CN206801564U - The hydraulic pressure support structure at existing station is worn under a kind of large span running tunnel super close distance - Google Patents

The hydraulic pressure support structure at existing station is worn under a kind of large span running tunnel super close distance Download PDF

Info

Publication number
CN206801564U
CN206801564U CN201720598656.7U CN201720598656U CN206801564U CN 206801564 U CN206801564 U CN 206801564U CN 201720598656 U CN201720598656 U CN 201720598656U CN 206801564 U CN206801564 U CN 206801564U
Authority
CN
China
Prior art keywords
jack
protective case
support structure
worn under
hydraulic pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720598656.7U
Other languages
Chinese (zh)
Inventor
闫建龙
周自强
贾庆箭
吴熊熊
张瀚文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of CTCE Group
Original Assignee
Third Construction Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of CTCE Group filed Critical Third Construction Co Ltd of CTCE Group
Priority to CN201720598656.7U priority Critical patent/CN206801564U/en
Application granted granted Critical
Publication of CN206801564U publication Critical patent/CN206801564U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

It the utility model is related to the hydraulic pressure support structure that existing station is worn under a kind of large span running tunnel super close distance; including jack, protective case, elongated steel plate, deep floor and flexible liner; jack is multiple; each jack from can automatic regulation type hydraulic jack; the base of each jack is installed in the stopper slot of small pilot tunnel strip footing, and elongated steel plate and deep floor are set on jack base;Protective case is respectively provided with the outside of each jack, the telescopic end of jack is encapsulated in inside protective case;The upper end of each jack and protective case is withstood on both on the bottom plate of cable architecture by flexible liner.Both wired sedimentation can effectively be controlled using this hydraulic pressure support structure, the safety coefficient of construction is worn under raising, accelerating construction progress, reduce construction costs, mechanical property between enhancing structure, ensure the compactness of arch crown part, the technical barrier of building up station is worn under the large span section tunnel for solving to face at present.

