CN202544379U - Automatic climbing device - Google Patents

Automatic climbing device Download PDF

Info

Publication number
CN202544379U
CN202544379U CN2012201268521U CN201220126852U CN202544379U CN 202544379 U CN202544379 U CN 202544379U CN 2012201268521 U CN2012201268521 U CN 2012201268521U CN 201220126852 U CN201220126852 U CN 201220126852U CN 202544379 U CN202544379 U CN 202544379U
Authority
CN
China
Prior art keywords
guide rail
climbing device
automatic climbing
hanging seat
cylinder component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201268521U
Other languages
Chinese (zh)
Inventor
张会霞
刘成文
王彦峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaihai Institute of Techology
Original Assignee
Huaihai Institute of Techology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaihai Institute of Techology filed Critical Huaihai Institute of Techology
Priority to CN2012201268521U priority Critical patent/CN202544379U/en
Application granted granted Critical
Publication of CN202544379U publication Critical patent/CN202544379U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses an automatic climbing device, belonging to the field of buildings and overcoming the defects that the structure of climbing frames is complicated and installation operation is inconvenient in the prior art. The technical scheme is characterized in that the automatic climbing device comprises an embedded part assembly connected to a floor, a guide rail, a hanging seat connected to the guide rail and a lifting system for providing power, wherein the lifting system comprises a detachable oil cylinder assembly; the oil cylinder assembly is fixed on the hanging seat through a limiting device; and the guide rail is provided with two or more loading holes. The automatic climbing device is mainly applied to high-altitude operation of constructors or maintenance of peripheral safety nets and installation of high-altitude members.

