CN207063157U - A kind of continuous arch door opening structure of super-span using lightweight steel construction - Google Patents

A kind of continuous arch door opening structure of super-span using lightweight steel construction Download PDF

Info

Publication number
CN207063157U
CN207063157U CN201720728856.XU CN201720728856U CN207063157U CN 207063157 U CN207063157 U CN 207063157U CN 201720728856 U CN201720728856 U CN 201720728856U CN 207063157 U CN207063157 U CN 207063157U
Authority
CN
China
Prior art keywords
keel
door opening
super
steel construction
closure attachment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720728856.XU
Other languages
Chinese (zh)
Inventor
王程程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yitian Design Group Co ltd
Original Assignee
Hubei Yitian Decoration Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Yitian Decoration Design Co Ltd filed Critical Hubei Yitian Decoration Design Co Ltd
Priority to CN201720728856.XU priority Critical patent/CN207063157U/en
Application granted granted Critical
Publication of CN207063157U publication Critical patent/CN207063157U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model provides a kind of continuous arch door opening structure of super-span using lightweight steel construction, it is connected with agent structure, it includes the keel being evenly arranged and the built-in fitting being arranged in agent structure, and keel are encorbelmented by steel cantilever with the built-in fitting in agent structure to be connected;The bottom of keel is connected with closure attachment structure, and the shape of described closure attachment structure is identical with the door opening arc of Decoration Design moulding;Described keel and closure attachment structure are light steel building material.The utility model is by using lightweight steel construction, completely instead of the concreting in conventional art, it is complex to solve the position way connected herein in existing engineering, stability and security can not ensure, steel using amount is unreasonable the various problems such as to have a great influence to structure load itself;Not only construction method is simple, alleviates load, also eliminates the time for waiting concrete to dry, and substantially reduces construction period, no matter it is outside using which kind of ceiling material can, versatility is high.