Description

The hydraulic pressure support structure at existing station is worn under a kind of large span running tunnel super close distance
Technical field
Constructing metro tunnel technical field is the utility model is related to, under especially a kind of large span running tunnel super close distance Wear the hydraulic pressure support structure at existing station.
Background technology
With the utilization of the underground space, subway turns into a kind of irreplaceable trip mode, while with subway line Increase, it may appear that worn under newly-built circuit, side is worn, on wear building up station.Existing subway line, particularly bored tunnel are wherein worn down Under wear building up station technical difficulty and risk highest.It is former with the disturbance and deformation of soil layer in the work progress of newly-built circuit Some stress systems are destroyed, and can be deformed on existing line, after deformation reaches to a certain degree, can be produced destructive Influence, the normal operation of existing line will be influenceed.And the generation process of accident is irreversible, later stage repairing difficulty is big, applies Social influence is severe caused by work.
Newly-built circuit particularly large span running tunnel, under to wear building up station traditional design method be usually flat top wall, The span of flat top wall technological requirement list pilot tunnel is not more than 4 meters, more for big degree of collapsing section flat top wall technique chamber, and two linings are applied As when tear that support is complicated and structure stress conversion has problem open, engineering worn under general this type often turn into and limit whole engineering and enter The key node of exhibition, so how to improve down the safety coefficient for wearing operation and construction speed is particularly important.
Utility model content
The purpose of this utility model is to make up in place of the deficiencies in the prior art, there is provided one kind can improve speed of application and The hydraulic pressure support structure at existing station is worn under the large span running tunnel super close distance of security.
The purpose of this utility model is realized by following technological means:
The hydraulic pressure support structure at existing station is worn under a kind of large span running tunnel super close distance, it is characterised in that:Including thousand Jin top, protective case, elongated steel plate, deep floor and flexible liner, described jack are multiple, and it is along small pilot tunnel longitudinal axis Direction is set, each jack from can automatic regulation type hydraulic jack, the base of each jack is installed in small In the stopper slot of pilot tunnel strip footing, and the base of jack and pre-embedded steel slab fixation, set on jack base elongated Steel plate and deep floor;Protective case is respectively provided with the outside of each jack, the telescopic end of jack is encapsulated in inside protective case, and Protective case does shell nosing treatment in jack end and jack colligation;The upper end of each jack and protective case passes through flexible liner Pad is withstood on both on the bottom plate of cable architecture.
Moreover, described protective case is made of elastomeric material.
Moreover, the protective case outer layer in each jack is respectively provided with three fill concrete pipes, in reserved backfill Guan Shangshe Three slurry mouths that overflow are put, the Opening pressure of three slurry mouths that overflow increases successively from the bottom up, and stop grouting plug is set in reserved backfill bottom of the tube And backing plate.
Moreover, a pressure sensor is arranged in each hydraulic jack, pressure sensor connection control valve group, Synchronous hydraulic pumping plant is simultaneously connected through signal wire with PLC Multi-thread control devices.
The advantages of the utility model and good effect are:
1st, the utility model is applied to wear the way of building up station under multiple track tunnel, by using hydraulic pressure support to small pilot tunnel Structure, reduce the difficulty of construction, accelerate construction speed.
2nd, the utility model sets flexible protective casing on the outside of hydraulic jack, and the protective case airtight performance is good, can carry The service life of high jack, also, after the completion of agent structure applies, protective case is reusable, therefore can be greatly reduced and set Prepare and make and maintenance cost.
3rd, the utility model is respectively provided with three concretes backfill pipe around each jack, ensures backfill from bottom up successively Backfill, it is ensured that the compactness of backfill.
4th, the utility model arranges pressure sensor in each hydraulic jack, and pressure sensor is through control valve Group, synchronous hydraulic pumping plant are connected with PLC Multi-thread control devices.Operation is worn under whole, the top lift of jack is digitized Monitoring, and otherness regulation jacking can be carried out according to both wired structure differential settlements, it is ensured that both be deposited in could for cable architecture Within the scope of control.
5th, the utility model is the hydraulic pressure support structure that existing station is worn under a kind of large span running tunnel super close distance, is used This structure can effectively control both wired sedimentation, and the safety coefficient of construction is worn under raising, accelerating construction progress, reduces engineering Cost, the mechanical property between enhancing structure, ensure the compactness of arch crown part, solve under the large span section tunnel that faces at present Wear the technical barrier of building up station.
Brief description of the drawings
Fig. 1 is general illustration of the present utility model;
Fig. 2 is fill concrete built-in pipe schematic diagram at jack.
Embodiment
Describe embodiment of the present utility model in detail below in conjunction with the accompanying drawings;It should be noted that the present embodiment is narrative , it is not limited, it is impossible to which the scope of protection of the utility model is limited with this.
The hydraulic pressure support structure at existing station, including jack 4, protective case are worn under a kind of large span running tunnel super close distance 2nd, elongated steel plate 8, deep floor 7 and flexible liner 3, described jack are multiple, and it sets along small pilot tunnel longitudinal axis direction Put, each jack from can automatic regulation type hydraulic jack.
The base of each jack is installed in the stopper slot of small pilot tunnel strip footing 10, and the base of jack with it is pre- Bury the fixation of steel plate 9, elongated steel plate and deep floor be set on jack base, come fix and balanced hydraulic jack produce Side force.
Protective case is respectively provided with the outside of each jack, protective case requires that airtight performance is good, and is elastomeric material.It is very heavy The telescopic end on top is encapsulated in inside protective case, is prevented the soil body and concrete slurry from hydraulic jack is caused to corrode and destroyed, is carried The service life of high jack.Protective case does shell nosing treatment in jack end and jack colligation, it is ensured that during backfill slip casting, thousand Jin top can normally provide top lift.
The upper end of each jack and protective case is withstood on the bottom plate 1 of both cable architectures by flexible liner, prevents liquid Pressure jack produces stress concentration and both cable architecture bottom plates is damaged.
Three fill concrete pipes 5 are respectively provided with the protective case outer layer of each jack, three are set on reserved backfill pipe Individual excessive slurry mouth 15,16,17, to ensure that filling is closely knit, improves the stress performance of structure, and the Opening pressures of three slurry mouths that overflow are from lower past On increase successively, in reserved backfill bottom of the tube, stop grouting plug 18 and backing plate 19 are set.
Arrange a pressure sensor 6 in each hydraulic jack, it is pressure sensor connection control valve group 11, same Stepped hydraulic pumping plant 12 is simultaneously connected 14 through signal wire 13 with PLC Multi-thread control devices.During Initial Stage Construction, the numerical value of setting load should not mistake Greatly, should be to meet to form existing structure bottom plate effectively support for principle, while keep a close eye on building up station settlement observation value. In small pilot tunnel after jack installation, and it is in the milk after backfill completion, carries out the excavation in section main track tunnel.
The use step of this hydraulic pressure support structure is:
Strip footing is applied in small pilot tunnel, when strip footing is constructed, in hydraulic jack correspondence position pre-embedded steel slab, and Make jack base stopper slot.
The position of jack is released by survey crew, Zhi Jinhang at the beginning of small pilot tunnel is abolished, is preferably cut from water drilling, reduction pair Both wired disturbance, it pneumatic pick can be used to be abolished when appropriate, abolish hole diameter preferably than hydraulic jack nominal diameter Big 15cm or so.
Artificial digging, jack is installed, jack end is arranged in the stopper slot of strip footing, and other end passes through soft Property pad withstand on both on the bottom plate of cable architecture, it is ensured that the perpendicularity of jack when installing jack, orifice position is carried out Closed processes, jack set hydraulic jack protective case before hole installation is entered on the outside of it, and protective case requires that airtight performance is good It is good, and be elastomeric material, in jack end and jack colligation, do shell nosing treatment, it is ensured that during backfill slip casting, jack can It is normal that top lift is provided.
Meanwhile fill concrete pipe is set in protective case outer layer, three slurry mouths that overflow are set on reserved backfill pipe, to ensure Fill closely knit, improve the stress performance of structure, three slurry mouths that overflow set Opening pressures, be followed successively by from the bottom up 0.2M, 0.5Mpa, 1.0Mpa;In reserved backfill bottom of the tube, stop grouting plug and backing plate are set.Set three concretes to backfill pipe around each jack, ensure back Fill out from bottom and up backfill successively, it is ensured that the compactness of backfill.
Jack from can automatic regulation type hydraulic jack, in the small pilot tunnel construction stage, hydraulic jack is provided Initial top lift, the size of initial top lift should be can control pilot drive and both wired be settled into standard;Jack has jacked Into afterwards, to small pilot tunnel vault slotting position, arrangement backfill filling system, reinforce because of crack caused by excavation, and carry out aperture Seal operation.