Description

Automatic climbing device
Technical field
The utility model belongs to a kind of equipment for building, specifically, relates in particular to a kind of automatic climbing device.
Background technology
At present, for constructor's high-rise working or peripheral safety net are safeguarded and the high-altitude installation component, building trade mainly adopts lands frame, builder's jack and climbing frame.Landing frame and builder's jack exists the problem of long work high above the ground and a large amount of wall-connecting piece difficult management, has more potential safety hazard.Along with the progress of society, climbing frame obtains increasing application, and climbing frame is to utilize the up-down power-equipment to increase the outer safeguard of a kind of building structure construction that successively climbs with agent structure.The automatic climbing device support body of existing climbing frame is from great, and materials used is more, installs loaded down with trivial details; Security performance is also not fully up to expectations; And generally adopting electric block is lifting means, this equipment carrying turnover difficulty, and equipment damages easily; Therefore builing industry need a kind of simple in structure, install easy, easy to operate, safe coefficient is high, speed of application is fast and can adapt to the production of modern architecture construction safety, the advanced person's of the requirement of carrying out production strictly in line with rules and regulations modern architecture construction equipment.
Summary of the invention
The utility model purpose provides a kind of automatic climbing device, with complex structure, the inconvenient defective of fitting operation that overcomes climbing frame in the prior art.
The utility model draw-gear is to adopt following technical scheme to realize: a kind of automatic climbing device; Comprise the hanging seat of the embedded part assembly that is connected on the floor, guide rail, connection guide rail and the Hoisting System of power is provided; Said Hoisting System comprises detachable cylinder component; Said cylinder component is fixed on the hanging seat through stopping means, and said guide rail is provided with two or more load-bearing hole.
Institute's guide rail is that two channel-section steels and one group of ladder shelves assembly welding form.
Said two channel-section steel spacings are preferably 300mm.
Compared with prior art, the beneficial effect of the utility model is: (1) is simple in structure, and is easy for installation, specious, neat; (2) simple to operate, reliable, safe coefficient is high, and speed of application is fast; (3) the system standardization degree is high, and is reusable, reduces building costs; (4) adopt hydraulic system to realize, avoided the trouble of lifting repeatedly from climbing.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the structural representation after guide rail is installed;
Fig. 3 is the A-A sectional view of Fig. 2;
Fig. 4 is the partial enlarged drawing of the I part of Fig. 3.
Among the figure: 1, floor; 2, hanging seat; 3, cylinder component; 4, guide rail; 5, load-bearing hole; 6, stopping means; 7, bearing pin; 8, embedded part assembly; 9, protection screen; 10, channel-section steel; 11, ladder shelves.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described further.
In Fig. 1, Fig. 2, Fig. 3, Fig. 4, automatic climbing device mainly comprises: embedded part assembly 8, guide rail 4, self-lifting system are formed.Embedded part assembly 8 comprises embedded part plate, high-strength screw rod, climbs awl, stressed bolt and hanging seat 2 etc.The embedded part plate is connected with high-strength screw rod, can make embedded part have good tension effect, also plays material-saving and the effect of saving the space simultaneously, climbs the location that awl and erection bolt are used for embedded part plate and high-strength screw rod, before concrete is built, climbs awl and is fixed on the panel through erection bolt; Hanging seat 2 connects embedded part and guide rail 4; It receives the synergy of loads such as construction live load, gravity load, wind load; Have strong anti-vertical force, horizontal force and moment of flexure effect; Hanging seat 2 connects with floor 1 through embedded part assembly 8 and joins, and noting in work progress, should having at least could mounting guide rail 4 under the situation of two hanging seats 2.
Guide rail 4 is the tracks that climb of whole system; It is formed by two channel-section steels 10 and one group of ladder shelves 11 assembly welding, and ladder shelves 11 spacing 300mm transfer loads to guide rail 4; And then be delivered in the embedded part system; Guide rail 4 is passed between the bending plate of hanging seat 2, and insert safe bearing pin 7 in position, be fixedly connected with the protection screen 9 of security protection effect on the guide rail 4.
Hydraulic system comprises hydraulic pump and cylinder component 3; Hydraulic pump and oil cylinder hydraulic pump and cylinder component 3 provide up-down power to the whole protecting screen system, and stay hook and load carrier are used for realizing the upwards function of lift rail 4 on the hanging seat 2.Can assembly be fixed on the hanging seat 2 through closing stopping means 6 when cylinder component 3 is installed, the effect of stopping means 6 is to prevent cylinder component 3 dislocations; The function of cylinder component 3 is accomplished through the operation hydraulic system, and the control oil cylinder contracts the second month in a season, drives guide rail 4 through stay hook and rises; Dismounting must at first be plugged bearing pin 7 before the cylinder component 3, or load carrier must be in the operating position, should note opening stopping means 6 when dismantling cylinder component 3, to prevent to break stopping means 6.
The operating principle of the utility model: the utility model is that the attached building plate is from climbing support body; Through the operation hydraulic system; Control cylinder component 3 is accomplished the lifting of protection screen 9, should guarantee that stopping means 6 is in the closed position during cylinder component 3 work, prevents cylinder component 3 dislocations; Protection screen 9 is plugged bearing pin 7 after climbing and arriving the precalculated position; Remove the oil pipe that oil cylinder connected, push limiting plate aside, cylinder component 3 removed; The cylinder component that unloads 3 is promoted to the last layer platform, and is installed on the hanging seat 2, connect fluid pressure line, prepare to promote (limiting plate is closed in attention, prevents the oil cylinder dislocation) next time; Unload orlop hanging seat 2 at last in order to recycling.
The utility model passes through attached support structure attached on the engineering structures; The automatic lift rail support body of the hydraulic jacking system that dependence itself carries; Realize the function of climbing of climbing frame; In the work progress that climbs, need not other crane gear, and have advantage simple in structure, that installation is easy, easy to operate, safe coefficient is high, speed of application is fast.

