CN204738406U CN201520349361.7U CN201520349361U CN204738406U CN 204738406 U CN204738406 U CN 204738406U CN 201520349361 U CN201520349361 U CN 201520349361U CN 204738406 U CN204738406 U CN 204738406U
Authority
CN
China
Prior art keywords
prefabricated frame
metallic conductor
frame trestle
protection device
lightning protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520349361.7U
Other languages
Chinese (zh)
Inventor
李宁
李玮
吴敦军
刘亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Yangtze River Urban Architectural Design Co Ltd
Original Assignee
Nanjing Yangtze River Urban Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Yangtze River Urban Architectural Design Co Ltd filed Critical Nanjing Yangtze River Urban Architectural Design Co Ltd
Priority to CN201520349361.7U priority Critical patent/CN204738406U/en
Application granted granted Critical
Publication of CN204738406U publication Critical patent/CN204738406U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a lightning protection device of prefabricated frame post, including predetermineeing the metallic conductor in prefabricated frame post, metallic conductor vertically run through prefabricated frame post, two piece upper and lower adjacent prefabricated frame posts are at the building floor fixed connection of department, upper and lower two adjacent metallic conductor buckle and weld each other in the building floor, the metallic conductor's in the prefabricated frame post of top upper end is connected with the arrester, the prefabricated frame post of bottom in metallic conductor's lower extreme be connected with earthing device, the beneficial effects of the utility model are that: weld into lightning protection device's downlead in proper order by upper and lower adjacent metallic conductor, satisfy and prevent attacking the thunder directly, prevent that the lightning surge is invaded and thunder and lightning electromagnetic pulse's requirement.

