CN206971760U - A kind of full steel structure assembled climbs material platform - Google Patents

A kind of full steel structure assembled climbs material platform Download PDF

Info

Publication number
CN206971760U
CN206971760U CN201720574402.1U CN201720574402U CN206971760U CN 206971760 U CN206971760 U CN 206971760U CN 201720574402 U CN201720574402 U CN 201720574402U CN 206971760 U CN206971760 U CN 206971760U
Authority
CN
China
Prior art keywords
platform
windrow
guide rail
wall
material platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720574402.1U
Other languages
Chinese (zh)
Inventor
张永前
刘建国
刘太峰
石丛林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINGHEREN CONSTRUCTION TECHNOLOGY Co Ltd BEIJING
Original Assignee
XINGHEREN CONSTRUCTION TECHNOLOGY Co Ltd BEIJING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINGHEREN CONSTRUCTION TECHNOLOGY Co Ltd BEIJING filed Critical XINGHEREN CONSTRUCTION TECHNOLOGY Co Ltd BEIJING
Priority to CN201720574402.1U priority Critical patent/CN206971760U/en
Application granted granted Critical
Publication of CN206971760U publication Critical patent/CN206971760U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

It the utility model is related to technical field of building construction, there is provided a kind of full steel structure assembled climbs material platform, including guide rail, windrow platform, operating platform, the lifting hanging seat on external wall;Guide rail is arranged on external wall by wall-attaching equipment, and windrow platform, operating platform are each attached on guide rail;Operating platform is located at the lower section of windrow platform;Steel wire rope upper end is mounted on the suspension ring of lifting hanging seat, and lower end is connected through the pulley on operating platform with the guide chain of electric block lower end;Electric block is arranged at the bottom of windrow platform.The beneficial effects of the utility model are:Material platform is easy for installation, and ground once assembles, and the mode of relatively conventional every layer of installation of material platform is saved manually, the operation dangerous matter sources that high-altitude peace is torn open are reduced, climb operation is simple, has falling proof device safe and reliable, it can return to and be used in turn, there is good Social benefit and economic benefit.