Description

A kind of continuous arch door opening structure of super-span using lightweight steel construction
Technical field
The utility model belongs to architectural design field, and in particular to a kind of continuous arch of super-span using lightweight steel construction Door opening structure.
Background technology
In building field, some arch door opening structure designs, the mode of generally use concreting are commonly used.However, For the continuous arch door opening of some super-spans, concreting arc difficulty is big, load weight, pours rear easy to crack.From building From the point of view of design, traditional method is complex, and stability and security can not ensure.
Utility model content
The technical problems to be solved in the utility model is:A kind of continuous arched door of the super-span using lightweight steel construction is provided Hole structure, the stability and security of structure, and easy construction are ensured.
The utility model is to solve the technical scheme that above-mentioned technical problem is taken to be:A kind of super large using lightweight steel construction The continuous arch door opening structure of span, is connected with agent structure, it is characterised in that:It includes the keel being evenly arranged and is arranged on master Built-in fitting in body structure, keel are encorbelmented by steel cantilever with the built-in fitting in agent structure to be connected;The bottom of keel is connected with Attachment structure is closed, the shape of described closure attachment structure is identical with the door opening arc of Decoration Design moulding;Described keel It is light steel building material with closure attachment structure.
By such scheme, described keel and closure attachment structure are coating steel pipe.
By such scheme, it is welded and fixed between described keel and closure attachment structure.
By such scheme, described agent structure includes main column and body pillar.
By such scheme, described keel are externally connected with the facing of any finishing material.
The beneficial effects of the utility model are:By using lightweight steel construction, poured completely instead of the concrete in conventional art Build, solve that the position way connected herein in existing engineering is complex, and stability and security can not ensure that steel using amount is not The various problems such as rationally have a great influence to structure load itself;Not only construction method is simple, alleviates load, also eliminates wait The time that concrete dries, substantially reduce construction period, no matter it is outside using which kind of ceiling material can, versatility pole It is high.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the embodiment of the utility model one.
Fig. 2 is keel and the profile of agent structure junction.
In figure:1- keel, 2- steel cantilevers, 3- built-in fittings, 4- agent structures, the body pillars of 4-1- first, 4-2- main columns, 4- The body pillars of 3- second, the body pillars of 4-4- the 3rd, 5- closure attachment structures, 6- metope pillars.
Embodiment
The utility model is described further with reference to instantiation and accompanying drawing.
The utility model provides a kind of continuous arch door opening structure of super-span using lightweight steel construction, such as Fig. 1 and Fig. 2 institutes Show, be connected with agent structure 4, it includes the keel 1 being evenly arranged and the built-in fitting 3 being arranged in agent structure 4, and keel 1 are logical Cross steel cantilever 2 and encorbelmented with the built-in fitting 3 in agent structure 4 and is connected;The bottom of keel 1 is connected with closure attachment structure 5, described The shape for closing attachment structure 5 is identical with the door opening arc of Decoration Design moulding;Described keel 1 and closure attachment structure 5 are equal For light steel building material.
In the present embodiment, described keel 1 and closure attachment structure 5 are coating steel pipe;Keel 1 and closure attachment structure It is welded and fixed between 5.
Described agent structure includes main column and body pillar.In the present embodiment, described agent structure 4 includes the first master Body beam 4-1, and the first body pillar 4-1 the main column 4-2 being connected and the second body pillar 4-3, and it is connected to main column 4-2 bottoms The 3rd body pillar 4-4, body pillar and main column in these agent structures 4 can according to structure design with or without.According to dress Design model is repaiied, it is necessary to respectively set a door opening in the 3rd body pillar 4-4 both sides, therefore from the first body pillar in the present embodiment 4-1 sets keel 1 straight down, in the 3rd body pillar 4-4 both sides using closure 2 door openings of composition of attachment structure 5, and with Keel 1 weld.When keel 1 are connected with the first body pillar 4-1, main column 4-2, the second body pillar 4-3 and the 3rd body pillar 4-4, Built-in fitting 3 can be according to different structure detailing requiments using being directly embedded in agent structure 4, or rearmounted are connected with agent structure 4. After the completion of connection, bottom reconnects metope pillar 6.
Preferably, the described outside of keel 1 can use any finishing material facing, you can all kinds of finishing materials of arranging in pairs or groups apply Face keel.So door opening can just form an entirety, and increase other ornamental materials outside.
The continuous arch door opening structure of a kind of super-span using lightweight steel construction provided by the utility model, is solved existing The position way connected herein in engineering is complex, and stability and security can not ensure that steel using amount is unreasonable to structure sheet Body load such as has a great influence at the various problems;Its drip irrigation device is the arc according to Decoration Design moulding using a kind of coating steel pipe Shape radian is evenly arranged, and forms closure attachment structure by same material in bottom, coating steel pipe is encorbelmented connection by steel cantilever To built-in fitting,(Built-in fitting can be connected according to different structure detailing requiments using pre-buried or post-install with agent structure);This turn Changing layer has that stability is good, easy construction(It is big to reduce concreting arc difficulty), it is safe(Load is light, avoids arc Shape concrete structure is easy to crack,), versatility it is high(No matter which kind of ceiling material outside uses), short construction period the features such as.
Above example is merely to illustrate design philosophy and feature of the present utility model, in the art its object is to make Technical staff can understand content of the present utility model and implement according to this, and the scope of protection of the utility model is not limited to above-mentioned implementation Example.So equivalent variations that all principle, mentalities of designing according to disclosed in the utility model are made or modification, in this practicality Within new protection domain.

Claims (5)