Claims (4)

1. the hydraulic pressure support structure at existing station is worn under a kind of large span running tunnel super close distance, it is characterised in that:Including very heavy Top, protective case, elongated steel plate, deep floor and flexible liner, described jack is multiple, and it is along small pilot tunnel longitudinal axis side To setting, each jack from can automatic regulation type hydraulic jack, the base of each jack is installed in small lead In the stopper slot of hole strip footing, and the base of jack and pre-embedded steel slab fixation, elongated steel is set on jack base Plate and deep floor;Protective case is respectively provided with the outside of each jack, the telescopic end of jack is encapsulated in inside protective case, and is protected Sheath does shell nosing treatment in jack end and jack colligation;The upper end of each jack and protective case passes through flexible liner Withstand on both on the bottom plate of cable architecture.
2. the hydraulic pressure support structure at existing station is worn under a kind of large span running tunnel super close distance according to claim 1, It is characterized in that:Described protective case is made of elastomeric material.
3. the hydraulic pressure support structure at existing station is worn under a kind of large span running tunnel super close distance according to claim 1, It is characterized in that:Three fill concrete pipes are respectively provided with the protective case outer layer of each jack, are set on reserved backfill pipe Three slurry mouths that overflow, the Opening pressures of three slurry mouths that overflow increase successively from the bottom up, reserved backfill bottom of the tube set stop grouting plug and Backing plate.
4. the hydraulic pressure support structure at existing station is worn under a kind of large span running tunnel super close distance according to claim 1, It is characterized in that:Arrange a pressure sensor in each hydraulic jack, it is pressure sensor connection control valve group, same Stepped hydraulic pumping plant is simultaneously connected through signal wire with PLC Multi-thread control devices.
CN201720598656.7U 2017-05-26 2017-05-26 The hydraulic pressure support structure at existing station is worn under a kind of large span running tunnel super close distance Expired - Fee Related CN206801564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720598656.7U CN206801564U (en) 2017-05-26 2017-05-26 The hydraulic pressure support structure at existing station is worn under a kind of large span running tunnel super close distance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720598656.7U CN206801564U (en) 2017-05-26 2017-05-26 The hydraulic pressure support structure at existing station is worn under a kind of large span running tunnel super close distance

Publications (1)

Publication Number Publication Date
CN206801564U true CN206801564U (en) 2017-12-26

Family

ID=60742000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720598656.7U Expired - Fee Related CN206801564U (en) 2017-05-26 2017-05-26 The hydraulic pressure support structure at existing station is worn under a kind of large span running tunnel super close distance

Country Status (1)

Country Link
CN (1) CN206801564U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537462A (en) * 2018-12-06 2019-03-29 鄂宇 A kind of mistake wears the Construction Support device and method of highway structures
CN109869167A (en) * 2019-04-15 2019-06-11 中南大学 A kind of anti-surrender servo-system of tunnel steel arch frame and deformation control method
CN114183151A (en) * 2021-12-01 2022-03-15 中铁隧道局集团有限公司 Device for compensating ground settlement

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537462A (en) * 2018-12-06 2019-03-29 鄂宇 A kind of mistake wears the Construction Support device and method of highway structures
CN109869167A (en) * 2019-04-15 2019-06-11 中南大学 A kind of anti-surrender servo-system of tunnel steel arch frame and deformation control method
CN109869167B (en) * 2019-04-15 2024-03-22 中南大学 Tunnel steel arch anti-yielding servo system and deformation control method
CN114183151A (en) * 2021-12-01 2022-03-15 中铁隧道局集团有限公司 Device for compensating ground settlement

Similar Documents

Publication Publication Date Title
CN108060908B (en) Long-distance horizontal directional drilling and grouting reinforcement process for water-rich sand layer under building group
CN104453913B (en) A kind of Shaft Stopes front pre-grouting method
CN106988750A (en) The embodiment at existing station is worn under a kind of large span running tunnel super close distance
CN206801564U (en) The hydraulic pressure support structure at existing station is worn under a kind of large span running tunnel super close distance
CN102777189B (en) A kind of ultra-long tube curtain non-relay jacking construction device and method
CN101761237B (en) Method for constructing isolation pile for shield tunnel to go through deformation control of buildings and structures at short distance
CN105040775B (en) Deep layer pressure-bearing artesian well plugging system and method
CN105370290A (en) Rectifying and reinforcing method of shield tunnels
AU2020100838A4 (en) A kind of stress adjustment system for side walls of foundation pit in deep and unstable strata
CN103670448B (en) A kind of underground utilities protective device and apply the supporting method of this device
CN109578014B (en) Anti-surging bottom sealing structure and construction method
CN107268688B (en) Construction method for reinforcing and sealing I-shaped steel joint of underground continuous wall
CN108194703A (en) A kind of the amendment construction system and its modification method of push pipe of constructing
CN103410522A (en) Continuous close-range underpass railway bridge construction method employing shallow tunneling method
CN107178078B (en) Change to half intercept form block wall construction method of section in subway station
CN202970719U (en) Relay chamber-free jacking construction device for ultra-long pipe roof
CN111720126A (en) Construction method for entering tunnel through ingate of underground excavation tunnel
CN105180787A (en) High-pressure grouting lifting deformation monitor and installation method thereof
CN109944236A (en) Root pile actively follows track delamination pour slurry system and construction method
CN110499740A (en) The safe method for blocking of diversion tunnel under a kind of hydroelectric project high water head unfavorable geological condition
CN204788226U (en) High -pressure grouting lifts warp monitoring devices
CN105605335A (en) Large-caliber prestressed steel cylinder concrete pipe for jacking construction
CN105804203A (en) Plugging method of deep-buried large-diameter waste water pipeline
CN105332716A (en) Adaptive lining structure capable of bearing simultaneous actions of high internal and external water
CN109268035A (en) For leaning on the real-time regulation system and method for segment deformation after controlling

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226