Description

A kind of full steel structure assembled climbs material platform
Technical field
Technical field of building construction is the utility model is related to, more particularly to a kind of full steel structure assembled material that climbs is put down Platform.
Background technology
In Tall Reinforced Concrete Buildings construction, exterior wall discharging platform uses steel wood mixed form more.But current institute Some shortcomings all be present in the discharge platform device used:Due to using steel wood mixed form, connection is not firm, and piece is not rigorous, Expect platform platform bad sealing;Off-load is fixed in material platform platform closing piece, and material platform platform is directly shelved on the inside of balcony or window opening On floor, safety coefficient is low;Material platform platform has from function of climbing, and every layer of construction completion needs tower crane to coordinate to be lifted into upper strata and build Build and reinstall, labor intensity is big.
Utility model content
The purpose of this utility model is exactly overcome the deficiencies in the prior art, there is provided a kind of full steel structure assembled climbs thing Expect platform, can all be connected by screw bolts, disposably be set up on ground, realize discharging platform certainly by electric block after lifting Climb function, windrow platform floor and protection network create the high work of a safety coefficient all using full steel structure to worker Environment.
A kind of full steel structure assembled of the utility model climbs material platform, including guide rail, windrow platform, operating platform, Lifting hanging seat on external wall;
The guide rail is arranged on external wall by wall-attaching equipment, and the windrow platform, operating platform are each attached to institute State on guide rail;The operating platform is located at the lower section of the windrow platform;
Steel wire rope upper end is mounted on the suspension ring of the lifting hanging seat, and lower end passes through pulley and electricity on the operating platform The guide chain connection of dynamic cucurbit lower end;The electric block is arranged at the bottom of the windrow platform.
Further, the guide rail is 2, and 2 guide rails are connected as one by connection framework;The windrow is put down Platform, operating platform are each attached on 2 guide rails.
Further, the windrow platform is firmly connected by sub-truss with guide rail;Described sub-truss one end and institute Guide rail connection is stated, the other end is connected with the windrow mesa base;The windrow platform, guide rail, sub-truss collectively form three Angular rock-steady structure.
Further, the wall-attaching equipment is fixed on external wall by through-wall bolt.
Further, the material platform also includes closing piece, and the guide rail can be locked by fastening the bolt on the closing piece In the wall-attaching equipment.
Further, the windrow platform periphery is provided with guardrail board.
Further, the wall-attaching equipment is 3, is respectively arranged on 3 layers of adjacent external wall.
The beneficial effects of the utility model are:Material platform is easy for installation, and ground once assembles, relatively conventional every layer of material platform The mode of installation is saved and manually, reduces the operation dangerous matter sources that high-altitude peace is torn open, and climb operation is simple, and there is falling proof device safely may be used Lean on, can return to and be used in turn, there is good Social benefit and economic benefit.
Brief description of the drawings
Fig. 1 show a kind of full steel structure assembled of the utility model embodiment and climbed material platform structural representation.
Fig. 2 show the wall-attaching equipment and lifting hanging seat mounting structure schematic diagram of the utility model embodiment.
Fig. 3 show the through-wall bolt installation and windrow platform turnover panel schematic diagram of the utility model embodiment.
Fig. 4 show the electric block schematic view of the mounting position of the utility model embodiment.
Fig. 5 show after the utility model climbs in place schematic diagram under working condition.
Wherein:1- guide rails, 2- connection frameworks, 3- wall-attaching equipments, 4- liftings hanging seat, 5- electric blocks, 6- closing pieces, 7- supports Truss, 8- guardrail boards, 9- windrows platform, 10- operating platforms, 11- external walls, 12- through-wall bolts, 13- steel wire ropes, 14- Turnover panel.
Embodiment
The utility model specific embodiment is described in detail below in conjunction with specific accompanying drawing.It should be noted that following implementations Example described in technical characteristic or technical characteristic combination be not construed as it is isolated, they can be mutually combined from And reach superior technique effect.In the accompanying drawing of following embodiments, the identical label that each accompanying drawing occurs represents identical spy Sign or part, can be applied in different embodiments.
As Figure 1-5, a kind of full steel structure assembled of the utility model embodiment climbs material platform, including guide rail 1, Windrow platform 9, operating platform 10, installed in external wall(Building structure)Lifting hanging seat 4 on 11;
The guide rail 1 is arranged on external wall by wall-attaching equipment 3(Building structure)On 11, the windrow platform 9, operation Platform 10 is each attached on the guide rail 1;The operating platform 10 is located at the lower section of the windrow platform 9;
The upper end of steel wire rope 13 is mounted on the suspension ring of the lifting hanging seat 4, and lower end passes through the cunning on the operating platform 10 Wheel is connected with the guide chain of the lower end of electric block 5;The electric block 5 is arranged at the bottom of the windrow platform 9.
The guide rail 1 is 2 or multiple(Determined according to material platform size), pass through between 2 or multiple guide rails 1 Connection framework 2 connects as one;The windrow platform 9, operating platform 10 are each attached on 2 or multiple guide rails 1.
Preferably, the windrow platform 9 is firmly connected by sub-truss 7 with guide rail 1;Described one end of sub-truss 7 with The guide rail 1 is connected, and the other end is connected with the bottom of windrow platform 9;The windrow platform 9, guide rail 1, sub-truss 7 are common Triangle rock-steady structure.
The wall-attaching equipment 3 is fixed on external wall by through-wall bolt 12(Building structure)On 11.
Preferably, the material platform also includes closing piece 6, and the guide rail 1 can be locked by fastening the bolt on the closing piece 6 In the wall-attaching equipment 3.
The periphery of windrow platform 9 is provided with guardrail board 8, to ensure safety.
In actual use is installed, on ground by guide rail 1, connection framework 2, wall-attaching equipment 3, closing piece 6, sub-truss 7, anti- Guardrail board 8, windrow platform 9, operating platform 10 connect integral.
As shown in Fig. 2 external wall can be lifted into by building site tower crane(Building structure)11 extensions, adjust wall-attaching equipment 3 With the relative position of guide rail 1, wall-attaching equipment 3 is fixed to external wall using through-wall bolt 12(Building structure)On 11, and will Bolt fastening on closing piece 6, external wall is locked to by this device(Building structure)On 11, as Fig. 4 passes through through-wall bolt 12 3 wall-attaching equipments 3 are installed.
As shown in figure 4, the upper end of boom hoist cable 13 is mounted on the suspension ring of lifting hanging seat 4, lower end passes through operating platform 10 On pulley be connected with the lower end guide chain of electric block 5, after installing, do site tests, meet operation of being climbed after requiring.
When climbing, all items in windrow platform 9 are removed totally, starts electric block 5 and shrinks guide chain, drive whole body After 10cm climbs upwards along wall-attaching equipment 3 in system, closing piece 6 is removed, then proceedes to climb, is installed after being raised to superstructure plate face height Whole system is locked in superstructure structural edge by closing piece 6, and electric block 5 is loosened and pulled down, and is had enough to meet the need to superstructure, is such as schemed 5 remove lifting hanging seat 4 and through-wall bolt 12, are installed to superstructure structure.Treat to repeat above-mentioned stream after the completion of superstructure discharging Journey, it is repeatedly lifted up.
Top building construction discharging is completed, and hanging method, which hangs whole system, when passing through installation tears open to ground, is disintegrated, Encapsulation storage.
The beneficial effects of the utility model are:Material platform is easy for installation, and ground once assembles, relatively conventional every layer of material platform The mode of installation is saved and manually, reduces the operation dangerous matter sources that high-altitude peace is torn open, and climb operation is simple, and there is falling proof device safely may be used Lean on, can return to and be used in turn, there is good Social benefit and economic benefit.
Although having been presented for several embodiments of the present utility model herein, those skilled in the art should manage Solution, in the case where not departing from the utility model spirit, can be changed to the embodiments herein.Above-described embodiment simply shows Example property, restriction that should not using the embodiments herein as the utility model interest field.