1. a kind of continuous arch door opening structure of super-span using lightweight steel construction, is connected with agent structure, it is characterised in that:It Including the keel that are evenly arranged and the built-in fitting being arranged in agent structure, keel by steel cantilever with it is pre-buried in agent structure Part is encorbelmented connection;The bottom of keel is connected with closure attachment structure, and the shape of described closure attachment structure is made with Decoration Design The door opening arc of type is identical;Described keel and closure attachment structure are light steel building material.
2. the continuous arch door opening structure of the super-span according to claim 1 using lightweight steel construction, it is characterised in that:Institute The keel and closure attachment structure stated are coating steel pipe.
3. the continuous arch door opening structure of the super-span according to claim 1 or 2 using lightweight steel construction, its feature exist In:It is welded and fixed between described keel and closure attachment structure.
4. the continuous arch door opening structure of the super-span according to claim 1 or 2 using lightweight steel construction, its feature exist In:Described agent structure includes main column and body pillar.
5. the continuous arch door opening structure of the super-span according to claim 1 or 2 using lightweight steel construction, its feature exist In:Described keel are externally connected with the facing of any finishing material.
CN201720728856.XU 2017-06-21 2017-06-21 A kind of continuous arch door opening structure of super-span using lightweight steel construction Expired - Fee Related CN207063157U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720728856.XU CN207063157U (en) 2017-06-21 2017-06-21 A kind of continuous arch door opening structure of super-span using lightweight steel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720728856.XU CN207063157U (en) 2017-06-21 2017-06-21 A kind of continuous arch door opening structure of super-span using lightweight steel construction

Publications (1)

Publication Number Publication Date
CN207063157U true CN207063157U (en) 2018-03-02

Family

ID=61510069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720728856.XU Expired - Fee Related CN207063157U (en) 2017-06-21 2017-06-21 A kind of continuous arch door opening structure of super-span using lightweight steel construction

Country Status (1)

Country Link
CN (1) CN207063157U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523357A (en) * 2020-09-04 2021-03-19 浙大城市学院 Steel supporting cylinder-lower hanging type truss system with arc-shaped vertical face and large open hole and application

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523357A (en) * 2020-09-04 2021-03-19 浙大城市学院 Steel supporting cylinder-lower hanging type truss system with arc-shaped vertical face and large open hole and application
CN112523357B (en) * 2020-09-04 2022-06-17 浙大城市学院 Steel supporting cylinder-lower hanging type truss system with arc-shaped vertical face and large open hole and application

Similar Documents

Publication Publication Date Title
CN106436893A (en) Fully-prefabricated structure and construction method thereof
CN105569264B (en) Two-sided composite beam and its construction method
CN205894287U (en) Prefabricated building structure beam
CN104153495B (en) A kind of attachment structure of Multi-function light concrete curtain wall
CN108277881A (en) A kind of assembled beam-column connecting node
CN207063157U (en) A kind of continuous arch door opening structure of super-span using lightweight steel construction
CN104963421B (en) Prefabricated heat-insulation plate for external and the heat-preserving wall being assembled to form by which and construction method
CN105155836B (en) Aluminum alloy mould plate for building and its using method
CN207144232U (en) The Light trabses of assembled architecture
CN204001309U (en) A kind of syndeton of Multi-function light concrete curtain wall
CN106759933A (en) Prefabricated post composite beam intermediate layer interior joint connection method in assembled RC frame-shear structures
CN204551796U (en) Building structure at the bottom of a kind of Vierendeel girder
CN208605122U (en) A kind of connecting elements for bridge pier safety climbing ladder
CN107201796B (en) A kind of truss plate
CN106284681B (en) Assembly concrete is whole without heat bridge board wall and the connection method of running-on floor
CN206016002U (en) Assembly concrete beam
CN108457444A (en) Exterior wall PU decorating structures and its construction method
CN106836473A (en) Prefabricated post composite beam intermediate layer mid-side node connection method in assembled RC frame-shear structures
CN204662739U (en) A kind of steel bar truss floor support plate and light-steel light-concrete combining structure
CN206616695U (en) A kind of concrete panel and girt strip floor dry type connecting node
CN208884728U (en) Steel-concrete combines precast beam and prefabricated post connection structure
CN207597638U (en) A kind of fast joint type heat-preserving wall component
CN207512968U (en) A kind of splicing node of steel plate combined shear wall
CN207553363U (en) A kind of prefabricated partition wall connecting structure
CN205369709U (en) Two -sided composite beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 430000 attached building of 11 Zhiyin office building, 169 Donghu Road, Wuchang District, Wuhan City, Hubei Province

Patentee after: Yitian Design Group Co.,Ltd.

Address before: 430000 East Lake Road, Hubei city of Wuhan province Wuchang District No. 169 salon media group hospital Yitian building design

Patentee before: HUBEI YITIAN BUILDING DECORATION DESIGN Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180302