal step face be provided with noctilucence tread plate 12.

Claims (4)

1. assembled stair, including gangboard, plate support and armored concrete stage.Characterized in that, armored concrete stage has mutually For vertical horizontal step face and vertical supporting surface, the horizontal step face of armored concrete stage is fluted, vertical supporting surface bottom Hold size corresponding with groove size, two neighboring armored concrete stage, the vertical support of a upper armored concrete stage Face bottom is put in the horizontal step face groove of next armored concrete stage, and cement is provided with groove and sits slurry, reinforced concrete Cement is provided between native stage and plate support below sits and starch, on the first rest ledge, lower end is placed on the upper ends of gangboard On second rest ledge, the both ends of gangboard are provided with card article, and the first rest ledge and the second rest ledge are provided with the neck for coordinating card article, ladder Plate both ends, which contact bottom with rest ledge, has cement to sit slurry.
2. a kind of assembled stair described in claim 1, it is characterised in that between single armored concrete stage and gangboard Provided with plate support, plate support is rectangular triangle column, the pre-buried threaded sleeve in plate support bottom, and corresponding position sets screw thread on gangboard Sleeve pipe, it is bolted, structure glue is provided between plate support and gangboard.
A kind of 3. assembled stair described in claim 1, it is characterised in that the armored concrete stage of the top on gangboard Horizontal step face is no longer provided with groove, is provided with gangboard between the vertical supporting surface and gangboard of the armored concrete stage of bottom Cement sits slurry.
4. a kind of assembled stair described in claim 1, it is characterised in that set on the horizontal step face of armored concrete stage There is noctilucence tread plate.
CN201720268573.1U 2017-03-20 2017-03-20 A kind of assembled stair Expired - Fee Related CN207063371U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720268573.1U CN207063371U (en) 2017-03-20 2017-03-20 A kind of assembled stair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720268573.1U CN207063371U (en) 2017-03-20 2017-03-20 A kind of assembled stair

Publications (1)

Publication Number Publication Date
CN207063371U true CN207063371U (en) 2018-03-02

Family

ID=61501964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720268573.1U Expired - Fee Related CN207063371U (en) 2017-03-20 2017-03-20 A kind of assembled stair

Country Status (1)

Country Link
CN (1) CN207063371U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322452A (en) * 2018-12-08 2019-02-12 河南清水建设科技有限公司 A kind of prefabricated concrete trestle is marked time and its application method
CN110792236A (en) * 2019-12-03 2020-02-14 张延年 Clamping groove type assembled concrete stair

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322452A (en) * 2018-12-08 2019-02-12 河南清水建设科技有限公司 A kind of prefabricated concrete trestle is marked time and its application method
CN110792236A (en) * 2019-12-03 2020-02-14 张延年 Clamping groove type assembled concrete stair

Similar Documents

Publication Publication Date Title
CN201567532U (en) Novel supporting structure of lid beam of bridge
CN108755333B (en) Road and bridge crack repairing device and method
CN207063371U (en) A kind of assembled stair
CN105908965A (en) Assembly type concrete wall board, assembly type building and assembly method
CN105839784B (en) Assembled jacking type construction techniques
CN206937564U (en) A kind of embedded parts positioning device
CN205818107U (en) A kind of quick process units of non-light tight concrete modularity
CN209099600U (en) A kind of assembled steel bar concrete floor structure
CN205917915U (en) Assembled shear force wall (post) component of installation is connected to method of inserting
CN204510650U (en) A kind of precast splice type stringer type stairway
CN206267443U (en) A kind of prefabrication and assembly construction concrete structure stair
CN209308409U (en) It is a kind of for pouring the quick assembling steel form of steel reinforced concrete rectangular column
CN203129513U (en) Floor tile paving frame
CN104047421B (en) Finished product assembly type plastic composition turnover mould board construction method
CN103552911A (en) Movable hoisting apparatus and construction installation method used by same
CN207110029U (en) A kind of assembled house
CN203200982U (en) Steel bar truss buckling hanging type floor support plate
CN102877481B (en) Equipment foundation standard mould of multifunctional transformer substation
CN206513016U (en) A kind of novel quick release frame
CN205444197U (en) Batter pile test model concrete placement stand pipe inclines
CN204920244U (en) Supporting structure of large -span steel construction segmentation hoist and mount
CN204442237U (en) A kind of roof photovoltaic bracket
CN103590419A (en) Assembled type adjustable high-voltage reactor foundation
CN203569833U (en) Novel dry hanging system for building outer decoration and insulation integrated boards
CN104389346B (en) A kind of high-strength light shearing formula assembled building structural system and preparation method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180302

Termination date: 20190320