CN206784158U - A kind of prefabricated bent cap constructs with Precast Pier Columns connecting node - Google Patents

A kind of prefabricated bent cap constructs with Precast Pier Columns connecting node Download PDF

Info

Publication number
CN206784158U
CN206784158U CN201720552759.XU CN201720552759U CN206784158U CN 206784158 U CN206784158 U CN 206784158U CN 201720552759 U CN201720552759 U CN 201720552759U CN 206784158 U CN206784158 U CN 206784158U
Authority
CN
China
Prior art keywords
joint bar
precast pier
pier columns
bent cap
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720552759.XU
Other languages
Chinese (zh)
Inventor
徐庆平
童祖玲
靳坤
马娟
孙巍
徐鑫
梁治建
张颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tongli Construction Group Co Ltd
Original Assignee
Nanjing Tongli Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tongli Construction Group Co Ltd filed Critical Nanjing Tongli Construction Group Co Ltd
Priority to CN201720552759.XU priority Critical patent/CN206784158U/en
Application granted granted Critical
Publication of CN206784158U publication Critical patent/CN206784158U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of prefabricated bent cap and Precast Pier Columns connecting node is the utility model is related to construct, the Precast Pier Columns be hollow shell pill, built-in one block round supporting plate and Duo Gen joint bars, and with microdilatancy pea gravel concreten consolidation;The lower end of the joint bar is connected with the round supporting plate, and upper end is located on the upper end of the Precast Pier Columns;The prefabricated bent cap is provided with jack corresponding with the joint bar, and the joint bar can be made to insert in the jack when mounted, and irrigates high-strength mortar in the jack and the joint bar is firmly connected with the jack.The utility model is designed reasonably, it is simple in construction, it is easy for construction, meet foot bridge load and shockproof requirements, efficiency of construction can be effectively improved, reducing environment influences.

Description

A kind of prefabricated bent cap constructs with Precast Pier Columns connecting node
Technical field
A kind of building engineering structure is the utility model is related to, it is especially a kind of to be applied to preform lid when foot bridge beam is built The structure that beam and Precast Pier Columns are attached, specifically a kind of prefabricated bent cap construct with Precast Pier Columns connecting node.
Background technology
At present, overpass substructure in China's is built still based on cast-in-place method, and cast-in-place method needs a large amount of labours, construction Cycle is grown, and the environmental pollution such as live mud, dust is big, and some row drawbacks of grade big to traffic impact of constructing, in present situation traffic It is big that overpass operation pressure is built on the big urban road of flow.Therefore, be badly in need of researching and developing new mode of construction to solve on State problem.
Utility model content
The purpose of this utility model is the company between prefabricated bent cap and Precast Pier Columns when being built for current assembled foot bridge Connect problem, there is provided a kind of prefabricated bent cap constructs with Precast Pier Columns connecting node, simple in construction, easy for construction, meets foot bridge lotus Load and shockproof requirements, efficiency of construction can be effectively improved, reducing environment influences.
The technical solution of the utility model is:
A kind of prefabricated bent cap constructs with Precast Pier Columns connecting node, and the Precast Pier Columns are hollow shell pill, built-in one piece of circle Supporting plate and Duo Gen joint bars, and consolidated with microdilatancy pea gravel concreten;The lower end of the joint bar is connected with the round supporting plate, upper end position On the upper end of the Precast Pier Columns;The prefabricated bent cap is provided with jack corresponding with the joint bar, can make when mounted The joint bar is inserted in the jack, and is irrigated high-strength mortar in the jack and the joint bar is firmly connected with the jack Connect.
Further, it is uniformly distributed on circumference of the joint bar along the round supporting plate.
Further, multiple positioning bars being connected with each joint bar, annular are additionally provided with;The positioning bar is indulged along the joint bar To being placed equidistant.
Further, the upper end of the joint bar is provided with screw thread, and is fastened on by backing plate and nut on the prefabricated bent cap.
The beneficial effects of the utility model:
The utility model is designed reasonably, it is simple in construction, it is easy for construction, meet foot bridge load and shockproof requirements, can be effective Efficiency of construction is improved, reducing environment influences.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is Fig. 1 top view.
Fig. 3 is A-A profiles in Fig. 1.
Wherein:1- Precast Pier Columns;2- justifies supporting plate;3- joint bars;4- positioning bars;5- jacks;6- high-strength mortars;7- backing plates;8- Nut;9- protective jackets;The prefabricated bent caps of 10-;11- microdilatancy pea gravel concretens.
Embodiment
The utility model is further described with reference to the accompanying drawings and examples.
As shown in Figures 1 to 3.
Precast Pier Columns 1 are made up of D800 hybrid reinforcement prestressed concretes, are hollow shell pill.It is prefabricated machine after, first Poured with C40 microdilatancies pea gravel concreten 11 in the Precast Pier Columns 1 away from top 2.4m with lower part.Then, 8 φ of processing welding The steel of 20mm HRB400 level reinforcing bars joint bar 3, multiple φ 10mm HRB400 level reinforcing bar annulars positioning bars 4 and a 5mm thickness Circle supporting plate 2.The lower end of 8 joint bars 3 is welded on round supporting plate 2, and is distributed along the even circumferential of the circle supporting plate 2.The positioning Muscle 4 along the joint bar 3 longitudinal direction per 20cm arrange one, and with the every firm welding of joint bar 3, it is ensured that the mutual alignment of joint bar 3 Accurately.Processing is positioned in the Precast Pier Columns 1 after being welded, and the upper end of the joint bar 3 is located at the Precast Pier Columns 1 On upper end.Then, microdilatancy pea gravel concreten 11 then into the Precast Pier Columns 1 is poured, makes the round supporting plate 2 and joint bar 3 With the Joint of Precast Pier Columns 1.
Prefabricated bent cap 10 reserves jack 5 corresponding with the joint bar 3 when making.The aperture of the jack 5 is φ 5mm, is passed through Wear the prefabricated bent cap 10.After the microdilatancy pea gravel concreten 11 in the Precast Pier Columns 1 reaches intensity, hoisting prefabricated bent cap 10,8 joint bars 3 is all properly inserted in corresponding jack 5.Because the aperture of above-mentioned jack 5 is straight slightly larger than the joint bar 3 Footpath, therefore, high-strength mortar 6 can be irrigated to the gap between joint bar 3 and jack 5, the joint bar 3 is firmly connected with jack 5.So Afterwards, the end for the prefabricated bent cap 10 being passed in the joint bar 3 penetrates 100mm × 100mm × 10mm steel backing plate 7, and After the top of backing plate 7 is fastened with nut 8, the nut 8 and the spot welding of backing plate 7 are completed between prefabricated bent cap 10 and Precast Pier Columns 1 Connection.Finally, plastic protection set 9 can be also put on the nut 8 to be protected.
The utility model is not directed to partly same as the prior art or can realized using prior art.