Description

A kind of lightning protection device of prefabricated frame trestle
Technical field
The utility model belongs to electric fixtures security technology area, relates to a kind of lightning protection device of prefabricated frame trestle.
Background technology
For preventing the building that is struck by lightning, current builing industry generally adopts installation lightning protection device, and to meet direct striking thunder prevention, anti-lightning surge invades and the requirement of Lightning Electromagnetic Pulse.
As the ingredient that lightning protection device is important, down lead requires that it should meet mechanical strength, corrosion-resistant and heat-staple requirement.
Usually to utilize in the reinforced concrete column of building or shear wall two elongated longitudinal reinforcements as down lead.But, because the longitudinal reinforcement of prefabricated frame trestle is connected by straight screw sleeve grouting in prefabricated costruction, longitudinal reinforcement in upper and lower prefabricated frame trestle cannot form continuous conductor, therefore the longitudinal reinforcement of prefabricated frame trestle cannot as the metallic conductor of connecting roof arrester and ground device.
Utility model content
The utility model need solve the problems referred to above be in prefabricated costruction in above-mentioned prior art due to the main muscle of prefabricated frame trestle by straight screw sleeve grouting connect, main muscle in upper and lower prefabricated frame trestle cannot form the deficiency of continuous conductor, and provides a kind of lightning protection device being welded into the prefabricated frame trestle of down lead by metallic conductor order.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is:
A kind of lightning protection device of prefabricated frame trestle, comprise the metallic conductor be preset in prefabricated frame trestle, described metallic conductor longitudinally runs through prefabricated frame trestle, upper and lower two adjacent prefabricated frame trestles are fixedly connected with at construction floor place, two neighbouring metallic conductors carry out bending and being welded to each other in construction floor, the upper end of the metallic conductor in the prefabricated frame trestle of top is connected with arrester, and the lower end of the metallic conductor in the prefabricated frame trestle of described lowermost end is connected with ground device.
Described metallic conductor is round steel or band steel.
Described metallic conductor is 40*4 Hot-dip zinc-coated flat steel sheet.
Described metallic conductor is positioned at the edge of prefabricated frame trestle.
The length of stretching out prefabricated frame trestle after described metallic conductor bending is more than or equal to 150mm.
The length that two neighbouring metallic conductors are welded to each other is more than or equal to 50mm.
Compared with prior art, the beneficial effects of the utility model are:
(1) upper and lower two adjacent prefabricated frame trestles are fixedly connected with at construction floor place, two neighbouring metallic conductors carry out bending and being welded to each other in construction floor, thus form the down lead of lightning protection device in prefabricated frame trestle, the upper end of the metallic conductor in the prefabricated frame trestle of top is connected with arrester, the lower end of the metallic conductor in the prefabricated frame trestle of lowermost end is connected with ground device, form lightning protection device, meet direct striking thunder prevention, anti-lightning surge invades and the requirement of Lightning Electromagnetic Pulse.
(2) metallic conductor is round steel or band steel, meets mechanical strength, corrosion-resistant and heat-staple requirement.
(3) overcome the defect affecting outward appearance that in prior art, down lead lays along skin, just can complete in process of construction meanwhile, very convenient, also not easily by artificial damage.
Accompanying drawing explanation
Fig. 1 is the structural representation of the lightning protection device of prefabricated frame trestle of the present utility model;
Wherein, 1, prefabricated frame trestle, 2, metallic conductor, 3, construction floor.
Detailed description of the invention
By reference to the accompanying drawings the utility model is described in further detail now.These accompanying drawings are the schematic diagram of simplification, only basic structure of the present utility model are described in a schematic way, and therefore it only shows the formation relevant with the utility model.
As shown in Figure 1, a kind of lightning protection device of prefabricated frame trestle, comprise the metallic conductor 2 be preset in prefabricated frame trestle 1, described metallic conductor 2 longitudinally runs through prefabricated frame trestle 1, upper and lower two adjacent prefabricated frame trestles 1 are fixedly connected with at construction floor 3 place, two neighbouring metallic conductors 2 carry out bending and being welded to each other in construction floor 3, the upper end of the metallic conductor 2 in the prefabricated frame trestle 1 of top is connected with arrester, and the lower end of the metallic conductor 2 in the prefabricated frame trestle 1 of described lowermost end is connected with ground device.
Described metallic conductor 2 is round steel or band steel.
Described metallic conductor 2 is 40*4 Hot-dip zinc-coated flat steel sheet.
Described metallic conductor 2 is positioned at the edge of prefabricated frame trestle 1.
Described metallic conductor 2 stretches out prefabricated frame trestle 1 length after bending is more than or equal to 150mm.
The length that two neighbouring metallic conductors 2 are welded to each other is more than or equal to 50mm.
The construction method of the lightning protection device of prefabricated frame trestle, comprises the following steps:
A, manufacture prefabricated frame trestle 1: longitudinal built-in metal conductor 2 in prefabricated frame trestle 1, makes metallic conductor 2 run through prefabricated frame trestle 1;
B, hoisting prefabricated frame column 1: prefabricated frame trestle 1 lifting put in place, make upper and lower two adjacent prefabricated frame trestles 1 be mutually permanently connected at construction floor 3 place;
C, weld metal conductor 2: neighbouring two metallic conductors 2 are carried out bending and being welded to each other in construction floor 3;
D, connection arrester and ground device: the upper end of the metallic conductor 2 in the prefabricated frame trestle 1 of top is connected with arrester, the lower end of the metallic conductor 2 in the prefabricated frame trestle 1 of lowermost end is connected with ground device.
With above-mentioned according to desirable embodiment of the present utility model for enlightenment, by above-mentioned description, relevant staff in the scope not departing from this utility model technological thought, can carry out various change and amendment completely.The technical scope of this utility model is not limited to the content on manual, must determine its technical scope according to right.

Claims (6)

1. the lightning protection device of a prefabricated frame trestle, it is characterized in that: comprise the metallic conductor be preset in prefabricated frame trestle, described metallic conductor longitudinally runs through prefabricated frame trestle, upper and lower two adjacent prefabricated frame trestles are fixedly connected with at construction floor place, two neighbouring metallic conductors carry out bending and being welded to each other in construction floor, the upper end of the metallic conductor in the prefabricated frame trestle of top is connected with arrester, and the lower end of the metallic conductor in the prefabricated frame trestle of described lowermost end is connected with ground device.
2. the lightning protection device of prefabricated frame trestle according to claim 1, is characterized in that: described metallic conductor is round steel or band steel.
3. the lightning protection device of prefabricated frame trestle according to claim 1, is characterized in that: described metallic conductor is 40*4 Hot-dip zinc-coated flat steel sheet.
4. the lightning protection device of prefabricated frame trestle according to claim 1, is characterized in that: described metallic conductor is positioned at the edge of prefabricated frame trestle.
5. the lightning protection device of prefabricated frame trestle according to claim 1, is characterized in that: the length of stretching out prefabricated frame trestle after described metallic conductor bending is more than or equal to 150mm.
6. the lightning protection device of prefabricated frame trestle according to claim 1, is characterized in that: the length that two neighbouring metallic conductors are welded to each other is more than or equal to 50mm.
CN201520349361.7U 2015-05-27 2015-05-27 Lightning protection device of prefabricated frame post Active CN204738406U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520349361.7U CN204738406U (en) 2015-05-27 2015-05-27 Lightning protection device of prefabricated frame post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520349361.7U CN204738406U (en) 2015-05-27 2015-05-27 Lightning protection device of prefabricated frame post

Publications (1)

Publication Number Publication Date
CN204738406U true CN204738406U (en) 2015-11-04

Family

ID=54420149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520349361.7U Active CN204738406U (en) 2015-05-27 2015-05-27 Lightning protection device of prefabricated frame post

Country Status (1)

Country Link
CN (1) CN204738406U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104878848A (en) * 2015-05-27 2015-09-02 南京长江都市建筑设计股份有限公司 Lightning protection device for prefabricated frame columns and construction method of lightning protection device
CN109629673A (en) * 2018-12-18 2019-04-16 广州机施建设集团有限公司 A kind of prefabricated frame trestle lightning protection downlead attachment device and its installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104878848A (en) * 2015-05-27 2015-09-02 南京长江都市建筑设计股份有限公司 Lightning protection device for prefabricated frame columns and construction method of lightning protection device
CN109629673A (en) * 2018-12-18 2019-04-16 广州机施建设集团有限公司 A kind of prefabricated frame trestle lightning protection downlead attachment device and its installation method

Similar Documents

Publication Publication Date Title
CN204738406U (en) Lightning protection device of prefabricated frame post
CN206800622U (en) A kind of assembled integral concrete shear force wall balcony attachment structure
CN206289945U (en) A kind of assembled Portable safety crosshead
CN104882686A (en) Lightning protection downlead and construction method thereof
CN204752026U (en) Tower crane escape way
CN205025183U (en) Safe electric power steel pole
CN103541477B (en) For keel and the mounting method thereof of dry-hang stone curtain wall
CN204614975U (en) A kind of lightning protection downlead
CN210507820U (en) Newly-built archaize building timber structure wall post connecting device
CN208518307U (en) A kind of fast pylon easy to install of adjustable platform width
CN204112697U (en) A kind of protector carrying raise scaffold turnover panel
CN204040437U (en) Cantilever tripod and single protective frame system of encorbelmenting
CN104500512B (en) A kind of fixed structure boundling line side of returning device being fixed to electric pole
CN104878848A (en) Lightning protection device for prefabricated frame columns and construction method of lightning protection device
CN206636168U (en) A kind of overhanging scaffold system
CN206448505U (en) Adjustable draw and insert-type all steel attachment type raise scaffold back cover panel assembly
CN204781425U (en) Light antiknock wall system based on hard shield board of type B steel
CN205954972U (en) Steel structure floor slab
CN201753538U (en) Prestress electric pole with ground wire
CN204662926U (en) A kind of operating platform for steel pipe column top construction operation
CN208723518U (en) A kind of lightning-arrest structure of building
CN203856256U (en) Lightning protection building
CN208656163U (en) It is a kind of for building the arrester structure of prominent edge list
CN111608376B (en) Comprehensive construction method for shaping component
CN203361672U (en) Novel shape-fixed steel plate net protective barrier

Legal Events

Date Code Title Description
C14 Grant of patent or utility model