Claims (3)

1. automatic climbing device; Comprise the embedded part assembly (8) that is connected on the floor, guide rail (4), connect the hanging seat (2) of guide rail (4) and the Hoisting System of power is provided; It is characterized in that: said Hoisting System comprises detachable cylinder component (3); Said cylinder component (3) is fixed on the hanging seat (2) through stopping means (6), and said guide rail (4) is provided with two or more load-bearing hole (5).
2. automatic climbing device according to claim 1 is characterized in that: institute's guide rail (4) is that two channel-section steels (10) and one group of ladder shelves (11) assembly welding form.
3. automatic climbing device according to claim 2 is characterized in that: said two channel-section steels (10) spacing is 300mm.
CN2012201268521U 2012-03-29 2012-03-29 Automatic climbing device Expired - Fee Related CN202544379U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201268521U CN202544379U (en) 2012-03-29 2012-03-29 Automatic climbing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201268521U CN202544379U (en) 2012-03-29 2012-03-29 Automatic climbing device

Publications (1)

Publication Number Publication Date
CN202544379U true CN202544379U (en) 2012-11-21

Family

ID=47165031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201268521U Expired - Fee Related CN202544379U (en) 2012-03-29 2012-03-29 Automatic climbing device

Country Status (1)

Country Link
CN (1) CN202544379U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109160449A (en) * 2018-09-30 2019-01-08 淮安欧跃机械设备科技有限公司 Climbing type material platform with gantry crane
CN109205502A (en) * 2018-09-30 2019-01-15 淮安欧跃机械设备科技有限公司 Climbing type material platform
CN110670866A (en) * 2019-09-16 2020-01-10 广东博智林机器人有限公司 Climbing frame jacking control method
CN110670865A (en) * 2019-09-16 2020-01-10 广东博智林机器人有限公司 Climbing frame jacking system, building machine and climbing frame jacking control method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109160449A (en) * 2018-09-30 2019-01-08 淮安欧跃机械设备科技有限公司 Climbing type material platform with gantry crane
CN109205502A (en) * 2018-09-30 2019-01-15 淮安欧跃机械设备科技有限公司 Climbing type material platform
CN109160449B (en) * 2018-09-30 2023-09-01 江苏恒桂创科智能科技有限公司 Climbing material table with gantry crane
CN109205502B (en) * 2018-09-30 2023-09-15 江苏恒桂创科智能科技有限公司 Climbing material table
CN110670866A (en) * 2019-09-16 2020-01-10 广东博智林机器人有限公司 Climbing frame jacking control method
CN110670865A (en) * 2019-09-16 2020-01-10 广东博智林机器人有限公司 Climbing frame jacking system, building machine and climbing frame jacking control method
CN110670866B (en) * 2019-09-16 2021-12-14 广东博智林机器人有限公司 Climbing frame jacking control method

Similar Documents

Publication Publication Date Title
CN205077885U (en) Hydraulic intelligent climbing protection platform for core tube of building
CN211524016U (en) Double-working-surface guide frame climbing type working platform and system
CA2713161A1 (en) Load transportation system
CN202544379U (en) Automatic climbing device
CN112900825B (en) Well is from climbing operation platform
CN201635379U (en) Safety platform for installation and construction of roof contour plate hang ceiling
CN110228743A (en) Two-to-one suspension is set in elevator traction than building hoist and its operational method
CN101787792A (en) Building protection screen system
CN102502378A (en) Climbing elevator for building construction
CN103193137B (en) High-altitude full automatic lifting and using method thereof
CN202450762U (en) Construction lifting platform
CN102493666A (en) High-altitude translation installation and construction method for super-large super-heavy member
CN102828608A (en) Hydraulic climbing protection device for high-rise building construction
CN103967263B (en) Hydraulic automatic jumping discharging platform
CN203173644U (en) Multifunctional lifting shaft working platform system
CN205773024U (en) Convenient pipeline promotes auxiliary device
CN202785351U (en) Tower cranes attached operating platform
CN204418629U (en) Integrated form climbs frame
CN101818563B (en) Jack-up integral lifting mobile platform and using method
CN206680101U (en) A kind of simple and convenient guardrail model sheetinstallat chassis
CN206971760U (en) A kind of full steel structure assembled climbs material platform
KR100823859B1 (en) Inspection & repair method and the device for an elevated road
CN101701492A (en) Guide rail frame type adhering lifting scaffold
CN201460186U (en) Adhesive lifting scaffold
CN206521755U (en) A kind of dismounting device of building foundation pit prestressing force shaped steel combination inner bracing member

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121121

Termination date: 20130329