Claims (4)

1. a kind of prefabricated bent cap constructs with Precast Pier Columns connecting node, it is characterized in that the Precast Pier Columns are hollow shell pill, it is built-in One block of round supporting plate and Duo Gen joint bars, and consolidated with microdilatancy pea gravel concreten;The lower end of the joint bar is connected with the round supporting plate, Upper end is located on the upper end of the Precast Pier Columns;The prefabricated bent cap is provided with jack corresponding with the joint bar, can pacify The joint bar is inserted in the jack during dress, and irrigate high-strength mortar in the jack and make the joint bar and jack jail It is solidly connected.
2. prefabricated bent cap according to claim 1 and Precast Pier Columns connecting node construct, it is characterized in that the joint bar is along institute State and be uniformly distributed on the circumference of round supporting plate.
3. prefabricated bent cap according to claim 1 and Precast Pier Columns connecting node construct, it is characterized in that be additionally provided with it is multiple with Positioning bar that each joint bar is connected, annular;The positioning bar is longitudinally placed equidistant along the joint bar.
4. prefabricated bent cap according to claim 1 constructs with Precast Pier Columns connecting node, it is characterized in that the joint bar is upper End is provided with screw thread, and is fastened on by backing plate and nut on the prefabricated bent cap.
CN201720552759.XU 2017-05-18 2017-05-18 A kind of prefabricated bent cap constructs with Precast Pier Columns connecting node Active CN206784158U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720552759.XU CN206784158U (en) 2017-05-18 2017-05-18 A kind of prefabricated bent cap constructs with Precast Pier Columns connecting node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720552759.XU CN206784158U (en) 2017-05-18 2017-05-18 A kind of prefabricated bent cap constructs with Precast Pier Columns connecting node

Publications (1)

Publication Number Publication Date
CN206784158U true CN206784158U (en) 2017-12-22