Claims (7)

  1. The material platform 1. a kind of full steel structure assembled climbs, it is characterised in that including guide rail, windrow platform, operating platform, peace Lifting hanging seat on external wall;
    The guide rail is arranged on external wall by wall-attaching equipment, and the windrow platform, operating platform are each attached to described lead On rail;The operating platform is located at the lower section of the windrow platform;
    Steel wire rope upper end is mounted on the suspension ring of the lifting hanging seat, and lower end passes through pulley and electronic calabash on the operating platform The guide chain connection of reed lower end;The electric block is arranged at the bottom of the windrow platform.
  2. 2. material platform as claimed in claim 1, it is characterised in that the guide rail is 2, and 2 guide rails pass through connection Framework connects as one;The windrow platform, operating platform are each attached on 2 guide rails.
  3. 3. material platform as claimed in claim 1, it is characterised in that the windrow platform is firm with guide rail by sub-truss Connection;Described sub-truss one end is connected with the guide rail, and the other end is connected with the windrow mesa base;The windrow is put down Platform, guide rail, sub-truss collectively form triangle rock-steady structure.
  4. 4. material platform as claimed in claim 1, it is characterised in that the wall-attaching equipment is fixed on building by through-wall bolt On exterior wall.
  5. 5. the material platform as described in claim any one of 1-4, it is characterised in that the material platform also includes closing piece, tightly Gu the guide rail can be locked in the wall-attaching equipment by the bolt on the closing piece.
  6. 6. the material platform as described in claim any one of 1-4, it is characterised in that the windrow platform periphery is provided with protection Breast board.
  7. 7. the material platform as described in claim any one of 1-4, it is characterised in that the wall-attaching equipment is 3, is installed respectively In on 3 layers of adjacent external wall.
CN201720574402.1U 2017-05-22 2017-05-22 A kind of full steel structure assembled climbs material platform Expired - Fee Related CN206971760U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720574402.1U CN206971760U (en) 2017-05-22 2017-05-22 A kind of full steel structure assembled climbs material platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720574402.1U CN206971760U (en) 2017-05-22 2017-05-22 A kind of full steel structure assembled climbs material platform

Publications (1)

Publication Number Publication Date
CN206971760U true CN206971760U (en) 2018-02-06

Family

ID=61409695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720574402.1U Expired - Fee Related CN206971760U (en) 2017-05-22 2017-05-22 A kind of full steel structure assembled climbs material platform

Country Status (1)

Country Link
CN (1) CN206971760U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113353A (en) * 2018-07-24 2019-01-01 北京天恒建设集团有限公司 A kind of construction material feeding plateform system with enhanced feature
CN110512869A (en) * 2018-05-21 2019-11-29 王四兵 It is novel and multifunctional to cut wall drill hole fluting and material lift all-in-one machine
CN113089990A (en) * 2021-05-12 2021-07-09 江西致邦住宅工业集团有限公司 High-rise steel structure construction platform

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512869A (en) * 2018-05-21 2019-11-29 王四兵 It is novel and multifunctional to cut wall drill hole fluting and material lift all-in-one machine
CN109113353A (en) * 2018-07-24 2019-01-01 北京天恒建设集团有限公司 A kind of construction material feeding plateform system with enhanced feature
CN109113353B (en) * 2018-07-24 2020-12-04 北京天恒建设集团有限公司 Building construction receiving platform system with lifting function
CN113089990A (en) * 2021-05-12 2021-07-09 江西致邦住宅工业集团有限公司 High-rise steel structure construction platform
CN113089990B (en) * 2021-05-12 2022-07-15 致邦住宅工业集团有限公司 High-rise steel structure construction platform

Similar Documents

Publication Publication Date Title
CN206971760U (en) A kind of full steel structure assembled climbs material platform
CN205077885U (en) Hydraulic intelligent climbing protection platform for core tube of building
CN109779244A (en) A kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction
CN106121255A (en) Apparatus installed by a kind of Super High glass curtain wall
CN102502378A (en) Climbing elevator for building construction
CN211923476U (en) Electric hoist lifting system attached to lifting scaffold
CN205743040U (en) A kind of integrated form material hoisting platform
CN204418629U (en) Integrated form climbs frame
CN202214974U (en) 5.8 m ultrahigh external climbing frame
CN106904538A (en) A kind of installation method of cucurbit gantry crane
CN204529038U (en) Construction elevator floor passageway integral type turns over a door system
CN205000656U (en) From over -and -under type material cycling platform
CN204626930U (en) Integrated lifting frame operating platform
CN212052333U (en) Suspension bridge catwalk surface course installing the system
CN202441045U (en) Rail-type electric attached lifting scaffold
CN202544379U (en) Automatic climbing device
CN212154622U (en) Outer wall plate mounting ladder stand for steel structure factory building
CN214885380U (en) Portable tower crane construction platform passageway
CN214269987U (en) Hoisting device applied to high-rise building roof elevator shaft
CN110616909B (en) Construction method of suspension track system at bottom of connecting bridge of super high-rise building
CN103225390B (en) Hollow facade pulley guide attached-type lifting scaffold
CN210655915U (en) Connecting device for climbing frame and tower crane
CN204079399U (en) Coupling type aerial work basket
CN114165061A (en) Construction method of vertical transportation system
CN105781610A (en) Safety cabin for manual hole digging operation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180206