Family

ID=60712646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720552759.XU Active CN206784158U (en) 2017-05-18 2017-05-18 A kind of prefabricated bent cap constructs with Precast Pier Columns connecting node

Country Status (1)

Country Link
CN (1) CN206784158U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118611A (en) * 2018-01-23 2018-06-05 安徽省交通控股集团有限公司 A kind of prefabricated pier, plate tubular Crossing brace connection structure
CN108360366A (en) * 2018-01-23 2018-08-03 安徽省交通控股集团有限公司 A kind of prefabricated pier, plate cross Crossing brace connection structure
CN108532445A (en) * 2018-07-04 2018-09-14 深圳市市政设计研究院有限公司 A kind of connecting structure and its construction method of prefabricated bent cap and Precast Pier Columns
WO2020001156A1 (en) * 2018-06-29 2020-01-02 比亚迪股份有限公司 Bridge and bridge pier thereof
CN110656574A (en) * 2018-06-29 2020-01-07 比亚迪股份有限公司 Method for manufacturing bridge pier

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118611A (en) * 2018-01-23 2018-06-05 安徽省交通控股集团有限公司 A kind of prefabricated pier, plate tubular Crossing brace connection structure
CN108360366A (en) * 2018-01-23 2018-08-03 安徽省交通控股集团有限公司 A kind of prefabricated pier, plate cross Crossing brace connection structure
CN108118611B (en) * 2018-01-23 2023-10-17 安徽省交通控股集团有限公司 Prefabricated mound, board cylindric shear force prop connection structure
CN108360366B (en) * 2018-01-23 2024-02-23 安徽省交通控股集团有限公司 Prefabricated pier and plate cross shear support connection structure
WO2020001156A1 (en) * 2018-06-29 2020-01-02 比亚迪股份有限公司 Bridge and bridge pier thereof
CN110656575A (en) * 2018-06-29 2020-01-07 比亚迪股份有限公司 Bridge and pier thereof
CN110656574A (en) * 2018-06-29 2020-01-07 比亚迪股份有限公司 Method for manufacturing bridge pier
CN110656574B (en) * 2018-06-29 2022-03-18 比亚迪股份有限公司 Method for manufacturing bridge pier
CN108532445A (en) * 2018-07-04 2018-09-14 深圳市市政设计研究院有限公司 A kind of connecting structure and its construction method of prefabricated bent cap and Precast Pier Columns

Similar Documents

Publication Publication Date Title
CN206784158U (en) A kind of prefabricated bent cap constructs with Precast Pier Columns connecting node
CN103074941B (en) Assembling regeneration concrete node and the practice of steel bar girder beam are contained in a kind of end
CN104746422B (en) A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method
CN203080430U (en) Assembly and cast-in-place combined type reinforced concrete pipe type culvert
CN203222809U (en) Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN209260897U (en) Assembly concrete beam column sleeve combination connecting node
CN201330395Y (en) Pretensioning prestressed concrete hollow shaped square pile
CN206942196U (en) The structure of attached assembling type node power consumption frame strengthening outside a kind of existing framework
CN206308707U (en) A kind of city integrated Pipe rack of prefabricated assembled concrete
CN203440993U (en) Connection joint of prefabricated reinforced concrete beam
CN106400838B (en) A kind of city integrated Pipe rack of prefabricated assembled concrete and construction method
CN105386441A (en) PVC pipe wrapped inner supporting cross prestress recycled concrete tubular pile
CN206329032U (en) Template suitable for pouring section after assembled beam-column
CN105386442A (en) FRP wrapped prestress recycled concrete tubular pile
CN205712565U (en) A kind of prefabricated two-sided wall
CN105839851B (en) Using the construction method for the prefabricated frame trestle that segmentation connection is formed
CN204690563U (en) A kind of novel device for promoting concrete plate
CN205314372U (en) Steel reinforcement cage protective layer cushion
CN212054734U (en) A template that is used for quick lining cutting of city portal tunnel
CN204112858U (en) The prefabricated enclosure wall of a kind of prestressed concrete
CN203924484U (en) A kind of precast beam and there is the reinforced concrete structure of tenon anchor system
CN209323555U (en) The moment connection structure and foundation structure of railroad bridge large-diameter tubular pile and cushion cap
CN203429618U (en) Novel slope protection and soil blocking special-shaped row pile
CN202767096U (en) Single-pole-tower precast independent foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant